{"id":20023,"date":"2026-01-12T15:11:34","date_gmt":"2026-01-12T14:11:34","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20023"},"modified":"2026-09-12T19:53:34","modified_gmt":"2026-09-12T17:53:34","slug":"tunnel-formwork","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-formwork","title":{"rendered":"Tunnel formwork"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Tunnel formwork is one of the defining elements in cast-in-place concrete tunnel construction. It gives the structure its cross-section, surface, and watertightness and ensures that concreting segments are produced reproducibly at high quality. Whether in conventional heading, shield-driven tunneling with a subsequent inner lining, or cut-and-cover construction: tunnel formwork unites planning, structural analysis, logistics, and execution into a precise work cycle. Where adjustments, corrections, or selective deconstruction of the inner lining are required, low-vibration methods are often used in practice &#8211; for example with <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> or <strong>concrete demolition shear<\/strong> as part of <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition \u2013 deconstruction<\/a>. In addition to geometric accuracy, the systemized workflow enables consistent watertightness concepts, predictable cycle times, and verifiable quality documentation under constrained tunnel logistics.<\/p>\n<h2>Definition: What is meant by tunnel formwork?<\/h2>\n<p>A tunnel formwork is a reusable, often hydraulically operated formwork system (formwork traveller) for producing the cast-in-place concrete inner lining of tunnel structures. It shapes the invert, walls, and crown\/arch and is advanced in staged sections. Depending on geometry, there are full-section formwork systems, half formwork systems, or separate systems for invert and crown. Characteristic features include a load-bearing support frame, a precisely fitting formwork sheathing, integrated work platforms, a running gear (rails or wheels), and equipment for concreting, compaction, and striking. The goal is a dimensionally accurate, tight, and durable inner lining with controlled fresh concrete loads and short cycle times. Typical cycle lengths comprise several meters per pour with shift-based operations; optional heating, curing, and insulation measures stabilize early-age performance and schedule reliability.<\/p>\n<h2>Structure, mode of operation, and construction sequence of a tunnel formwork<\/h2>\n<p>A modern tunnel formwork is a precise interplay of support frame, formwork sheathing, drives, and work platforms. It is set up in the tunnel, aligned to the axis, and used in recurring steps: set up, reinforce, form, concrete, cure, strike, and reposition. Depending on cross-section, gradient, curvature, and surface requirements, the design and equipment vary. Decisive are uniform load transfer, control of fresh concrete pressure, and safe, ergonomic workflows. Increasingly, target points for total stations, laser scanning references, and on-form sensors for pressures, temperatures, and deflections support alignment, monitoring, and quality records.<\/p>\n<h3>Key components of a tunnel formwork<\/h3>\n<ul>\n<li><strong>Support frame and structure<\/strong>: Takes self-weight, fresh concrete pressure, and assembly forces; often modular and adjustable for changing cross-sections.<\/li>\n<li><strong>Formwork sheathing<\/strong>: Steel, timber, or GFRP; largely determines surface quality (up to architectural concrete requirements) and durability in service.<\/li>\n<li><strong>Hydraulics and drives<\/strong>: Swing-in\/out, lowering\/raising, fine adjustment, and advance; redundant safeguards for <em>safe<\/em> striking.<\/li>\n<li><strong>Running gear<\/strong>: Rail- or wheel-guided; load distribution onto the tunnel invert, often with repositioning aids for tight radii.<\/li>\n<li><strong>Work and concreting platforms<\/strong>: Safe access for reinforcement, embedded items, waterstops, built-in components, and concreting.<\/li>\n<li><strong>Supply<\/strong>: Pump and delivery lines, power, lighting, communication; clean separation of traffic and work areas.<\/li>\n<li><strong>Safety equipment<\/strong>: Guardrail, fall protection, emergency stop, pressure reliefs in the hydraulics, escape and rescue routes.<\/li>\n<li><strong>Sealing and joint technology<\/strong>: Stop-end bulkheads, keyways, beveled edges, and defined rebates for controlled construction joints and watertight transitions.<\/li>\n<li><strong>Instrumentation and control<\/strong>: Pressure gauges, load and stroke monitoring, overtravel limiters, and documented setup and striking logs for traceable QA.<\/li>\n<\/ul>\n<h3>Types and use<\/h3>\n<ul>\n<li><strong>Full-section formwork<\/strong>: One cycle forms walls and crown, often for constant cross-sections and long stretches.<\/li>\n<li><strong>Crown\/wall formwork<\/strong>: Separate formwork for invert and crown, advantageous for complex geometries or demanding joint and waterproofing concepts.<\/li>\n<li><strong>Slipform\/trailing formwork<\/strong>: Continuous advance for particularly uniform cross-sections; high requirements for mix design and logistics.<\/li>\n<li><strong>Special solutions<\/strong>: Adaptable systems for turnout areas, cross-section enlargements, niches, cross-passages, and shafts.<\/li>\n<li><strong>Adjustable formwork<\/strong>: Telescopic or segmental solutions for variable gradients, transitions, and slight cross-section variations without complete reconfiguration.<\/li>\n<\/ul>\n<h3>Cycled construction process<\/h3>\n<ol>\n<li><strong>Surveying and setup<\/strong>: Axis and elevation control, setting up the formwork, installation of embedded parts; use a pre-pour checklist and reference points for control measurements.<\/li>\n<li><strong>Reinforcement<\/strong>: Layered placement, spacers, connection at construction joints; coordination with penetrations; verify cover with gauges before closing.<\/li>\n<li><strong>Closing the formwork<\/strong>: Check sealing strips, clean bearing surfaces, control transitions at joints; confirm tightness and release-agent application is uniform and compatible.<\/li>\n<li><strong>Concreting and compaction<\/strong>: Pumped concrete with controlled consistency; compliant compaction, monitoring of fresh concrete pressure and temperature development; place in lifts with a defined rate of rise and vibrator spacing pattern.<\/li>\n<li><strong>Curing<\/strong>: Protect from drying out, temperature control, surface finishing where required; consider insulating blankets, curing compounds, or maturity monitoring.<\/li>\n<li><strong>Striking and repositioning<\/strong>: Release without damaging the surface; careful repositioning to the next cycle; inspect joints and surfaces, and log deviations with as-built photos.<\/li>\n<\/ol>\n<h3>Surface, tolerances, and fresh concrete pressure<\/h3>\n<p>The formwork sheathing and its cleanliness determine porosity, flatness, and color tone. Requirements range from technical surface to architectural concrete. Fresh concrete pressure depends on consistency, temperature, rate of rise, and admixtures; it governs the cycle and the formwork sizing. Dimensional accuracy is essential for waterproofing, equipment, and subsequent attachments and built-ins. Robust outcomes are supported by:<\/p>\n<ul>\n<li><strong>Release-agent management<\/strong>: Compatible systems, thin and even films, and avoidance of residue that impairs bonding at joints.<\/li>\n<li><strong>First-article pours<\/strong>: Mock-up or test bays to calibrate pressure assumptions, compaction regime, and surface expectations.<\/li>\n<li><strong>Defined tolerances<\/strong>: Clear limits for radius, cant, alignment, and joint steps to ensure fit-up of waterproofing and equipment.<\/li>\n<\/ul>\n<h2>Construction methods and typical areas of application<\/h2>\n<p>Tunnel formworks are used in conventional tunnel construction (NATM with shotcrete primary support and cast-in-place inner lining), in shield and TBM tunneling (secondary lining to improve watertightness and surface), in pressure tunnels, wastewater and infrastructure conduits, as well as in cut-and-cover (top-down\/diaphragm wall, followed by the inner lining). In the area of <strong>rock excavation and tunnel construction<\/strong>, geometric deviations from heading must be compensated; the formwork then creates a defined inner lining. Interfaces with mechanical, electrical, and ventilation systems benefit from early coordination to keep penetrations, blockouts, and joint layouts consistent with the cycle plan.<\/p>\n<h2>Planning, design, and material concept<\/h2>\n<p>The design of the inner lining considers earth and water pressure, temperature and restraint effects, as well as durability requirements (e.g., exposure classes, freeze-thaw\/de-icing salt or chemical attack). The composite of primary support and secondary lining must be consistent in calculation and detailing. Important are a joint and waterproofing concept, the choice of concrete (if necessary with low heat of hydration), surface specifications, and cycle lengths. For the formwork, load assumptions for fresh concrete pressure are decisive. Close coordination between structural analysis, geotechnical engineering, building physics, and execution is indispensable. Fire resistance, serviceability limits for deformations, and provisions for future maintenance access should be addressed at the design stage.<\/p>\n<ul>\n<li><strong>Typical design checks<\/strong>: Frame stability and anchorage, sheathing deflection limits, allowable joint steps, clearance envelope for transport and evacuation, and early-age thermal crack control.<\/li>\n<li><strong>Concrete concept<\/strong>: Robust mix for pumpability and cohesive placement, controlled heat of hydration, and verified compatibility with waterstops and release agents.<\/li>\n<\/ul>\n<h2>Concreting, joints, and waterproofing<\/h2>\n<p>Construction and expansion joints are planned, sealed, and documented. Waterstops, swelling waterstops, or injection hoses are frequently used to ensure watertightness. The sequence invert &#8211; walls &#8211; crown has proven itself because it optimizes bearing, drainage, and working space. With varying temperatures, controlled joint spacing and appropriate curing are crucial to limit crack formation. Stop-ends and joint formers require precise alignment and compaction access, while injection systems are pressure-tested at defined stages to verify watertightness.<\/p>\n<h2>Quality assurance and surface requirements<\/h2>\n<p>Quality starts with clean formwork sheathing and ends with documented curing. Inspections include dimensional accuracy, flatness, porosity, joint alignment, and tightness. For plant tunnels and transport infrastructure structures, requirements vary: from functional surfaces to heightened architectural demands in accessible areas. A consistent mix design, stable delivery logistics, and an orderly cycle are essential. Supplementary measures include targeted trial pours, laser-based as-built checks, permeability or water-pressure tests at critical sections, and traceable photo documentation of each cycle.<\/p>\n<h2>Occupational safety and logistics in the tunnel<\/h2>\n<p>In tunnels, confined conditions, heavy components, and continuous concrete logistics come together. Lighting, ventilation, dust and noise reduction, clear routing, emergency concepts, and hydraulic interlocks are standard. For concrete supply, pump lines, truck-mixer logistics, or conveyor belts must be coordinated. Cleaning and maintenance on the formwork are performed secured and depressurized. Clear traffic management, radio communication procedures, and lockout-tagout for hydraulic and electrical systems reduce risk in shift-based operations.<\/p>\n<h2>Dismantling, adjustments, and maintenance around the tunnel formwork<\/h2>\n<p>Even with careful planning, spot corrections, additional openings, or selective deconstruction are necessary &#8211; e.g., exposing construction joints, creating cable and ventilation openings, removing excess concrete, or adjusting niches. In tunnels, low-vibration, precise methods are required so as not to impair young structural elements, equipment, or the shotcrete primary support. Dust control, water management, and careful sequencing of cut and removal steps limit secondary damage and keep operations compatible with ongoing logistics.<\/p>\n<h3>Tools and applications related to the inner lining<\/h3>\n<ul>\n<li><strong>Stone and concrete splitters<\/strong>: Controlled expansion of predrilled holes for low-crack separation of concrete &#8211; suitable for removing protrusions, opening predetermined breaking zones, and removing temporary concreting plugs.<\/li>\n<li><strong>Concrete demolition shear<\/strong>: Selective biting and removal of edges, webs, or thin-walled areas; helpful when working at joints, adjusting embedded parts, or deconstructing smaller concrete volumes.<\/li>\n<li><strong>Steel shears<\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a><\/strong>: Cutting reinforcement steel, embedded parts, and sections in the course of adjustments or strip-out.<\/li>\n<li><strong>Combination shears<\/strong>: Flexible when mineral and metallic materials occur alternately.<\/li>\n<li><strong>Rock splitting cylinders<\/strong>: For rock protrusions in the invert or at benches, when overbreak has to be removed in a targeted, low-vibration manner.<\/li>\n<li><strong>Tank cutters<\/strong>: For special operations, such as removing steel containers or large pipelines in shafts or cross-passages.<\/li>\n<li><strong>Core drilling and wire sawing<\/strong>: Low-vibration creation of openings, precise trimming of edges, and controlled separation where minimal disturbance is required.<\/li>\n<\/ul>\n<p>Such methods are typically assigned to the fields of <strong>concrete demolition and special demolition<\/strong>, <strong>strip-out and cutting<\/strong>, <strong>rock excavation and tunnel construction<\/strong>, and <strong>special operations<\/strong>. Selection depends on component thickness, degree of reinforcement, vibration tolerance, ventilation, and transport routes. Careful <strong>work preparation<\/strong> minimizes dust, noise, and secondary damage, while defined removal, disposal, and recycling routes maintain orderly site logistics.<\/p>\n<h2>Interfaces with heading and rock<\/h2>\n<p>Conventional heading produces irregular contours. Before installing the formwork, breakouts and protrusions are equalized, often with shotcrete and targeted removal. Where the surroundings are sensitive, <strong>stone and concrete splitters<\/strong> contribute to controlled profile correction. In rock sections and when producing invert slots or drainage channels, jointed splitting can be preferable to demolition with heavy hammers. Clearly defined overbreak allowances, smoothing layers, and contact grouting ensure the inner lining is supported and geometrically controlled.<\/p>\n<h2>Sustainability and development trends<\/h2>\n<p>Tunnel formworks are designed for many reuse cycles; robust sheathing, easy cleaning, and modular adaptability extend service life. Resource conservation starts with a material-efficient design of the inner lining and continues in execution: optimized cycle lengths, consistent concrete quality, low reject rates. Low-clinker cements, temperature management, and digital cycle planning (including sensors for temperature and deformations) support quality and schedule adherence. Low-noise, low-vibration processing methods &#8211; such as with <em>concrete demolition shear<\/em> or splitting technology &#8211; can improve local working conditions; any broader environmental effect requires project-specific assessment. Energy or fuel use and the quantity of reusable auxiliary materials should be recorded across projects; environmental effects must be calculated from those data.<\/p>\n<h2>Practical notes on tunnel formwork in the project workflow<\/h2>\n<ul>\n<li>Clarify interface management early between geotechnics, waterproofing, reinforcement, equipment, and formwork; keep joint layout and embedded parts consistent.<\/li>\n<li>Set fresh concrete pressure realistically; coordinate rate of rise, temperature, and consistency to ensure surface quality and safety.<\/li>\n<li>Schedule logistics rigorously: synchronize concrete, personnel, equipment, and curing; avoid standstills.<\/li>\n<li>Plan deconstruction and adjustment steps in advance; in tunnels, prefer low-vibration methods (e.g., <strong>stone and concrete splitters<\/strong>, <strong>concrete demolition shear<\/strong>).<\/li>\n<li>Firmly plan for the maintenance of the formwork: clean the formwork sheathing, check sealing strips, service hydraulics and interlocks.<\/li>\n<li>Arrange mock-ups and first-article pours to align expectations on surface, joints, and compaction regime before series production.<\/li>\n<li>Document each cycle with measurements, photos, and checklists; capture deviations promptly and define corrective actions.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Tunnel formwork is one of the defining elements in cast-in-place concrete tunnel construction. It gives the structure its cross-section, surface, and watertightness and ensures that concreting segments are produced reproducibly at high quality. Whether in conventional heading, shield-driven tunneling with a subsequent inner lining, or cut-and-cover construction: tunnel formwork unites <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-formwork\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20023","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tunnel Formwork for Concrete Tunnel Inner Lining<\/title>\n<meta name=\"description\" content=\"Your guide to tunnel formwork for cast-in-place concrete linings \u2713 design, components, cycles &amp; waterproofing.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-formwork\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tunnel Formwork for Concrete Tunnel Inner Lining\" \/>\n<meta property=\"og:description\" content=\"Your guide to tunnel formwork for cast-in-place concrete linings \u2713 design, components, cycles &amp; waterproofing.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-formwork\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:34+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-formwork\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-formwork\",\"name\":\"Tunnel Formwork for Concrete Tunnel Inner Lining\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-12T14:11:34+00:00\",\"dateModified\":\"2026-09-12T17:53:34+00:00\",\"description\":\"Your guide to tunnel formwork for cast-in-place concrete linings \u2713 design, components, cycles & waterproofing.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-formwork#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-formwork\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-formwork#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tunnel formwork\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tunnel Formwork for Concrete Tunnel Inner Lining","description":"Your guide to tunnel formwork for cast-in-place concrete linings \u2713 design, components, cycles & waterproofing.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-formwork","og_locale":"en_US","og_type":"article","og_title":"Tunnel Formwork for Concrete Tunnel Inner Lining","og_description":"Your guide to tunnel formwork for cast-in-place concrete linings \u2713 design, components, cycles & waterproofing.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-formwork","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:34+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-formwork","url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-formwork","name":"Tunnel Formwork for Concrete Tunnel Inner Lining","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-12T14:11:34+00:00","dateModified":"2026-09-12T17:53:34+00:00","description":"Your guide to tunnel formwork for cast-in-place concrete linings \u2713 design, components, cycles & waterproofing.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-formwork#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tunnel-formwork"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-formwork#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tunnel formwork"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20023","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20023"}],"version-history":[{"count":3,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20023\/revisions"}],"predecessor-version":[{"id":29151,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20023\/revisions\/29151"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}