{"id":20011,"date":"2026-01-10T13:29:29","date_gmt":"2026-01-10T12:29:29","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20011"},"modified":"2026-06-06T14:50:03","modified_gmt":"2026-06-06T12:50:03","slug":"tunnel-construction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-construction","title":{"rendered":"Tunnel construction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Tunnel construction encompasses the planning, tunnel excavation, tunnel support and lining of underground voids for transport, utilities and infrastructure. It combines geology, construction methods engineering and occupational safety in a particularly sensitive environment: confined workspace, constrained construction logistics, stringent vibration and noise control, and strict procedures for handling water, dust and explosives. Under these conditions, precise, controlled, low-vibration working methods are crucial. Tools and systems from Darda GmbH are used above all in <em><a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a><\/em>, in <em>concrete demolition and special demolition<\/em> as well as in <em>building gutting and cutting<\/em>, for example <strong>concrete pulverizers<\/strong> for selective secondary demolition and <strong>hydraulic wedge splitters<\/strong> for controlled splitting of rock and concrete. In practice, decisive factors include compact dimensions, controllable force application, and the ability to work with minimized dust and rebound in the tunnel cross-section.<\/p>\n<h2>Definition: What is meant by tunnel construction?<\/h2>\n<p>Tunnel construction comprises all processes for the creation, maintenance and, where applicable, the deconstruction of underground structures. This includes excavation methods (mechanized or conventional with drill-and-blast), geotechnical support measures (shotcrete, anchors, lattice girder beams), the lining (segment rings or cast-in-place concrete shells), sealing and drainage, as well as construction monitoring. The term also covers cross-passages, shafts, caverns, niches and safety rooms. In addition to construction, subsequent conversion and refurbishment works play an increasing role: profile corrections, enlargement of the excavation, replacement of damaged concrete, removal of equipment, and separation cutting of reinforcing steel and built-in components.<\/p>\n<p><strong>Typical interfaces<\/strong> include MEP installation corridors, fire protection and escape route concepts, drainage and waterproofing repairs, as well as the selective exposure of reinforcement for structural verifications. Increasingly, documentation and handover are aligned with digital models and measurable acceptance criteria.<\/p>\n<h2>Construction methods in tunnel construction: conventional and mechanized<\/h2>\n<p>In conventional tunnel construction (often referred to as NATM\/Austrian method), excavation proceeds in stages via top heading, bench and invert, typically using excavators, milling machines or drill-and-blast. Mechanized excavation uses roadheaders or tunnel boring machines (TBM) with immediate support and lining. Regardless of the method, tasks arise that require precise, low-vibration removal of rock or concrete: profile finishing, removing shotcrete overbuild, demolition of test specimens, opening niches and cross-passages, or the deconstruction of temporary supports. Depending on the construction state, <strong>concrete pulverizers<\/strong> are used for secondary demolition and <strong>hydraulic wedge splitters<\/strong> for the controlled splitting of rock or massive concrete components.<\/p>\n<p><em>Method selection<\/em> is governed by geological conditions, groundwater and inflow management, stand-up time, permissible settlements, vibration limits and available access windows. Where blasting is restricted, preconditioning by drilling and hydraulic splitting enables safe advance and accurate profile control.<\/p>\n<h2>Materials, support and lining in the tunnel<\/h2>\n<p>Central building blocks are the geological composite and the temporary support. Shotcrete provides short-term stabilization; anchors, lattice girder beams and spiles provide load redistribution; segment rings or inner shells ensure durability and watertightness. Even during construction, <em>profile correction<\/em> is often necessary to ensure target dimensions and to balance over- or under-profiles.<\/p>\n<ul>\n<li><strong>Shotcrete<\/strong>: rapid skin formation, early strength, compatible with mesh and fibers.<\/li>\n<li><strong>Anchors and bolts<\/strong>: pattern, capacity and load transfer adapted to face stability.<\/li>\n<li><strong>Segment rings and inner shells<\/strong>: tightness, durability and fire performance, including joint detailing and grout management.<\/li>\n<\/ul>\n<h3>Shotcrete and profile correction<\/h3>\n<p>Protrusions, noses and accretions of shotcrete can be removed with low vibration in the confined tunnel cross-section. <strong>Concrete pulverizers<\/strong> offer high edge control on the excavation shell without unnecessarily loading adjacent support elements. For massive areas where a separating cut is not expedient, <strong>hydraulic wedge splitters<\/strong> with inserted <em>rock splitting cylinders<\/em> allow targeted widening of boreholes and controlled fracturing of the structure.<\/p>\n<p>For dimensional control, profile scans and total station checks provide the basis for selective removal. Wetting, local extraction and rebound control reduce dust and protect adjacent reinforcement and membrane systems.<\/p>\n<h3>Reinforcement, built-ins and segment rings<\/h3>\n<p>During lining works, steel reinforcement, lattice girder beams and temporary steel components must be separated. Depending on material thickness and accessibility, <em>combination shears<\/em>, <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a><\/em> or <em>Multi Cutters<\/em> are suitable. In segment ring tunnels, different tasks arise: opening segments for breakthroughs, removing grout cones, or controlled removal of damaged areas, for which <strong>concrete pulverizers<\/strong> in combination with <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/em> deliver precise, reproducible results.<\/p>\n<p>Sequenced cuts and progressive relief prevent uncontrolled stress release in reinforced sections. Tolerances at segment interfaces and gaskets can be maintained by limiting chipping depth and using tools with high edge fidelity.<\/p>\n<h2>Secondary demolition and deconstruction in the tunnel<\/h2>\n<p>Underground, limits for noise and vibrations are particularly important. In the <em>special demolition<\/em> of inner linings, chambers or cross-passages, a selective approach is required: components are divided into logical segments, reinforcement and built-ins are separated in a targeted manner, and adjacent structures are protected. <strong>Concrete pulverizers<\/strong> allow biting concrete with well-controlled break edges. <strong>Hydraulic wedge splitters<\/strong> create crack lines in thick-walled components that can then be separated with minimal force. For cutting massive sections or pipelines in tunnel operations, <em>Multi Cutters<\/em>, <em>steel shears<\/em> and, for special tank and jacket plates, a <em>cutting torch<\/em> are available. Power is typically supplied via <strong>hydraulic power packs<\/strong> adapted to limited ventilation and transport within the cross-section.<\/p>\n<ul>\n<li><strong>Typical method sequence<\/strong>: survey and mark-up, isolate services, dust and water management, trial bite or trial split, main separation, edge finishing, clearance and documentation.<\/li>\n<li><strong>Protection of adjacent structures<\/strong>: staging and shielding, limit forces at interfaces, temporary propping where required.<\/li>\n<\/ul>\n<h2>Rock breakout and tunnel construction: controlled splitting instead of blasting<\/h2>\n<p>Not every section can be blasted economically or safely. In sensitive areas &#8211; such as inner-city locations, beneath existing buildings, or near critical infrastructure &#8211; hydraulic splitting offers a low-vibration alternative. <strong>Hydraulic wedge splitters<\/strong> create controlled separation joints via pairs of boreholes. The resulting blocks can be removed with smaller equipment. This method reduces secondary damage, minimizes follow-up support, and facilitates compliance with strict limits for vibrations and airborne sound.<\/p>\n<ul>\n<li>Preferable where blast-induced vibration or air overpressure must be strictly limited.<\/li>\n<li>Effective for enlargements, breakthroughs and selective removal near sensitive assets.<\/li>\n<li>Enables predictable block sizes for safe handling and transport.<\/li>\n<\/ul>\n<h2>Planning, geotechnics and monitoring<\/h2>\n<p>Excavation and support decisions are based on ground models, prediction classes and measurement programs. Deformations, convergences and strengths are recorded during construction and compared with the target behavior. For interventions in existing structures &#8211; such as cross-section enlargements, structural repair or opening breakthroughs &#8211; work methods must be chosen to suit the specific geology, lining state and required operational safety. Tools such as <strong>concrete pulverizers<\/strong> and <strong>hydraulic wedge splitters<\/strong> can be integrated into such monitoring concepts, as they enable reproducible interventions with well-documentable parameters.<\/p>\n<ul>\n<li><strong>Instrumentation<\/strong>: convergence arrays, extensometers, load cells on anchors, piezometers and settlement points.<\/li>\n<li><strong>Controls<\/strong>: trigger values with escalation paths, verification by test fields and method statements.<\/li>\n<li><strong>Data<\/strong>: structured logging of forces, cycles and removal depths for later audits.<\/li>\n<\/ul>\n<h2>Occupational safety, emissions and logistics underground<\/h2>\n<p>Underground work requires special measures for dust, noise, vibrations, ventilation, lighting and emergency escape routes. Depending on the project, different codes and regulatory requirements apply; specific requirements must be verified for each site. In general, hydraulic methods favor a <em>dust- and noise-reduced<\/em> way of working. This applies both to biting concrete with <strong>concrete pulverizers<\/strong> and to drilling and splitting with <strong>hydraulic wedge splitters<\/strong>. For construction logistics, the weight, dimensions and hose routing of the equipment are decisive, as is the compatibility of the <strong>hydraulic power packs<\/strong> with the available power supply and ventilation.<\/p>\n<ul>\n<li>Use localized extraction and water misting to limit respirable dust in confined headings.<\/li>\n<li>Define escape routes, muster points and communication protocols for staged works.<\/li>\n<li>Plan transport and lifting within narrow curves and gradients, including interim storage areas.<\/li>\n<\/ul>\n<h2>Typical tasks in tunnel construction and suitable tools<\/h2>\n<ul>\n<li>Profile finishing on shotcrete shells: <strong>concrete pulverizers<\/strong> for controlled edges, <em>combination shears<\/em> to separate smaller built-in components.<\/li>\n<li>Creating cross-passages and niches: drilling, <strong>hydraulic wedge splitters<\/strong> for forming separating crack lines, followed by targeted removal.<\/li>\n<li>Deconstruction of temporary steel structures: <em>steel shears<\/em> and <em>Multi Cutters<\/em> for sections, meshes and beams.<\/li>\n<li>Refurbishment of damaged inner linings: removal with <strong>concrete pulverizers<\/strong>, exposing the reinforcement, selective cutting with <em>combination shears<\/em>.<\/li>\n<li>Rock excavation in sensitive environments: <strong>hydraulic wedge splitters<\/strong> for low-vibration block formation.<\/li>\n<li>Gutting and cutting of pipelines and built-in components: <em>Multi Cutters<\/em> and, for special jacket materials, a <em>cutting torch<\/em>.<\/li>\n<li>Opening invert drains and sumps: selective breakout with <strong>concrete pulverizers<\/strong>, controlled separation of reinforcement with <em>combination shears<\/em>.<\/li>\n<li>Removal of test specimens and cores: low-vibration trimming and edge finishing to preserve surrounding fabric.<\/li>\n<\/ul>\n<h2>Special boundary conditions: inner-city and in existing structures<\/h2>\n<p>Under urban areas, limits for vibrations and airborne sound are often very low, while requirements for construction monitoring and third-party protection are high. Methods with limited propagation of vibrations &#8211; such as hydraulic splitting or biting with <strong>concrete pulverizers<\/strong> &#8211; support compliance with these specifications. When working in existing tubes during partial operation, compact, mobile units with <strong>hydraulic power packs<\/strong> and short setup times are advantageous.<\/p>\n<p>Additional constraints arise from limited access windows, night-time restrictions and coordination with operations. Work packaging and rapid, clean demobilization are therefore central to risk and stakeholder management.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Documented work parameters and acceptance processes are required for dimensional accuracy and durability: target-actual comparison of geometry, evidence of concrete removal to the defined depth, logged separation cuts and splitting sequences. Tools with well-controllable forces &#8211; such as <strong>concrete pulverizers<\/strong> and <strong>hydraulic wedge splitters<\/strong> &#8211; facilitate reproducible results and seamless documentation of the work steps.<\/p>\n<ol>\n<li>Define measurable acceptance criteria and protection zones.<\/li>\n<li>Establish test areas to calibrate removal rates and edge quality.<\/li>\n<li>Log drilling patterns, splitting cycles and cutting sequences.<\/li>\n<li>Verify geometry and residual thicknesses by survey and non-destructive tests where applicable.<\/li>\n<li>Compile as-built records for handover and future maintenance.<\/li>\n<\/ol>\n<h2>Sustainability and resource efficiency<\/h2>\n<p>Resource-conserving methods reduce material losses, energy demand and transport. Low-vibration methods mitigate consequential damage and follow-up support. Controlled splitting produces blocks with favorable transport dimensions; selective removal with <strong>concrete pulverizers<\/strong> preserves adjacent components and facilitates clean separation of concrete and steel &#8211; an essential prerequisite for high-quality recycling. In the sense of the circular economy, this supports efficient utilization of the excavated material.<\/p>\n<ul>\n<li>Minimize overbreak and rework by precise profiling and early measurement.<\/li>\n<li>Separate materials at the source to enable high-grade recycling and traceability.<\/li>\n<li>Target lower embodied carbon through selective refurbishment instead of full replacement where feasible.<\/li>\n<\/ul>\n<h2>Special use cases in tunnel construction<\/h2>\n<p>In special situations &#8211; such as emergency measures, exposing incident areas, or opening service caverns &#8211; fast, controlled separation and opening is required. Depending on the material mix, <em>combination shears<\/em>, <em>Multi Cutters<\/em> and <em>steel shears<\/em> offer flexible options. Where closed tank or jacket structures must be processed underground, a <em>cutting torch<\/em> can be part of a safety-compliant plan. The selection and application of such methods must always align with the applicable regulations and project-specific approvals.<\/p>\n<p>Permit regimes for hot works, gas monitoring and temporary ventilation concepts must be integrated into the method statement and verified prior to execution.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Tunnel construction encompasses the planning, tunnel excavation, tunnel support and lining of underground voids for transport, utilities and infrastructure. It combines geology, construction methods engineering and occupational safety in a particularly sensitive environment: confined workspace, constrained construction logistics, stringent vibration and noise control, and strict procedures for handling water, dust <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-construction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20011","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tunnel Construction in Civil Engineering<\/title>\n<meta name=\"description\" content=\"Expert guide to tunnel construction in civil engineering \u2713 methods, excavation, support, lining, safety &amp; low vibration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-construction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tunnel Construction in Civil Engineering\" \/>\n<meta property=\"og:description\" content=\"Expert guide to tunnel construction in civil engineering \u2713 methods, excavation, support, lining, safety &amp; low vibration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-construction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-06T12:50:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-construction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-construction\",\"name\":\"Tunnel Construction in Civil Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-10T12:29:29+00:00\",\"dateModified\":\"2026-06-06T12:50:03+00:00\",\"description\":\"Expert guide to tunnel construction in civil engineering \u2713 methods, excavation, support, lining, safety & low vibration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-construction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-construction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-construction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tunnel construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tunnel Construction in Civil Engineering","description":"Expert guide to tunnel construction in civil engineering \u2713 methods, excavation, support, lining, safety & low vibration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-construction","og_locale":"en_US","og_type":"article","og_title":"Tunnel Construction in Civil Engineering","og_description":"Expert guide to tunnel construction in civil engineering \u2713 methods, excavation, support, lining, safety & low vibration.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-construction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-06T12:50:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-construction","url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-construction","name":"Tunnel Construction in Civil Engineering","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-10T12:29:29+00:00","dateModified":"2026-06-06T12:50:03+00:00","description":"Expert guide to tunnel construction in civil engineering \u2713 methods, excavation, support, lining, safety & low vibration.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-construction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tunnel-construction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-construction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tunnel construction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20011","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20011"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20011\/revisions"}],"predecessor-version":[{"id":28126,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20011\/revisions\/28126"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}