{"id":20015,"date":"2026-01-10T10:48:13","date_gmt":"2026-01-10T09:48:13","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20015"},"modified":"2026-06-06T17:24:03","modified_gmt":"2026-06-06T15:24:03","slug":"tunnel-drainage","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-drainage","title":{"rendered":"Tunnel drainage"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>Tunnel drainage<\/strong> is a central component of every underground structure. It safeguards traffic safety, preserves the durability of inner linings and equipment, and ensures controlled handling of seepage and operational water. In practice, the spectrum ranges from backfill drainage layers to channels and collector lines through to pump sumps with downstream treatment. In construction, refurbishment, and operation, selective concrete removal plays an important role &#8211; for example when creating slot trenches, openings, and shafts. Low vibration methods are generally used here, such as the use of concrete pulverizers or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> in combination with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>, particularly in confined work areas in rock excavation and tunnel construction as well as in concrete demolition and special demolition. Well-designed drainage reduces lifecycle risks, supports regulatory compliance, and enables maintainable, safe operations under constrained conditions.<\/p>\n<h2>Definition: What is meant by tunnel drainage?<\/h2>\n<p><strong>Tunnel drainage<\/strong> encompasses all structural and operational measures that capture, convey, treat, and safely discharge water occurring in the tunnel. This includes rock and seepage water behind the inner lining, surface water on the pavement, cleaning water, firefighting water in the event of an incident, and water from operations contaminated with salts and pollutants. Typical elements are backfill drainage, filter and protection layers, drainage mats, longitudinal and transverse slopes, drainage channels, collector and pressure lines, pump sumps, inspection and cleaning openings, as well as facilities for treatment and intermediate storage. Tunnel drainage is therefore an interface between the load-bearing structure, operational technology, and water management approval. Clear boundaries to adjacent systems and a defined transfer point to higher-level infrastructure are essential for responsibilities and permits.<\/p>\n<ul>\n<li><em>Typical water categories within the system boundary:<\/em> rock and seepage water, roadway surface water, wash-down and cleaning water, firefighting and incident-related water, and operational water impacted by salts or hydrocarbons.<\/li>\n<li><em>Typical out-of-scope aspects:<\/em> external route drainage outside the tunnel, portal forecourt drainage, and catchments not hydraulically connected to the tunnel interior.<\/li>\n<\/ul>\n<h2>System variants of tunnel drainage<\/h2>\n<p>Fundamentally, a distinction is made between <strong>draining systems<\/strong> that purposefully capture rock water behind the lining and <strong>watertight systems<\/strong> with closed sealing. Draining solutions rely on filter and drainage layers to convey water in a controlled manner; watertight systems keep water away from the structure and discharge it through defined penetrations. The choice depends on the geology, water pressure, environmental objectives, and the construction method (e.g., cyclic excavation with shotcrete or machine excavation with segmental lining). Both variants impose high demands on design, cleanability, and accessibility. In existing facilities, hybrid concepts are often implemented during refurbishment, such as the targeted retrofitting of seepage lines or pump sumps. For openings and selective interventions in the inner lining, concrete pulverizers or rock and concrete splitters are frequently used in existing structures to work gently on the structure. In addition, resilience regarding future loads, climate trends, and passive safety in failure scenarios should be weighed at concept stage.<\/p>\n<ul>\n<li><strong>Draining systems:<\/strong> robust conveyance of unavoidable inflows; filter stability and cleaning access are critical design drivers.<\/li>\n<li><strong>Watertight systems:<\/strong> reduced water ingress and minimized drawdown; detailing of penetrations and joints is decisive for durability.<\/li>\n<\/ul>\n<h2>Functions and requirements<\/h2>\n<p>A professionally planned tunnel drainage system fulfills several tasks: It keeps the roadway free of standing water, reduces icing risks, protects the inner lining from dampness and efflorescence, limits hydraulic uplift, prevents damage from freeze-thaw and de-icing salts, and ensures regulated conveyance and treatment. From a planning perspective, proof must be provided for hydraulic performance, structural stability of adjacent components, maintainability, and environmental compatibility. In Germany, design generally follows applicable technical regulations and official requirements; project-specific requirements may vary depending on the tunnel type and must be coordinated with the responsible authorities on a case-by-case basis. Beyond compliance, concepts should prioritize <em>redundancy<\/em>, <em>simple cleanability<\/em>, and <em>fail-safe behavior<\/em> in partial outages or incident conditions.<\/p>\n<h2>Structure and components of a drainage system<\/h2>\n<p>The specific configuration depends on the application (road, rail, utilities) and the construction method. Frequently recurring components are:<\/p>\n<ul>\n<li><strong>Backfill drainage<\/strong> with filter and protection layer to capture rock water.<\/li>\n<li><strong>Drainage mats<\/strong> or dimpled membranes behind the inner lining for area-wide conveyance.<\/li>\n<li><strong>Longitudinal drains<\/strong> in the invert or edge area with sufficient longitudinal slope.<\/li>\n<li><strong>Drainage channels<\/strong> (e.g., slot channels) to capture surface water.<\/li>\n<li><strong>Crossfall<\/strong> of the pavement and defined inlets.<\/li>\n<li><strong>Collector lines<\/strong> and <strong>flushing lines<\/strong> with inspection openings.<\/li>\n<li><strong>Pump sumps and shaft structures<\/strong> with level control and redundancy.<\/li>\n<li><strong>Treatment stages<\/strong> such as sedimentation, filtration, and separation for contaminated water.<\/li>\n<li><strong>Emergency drainage<\/strong> and retention for incidents, e.g., firefighting water.<\/li>\n<li><strong>Backflow prevention and overflow structures<\/strong> to protect against surcharge and reverse flows.<\/li>\n<li><strong>Monitoring and control<\/strong> (e.g., level, conductivity, or turbidity sensors) to support condition-based operation.<\/li>\n<\/ul>\n<h2>Constructive solutions: sealing or draining<\/h2>\n<p>In draining concepts, a clog-resistant filter design with ensured cleanability is paramount. Tunnels designed to be watertight (e.g., segmented inner linings with joint seals) minimize water ingress; water that occurs is collected via defined inlets. In hydrogeologically sensitive areas, reducing groundwater drawdown can be a decisive factor. Equally important is avoiding backflow behind the lining and bypass flows at connections, transitions in cross-sections, and joints. Durable detailing requires coordinated solutions at penetrations, terminations, and interfaces to ensure continuity of sealing and drainage functions over the full service life.<\/p>\n<h2>Hydraulic design<\/h2>\n<p>Design accounts for rock water inflows, operational loads (cleaning water, de-icing salts), incidents (firefighting water), and requirements for retention. Relevant parameters include longitudinal and cross slopes, roughness, self-cleaning velocities, sediment settling behavior, surge loads, and frost safety. For drains, filter stability, gradation, and clogging propensity (e.g., iron ochre formation, scaling) must be verified. <em>Maintainability<\/em> and <em>inspection access<\/em> must be included in the design. In addition, design storm assumptions, return periods, and retention strategies should be selected consistently with approvals and the sensitivity of the receiving water body.<\/p>\n<ul>\n<li><strong>Checks in design and verification:<\/strong> hydraulic capacity including incident scenarios, stability against uplift and flotation, and accessibility for flushing over the complete route.<\/li>\n<li><strong>Operational robustness:<\/strong> tolerance to partial blockages, sediment pulses, and temporary outage of pumping equipment.<\/li>\n<\/ul>\n<h2>Construction execution in rock excavation and tunnel construction<\/h2>\n<p>When constructing or refurbishing tunnel drainage, selective interventions in concrete and rock areas are often necessary: slot trenches in the invert, openings for collector lines, niches for pump sumps, adjustments to channels and shafts, and removal of local defects. In confined cross-sections with sensitive equipment, low vibration, controlled methods are proven. In practice, concrete pulverizers and rock and concrete splitters from Darda GmbH are used together with hydraulic power packs. For cutting or shortening embedded steel components &#8211; depending on the requirement &#8211; combi shears, steel shears, or multi cutters can be used. <em>Special operations<\/em> arise, for example, when dismantling tanks or equipment components in technical niches; if needed, a tank cutting torch is also available. Temporary bypass conveyance, water retention, and debris management should be organized so that tunnel operations and safety installations remain functional.<\/p>\n<ul>\n<li><strong>Good practice on site:<\/strong> vibration and crack monitoring on sensitive structures, dust and water capture at the source, and staged work windows coordinated with operations control.<\/li>\n<li><strong>Detailing during execution:<\/strong> clean interfaces for bonding and sealing, protected terminations, and clear marking of new lines for later inspections.<\/li>\n<\/ul>\n<h3>Example work steps for retrofitting a seepage line<\/h3>\n<ol>\n<li>Locate the route and define interventions, taking load transfer and fire protection into account.<\/li>\n<li>Selectively open the inner lining and invert area, e.g., with concrete pulverizers or with rock and concrete splitters to minimize vibrations and breakout edges.<\/li>\n<li>Create the slot trench, install filter and bedding layers, and place the line with defined slope.<\/li>\n<li>Install flushing and inspection openings, connect to the collector line or pump sump.<\/li>\n<li>Restore the surface, form joints, and document the route of the line.<\/li>\n<li>Commission the system, verify flushing and function, and update the documentation.<\/li>\n<\/ol>\n<h2>Operation, inspection, and cleaning<\/h2>\n<p>Drainage systems must be inspected and cleaned regularly. Typical challenges include sediment accumulation, scaling and iron ochre formation, organic loads, and de-icing salts. Proven measures include flushing concepts with sufficient velocities, accessible inspection shafts, and the replaceability of line sections. During repairs under ongoing operations, a low-dust and low-vibration approach is essential; when opening shafts or channels, concrete pulverizers are suitable for controlled edges and limited fracture zones. Rock and concrete splitters allow components to be separated without percussive impact, protecting the surrounding installations. Documented inspection regimes, condition-triggered cleaning, and the use of monitoring data help to optimize intervals and reduce downtime.<\/p>\n<h2>Environmental and water management aspects<\/h2>\n<p>Tunnel wastewater can be contaminated with solids, de-icing salts, mineral oil hydrocarbons, or heavy metals. Depending on location and use, preliminary treatment, separation, retention, and possibly throttling must be provided. Seepage water may generally not be discharged uncontrolled into sensitive aquifers. Requirements arise from applicable water regulations and project-specific conditions. Statements to this effect are always <em>general in nature<\/em>; the specific design must be coordinated with the responsible authorities. For incidents (e.g., firefighting water), retention volumes and operating strategies must be provided. Discharge permits, sampling concepts, and segregation of first flush volumes from routine flows improve environmental protection and legal certainty.<\/p>\n<h2>Occupational safety, health protection, and emissions<\/h2>\n<p>In tunnels, limiting emissions, reducing dust, lowering noise, and ensuring spark-free operations are particularly important. Methods with low vibration levels and low shock support the protection of sensitive equipment and reduce impacts on operations. The use of concrete pulverizers, rock and concrete splitters, and matching hydraulic power packs helps implement controlled interventions. Personal protective equipment, ventilation, extraction, and a coordinated emergency management plan are integral parts of the work concept. Risk assessments for confined spaces, potential hazardous atmospheres, and hot works permitting must be incorporated into planning and supervision.<\/p>\n<h2>Typical damage patterns and rehabilitation strategies<\/h2>\n<p>Common observations include efflorescence, damp patches, calcite sinter, local leaks at joints and penetrations, blockages in drainage and collector lines, and spalling at channels. Rehabilitation aims at eliminating the cause (e.g., filter adjustment, new conveyance paths) and at durable, cleaning-friendly details. Selective deconstruction makes it possible to open only the affected zones. In practice, concrete pulverizers are used for controlled concrete removal at channels and shaft structures, and rock and concrete splitters are used for low-vibration separation of larger components; steel components can be adapted if necessary with steel shears or combi shears. Systematic root cause analysis, trial cleanings, and mock-ups of detail solutions increase the likelihood of durable remediation results.<\/p>\n<h3>Decision factors for choosing the method<\/h3>\n<ul>\n<li>Available space, accessibility, and protection of adjacent systems (cables, ventilation, fire protection).<\/li>\n<li>Requirements for vibration, noise, dust, and spark-free operations under ongoing service.<\/li>\n<li>Concrete strength, reinforcement ratio, and component thickness, including joint and connection details.<\/li>\n<li>Cleaning friendliness and future maintenance access.<\/li>\n<li>Construction time windows, phasing, deconstruction and disposal concept.<\/li>\n<li>Requirements from the areas of <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, strip-out and cutting, as well as special operations.<\/li>\n<li>Hydrogeology, permissible drawdown, and potential for ochre formation affecting filters and drains.<\/li>\n<li>Permitting framework, discharge limits, and interfaces to incident management and fire protection strategies.<\/li>\n<\/ul>\n<h2>Digitization and documentation<\/h2>\n<p>Up-to-date, accurate documentation of drainage systems facilitates inspection, cleaning, and rehabilitation. Digital pipeline plans, condition data, and photo documentation support condition assessment and maintenance management. During interventions, routes, elevations, materials, and transitions should be updated to enable targeted planning of future maintenance and any potential extensions. Integration with GIS or BIM environments, asset IDs with clear labeling, and consistent data standards improve traceability and lifecycle management.<\/p>\n<h2>Interfaces to other trades<\/h2>\n<p>Tunnel drainage closely interacts with pavement structure, surfacing, ventilation, electrical and control systems, fire protection, and structural preservation. Installations such as channels, inlets, and shafts must be placed so they remain accessible to cleaning vehicles, flushing equipment, and mobile units. For subsequent adjustments, route crossings and bearing zones should be clarified early; selective interventions, for example with concrete pulverizers, facilitate working in the immediate vicinity of sensitive systems. Maintainability reviews, clash checks, and coordination of traffic and operations management during works help avoid rework and service disruptions.<\/p>\n<h2>Practical notes for planning and execution<\/h2>\n<ul>\n<li>Provide sufficient longitudinal and cross slopes, and consider self-cleaning velocities.<\/li>\n<li>Design filter and drainage layers to minimize clogging and fine particle transport.<\/li>\n<li>Plan inspection openings, flushing points, and adequately sized shafts.<\/li>\n<li>Provide redundant conveyance paths and pump concepts, especially for long tunnels.<\/li>\n<li>Match material selection to chemical loads (de-icing salts, hydrocarbons) and freeze-thaw cycles.<\/li>\n<li>For selective interventions, specify methods with controlled removal, e.g., concrete pulverizers or rock and concrete splitters from Darda GmbH, adapted to the respective application.<\/li>\n<li>Organize temporary bypass and retention measures for refurbishments to maintain service and incident readiness.<\/li>\n<li>Separate clean and contaminated flows where feasible to reduce treatment effort and operational costs.<\/li>\n<\/ul>\n<h2>Terms and distinctions in context<\/h2>\n<p>Tunnel drainage includes the capture of water behind and in front of the inner lining as well as conveyance within the structure up to the transfer point to the higher-level infrastructure. This is distinct from external excavation and route drainages, surface drainage at portals, and water management outside the tunnel. Similar drainage issues arise in special foundation engineering and natural stone extraction; however, in tunnel construction the requirements for operation, safety, and accessibility are particularly high. Clear terminology and scope definitions improve planning certainty, permit coordination, and the delineation of maintenance responsibilities.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Tunnel drainage is a central component of every underground structure. It safeguards traffic safety, preserves the durability of inner linings and equipment, and ensures controlled handling of seepage and operational water. In practice, the spectrum ranges from backfill drainage layers to channels and collector lines through to pump sumps with <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-drainage\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20015","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tunnel Drainage | Design, Systems &amp; Maintenance<\/title>\n<meta name=\"description\" content=\"Expert guide to tunnel drainage in underground engineering \u2713 safety, design, water capture, pumps, cleaning &amp; treatment.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-drainage\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tunnel Drainage | Design, Systems &amp; Maintenance\" \/>\n<meta property=\"og:description\" content=\"Expert guide to tunnel drainage in underground engineering \u2713 safety, design, water capture, pumps, cleaning &amp; treatment.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-drainage\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-06T15:24:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-drainage\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-drainage\",\"name\":\"Tunnel Drainage | Design, Systems & Maintenance\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-10T09:48:13+00:00\",\"dateModified\":\"2026-06-06T15:24:03+00:00\",\"description\":\"Expert guide to tunnel drainage in underground engineering \u2713 safety, design, water capture, pumps, cleaning & treatment.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-drainage#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-drainage\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-drainage#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tunnel drainage\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tunnel Drainage | Design, Systems & Maintenance","description":"Expert guide to tunnel drainage in underground engineering \u2713 safety, design, water capture, pumps, cleaning & treatment.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-drainage","og_locale":"en_US","og_type":"article","og_title":"Tunnel Drainage | Design, Systems & Maintenance","og_description":"Expert guide to tunnel drainage in underground engineering \u2713 safety, design, water capture, pumps, cleaning & treatment.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-drainage","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-06T15:24:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-drainage","url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-drainage","name":"Tunnel Drainage | Design, Systems & Maintenance","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-10T09:48:13+00:00","dateModified":"2026-06-06T15:24:03+00:00","description":"Expert guide to tunnel drainage in underground engineering \u2713 safety, design, water capture, pumps, cleaning & treatment.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-drainage#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tunnel-drainage"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-drainage#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tunnel drainage"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20015"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20015\/revisions"}],"predecessor-version":[{"id":28134,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20015\/revisions\/28134"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}