{"id":20007,"date":"2026-01-09T12:27:31","date_gmt":"2026-01-09T11:27:31","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20007"},"modified":"2026-06-05T14:06:02","modified_gmt":"2026-06-05T12:06:02","slug":"carrier-safety","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/carrier-safety","title":{"rendered":"Carrier safety"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Carrier safety describes the safe control of loads, forces, and movements that arise when using hydraulic demolition and splitting technology &#8211; both on the <em>carrier machine<\/em> (e.g., crawler excavator, demolition robot, or handheld tool) and on the <em>load-bearing structural element<\/em> itself (beams, girders, columns, bracing). In the typical fields of application of Darda GmbH &#8211; from <strong>concrete demolition<\/strong> and <strong>special demolition<\/strong> through gutting and cutting to <strong>rock breakout<\/strong>, <strong>tunnel construction<\/strong>, <strong>natural stone extraction<\/strong>, and special operations &#8211; carrier safety determines stability, process quality, and personal protection. The focus is on equipment such as <strong>concrete pulverizers<\/strong>, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> (<strong>hydraulic wedge splitter<\/strong>), <strong>hydraulic power packs<\/strong>, <strong>hydraulic demolition shears<\/strong>, Multi Cutters, <strong>steel shears<\/strong>, <strong>cutting torch<\/strong>, as well as specific <strong>rock wedge splitter<\/strong>. Forward-looking <strong>work planning<\/strong>, traceable <strong>load transfer<\/strong>, and controlled handling of <strong>shear force<\/strong>, compressive, and splitting forces form the basis for a safe and efficient workflow. In addition, coherent interfaces between teams and a documented alignment of method, tooling, and temporary supports increase reproducibility and reduce unplanned downtime.<\/p>\n<h2>Definition: What is meant by carrier safety?<\/h2>\n<p>Carrier safety is understood as the sum of all measures and technical prerequisites that ensure <strong>safe work on the carrier machine<\/strong> and on <strong>load-bearing structures<\/strong>. This includes the correct selection, installation, and operation of <strong>attachments<\/strong> such as concrete pulverizers, rock and concrete splitters, or steel shears, the stable hydraulic supply via suitable <strong>hydraulic power packs<\/strong>, a statically clear dismantling and splitting sequence, controlled load transfer, as well as shoring or temporary securing of components. Carrier safety is therefore both <em>organizational<\/em> (hazard analysis, instruction, communication, access control) and <em>technical<\/em> (load capacity, tipping stability, pressure\/flow rate, cutting forces, splitting forces, energy isolation). Legal requirements and technical rules must be observed in general; binding assessments in individual cases always require expert evaluation, including verification of site-specific constraints and permits.<\/p>\n<h2>Fundamentals of carrier safety in deconstruction and demolition<\/h2>\n<p>Carrier safety arises when all forces in the system are balanced and the reactions on the carrier machine, the subsoil, and the processed structural element are controlled. When using concrete pulverizers, high <em>shear and crushing forces<\/em> act, which perform <strong>rebar cutting<\/strong> and break concrete; rock and concrete splitters and specific rock wedge splitters generate <em>radial splitting forces<\/em> that open the structure along crack lines. Both methods have <strong>low vibration levels<\/strong> and are non-explosive, but require precise guidance, continuous monitoring of crack formation, and safe removal of loosened masses. <strong>Hydraulic power packs<\/strong> provide the required pressure and volume flow. Overturning moments, dynamic load changes (<strong>load spectrum (structural)<\/strong>), vibrations, and hydraulic temperature are relevant in planning because they affect the stability of the carrier machine and the condition of the structure. Equally important are rebound energy, backpressure effects in the hydraulic system, and the influence of environmental conditions on visibility, traction, and communication.<\/p>\n<h2>Carrier safety on the carrier machine: selection, installation, and operation<\/h2>\n<p>Safe work with attachments and handheld tools requires a suitable carrier machine. Key aspects are load capacity, tipping stability, hydraulic supply, visibility, and freedom of movement &#8211; particularly in confined environments such as gutting works, <strong>tunnel construction<\/strong>, or special operations. Protective structures, adequate lighting, and reliable communication channels complement the technical prerequisites.<\/p>\n<h3>Load capacity, center of gravity, and overturning moment<\/h3>\n<ul>\n<li>Tool weight and geometry: concrete pulverizers, hydraulic demolition shears, Multi Cutters, and steel shears influence the carrier machine\u00e2\u0080\u0099s center of gravity. Longer booms or add-ons increase the overturning moment.<\/li>\n<li>Working position: overhead or extended front work increases risk. A low, wide stance improves tipping reserve.<\/li>\n<li>Subsoil: bearing capacity of the <strong>subsoil<\/strong>, possible voids, and vibrations must be checked; temporary load distribution (e.g., timber or steel mats underneath) increases stability.<\/li>\n<li>Load charts and reach: observe attachment-specific load charts and permissible working ranges across radius and slewing angle; avoid side-loading on gradients and uneven ground.<\/li>\n<\/ul>\n<h3>Hydraulic supply and hydraulic power packs<\/h3>\n<ul>\n<li><strong>Operating pressure<\/strong> and volume flow must match the concrete pulverizer, rock and concrete splitter, rock wedge splitter, cutting torch, hydraulic demolition shears, Multi Cutters, or steel shears; over- or undersupply impairs performance and safety.<\/li>\n<li>Return line, filtration, oil temperature, and leak-tightness of lines must be checked regularly; pressure testing and bleeding prevent cavitation and loss of performance.<\/li>\n<li>Leakage and burst protection: protective sleeves, retaining chains, and neatly routed lines minimize crushing and tear-off hazards.<\/li>\n<li>Line sizing and connections: quick couplers and hose IDs must suit the permissible flow velocity to prevent throttling; apply cold-start routines and oil warm-up, and monitor case drain where required by the tool.<\/li>\n<\/ul>\n<h3>Mounting, locking, and operation<\/h3>\n<ul>\n<li>Secure coupling: <strong>quick coupler<\/strong> locking systems must close completely; visual and tug test before starting work.<\/li>\n<li>Operating logic: slowly ramp up pressure, continually follow through, controlled release under load.<\/li>\n<li>Communication: unambiguous signals, clear lines of sight, and coordinated procedures between operator and safety watch.<\/li>\n<li>Handling heavy tools: use rated lifting points and correct sling angles for attachment changes; maintain exclusion zones with physical barriers and a designated spotter.<\/li>\n<\/ul>\n<h2>Carrier safety on the structure: safe handling of beams, girders, and columns<\/h2>\n<p>The load-bearing system remains effective until the last cut. Therefore, <strong>load transfer<\/strong> and dismantling sequence must be defined, temporary <strong>shoring<\/strong> planned, and self-weight as well as residual stresses reduced in a controlled manner. Components may only be released once their stability and the removal path of masses are secured. Composite action, hidden prestressing, restraint, and unintended arching effects must be identified and neutralized before separation.<\/p>\n<h3>Particularities when using concrete pulverizers<\/h3>\n<ul>\n<li>Crack control: apply closing motion in a controlled manner; observe reinforcement layout to avoid uncontrolled spalling.<\/li>\n<li>Cutting against support: counter-held areas reduce <strong>impact load<\/strong> and prevent unintended redirection of loads.<\/li>\n<li>Residual connections: do not underestimate remaining reinforcement and hangers; release only when shoring is prepared.<\/li>\n<li>Rebound and pinch hazards: stored elastic energy can cause sudden movements; maintain stand-off distances and use back-up props to guide crack opening.<\/li>\n<\/ul>\n<h3>Rock and concrete splitters in existing elements<\/h3>\n<ul>\n<li>Borehole pattern and spacing: even load distribution of the splitting wedges; maintain <strong>edge distance<\/strong> to avoid breakout.<\/li>\n<li>Splitting sequence: work from relieved to loaded zones; monitor crack propagation and set intermediate securing if needed.<\/li>\n<li>Rock wedge splitter: high splitting forces require robust reaction abutments; consider voids and reinforcement layout.<\/li>\n<li>Hole preparation: clean and, if specified, lubricate holes to ensure uniform wedge friction; mark intended crack arrest lines and apply auxiliary measures where appropriate.<\/li>\n<\/ul>\n<h2>Applications and typical scenarios<\/h2>\n<p>Carrier safety is essential in all fields of application, but the focus varies.<\/p>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> concrete pulverizers and hydraulic demolition shears enable controlled dismantling. Load-bearing cross-sections are only processed after shoring or relief. Sequencing avoids unintended load redistribution and progressive collapse.<\/li>\n<li><strong>Gutting and cutting:<\/strong> in buildings with limited space, handheld tools in combination with hydraulic power packs are common. Cutting and splitting sequences must preserve building stability. Access, dust, and noise control require coordinated logistics and time windows.<\/li>\n<li><strong>Rock breakout and tunnel construction:<\/strong> rock and concrete splitters as well as rock wedge splitters work without explosives. Supporting the crown, controlled crack guidance, and stability of the <strong>tunnel face<\/strong> secure operations. Water ingress, gases, and debris management must be anticipated.<\/li>\n<li><strong>Natural stone extraction:<\/strong> splitting technology enables precise separation. Define <strong>fall direction<\/strong> and <strong>transport route<\/strong> in advance so that released blocks move in a controlled manner. Stabilize benches and working platforms to maintain safe access.<\/li>\n<li><strong>Special operations:<\/strong> cutting torch is used on tanks, pipes, and in sensitive environments. Media-free condition, degassing, and grounding must be verified before cutting. Fire watches, spark containment, and hot-work permits complement the safeguards.<\/li>\n<\/ul>\n<h2>Planning and hazard assessment<\/h2>\n<p>Systematic planning is the basis of carrier safety and aligns technology, personnel, and process.<\/p>\n<ol>\n<li>Survey of existing conditions: record structural system, material, reinforcement, prestressing, utilities, media, and access; include temporary states and constraints.<\/li>\n<li>Method selection: choose concrete pulverizer, rock and concrete splitter, hydraulic demolition shears, Multi Cutters, steel shears, or cutting torch according to structure and boundary conditions; justify selection by risk and performance criteria.<\/li>\n<li>Structural analysis and shoring: secure load paths, size temporary beams and <strong>shoring prop<\/strong>, define demolition or splitting sequence; verify robustness against accidental actions.<\/li>\n<li>Hydraulic concept: specify hydraulic power packs, line routing, pressure\/volume flow, cooling, and leakage precautions; plan energy isolation and pressure relief procedures.<\/li>\n<li>Work and communication routes: plan sight lines, exclusion zones, pick-up and lay-down areas; define radio protocols and hand signals.<\/li>\n<li>Emergency and shutdown concept: provide redundancy, orderly pressure relief, and retreat paths; predefine stop-work criteria and muster points.<\/li>\n<\/ol>\n<p>Legal and normative requirements are to be considered in general; binding individual assessments are carried out by qualified planners. Method statements, risk registers, permits, and briefings ensure that planning intentions are translated into action on site.<\/p>\n<h2>Technical parameters influencing carrier safety<\/h2>\n<ul>\n<li><strong>Equipment specifications:<\/strong> tool force, jaw opening, splitting force, cutting performance, dead weight; geometry and wear condition influence real performance.<\/li>\n<li><strong>Hydraulics:<\/strong> <strong>operating pressure<\/strong>, volume flow, return pressure, oil quality, temperature; hose lengths and quick couplers affect pressure losses.<\/li>\n<li><strong>Structure:<\/strong> cross-section, reinforcement ratio, material strength, crack condition, prestressing; connections and restraints govern load redistribution.<\/li>\n<li><strong>Dynamics:<\/strong> vibrations, load changes, shock factors, rebound; cycles and frequency affect fatigue and operator control.<\/li>\n<li><strong>Environment:<\/strong> space constraints, subsoil bearing capacity, weather, visibility, dust, and noise; lighting and ventilation quality determine perception and reaction time.<\/li>\n<\/ul>\n<h2>Workflows and best practices<\/h2>\n<ul>\n<li>Preparation: visual inspection of concrete pulverizer, rock and concrete splitter, rock wedge splitter, hydraulic demolition shears, Multi Cutters, steel shears, and cutting torch; function test of hydraulic power packs.<\/li>\n<li>Positioning: align the carrier machine securely, clear exclusion zones, install <strong>shoring<\/strong>.<\/li>\n<li>Smooth start: increase pressure gradually, observe crack formation or cutting path and follow through.<\/li>\n<li>Controlled release: secure loads, do not allow components to swing or tip unsecured.<\/li>\n<li>Step-by-step dismantling: prefer small, manageable partial cross-sections; synchronize removal and <strong>haulage logistics<\/strong>.<\/li>\n<li>Regular inspection breaks: check temperature, leaks, and wear; interrupt work if anomalies occur.<\/li>\n<li>Tool changeover and isolation: depressurize hydraulic circuits, secure attachments, and verify lock-out of energy sources before resuming work.<\/li>\n<li>Post-work controls: cool down, relieve pressure, clean work area, and document handover, including any deviations from plan.<\/li>\n<\/ul>\n<h2>Cutting and splitting methods with regard to carrier safety<\/h2>\n<p>The choice between shearing, cutting, and splitting depends on material, installation situation, and safety objectives. Preference is given to methods that minimize unintended energy input and allow continuous control of force application and crack guidance.<\/p>\n<ul>\n<li><strong>Concrete pulverizers\/hydraulic demolition shears:<\/strong> suitable for reinforced concrete; allow selective separation with low vibrations. Cutting strategy and jaw positioning reduce shock loading and preserve residual stability.<\/li>\n<li><strong>Rock and concrete splitters\/rock wedge splitters:<\/strong> non-explosive alternative; crack control and controlled force dosing are crucial. Borehole geometry and reaction backing determine effectiveness.<\/li>\n<li><strong>Steel shears\/Multi Cutters:<\/strong> for sections, reinforcement, tanks, and pipelines; consider cutting sequence and residual stresses. Secure free ends to avoid whiplash.<\/li>\n<li><strong>Cutting torch:<\/strong> for hollow bodies and vessels; ensure emptying, cleaning, and gas-free condition beforehand. Provide ventilation, fire protection, and shielding of adjacent areas.<\/li>\n<\/ul>\n<h2>Material and environmental influences<\/h2>\n<p>Moisture, temperature, aging, and corrosion change load-bearing capacity and fracture pattern. Dust, noise, and vibrations affect perception and communication. In tunnels and shafts, ventilation and lighting are critical to safety (<strong>tunnel ventilation<\/strong>). Uncertainties are mitigated by measurable checks (e.g., visual inspection, temperature, pressure) and by conservative approaches to force application. Freeze-thaw damage, carbonation, and embedded defects can alter crack paths; adequate lighting levels, traction on wet surfaces, and weather-related adjustments to sequences sustain process reliability.<\/p>\n<h2>Documentation and evidence<\/h2>\n<p>Continuous documentation increases carrier safety and the reproducibility of processes. Recommended are equipment data sheets, hydraulic logs, dismantling sequence plans, shoring concepts, handover and inspection checklists, as well as photo documentation of key steps. Changes on site must be recorded in a traceable manner. Digital records of pressures, temperatures, and tool hours, combined with annotated site plans, facilitate audits and later optimization.<\/p>\n<h2>Maintenance, testing, and upkeep<\/h2>\n<p>The safe function of concrete pulverizers, rock and concrete splitters, rock wedge splitters, hydraulic demolition shears, Multi Cutters, steel shears, cutting torches, and hydraulic power packs depends on regular care. Wear on blades, jaws, and wedges, hydraulic tightness, completeness of locks, and the condition of hoses and couplings must be checked at regular intervals. Components with safety relevance must be replaced in good time. Torque checks, calibration of pressure gauges, and, where appropriate, non-destructive testing increase confidence in component integrity between major services.<\/p>\n<h2>Competence and organization<\/h2>\n<p>Well-trained teams recognize load paths, correctly assess splitting and cutting behavior, and respond prudently to changes. Instruction, clear responsibilities, and practiced communication are essential elements of carrier safety. General specifications and recognized rules of technology serve as a framework; decisions on site are made situationally and by experts. Briefings, toolbox talks, and stop-work authority ensure that emerging risks are communicated early and addressed consistently.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Carrier safety describes the safe control of loads, forces, and movements that arise when using hydraulic demolition and splitting technology &#8211; both on the carrier machine (e.g., crawler excavator, demolition robot, or handheld tool) and on the load-bearing structural element itself (beams, girders, columns, bracing). In the typical fields of <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/carrier-safety\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20007","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Carrier Safety in Hydraulic Demolition &amp; Splitting<\/title>\n<meta name=\"description\" content=\"Ensure carrier safety \u2713 in hydraulic demolition and splitting with hydraulics, shoring, load transfer and control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/carrier-safety\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Carrier Safety in Hydraulic Demolition &amp; Splitting\" \/>\n<meta property=\"og:description\" content=\"Ensure carrier safety \u2713 in hydraulic demolition and splitting with hydraulics, shoring, load transfer and control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/carrier-safety\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-05T12:06:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/carrier-safety\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/carrier-safety\",\"name\":\"Carrier Safety in Hydraulic Demolition & Splitting\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-09T11:27:31+00:00\",\"dateModified\":\"2026-06-05T12:06:02+00:00\",\"description\":\"Ensure carrier safety \u2713 in hydraulic demolition and splitting with hydraulics, shoring, load transfer and control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/carrier-safety#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/carrier-safety\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/carrier-safety#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Carrier safety\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Carrier Safety in Hydraulic Demolition & Splitting","description":"Ensure carrier safety \u2713 in hydraulic demolition and splitting with hydraulics, shoring, load transfer and control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/carrier-safety","og_locale":"en_US","og_type":"article","og_title":"Carrier Safety in Hydraulic Demolition & Splitting","og_description":"Ensure carrier safety \u2713 in hydraulic demolition and splitting with hydraulics, shoring, load transfer and control.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/carrier-safety","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-05T12:06:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/carrier-safety","url":"https:\/\/www.darda.de\/en\/knowledge\/carrier-safety","name":"Carrier Safety in Hydraulic Demolition & Splitting","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-09T11:27:31+00:00","dateModified":"2026-06-05T12:06:02+00:00","description":"Ensure carrier safety \u2713 in hydraulic demolition and splitting with hydraulics, shoring, load transfer and control.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/carrier-safety#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/carrier-safety"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/carrier-safety#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Carrier safety"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20007","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20007"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20007\/revisions"}],"predecessor-version":[{"id":28092,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20007\/revisions\/28092"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20007"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}