{"id":20014,"date":"2026-01-10T16:02:33","date_gmt":"2026-01-10T15:02:33","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20014"},"modified":"2026-06-06T09:26:03","modified_gmt":"2026-06-06T07:26:03","slug":"tunnel-ceiling","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-ceiling","title":{"rendered":"Tunnel ceiling"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The tunnel ceiling is the uppermost load-bearing element of a tunnel cross-section. It closes off the excavation at the top, transfers earth and water pressure into the side abutments, and defines safety, durability, and operations. In planning, construction, maintenance, and deconstruction, the characteristics of the tunnel ceiling determine construction methods, equipment deployment, and risk management. Especially in confined conditions, low-vibration and precise methods gain importance, such as the use of concrete pulverizers or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a> as well as in rock excavation and tunnel construction. In addition, compliance with environmental and occupational exposure limits for noise, dust, and vibration guides method selection and sequencing.<\/p>\n<h2>Definition: What is meant by the tunnel ceiling?<\/h2>\n<p>The tunnel ceiling is the upper structural component of a tunnel, often referred to as the tunnel arch, crown (calotte), or ceiling slab. Depending on the construction method, it consists of reinforced shotcrete, segmented precast elements (segments), or a solid cast-in-place concrete ceiling (e.g., in the top-down deck method). The tunnel ceiling carries loads from overburden, traffic, and water, ensures enclosure of the space, accommodates installations (e.g., ventilation and cable trays), and provides fire protection as well as waterproofing. Its geometry, material composition, and detailing decisively influence aerodynamic behavior, maintenance access, and long-term durability.<\/p>\n<h2>Structure and construction types of the tunnel ceiling<\/h2>\n<p>The structural design depends on geology, cover depth, use, and construction method. Basic types are:<\/p>\n<ul>\n<li><strong>Shotcrete vault (NATM\/SEM):<\/strong> Shell-like tunnel ceiling made of shotcrete, often multi-layered with lattice girders, reinforcement, and temporary supports (anchors). Later often acting compositely with a permanent inner lining. Interfaces with waterproofing membranes and drainage layers must be detailed to avoid stress concentrations and water pathways.<\/li>\n<li><strong>Segmental lining:<\/strong> Ring closure made of precast concrete segments joined via gaskets; the tunnel ceiling is part of the closed ring and transfers loads arch-wise into the abutments. Bolted or dowelled joints, gasket compression, and segment tolerances govern leak-tightness and load distribution.<\/li>\n<li><strong>Cast-in-place ceiling in top-down method:<\/strong> Massive reinforced concrete ceiling, first constructed at the surface, followed by excavation beneath the deck. Common in urban areas. Temporary support conditions and early-age concrete behavior are key for crack control and deflection limits.<\/li>\n<li><strong>Steel or composite sections:<\/strong> Under special boundary conditions (e.g., temporary decks, construction stages), steel beams with composite slabs are used. Corrosion protection systems and fatigue design require particular attention.<\/li>\n<\/ul>\n<h2>Loads, design, and structural behavior<\/h2>\n<p>The tunnel ceiling acts as an arch or as a slab. Relevant actions include earth and water pressure, self-weight, thermal and shrinkage strains, traffic loads (in the top-down deck method), dynamic vibrations, and fire exposure. Design is carried out considering ground behavior (structure-soil\/rock interaction), joint and support details, and durability. In service, serviceability (crack width, deflection), fatigue, and waterproofing integrity govern. Robust design benefits from staged analyses, consideration of construction phases, and verification under accidental actions (e.g., fire, impact). Where appropriate, numerical models are calibrated by monitoring data to reduce uncertainty.<\/p>\n<h2>Waterproofing, drainage, and corrosion protection<\/h2>\n<p>Effective waterproofing of the tunnel ceiling is central to durability. Common systems include synthetic waterproofing membranes between outer and inner linings, waterstops, injection hoses, and drainage systems. Drainage removes inflow and seepage water in a controlled manner, reduces hydrostatic pressure, and protects reinforcement against corrosion. Surface coatings and tailored concrete mixes (e.g., low water\/cement ratio, admixtures, fibers) increase resistance to freeze-thaw with de-icing salts, chemical attack, and abrasion. Quality assurance includes spark testing, vacuum box testing of seams, and compartmentalized leak diagnosis to enable targeted remediation.<\/p>\n<h2>Construction: building the tunnel ceiling<\/h2>\n<p>The construction method determines the sequence:<\/p>\n<ul>\n<li><strong>Shotcrete method:<\/strong> Advance excavation using excavators or drill-and-blast, temporary support of the crown with shotcrete, lattice girders, and anchors; then inner lining in blocks using a formwork traveler. Quality control includes layer thickness, pull-off adhesion, and anchor loads. Consistent curing, rebound management, and verification of fiber content (if used) improve performance.<\/li>\n<li><strong>Segmental lining:<\/strong> The tunnel boring machine installs segments; the tunnel ceiling is created with ring closure with defined joint\/gasket compression and sealing. Dimensional accuracy, joint quality, and segment protection are crucial. Grouting behind the lining and protection of gaskets at keyways are decisive for water tightness.<\/li>\n<li><strong>Top-down deck method:<\/strong> Construction of diaphragm walls or piles, installation of beams, casting of the ceiling, then excavation below the deck. The ceiling carries construction-stage loads (traffic, construction equipment) and later the permanent loads. Early-age thermal control and crack width limitation are addressed through mix design, reinforcement detailing, and temperature monitoring.<\/li>\n<\/ul>\n<p>For all methods: monitor deformations (settlements, convergence), document concreting and curing, and coordinate embedded items (hangers, penetrations) in the tunnel ceiling at an early stage. Integrating survey control, digital as-built capture, and clash detection reduces rework and prevents damage to reinforcement or waterproofing.<\/p>\n<h2>Typical damage to tunnel ceilings and repair strategies<\/h2>\n<p>Cracks, damp patches, calcite deposits, voided areas\/delaminations, spalling, and corrosion-induced concrete loss can occur frequently. Causes include water ingress, chemical exposure, alkali-silica reaction, fatigue, or inadequate joints. Repairs range from crack injection and surface protection to partial renewals of the inner lining. Where substantial concrete removal is required in confined conditions, the use of <em>concrete pulverizers<\/em> has proven effective because they work gently on the material with low vibration. <em>Rock and concrete splitters<\/em> enable controlled splitting of massive areas with minimal secondary damage, for example in special deconstruction. Non-destructive testing (e.g., ground-penetrating radar, impact-echo, infrared thermography) supports diagnosis and targeted interventions.<\/p>\n<h2>Refurbishment and deconstruction at the tunnel ceiling: methods and equipment<\/h2>\n<p>Refurbishment and deconstruction works at the tunnel ceiling require a coordinated approach that addresses structural stability, emission control, and construction sequence. Tool selection depends on material, degree of reinforcement, accessibility, and permissible vibration levels. Permit conditions, operational time windows, and waste handling concepts must be integrated into planning from the outset.<\/p>\n<h3>Typical work steps<\/h3>\n<ol>\n<li>Investigation and monitoring: condition survey, locating reinforcement and installations, definition of sections and temporary supports.<\/li>\n<li>Preparation: dust and water management, protection of equipment (ventilation, cable trays), set-up of work platforms.<\/li>\n<li>Material removal: local shaving, breaking, crushing, separating reinforcement and installations.<\/li>\n<li>Rebuilding: reprofiling, applying new layers, waterproofing and joint works, documentation.<\/li>\n<li>Commissioning and verification: functional tests of drainage and ventilation interfaces, acceptance records, and updated as-built information.<\/li>\n<\/ol>\n<h3>Tools and their strengths<\/h3>\n<ul>\n<li><strong>Concrete pulverizers:<\/strong> Precise nibbling of concrete with good control of removal thickness; reduces vibration and is suitable for overhead work at the tunnel ceiling. Reinforcement can be exposed without causing widespread damage. Useful for reprofiling and for protecting adjacent installations.<\/li>\n<li><strong>Rock and concrete splitters:<\/strong> Split massive concrete bodies or blockwork with low vibration transmission &#8211; advantageous in existing tunnels, near sensitive neighboring structures, or in special deployment situations.<\/li>\n<li><strong>Hydraulic power packs:<\/strong> Supply pulverizers, splitters, combi shears, and multi cutters with energy. In tunnels, compact units with reliable cooling, sufficient power, and robust couplings are important. Low-emission operation and leak containment measures are essential.<\/li>\n<li><strong>Combi shears and multi cutters:<\/strong> Cut reinforcing steel, sections, and built-in components during partial deconstruction; helpful for gutting and cutting hangers, fittings, and claddings.<\/li>\n<li><strong>Steel shears:<\/strong> For stronger steel sections, e.g., steel beams of a composite ceiling or temporary shoring structures.<\/li>\n<li><strong>Tank cutters:<\/strong> Special applications in exceptional deployments, e.g., when dismantling vessels or pipelines in service and utility tunnels.<\/li>\n<\/ul>\n<h3>Occupational safety and emission management<\/h3>\n<ul>\n<li>Use sectional support and, where required, temporary propping of the tunnel ceiling.<\/li>\n<li>Dust and water management via local extraction, misting or spraying; safe disposal of slurries.<\/li>\n<li>Prefer low-vibration methods, take measurements, and monitor threshold values.<\/li>\n<li>Minimize hazards from overhead work: protection roofs, nets, clearly defined exclusion zones, personal protective equipment.<\/li>\n<li>Ensure adequate ventilation and lighting; implement hot-work permits and fire watch where cutting activities are involved.<\/li>\n<\/ul>\n<p>The approaches mentioned are general. Applicable rules and approvals by site supervision are decisive. Interfaces to ongoing operations and evacuation routes must remain functional at all times.<\/p>\n<h2>Specifics in urban environments and existing facilities<\/h2>\n<p>With low cover, crossing utilities, and adjacent buildings, additional restrictions apply. In the top-down deck method, tunnel ceilings often carry traffic during construction, which increases requirements for crack width control and fatigue. In existing facilities, installations (ventilation, cables, fire protection claddings) are often directly attached to the tunnel ceiling. Deconstruction and conversions must account for these interfaces. Low-vibration methods such as splitting and pulverizer processing reduce risks and operational interruptions. Tight time windows, noise limits, and settlement control via real-time monitoring further shape execution concepts.<\/p>\n<h2>Interfaces: ventilation, fire protection, and equipment at the tunnel ceiling<\/h2>\n<p>The tunnel ceiling carries hangers for ventilation systems, cable trays, lighting, and signage. Fire protection layers or claddings influence thermal behavior in an incident. Penetrations for anchors and hangers must be planned so that reinforcement and waterproofing are not impaired. When removing or retrofitting hangers, <em>combi shears<\/em> or <em>multi cutters<\/em> are practical for targeted cutting of attachments on the ceiling. Coordinated tolerances, corrosion protection of fasteners, and fatigue checks for dynamic systems (e.g., jet fans) are essential.<\/p>\n<h2>Geology, rock interaction, and tunnel crown<\/h2>\n<p>In rock, the tunnel ceiling (crown) is subject to the interplay of rock mass stress relief and reloading. Brittle failure, spalling, and swelling processes require flexible support concepts. Shotcrete, lattice girders, and anchors stabilize the crown area until the inner lining is installed. During reprofiling or removing loose material at the crown, <em>concrete pulverizers<\/em> and <em>rock and concrete splitters<\/em> are effective for controlled removal without significant vibrations, which offers similar benefits in natural stone extraction. In squeezing ground or zones with high water inflow, staged excavation, pre-support, and drainage measures are coordinated to limit convergence and maintain face stability.<\/p>\n<h2>Materials and building physics of the tunnel ceiling<\/h2>\n<p>Reinforced concrete and shotcrete with tailored mix designs (e.g., fiber-reinforced) dominate. Fiber concretes increase crack stability and spall resistance. High-quality aggregates and low water\/cement ratios improve tightness and durability. For segments, high-strength concretes with precise joint and sealing technology are used. Acoustic and thermal requirements influence the layer build-up and surface design of the tunnel ceiling. Low-clinker binders, supplementary cementitious materials, and optimized curing strategies can reduce the carbon footprint while maintaining durability classes appropriate to the exposure.<\/p>\n<h2>Practical tips for tool use at the tunnel ceiling<\/h2>\n<h3>Selection by material and objective<\/h3>\n<ul>\n<li><strong>Thick, heavily reinforced concrete:<\/strong> Combination of concrete pulverizer (removal) and shears (cutting reinforcement). Where environmental sensitivity is high, splitters are an alternative to impact tools.<\/li>\n<li><strong>Shotcrete layers:<\/strong> Pulverizers enable layer-by-layer removal to avoid damaging the waterproofing or inner lining.<\/li>\n<li><strong>Segmental linings:<\/strong> Separation cuts on built-in parts with multi cutters, careful release of segment joints; steel shears for stronger steel components.<\/li>\n<li><strong>Masonry or lightly reinforced zones:<\/strong> Splitters allow quiet, low-vibration separation; selective hand tools finalize edges near sensitive interfaces.<\/li>\n<\/ul>\n<h3>Energy supply and logistics<\/h3>\n<ul>\n<li>Operate hydraulic power packs close to the workface but with low emissions; plan adequate hose lengths, leak protection, and secure couplings.<\/li>\n<li>Check load capacities of work platforms; account for tool weights and reaction forces.<\/li>\n<li>Separate material flow for spoil, reinforcement, and waste; short routes reduce downtime.<\/li>\n<li>Provide spare jaws, hoses, and wear parts on site; plan for energy peaks and cooling air paths in confined spaces.<\/li>\n<\/ul>\n<h2>Operation, inspection, and monitoring of the tunnel ceiling<\/h2>\n<p>Regular visual inspections, moisture and crack monitoring, and spot tests (e.g., pull-off adhesion, anchor pull-out test) ensure serviceability. If anomalies occur, root cause analyses (drainage, waterproofing, reinforcement) should precede interventions. Digital documentation and condition maps facilitate planning of maintenance intervals. Sensor-based monitoring (e.g., strain, displacement, leak detection) and trend analyses support predictive maintenance and timely remediation.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Test plans for concreting, compaction, curing, and installation of waterproofing systems are essential building blocks. For interventions in the tunnel ceiling (gutting and cutting, deconstruction or conversion), complete documentation of work steps, measurements, and approvals is required. This facilitates later assessments and proofs of durability. Traceability of materials, photographic records, and updated 3D as-built models improve transparency and reduce lifecycle risks.<\/p>\n<h2>Environmental and sustainability aspects<\/h2>\n<p>Selective deconstruction, clean separation of concrete, steel, and outfitting components, and the use of low-vibration methods reduce environmental impacts. Reuse of materials, short transport routes, and a low-emission power supply for the hydraulic power packs contribute to resource conservation &#8211; especially in urban top-down (deck) projects. Water recycling for dust suppression, optimized waste logistics, and careful control of silica dust exposure strengthen both sustainability and occupational health.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The tunnel ceiling is the uppermost load-bearing element of a tunnel cross-section. It closes off the excavation at the top, transfers earth and water pressure into the side abutments, and defines safety, durability, and operations. In planning, construction, maintenance, and deconstruction, the characteristics of the tunnel ceiling determine construction methods, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-ceiling\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20014","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tunnel Ceiling Design, Construction &amp; Maintenance<\/title>\n<meta name=\"description\" content=\"Guide to the tunnel ceiling in civil engineering \u2713 design, loads, waterproofing, construction &amp; low vibration methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-ceiling\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tunnel Ceiling Design, Construction &amp; Maintenance\" \/>\n<meta property=\"og:description\" content=\"Guide to the tunnel ceiling in civil engineering \u2713 design, loads, waterproofing, construction &amp; low vibration methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-ceiling\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-06T07:26:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-ceiling\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-ceiling\",\"name\":\"Tunnel Ceiling Design, Construction & Maintenance\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-10T15:02:33+00:00\",\"dateModified\":\"2026-06-06T07:26:03+00:00\",\"description\":\"Guide to the tunnel ceiling in civil engineering \u2713 design, loads, waterproofing, construction & low vibration methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-ceiling#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-ceiling\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-ceiling#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tunnel ceiling\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tunnel Ceiling Design, Construction & Maintenance","description":"Guide to the tunnel ceiling in civil engineering \u2713 design, loads, waterproofing, construction & low vibration methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-ceiling","og_locale":"en_US","og_type":"article","og_title":"Tunnel Ceiling Design, Construction & Maintenance","og_description":"Guide to the tunnel ceiling in civil engineering \u2713 design, loads, waterproofing, construction & low vibration methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-ceiling","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-06T07:26:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-ceiling","url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-ceiling","name":"Tunnel Ceiling Design, Construction & Maintenance","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-10T15:02:33+00:00","dateModified":"2026-06-06T07:26:03+00:00","description":"Guide to the tunnel ceiling in civil engineering \u2713 design, loads, waterproofing, construction & low vibration methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-ceiling#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tunnel-ceiling"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-ceiling#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tunnel ceiling"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20014"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20014\/revisions"}],"predecessor-version":[{"id":28108,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20014\/revisions\/28108"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}