{"id":20020,"date":"2026-01-12T10:39:24","date_gmt":"2026-01-12T09:39:24","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20020"},"modified":"2026-06-06T09:17:02","modified_gmt":"2026-06-06T07:17:02","slug":"tunnel-portal","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-portal","title":{"rendered":"Tunnel portal"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The tunnel portal forms the visible transition between the open alignment and the underground structure. It concentrates geometry, load-bearing structure, geotechnics, drainage, safety, and design at a location where loads from rock pressure, traffic, and weather interact. In planning, construction, maintenance, and deconstruction, the portal requires particular care &#8211; from slope stabilization and sealing to the controlled removal of concrete and rock. Especially at portals, equipment and methods are used that work with low vibration, precision, and minimal material stress, for example in selective concrete demolition or controlled rock removal in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition in tunnel construction<\/a>. In addition, the portal constitutes the critical interface for operations &#8211; including visibility, drainage handover, emergency access, and the transition of structural and safety systems.<\/p>\n<h2>Definition: What is meant by a tunnel portal?<\/h2>\n<p>A tunnel portal is the structural portal at the inlet or outlet end of a tunnel. It typically comprises the portal body, wing walls, abutments, portal trough, drainage facilities, and, where applicable, portal roofs, enclosures, or galleries (e.g., noise or avalanche protection galleries) as well as the connection to the open alignment. The portal controls load transfer from overburden and traffic, protects against weather and rockfall influences, secures adjacent slopes, and organizes safety-related facilities such as emergency walkways, lighting, and fire stops. Depending on use case and location, additional features may include rockfall nets, snow sheds, noise barriers, and anti-icing measures to ensure durability and reliable operation at the transition zone.<\/p>\n<h2>Tasks and functions of the tunnel portal<\/h2>\n<p>The portal fulfills several functions reflected in technical, geotechnical, and operational requirements:<\/p>\n<ul>\n<li><strong>Load-bearing function<\/strong>: taking up and transferring loads from earth and rock pressures, traffic loads, and temperature effects.<\/li>\n<li><strong>Geotechnical stabilization<\/strong>: stabilizing the portal slope, rock and hillside areas; erosion and rockfall protection.<\/li>\n<li><strong>Hydraulics and sealing<\/strong>: capturing slope and seepage water, frost protection, controlled drainage, transitions between sealing systems.<\/li>\n<li><strong>Safety and operation<\/strong>: guidance of traffic flows, sight lines, emergency walkways, fire and smoke management in the transition zone.<\/li>\n<li><strong>Design and environment<\/strong>: integration into landscape and townscape, noise protection, greening, material selection (concrete, natural stone cladding).<\/li>\n<li><strong>Microclimate and aerodynamics<\/strong>: reducing icing risk at the mouth area and managing the piston effect to stabilize visibility and ventilation conditions.<\/li>\n<li><strong>Inspection and maintainability<\/strong>: safe access to drainage, joints, and protective systems for routine checks and repairs.<\/li>\n<\/ul>\n<h2>Design and construction types<\/h2>\n<h3>Portal body and wing walls<\/h3>\n<p>The portal body and wing walls transfer earth and traffic loads into the foundations. Depending on the subsoil, massive reinforced concrete cross-sections, reinforced shotcrete shells, or combined solutions with natural stone cladding are used. Transitions to the tunnel inner lining require precise joint formation and sealing. Detailing is decisive at exposure-prone areas: adequate concrete cover in splash zones, durable joint profiles and waterstops, and corrosion-resistant reinforcement at salt-loaded edges increase service life. Movement joints must be arranged and sealed so that differential settlements and temperature movements can be accommodated without damage.<\/p>\n<h3>Open portals, enclosures, and galleries<\/h3>\n<p>Open portals focus on load-bearing and stabilization functions. Enclosures, noise or avalanche protection galleries extend the portal to reduce weather and noise ingress. In alpine regions, portal roofs and avalanche galleries are common; in urban areas, noise protection structures are often used. Daylight guidance, fa\u00c3\u00a7ade texture, and robust edge detailing reduce glare and weathering, while enclosure geometry is coordinated with ventilation and smoke extraction concepts.<\/p>\n<h3>Portals in rock and unconsolidated ground<\/h3>\n<p>In rock, the portal is often formed with anchors, rock bolts, soil nails, and shotcrete, supplemented by rockfall protection. In unconsolidated ground, foundations, slope stabilization, sheet pile walls or pile walls, and drainage elements are decisive to control settlement and uplift. Where necessary, <em>ground improvement<\/em> (e.g., jet grouting, compensation grouting, or micropiles) and pre-support measures are combined with staged excavation to maintain stability in the transition zone.<\/p>\n<h2>Geotechnics and slope stabilization at the portal<\/h2>\n<p>The area near the portal is geotechnically sensitive: alternating layers, loose material over rock, groundwater or slope water, and freeze-thaw cycles interact. Measures range from nailed terrain steps and tie-back anchors to shotcrete catch shells and rockfall protection nets. For finely controlled rock removal in the portal area, low-vibration methods have proven effective. <strong>hydraulic wedge splitters<\/strong> and <em>rock wedge splitters<\/em> (such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>) allow controlled opening of the rock where blasting is not an option due to vibrations, nearby development, or operational constraints. Weathering-prone layers and joint systems are mapped and monitored; instrumentation (e.g., crack gauges and prism monitoring) supports verification of stability during construction and operation.<\/p>\n<h2>Construction: sequence at the tunnel portal<\/h2>\n<ol>\n<li>Expose and secure the portal slope, excavation and pit shoring, temporary dewatering.<\/li>\n<li>Controlled removal of rock and old concrete, profiling of the portal area and the abutments.<\/li>\n<li>Construction of foundations, portal body, wing walls, and transitions to the inner lining.<\/li>\n<li>Installation of sealing, drainage, frost protection, and surface drainage.<\/li>\n<li>Installation of protection and operating facilities (rockfall barriers, lighting, signage, emergency walkways).<\/li>\n<li>Surveying and quality assurance of geometry, waterproofing tests, and drainage function checks before backfilling.<\/li>\n<li>Commissioning, documentation, and handover with defined maintenance access and inspection points.<\/li>\n<\/ol>\n<p>For selective removal in existing structures, such as portal widening, <strong>concrete pulverizers<\/strong> are used to open reinforced components precisely and expose reinforcement. <em>combination shears<\/em> and <em>multi cutters<\/em> help separate reinforcement and embedded parts, while <em>steel shears<\/em> dismantle profiled steel components. The required energy is provided by <strong>hydraulic power packs<\/strong>, which reliably supply the tools and ensure continuous, controlled progress. Dust suppression, water management, and defined separation cuts at joints and edges limit collateral damage and ensure clean interfaces for rebuilding.<\/p>\n<h2>Drainage, sealing, and detailing<\/h2>\n<h3>Transition inner lining\/portal<\/h3>\n<p>The interface between the tunnel waterproofing and the portal is a critical point. Drainage layers, waterproofing membranes, joint seals, and drip edges must be arranged to minimize the ingress of water and de-icing salts and to maintain the durability of the structure. To increase robustness at this interface, the following principles are proven:<\/p>\n<ul>\n<li><strong>Redundant sealing concepts<\/strong> with combined membranes and joint waterstops at movement joints.<\/li>\n<li><strong>Inspectable components<\/strong>: accessible collector lines, cleanouts, and inspection shafts for routine maintenance.<\/li>\n<li><strong>Separation of clean and contaminated water<\/strong> to protect receiving waters and treatment facilities.<\/li>\n<\/ul>\n<h3>Surface and slope water<\/h3>\n<p>Channels, swales, gate boxes, and outfalls collect surface water. Slope and seepage water is controlled through drainage layers, filter fabrics, and collector pipes. Maintenance-friendly access to shafts is essential for operation. Capacities must consider intense rainfall events and winter salt loads; frost-resistant detailing at inlets and outlets reduces blockage and icing.<\/p>\n<h2>Operations, safety, and winter maintenance<\/h2>\n<p>In the portal area, sight lines overlap with braking and acceleration maneuvers. Lighting, marking, passive protection devices, and emergency walkways are tuned to the mixed climate between outside and tunnel. In cold regions, frost protection, de-icing, and spray water management must be considered; avalanche and rockfall barriers protect the portal mouth. Interventions in load-bearing components always prioritize structural safety; low-vibration demolition methods with <strong>concrete pulverizers<\/strong> and <em>hydraulic wedge splitters<\/em> reduce risks for operations and surroundings. The interaction of wind, traffic-induced turbulence, and temperature gradients is assessed to limit icing and fog formation at the mouth zone.<\/p>\n<h2>Maintenance, refurbishment, and deconstruction of tunnel portals<\/h2>\n<h3>Typical damage patterns<\/h3>\n<p>Cracks, concrete spalling, alkali-silica reaction, chloride-induced reinforcement corrosion, freeze-thaw damage, and detachment of claddings tend to concentrate at the portal. Regular condition surveys and structural diagnostics form the basis of any measure. Exposure classes, salt spray, and cyclical wetting-drying drive deterioration; timely sealing renewal and joint repairs extend service life.<\/p>\n<h3>Selective removal and strengthening<\/h3>\n<p>During refurbishment, low-dust and low-vibration methods are required to protect traffic and the environment. <strong>concrete pulverizers<\/strong> enable controlled removal of damaged zones and exposure of reinforcement for concrete replacement. For edge breakouts and opening rock or masonry areas, <em>rock wedge splitters<\/em> are suitable. <em>combination shears<\/em> and <em>multi cutters<\/em> separate embedded parts, grating, and lines; <em>steel shears<\/em> dismantle steel profiles or old support frames. Strengthening can include bonded overlays, shotcrete shells, or stainless reinforcement in splash zones; surface protection systems are selected according to exposure and compatibility with existing materials.<\/p>\n<h3>Deconstruction and portal widening<\/h3>\n<p>For portal widening, cross-section adjustments, or deconstruction of decommissioned portals, a selective approach is crucial: load-bearing and non-load-bearing areas are treated separately, reinforcement is cut in a controlled manner, and adjacent rock is loosened with low vibration. <strong>hydraulic power packs<\/strong> ensure continuous output to the tools used. In special operations, such as dismantling steel tanks of service or firefighting water systems in portal storage areas, <em>tank cutters<\/em> are used where the working environment permits. Temporary support, staged cuts, and monitoring of deformations and vibrations safeguard adjacent structures; material streams are separated for recycling and disposal.<\/p>\n<h2>Design, noise, and environmental protection<\/h2>\n<p>Portals shape the landscape and urban appearance. Material selection, texture, and greening reduce visual impact. Noise barriers, enclosures, and low-noise roadway transitions reduce emissions. When removing components in the context of natural stone extraction or with natural stone cladding, a careful approach is essential; <em>hydraulic wedge splitters<\/em> allow precise separation to preserve reusable elements. Biodiversity-sensitive design, avoidance of light spill, and the reuse of excavated natural stone support environmental objectives at the portal zone.<\/p>\n<h2>Quality management, surveying, and monitoring<\/h2>\n<p>Geometry and settlement behavior at the tunnel mouth are monitored by surveying. Crack monitoring, moisture measurements, and drainage control ensure serviceability. For interventions in existing structures, dense documentation of removal boundaries, rebar exposure, and concrete replacement is recommended &#8211; supported by clear work steps and defined separation cuts. Modern workflows include total station control, 3D scanning for as-built validation, and, where appropriate, sensor-based monitoring to track temperature, moisture, and displacement during the early operation phase.<\/p>\n<h2>Equipment: selection criteria at the portal<\/h2>\n<ul>\n<li>Minimize vibrations: protect sensitive structures, maintain operations near the portal, reduce settlement risks.<\/li>\n<li>Precision and selectivity: layered work, exactness at joints, edges, and connections.<\/li>\n<li>Performance and compactness: sufficient power reserves in a constrained work area.<\/li>\n<li>Safety and ergonomics: safe handling on slopes, good maintenance access.<\/li>\n<li>Noise and emissions: low noise levels and efficient dust suppression in populated or environmentally sensitive areas.<\/li>\n<li>Compatibility: suitable tool-hose interfaces and hydraulic flow-pressure matching to carriers and <strong>hydraulic power packs<\/strong>.<\/li>\n<\/ul>\n<p>Depending on the task, <strong>concrete pulverizers<\/strong> are suitable for reinforced concrete, <em>hydraulic wedge splitters<\/em> for rock and massive concrete, <em>combination shears<\/em> and <em>multi cutters<\/em> for mixed demolition, and <em>steel shears<\/em> for profiled steel. <strong>hydraulic power packs<\/strong> provide the required output and can be adapted to the demanded force and flow characteristics. Defined tool selection and quick, clean separation cuts enable interfaces that support rapid reconstruction without rework.<\/p>\n<h2>Occupational safety and permits<\/h2>\n<p>Construction and traffic areas meet in the portal zone. Barriers, traffic management, dust and noise control, dewatering, and emergency plans must be coordinated early. Legal requirements and technical standards must be observed; the notes here are general in nature and do not replace case-specific assessment. Methods such as low-vibration removal with <strong>concrete pulverizers<\/strong> or controlled splitting with <em>rock wedge splitters<\/em> help reduce risks and maintain operations. Risk assessments, tool qualification, lockout procedures for power supply, and water protection during dewatering are integral to execution planning.<\/p>\n<h2>Typical practical applications<\/h2>\n<h3>Portal refurbishment under traffic<\/h3>\n<p>Selective removal of damaged zones, exposure of reinforcement, concrete replacement, surface protection systems. Tools with high precision and low vibration are advantageous here. Work windows, staged traffic management, and continuous surveying ensure dimensional accuracy and short closure times.<\/p>\n<h3>Cross-section widening and portal renewal<\/h3>\n<p>Deconstruction of wing walls and portal caps, adjustment of foundations, renewed waterproofing routing. Combination of <strong>concrete pulverizers<\/strong> and <em>combination shears<\/em> for reinforcement and embedded parts. Temporary stabilization, verified joint detailing, and early testing of drainage transitions secure the tie-in to the inner lining.<\/p>\n<h3>Rock removal at the portal mouth<\/h3>\n<p>Profiling of the rock cut, securing with nailing and shotcrete. Use of <em>hydraulic wedge splitters<\/em> for controlled volume reduction in sensitive environments. Defined blasting alternatives, protection screens, and staged excavation minimize vibration and protect adjacent structures.<\/p>\n<h2>Planning interfaces and coordination<\/h2>\n<p>Portals concentrate interfaces between alignment, subsoil, drainage, tunnel systems, and operations. Coordinated planning with clear details on joint design, drainage routing, and construction stages reduces rework. In execution, a structured sequence, suitable tool selection, and sufficient energy supply via <strong>hydraulic power packs<\/strong> facilitate on-time completion. Digital coordination with model-based planning, clash checks, and a shared data environment improves interface management and documentation from design through commissioning.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The tunnel portal forms the visible transition between the open alignment and the underground structure. It concentrates geometry, load-bearing structure, geotechnics, drainage, safety, and design at a location where loads from rock pressure, traffic, and weather interact. In planning, construction, maintenance, and deconstruction, the portal requires particular care &#8211; from <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-portal\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20020","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tunnel Portal Engineering - Design &amp; Construction<\/title>\n<meta name=\"description\" content=\"Discover how a civil engineering tunnel portal \u2713 covers design, geotechnics, drainage, safety &amp; low vibration methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-portal\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tunnel Portal Engineering - Design &amp; Construction\" \/>\n<meta property=\"og:description\" content=\"Discover how a civil engineering tunnel portal \u2713 covers design, geotechnics, drainage, safety &amp; low vibration methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-portal\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-06T07:17:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-portal\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-portal\",\"name\":\"Tunnel Portal Engineering - Design & Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-12T09:39:24+00:00\",\"dateModified\":\"2026-06-06T07:17:02+00:00\",\"description\":\"Discover how a civil engineering tunnel portal \u2713 covers design, geotechnics, drainage, safety & low vibration methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-portal#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-portal\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-portal#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tunnel portal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tunnel Portal Engineering - Design & Construction","description":"Discover how a civil engineering tunnel portal \u2713 covers design, geotechnics, drainage, safety & low vibration methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-portal","og_locale":"en_US","og_type":"article","og_title":"Tunnel Portal Engineering - Design & Construction","og_description":"Discover how a civil engineering tunnel portal \u2713 covers design, geotechnics, drainage, safety & low vibration methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-portal","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-06T07:17:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-portal","url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-portal","name":"Tunnel Portal Engineering - Design & Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-12T09:39:24+00:00","dateModified":"2026-06-06T07:17:02+00:00","description":"Discover how a civil engineering tunnel portal \u2713 covers design, geotechnics, drainage, safety & low vibration methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-portal#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tunnel-portal"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-portal#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tunnel portal"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20020","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20020"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20020\/revisions"}],"predecessor-version":[{"id":28106,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20020\/revisions\/28106"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}