{"id":20003,"date":"2026-01-09T14:53:07","date_gmt":"2026-01-09T13:53:07","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20003"},"modified":"2026-09-12T19:53:34","modified_gmt":"2026-09-12T17:53:34","slug":"beam-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/beam-demolition","title":{"rendered":"Beam demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Beam demolition refers to the controlled removal, separation, and downsizing of steel, reinforced concrete, and composite beams in existing structures. It is a central part of deconstruction, refurbishment works, and conversion projects in which load-bearing members such as drop beams, purlins, I-sections, or HEB\/HEA girders are completely removed or dismantled in sections. Decisive factors are low-vibration, low-emission, and safe execution as well as precise coordination of work methods, structural analysis, and equipment technology &#8211; from concrete pulverizers through <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> to steel shears, combination shears, and hydraulic power packs. Pre-planning typically encompasses structural risk assessment, temporary works design, access and lifting logistics, and selective dismantling strategies that enable clean material separation and high recycling rates. Continuous documentation and monitoring of noise, vibration, and dust thresholds support compliance and predictable project delivery.<\/p>\n<h2>Definition: What is meant by beam demolition?<\/h2>\n<p>Beam demolition is understood as the entirety of measures by which load-bearing beams made of steel, reinforced concrete, or composite construction are released from a structure, relieved of load, separated, and either disposed of or prepared for recycling. Depending on material, cross-section, installation conditions, and environmental stipulations, mechanical cutting methods (e.g., concrete pulverizers, steel shears, multi cutters), controlled splitting (rock and concrete splitters with rock splitting cylinders), sawing, drilling, and thermal methods as well as combined approaches are used. The goal is controlled deconstruction with the least possible impact on adjacent components, users, neighbors, and the environment. Where reuse is feasible, members are preserved or cut to dimension; otherwise, materials are sorted into defined fractions to maximize recycling yields and traceability.<\/p>\n<h2>Beam types and material properties in demolition<\/h2>\n<p>For planning beam demolition, material science is crucial: Steel beams (e.g., IPE, HEA, HEB) can be precisely segmented with steel shears or combination shears; reinforced concrete beams are often first downsized with concrete pulverizers, exposing reinforcement that is then separated; prestressed concrete beams require special care and coordinated procedures to safely handle tendons. Composite beams with headed studs require a sequential approach to safely neutralize composite action. Autoclaved aerated concrete (AAC) beams and natural stone beams (rarer in existing structures) can be opened with low vibration using rock and concrete splitters. Material condition &#8211; e.g., corrosion and section loss in steel, carbonation depth and strength class in concrete, or prior fire exposure &#8211; influences achievable cutting forces, feasible separation methods, and safe sequencing.<\/p>\n<h2>Methods and procedures in beam demolition<\/h2>\n<p>The selection of the procedure is based on material, accessibility, noise limits, vibration thresholds, and the required cut quality. In practice, methods are combined to unite safety, speed, and precision. Water suppression and extraction, remote operation where indicated, and predefined segment weights contribute to process stability and quality of results.<\/p>\n<h3>Mechanical cutting and downsizing<\/h3>\n<ul>\n<li><strong>Concrete pulverizers<\/strong> crush reinforced concrete beams, reduce cross-sections, and expose reinforcing steel. Suitable for concrete demolition and special demolition, especially where space is limited and emission requirements are demanding.<\/li>\n<li><strong>Steel shears<\/strong> cut structural steel and reinforcement in a controlled manner. They are used in the deconstruction of steel beams and composite sections.<\/li>\n<li><strong>Combination shears<\/strong> combine cutting and crushing functions and are helpful when concrete and steel need to be addressed in the same operation.<\/li>\n<li><strong>Multi cutters<\/strong> enable flexible cuts in mixed construction materials where varying cross-sections and embedded items are present.<\/li>\n<li><strong>Sequencing and restraint<\/strong> improve safety and cut quality by mitigating binding, snap-back, and uncontrolled part release; anti-drop measures and pre-weakening lines are defined in the method statement.<\/li>\n<\/ul>\n<h3>Low-vibration splitting<\/h3>\n<p><strong>Rock and concrete splitters<\/strong> with suitable <em>rock splitting cylinders<\/em> create controlled crack formation and segmentation without significant vibration. This cold method is advantageous in building gutting and when cutting sensitive areas, as it generates little dust and noise and protects adjacent components. Predrilled hole patterns, matched wedge spacing, and sequenced pressurization guide crack propagation and keep loads within specified limits.<\/p>\n<h3>Sawing, drilling, and further methods<\/h3>\n<ul>\n<li>Wire saws and wall saws deliver dimensionally accurate cuts for fair-faced concrete or where high cut quality is required.<\/li>\n<li>Core drilling is used for relieving, for creating starting points for splitting wedges, or for lifting and safety gear.<\/li>\n<li>Thermal methods are used locally in steel beam demolition when mechanical shears reach limits due to accessibility or material thickness. In interior areas, emissions must be carefully considered.<\/li>\n<li>Track-guided systems and reusable templates increase repeatability and accuracy for repetitive cuts and interfaces.<\/li>\n<\/ul>\n<h2>Selection of tools and equipment technology<\/h2>\n<p>The right combination of tool and energy supply is a key success factor. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Properly matched hydraulic power units<\/a> provide the necessary drive power and must be matched to pressure, flow rate, and purpose of use. Quick-change jaw systems, remote controls, and noise-dampened housings can further enhance productivity and compliance in sensitive environments.<\/p>\n<h3>Tool selection by beam material<\/h3>\n<ul>\n<li>Reinforced concrete beams: concrete pulverizers for cross-section reduction, optionally followed by rock and concrete splitters for low-vibration opening; reinforcement cutting with steel shears or multi cutters.<\/li>\n<li>Steel beams: steel shears or combination shears for structural steel; in confined situations, compact cutting tools with high cutting force.<\/li>\n<li>Prestressed concrete: proceed only with a coordinated securing and relieving concept; cold separation strategies with splitting cylinders and segmented steps can offer advantages.<\/li>\n<li>Composite beams: staged separation of slab and girder, stepwise neutralization of studs, and defined interfaces for safe retrieval and subsequent finishing.<\/li>\n<\/ul>\n<h3>Hydraulic power packs and peripherals<\/h3>\n<ul>\n<li>Dimensioning according to tool demand (operating pressure\/flow rate) for constant performance and clean cut faces.<\/li>\n<li>Hose lengths, couplings, and oil quality influence response times, efficiency, and tool service life.<\/li>\n<li>Coordination with lifting devices, shoring, and catch systems for safe load handling.<\/li>\n<li>Variable-speed drives and noise enclosures reduce energy use and emissions in interior or urban settings.<\/li>\n<li>Remote condition monitoring and scheduled maintenance intervals improve availability and reduce unplanned downtime.<\/li>\n<\/ul>\n<h2>Process and construction logistics<\/h2>\n<p>A structured process minimizes risks, reduces downtime, and improves cut and fracture results.<\/p>\n<ol>\n<li>As-built survey: drawings, reinforcement and tendon layouts, composite details, fire protection claddings, embedded items.<\/li>\n<li>Load relief: temporary shoring, redistribution of loads, create separation joints.<\/li>\n<li>Pre-separation: remove non-structural layers, create access, disconnect utilities.<\/li>\n<li>Mechanical reduction: concrete pulverizers for the concrete cross-section, steel shears for reinforcement\/structural steel, optionally splitting cylinders for controlled crack guidance.<\/li>\n<li>Segmenting and retrieval: defined piece weights, secured haulage logistics, material sorting.<\/li>\n<li>Finishing: trim edges, expose built-in components, prepare contact surfaces.<\/li>\n<li>Monitoring and verification: track vibration, noise, and dust against limits; confirm deformation control and temporary works performance.<\/li>\n<li>Handover and documentation: record as-built edges and interfaces, waste and recycling documentation, and acceptance of temporary and permanent states.<\/li>\n<\/ol>\n<h2>Structural analysis, structural stability, and safeguarding<\/h2>\n<p>Beam demolitions intervene in load-transferring systems. Temporary shoring, defined cutting sequences, and secured bearing points are fundamental. With composite and prestressed systems, a careful, stepwise approach is required to avoid unintended redistributions and sudden component reactions. The information provided is general and does not replace an object-specific structural assessment. Calculation notes for temporary states, verified piece weights, and defined stop criteria form integral parts of the method statement and safety concept.<\/p>\n<h2>Low-vibration and low-emission work practices<\/h2>\n<p>In <strong>building gutting and cutting<\/strong> as well as in inner-city <strong>concrete demolition and special demolition<\/strong>, noise and vibration limits play a central role. <em>Rock and concrete splitters<\/em> and precise <em>concrete pulverizers<\/em> enable controlled segmentation with reduced dust exposure. In sensitive areas &#8211; such as hospitals, laboratories, or listed heritage buildings &#8211; these methods are often the first choice.<\/p>\n<ul>\n<li>Dust control: water suppression with minimal run-off, local extraction, and &#8211; where necessary &#8211; negative pressure enclosures.<\/li>\n<li>Noise control: acoustic screens, enclosure of power units, and optimized time windows.<\/li>\n<li>Vibration control: pre-cutting and splitting strategies that minimize per-blow energy and allow live monitoring.<\/li>\n<\/ul>\n<h2>Areas of application and typical scenarios<\/h2>\n<ul>\n<li>Concrete demolition and special demolition: deconstruction of reinforced concrete drop beams, composite beams, and bearing areas with concrete pulverizers and combination shears.<\/li>\n<li>Building gutting and cutting: selective detachment of individual beam fields during ongoing operations, low vibration by means of splitting cylinders.<\/li>\n<li>Rock excavation and tunnel construction: transferring controlled splitting know-how to massive components in mining-style conversion zones.<\/li>\n<li>Natural stone extraction: splitting technology provides impetus for crack-controlled opening of components with similar fracture behavior.<\/li>\n<li>Special applications: work under confined or contaminated conditions with compact shears, multi cutters, and matched hydraulic power packs.<\/li>\n<li>Bridge refurbishment: staged girder removal adjacent to traffic under stringent vibration and settlement control.<\/li>\n<li>Industrial plants: selective beam extraction during shutdowns with defined contamination controls and tight access logistics.<\/li>\n<\/ul>\n<h2>Quality, dimensional accuracy, and finishing<\/h2>\n<p>Depending on connection details, defined tolerances must be maintained. Mechanical separations with concrete pulverizers provide robust fracture surfaces; for exposed or bonding surfaces, sawing methods or subsequent finishing are advisable. Clean separation of concrete, reinforcing steel, and structural steel facilitates recycling and reduces construction waste disposal costs. Tolerances for bearing preparation, embedment depths, and surface roughness should be specified in advance and verified after finishing.<\/p>\n<ul>\n<li>Acceptance criteria: dimensional checks at interfaces, plumb and level verification, and documented edge quality.<\/li>\n<li>Surface preparation: removal of laitance, burrs, and sharp edges; preparation classes appropriate to subsequent bonding or sealing.<\/li>\n<li>Reinforcement handling: defined cut-back lengths, corrosion protection at exposed bars, and labeling for potential reuse or recycling.<\/li>\n<\/ul>\n<h2>Safety and environmental protection<\/h2>\n<p>Protection against falls, crushing hazard, and cutting hazards as well as control of falling parts have priority. Dust suppression and noise reduction measures, drip trays for hydraulic oils, low-spark work in sensitive areas, and a suitable fire protection plan are part of a safe process. The information is general and does not replace object-specific protection and rescue plans. Method statements should define exclusion zones, lifting plans, lockout-tagout for services, and emergency procedures including stop criteria.<\/p>\n<ul>\n<li>Hot work governance where thermal cutting is used, including permits and fire watch.<\/li>\n<li>Certification of lifting points, anchors, and catch systems before load application.<\/li>\n<li>Containment and catch measures (platforms, nets) for overhead work and confined shafts.<\/li>\n<li>Hazardous materials handling and spill response with suitable absorbents and disposal routes.<\/li>\n<\/ul>\n<h2>Regulatory framework and documentation<\/h2>\n<p>For beam demolition, requirements under construction code, occupational safety, and environmental law in construction must generally be observed. Common practice includes a documented as-built analysis, a deconstruction concept, evidence of stability verification for temporary states, and documentation of the waste management chain. The information is provided without claim to completeness and does not constitute legally binding advice. Typical deliverables include pre-demolition audits and material inventories, permits or notifications for noise and vibration, and waste transfer documentation with traceability; recording measured values and deviations increases legal certainty.<\/p>\n<h2>Challenges and proven solutions<\/h2>\n<h3>Confined access<\/h3>\n<p>Compact shears and concrete pulverizers on light carrier machines as well as modular hydraulic power packs facilitate use in interiors and shafts. Rigging plans tailored for low headroom and micro-segmentation keep piece weights manageable and safe.<\/p>\n<h3>Heavy reinforcement and composite details<\/h3>\n<p>Sequential approach: first reduce the cross-section with concrete pulverizers, then cut reinforcement with steel shears; with headed studs, neutralize composite action step by step. Where studs or reinforcement are inaccessible, targeted drilling or partial slab nibbling can separate components before final cuts.<\/p>\n<h3>Vibration and noise restrictions<\/h3>\n<p>Rock and concrete splitters minimize vibrations; wet cutting or dust extraction reduce dust; align work windows accordingly. Combining acoustic shielding with phased scheduling of quieter operations supports compliance with tight limits.<\/p>\n<h3>Uncertain as-built conditions<\/h3>\n<p>Test boreholes, locating embedded items, and trial exposures create planning certainty before beam demolition begins. Non-destructive testing &#8211; such as GPR, cover meters, and endoscopy &#8211; complements selective openings to verify assumptions early.<\/p>\n<h2>Power supply and hydraulic management<\/h2>\n<p>A stable power supply is a prerequisite for consistent cut quality. Hydraulic power packs should be sized for demand, lines protected, and couplings kept clean. Regular function checks prevent failures and keep the deconstruction sequence on pace. Redundant capacity, pre-checked spare hoses, and &#8211; where electrical supply is constrained &#8211; staged operations or intermediate energy storage help smooth peaks and avoid downtime.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Beam demolition refers to the controlled removal, separation, and downsizing of steel, reinforced concrete, and composite beams in existing structures. It is a central part of deconstruction, refurbishment works, and conversion projects in which load-bearing members such as drop beams, purlins, I-sections, or HEB\/HEA girders are completely removed or dismantled <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/beam-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20003","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Beam Demolition - Structural Steel &amp; Concrete<\/title>\n<meta name=\"description\" content=\"Master the safe deconstruction of structural beams \u2713 Beam demolition methods for steel, reinforced concrete &amp; composite.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/beam-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Beam Demolition - Structural Steel &amp; Concrete\" \/>\n<meta property=\"og:description\" content=\"Master the safe deconstruction of structural beams \u2713 Beam demolition methods for steel, reinforced concrete &amp; composite.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/beam-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:34+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/beam-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/beam-demolition\",\"name\":\"Beam Demolition - Structural Steel & Concrete\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-09T13:53:07+00:00\",\"dateModified\":\"2026-09-12T17:53:34+00:00\",\"description\":\"Master the safe deconstruction of structural beams \u2713 Beam demolition methods for steel, reinforced concrete & composite.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/beam-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/beam-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/beam-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Beam demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Beam Demolition - Structural Steel & Concrete","description":"Master the safe deconstruction of structural beams \u2713 Beam demolition methods for steel, reinforced concrete & composite.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/beam-demolition","og_locale":"en_US","og_type":"article","og_title":"Beam Demolition - Structural Steel & Concrete","og_description":"Master the safe deconstruction of structural beams \u2713 Beam demolition methods for steel, reinforced concrete & composite.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/beam-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:34+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/beam-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/beam-demolition","name":"Beam Demolition - Structural Steel & Concrete","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-09T13:53:07+00:00","dateModified":"2026-09-12T17:53:34+00:00","description":"Master the safe deconstruction of structural beams \u2713 Beam demolition methods for steel, reinforced concrete & composite.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/beam-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/beam-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/beam-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Beam demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20003","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20003"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20003\/revisions"}],"predecessor-version":[{"id":29328,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20003\/revisions\/29328"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20003"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}