{"id":20018,"date":"2026-01-10T15:53:34","date_gmt":"2026-01-10T14:53:34","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20018"},"modified":"2026-06-06T14:29:03","modified_gmt":"2026-06-06T12:29:03","slug":"tunnel-load","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-load","title":{"rendered":"Tunnel load"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Tunnel load refers to all actions acting on a tunnel during construction, operation, maintenance, or deconstruction. It encompasses the interplay of rock mass, ground, and mine water, construction stages, traffic, and temperature. A precise understanding of these loads is crucial for planning, execution, and the safe handling of components and materials &#8211; from rock breakout to controlled concrete demolition. In practice, tunnel load directly influences the choice of excavation method and equipment, for example in <em><a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock breakout and tunnel construction<\/a><\/em>, in <em>concrete demolition and special demolition<\/em>, or in <em>building gutting and cutting<\/em>. Tools such as concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> are preferred where a low-vibration approach helps reduce load redistribution and protect tunnel support.<\/p>\n<p>In engineering practice, reliable load models provide the basis for method selection, support dimensioning, and verification of service life. Early alignment between geotechnical investigation, construction method, and monitoring concept reduces uncertainty and supports robust decisions across all project phases.<\/p>\n<h2>Definition: What is meant by tunnel load?<\/h2>\n<p>Tunnel load is understood as the totality of <strong>static and dynamic<\/strong> actions acting on the lining, support, and fittings of a tunnel. These include permanent loads from rock pressure and overburden, variable loads from traffic, water levels, and temperature, as well as exceptional actions, for example from construction stages, vibrations, or fire. A typical distinction is made between loads in the construction stage (e.g., during excavation and support) and loads in the final stage (operation). The load level depends on the geological environment, the overburden, the construction method (e.g., cyclic blasting works, excavator breakout, hydraulic splitting), and the lining (shotcrete, segment rings, inner lining).<\/p>\n<ul>\n<li><strong>Static actions<\/strong>: self-weight, overburden, long-term rock pressure, groundwater level.<\/li>\n<li><strong>Dynamic or transient actions<\/strong>: traffic, blasting-induced vibrations, pressure waves, earthquakes.<\/li>\n<li><strong>Actions vs. effects<\/strong>: actions cause internal forces, deformations, and cracking; resistances are provided by support and lining systems.<\/li>\n<\/ul>\n<h2>Types of loads in tunnel construction: permanent, variable, and exceptional<\/h2>\n<p>Tunnel loads can be classified by duration, cause, and direction. For design, they are combined into load combinations; for construction execution, their temporal evolution and redistributions are decisive. Typical categories are:<\/p>\n<ul>\n<li>Permanent loads: self-weight of the lining, rock pressure, overburden, long-term deformations (creep\/shrinkage), settlements.<\/li>\n<li>Hydraulic actions: ground and mine water pressure, pore water pressure, uplift, pressure fluctuations during excavation backfilling and refilling.<\/li>\n<li>Variable loads: traffic actions (road, rail), aerodynamic pressure surges, temperature actions, maintenance and inspection loads.<\/li>\n<li>Exceptional actions: construction stage (partial excavation, partial ring), vibrations, earthquakes, fire exposure, local impact loads.<\/li>\n<li>Internal component effects: restraint from temperature and moisture gradients, shrinkage and heat of hydration, assembly tolerances.<\/li>\n<\/ul>\n<p>Depending on the construction method, load paths can vary significantly. In cyclic excavation, the early load-bearing effect of the shotcrete shell is decisive; in segmental tunnels, ring-by-ring closure and the gasketed joint govern behavior. A shear-resistant ring joint reduces redistributions, while delayed ring formation can allow higher temporary deformations. Directionally, actions may act radially, tangentially, or axially and are transferred by the lining to the surrounding ground.<\/p>\n<h2>Design and load case combinations<\/h2>\n<p>For structural checks, actions are combined into governing combinations. In the ultimate limit state, unfavorable superpositions (e.g., high rock pressure and water pressure) are of interest; in the serviceability limit state, deformations, cracking, and watertightness. It is important to distinguish between short-term peak loads and long-term effects. The verifications must be performed project- and site-specific; the following points serve for general orientation only:<\/p>\n<ol>\n<li>Determination of geotechnical parameters: rock mass classification, jointing, overburden, water levels, permeability.<\/li>\n<li>Definition of construction phases and load stages: excavation, temporary support, temporary props, ring or shell formation.<\/li>\n<li>Combinations for construction and final stage: permanent, frequent, quasi-permanent, and exceptional (e.g., fire, earthquake).<\/li>\n<li>Assessment of restraint and redistribution: temperature, shrinkage, settlements, construction joints.<\/li>\n<li>Monitoring and adaptation: measurement data to validate assumptions, with adjustment of support as needed.<\/li>\n<\/ol>\n<p>Design commonly follows a partial factor approach with differentiated safety on actions and resistances and with allowances for model uncertainty. Numerical or analytical models should be calibrated against measurements to ensure that predicted load paths and deformations remain consistent with observed behavior.<\/p>\n<h2>Tunnel load in the construction stage<\/h2>\n<p>The construction stage is central to safety: partial cross-sections, open rings, and incomplete systems lead to redistributions and peak loads. Stability depends on the sequence of work steps, from crown support to closure of the load-bearing cross-section.<\/p>\n<h3>Excavation, crown support and shotcrete<\/h3>\n<p>Shotcrete, lattice girders, anchors, and steel ribs form early-acting supports. The time window between excavation and support should remain short to limit deformations and convergences. Tunnel load during this phase is highly time-dependent. Early-age properties of shotcrete and the stiffness of first layers influence the immediate load uptake and crack control.<\/p>\n<h3>Influence of the excavation method<\/h3>\n<p>Blasting, excavator excavation, or hydraulic splitting influence vibrations and load redistribution. <strong>Rock and concrete splitters<\/strong> are used when vibrations must be minimized or when sensitive structures are nearby. They generate controlled cracking in rock or concrete, which favors low-load removal in the construction stage.<\/p>\n<h3>Hydraulic power packs and system tuning<\/h3>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power packs<\/a> provide the necessary pressure for split cylinders, concrete demolition shears, and other tools. Proper tuning of pressure, flow rate, and stroke speed supports controlled load paths and prevents shock loads on temporary supports.<\/p>\n<h3>Face stability and advance rate<\/h3>\n<p>Face stability, advance rate, and round length govern convergence, support pressure, and the mobilization of ground strength. Short rounds with prompt support closure reduce deformations, while excessive stand-up times can trigger unfavorable load redistributions and local instabilities.<\/p>\n<h2>Tunnel load in operation<\/h2>\n<p>In operation, rock and water predominate, supplemented by traffic loads and temperature. Aerodynamic effects (e.g., pressure waves in rail tunnels) can be locally governing. Durability and watertightness are in focus, particularly on water-bearing sections and in aggressive environments.<\/p>\n<h3>Temperature, creep and shrinkage<\/h3>\n<p>Temperature gradients and moisture changes generate restraint that can cause cracking. In inner linings, creep and shrinkage act over the long term; joint design and curing are therefore important.<\/p>\n<h3>Fire actions<\/h3>\n<p>Fire exposure constitutes exceptional actions that can trigger high temperature peaks, spalling, and strength losses. Material selection, protective layers, and maintenance strategies generally take such scenarios into account at the conceptual level.<\/p>\n<h3>Watertightness, durability and maintenance<\/h3>\n<p>Leak-tight joints, controlled drainage, and suitable concrete composition limit deterioration mechanisms such as leaching or chemical attack. Regular inspections with targeted repairs help keep operational loads and environmental actions within the design envelope.<\/p>\n<h2>Influence of rock mass, overburden and water<\/h2>\n<p>Geology and hydrology determine the nature and magnitude of tunnel load. Fracture water can generate additional pressure, karst voids lead to uneven support, and weak rock to settlements. High overburden increases rock pressure; horizontal stresses are relevant in tectonically pre-stressed zones.<\/p>\n<h3>Hard rock, soft rock and unconsolidated soil<\/h3>\n<p>In hard rock, the stability of the jointed blocks and their orientation dominates; in soft rock, time- and creep effects are pronounced. Unconsolidated soil often requires closed or frozen cross-sections and dewatering to control hydraulic loads.<\/p>\n<ul>\n<li><strong>Key parameters<\/strong>: in-situ stress state, discontinuity sets and spacing, anisotropy, groundwater regime, and potential for swelling or squeezing behavior.<\/li>\n<\/ul>\n<h2>Monitoring and the observational method<\/h2>\n<p>Measurements accompany excavation, lining, and operation. The aim is to verify assumptions, understand load paths, and adapt measures. Typical measured quantities are:<\/p>\n<ul>\n<li>Convergence and displacements of the tunnel cross-section.<\/li>\n<li>Anchor forces, strains and stresses in lining components.<\/li>\n<li>Groundwater and pore water pressure, flow rates.<\/li>\n<li>Temperature and moisture in the inner lining.<\/li>\n<li>Vibrations during demolition and cutting operations.<\/li>\n<\/ul>\n<p>Threshold values and action plans are defined in advance. If trigger levels are exceeded, the sequence typically is:<\/p>\n<ol>\n<li>Verify instrumentation and data plausibility.<\/li>\n<li>Reassess models and boundary conditions with back-analysis.<\/li>\n<li>Implement adaptations such as earlier closure, additional support, or adjusted advance rates.<\/li>\n<\/ol>\n<h2>Tunnel load and controlled demolition<\/h2>\n<p>During deconstruction or cross-section adjustments, components often carry <em>residual load<\/em>. Local interventions change the load path; accordingly, the work sequence and choice of tools are decisive. The goal is removal with minimal vibration and low risk of spalling to avoid endangering adjacent construction stages and operational equipment.<\/p>\n<h3>Concrete demolition shears in tunnels<\/h3>\n<p><strong>Concrete demolition shears<\/strong> enable gripping and shearing removal of inner linings, haunches, and webs in manageable cross-sections. They are helpful when reinforcement must be considered and when localized loads on temporary shoring are to be limited. In <em>building gutting and cutting<\/em>, service platforms, cable ducts, or thin-walled installations are removed in advance to reroute loads in a controlled manner.<\/p>\n<h3>Rock and concrete splitters for cross-section enlargements<\/h3>\n<p>For <em>cross-section enlargements<\/em> or niches, split cylinders are used to open rock or concrete linearly. This results in lower vibration levels and reduces the risk of undesirable load redistributions. In <em>rock breakout and tunnel construction<\/em>, this approach helps preserve existing supports, such as shotcrete arches or anchor heads.<\/p>\n<h3>Combination shears, multi cutters and steel shears<\/h3>\n<p>For steel profiles, lattice girders, reinforcements, and cable trays, <em>combination shears<\/em>, <em>multi cutters<\/em>, and <em>steel shears<\/em> are used. They cut metallic installations in a controlled manner, thereby minimizing unintended impulse loads. In industrially used tunnel facilities, a <em>tank cutter<\/em> may be required for dismantling vessels and pipelines in niches and cross-passages.<\/p>\n<h2>Work sequences that favorably influence tunnel loads<\/h2>\n<p>A low-impact construction or deconstruction sequence reduces risks. The following have proven effective:<\/p>\n<ul>\n<li>Step-by-step work with early closure of load-bearing cross-sections.<\/li>\n<li>Pre-relief by sawing, drilling, or splitting along planned separation cuts.<\/li>\n<li>Install temporary shoring before separating load-bearing components.<\/li>\n<li>Low-impact tool selection (e.g., hydraulic splitting, gripping separation with concrete demolition shears).<\/li>\n<li>Continuous monitoring and adaptation of measures.<\/li>\n<li>Document intermediate states with photos and measurements to confirm assumptions before proceeding.<\/li>\n<li>Coordinate interfaces between excavation, support, and demolition teams to avoid simultaneous actions that increase load peaks.<\/li>\n<\/ul>\n<h2>Planning and execution aspects<\/h2>\n<p>Planning for tunnel load includes forecasting actions, selecting the construction method, and defining supports. In execution, logistics, ventilation, water management, and emergency concepts must be considered. For repair and <em>special demolition<\/em>, the rule is: interventions in load-bearing structures only with a coordinated sequence and documented intermediate states. Notes of this kind are of a general nature and do not replace any object-specific calculation or release.<\/p>\n<p>Clear responsibilities, change management, and structured reporting ensure that load-related decisions remain traceable. Where feasible, staged design with predefined adaptation options supports timely reaction to monitored trends.<\/p>\n<h2>Term distinctions and common misconceptions<\/h2>\n<p>\u201cTunnel load\u201d is not synonymous with \u201crock pressure\u201d: it also includes water, traffic, temperature, and exceptional actions. Likewise, \u201clow-vibration\u201d is not the same as \u201cload-free\u201d: even gentle methods generate local stress changes that must be considered in planning. This applies in particular to partial demolition and adaptations in existing structures.<\/p>\n<p>Another common confusion is between actions and damage mechanisms. Actions describe what acts on the structure; damage mechanisms describe how materials respond. Keeping this distinction clear supports consistent design, monitoring, and intervention strategies.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Tunnel load refers to all actions acting on a tunnel during construction, operation, maintenance, or deconstruction. It encompasses the interplay of rock mass, ground, and mine water, construction stages, traffic, and temperature. A precise understanding of these loads is crucial for planning, execution, and the safe handling of components and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-load\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20018","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tunnel Load in Structural and Geotechnical Design<\/title>\n<meta name=\"description\" content=\"Engineering guide to tunnel load \u2713 static &amp; dynamic loads in design, construction, and operation for safer tunnels.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-load\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tunnel Load in Structural and Geotechnical Design\" \/>\n<meta property=\"og:description\" content=\"Engineering guide to tunnel load \u2713 static &amp; dynamic loads in design, construction, and operation for safer tunnels.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-load\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-06T12:29:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-load\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-load\",\"name\":\"Tunnel Load in Structural and Geotechnical Design\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-10T14:53:34+00:00\",\"dateModified\":\"2026-06-06T12:29:03+00:00\",\"description\":\"Engineering guide to tunnel load \u2713 static & dynamic loads in design, construction, and operation for safer tunnels.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-load#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-load\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-load#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tunnel load\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tunnel Load in Structural and Geotechnical Design","description":"Engineering guide to tunnel load \u2713 static & dynamic loads in design, construction, and operation for safer tunnels.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-load","og_locale":"en_US","og_type":"article","og_title":"Tunnel Load in Structural and Geotechnical Design","og_description":"Engineering guide to tunnel load \u2713 static & dynamic loads in design, construction, and operation for safer tunnels.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-load","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-06T12:29:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-load","url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-load","name":"Tunnel Load in Structural and Geotechnical Design","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-10T14:53:34+00:00","dateModified":"2026-06-06T12:29:03+00:00","description":"Engineering guide to tunnel load \u2713 static & dynamic loads in design, construction, and operation for safer tunnels.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-load#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tunnel-load"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-load#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tunnel load"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20018","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20018"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20018\/revisions"}],"predecessor-version":[{"id":28124,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20018\/revisions\/28124"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}