{"id":20000,"date":"2026-01-09T08:18:34","date_gmt":"2026-01-09T07:18:34","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20000"},"modified":"2026-06-05T09:22:02","modified_gmt":"2026-06-05T07:22:02","slug":"staircase-deconstruction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/staircase-deconstruction","title":{"rendered":"Staircase deconstruction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The professional deconstruction of staircases &#8211; whether concrete, natural stone, or steel &#8211; is among the most demanding tasks in existing buildings. Tight workspaces, structural constraints, noise control, dust suppression, low-vibration management, and proximity to sensitive zones in the building place high demands on planning and execution. In these scenarios, precise, low-vibration methods have proven effective, releasing stair elements piece by piece, reducing them in a controlled manner, and transporting them safely out of the building. Tools such as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">selective concrete crushers for stairs<\/a><\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> &#8211; powered by compact <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> &#8211; enable targeted removal in stages, which has become established particularly in <em>concrete demolition and special demolition<\/em> as well as in <em>building gutting and concrete cutting<\/em>. This approach supports precise sequencing, reliable time windows, and reproducible quality with minimal impact on adjacent components.<\/p>\n<h2>Definition: What is meant by staircase deconstruction?<\/h2>\n<p>Staircase deconstruction is the planned, step-by-step dismantling and size reduction of stair installations. This includes cast-in-place concrete stairs, precast stairs, natural stone stairs, as well as steel or composite constructions including parapets, landings, risers and treads, stringers, and supports. The goal is safe, low-vibration, and low-emission removal up to the restoration of defined connection surfaces. Staircase deconstruction is not \u201cdemolition,\u201d but a controlled deconstruction that accounts for structural analysis, component interfaces, ongoing building use, and logistical constraints. Depending on the construction type, different methods are used: splitting, removal with a concrete pulverizer, cutting, separating, and subsequent handling of reinforcement or steel components (rebar cutting and steel cutting). Where required, access boreholes, local exposure, and trial openings are incorporated to validate assumptions and to define tolerances for the restored bearing and connection surfaces.<\/p>\n<h2>Planning and procedures in staircase deconstruction<\/h2>\n<p>The process begins with an as-built survey: load-bearing principle (e.g., cast-in-place concrete with wall bearing, single or double run, with center or side stringer), material, reinforcement layout, support details at slabs and walls, adjacent components, utility line routing, escape routes, fire compartments, and usage states. Based on this, the demolition sequence, cut and splitting patterns, load transfer, shoring, and the transport route are defined. Low-impact methods &#8211; such as splitting with a <strong>hydraulic splitter (wedge)<\/strong> or selective \u201cbiting\u201d with a <strong>concrete pulverizer<\/strong> &#8211; minimize vibration levels and noise emissions. <strong>Hydraulic power packs<\/strong> supply the tools with the required force without using heavy carrier machines. Actual dismantling usually proceeds in segments: preliminary separation cuts at connections, relieving by splitting or pulverizer, lifting or catching, size reduction into portable units, and organized disposal along the waste management chain. A written method statement, including permit management for hot work and confined spaces, increases process reliability.<\/p>\n<h2>Types of stair construction and specific deconstruction strategies<\/h2>\n<p>The construction type determines the method. Cast-in-place concrete stairs are monolithically tied to the structural shell; here, controlled separation cuts at supports followed by <em>splitting<\/em> or <em>pulverizer-based removal<\/em> are common. Precast stairs have defined bearing points; they can be segmented and split after being relieved. Natural stone stairs benefit from wedge-shaped splitting patterns that separate without cracks and protect edges. Steel stringer stairs are dismantled via cuts, steel shear, and, if necessary, Multi Cutters. Composite stairs (reinforced concrete or steel) require a combination: first concrete removal (concrete pulverizer, hydraulic splitter), then exposing and cutting the reinforcement. Anchors, grout beds, and embedded plates are verified in advance to avoid unplanned load paths during release.<\/p>\n<h3>Cast-in-place and precast staircases<\/h3>\n<p>For cast-in-place concrete: shore supports at slabs and walls, make separation cuts, split tread fields into blocks, and remove them in a controlled manner. Precast units are released after exposing the bearings, secured, and segmented. <strong>Concrete pulverizers<\/strong> are proven for material removal at edges and for \u201cbiting off\u201d step upstands. Where segments are lifted, <em>lifting eyes<\/em> or slings are placed on reinforced zones and edges are protected to prevent spalling.<\/p>\n<h3>Natural stone staircases<\/h3>\n<p>Natural fracture lines and brittleness call for a low-stress approach. <strong>Hydraulic splitter (wedge)<\/strong> and <em>rock wedge splitter<\/em> create defined split joints, allowing steps to be released without additional impact energy. This protects adjacent finishes and minimizes secondary damage. Marking grain direction, padding bearing points, and avoiding point loads further reduce the risk of uncontrolled breakage.<\/p>\n<h3>Steel and composite structures<\/h3>\n<p>For steel stringers, guardrails, and plate landings, cuts and shears are used. <em>Steel shear<\/em> and <em>Multi Cutters<\/em> separate profiles and guardrail posts, while for composite stairs the concrete is removed first and then the reinforcement is gripped and separated. In industrial existing buildings, <em>combination shears<\/em> can be useful for processing both concrete remnants and steel portions. Residual loads in stringers and handrails are relieved in a controlled manner before final separation to prevent sudden releases.<\/p>\n<h2>Method selection: splitting, pulverizer, cutting, and separating<\/h2>\n<p>The selection is guided by material, environment, and boundary conditions (low vibration levels, noise emission, dust, accessibility). Splitting methods work nearly vibration free and are advantageous in occupied buildings. Pulverizers are precise for removing edges and local thickenings. Cutting separates connections and creates clean joints. Rebar cutting and steel cutting follow subsequently. In practice, methods are often combined to align with the emission targets and geometry of the stairwell.<\/p>\n<h3>Splitting with hydraulic splitter (wedge)<\/h3>\n<p>Boreholes define the split line; then split cylinders expand the concrete in a controlled manner. Advantages: low vibration levels, high precision, few secondary damages. Fields of application: <em>concrete demolition and special demolition<\/em>, <em>building gutting and concrete cutting<\/em>, <em>special demolition<\/em> in sensitive areas. Hole spacing and depth are adapted to component thickness and reinforcement; dry, water-free operation helps reduce slurry and contamination.<\/p>\n<h3>Removal with concrete pulverizer<\/h3>\n<p><strong>Concrete pulverizers<\/strong> \u201cbite\u201d step edges and thickenings, open cavities, and expose reinforcement. They are suitable for selective deconstruction in confined stairwells, for example during refurbishments in ongoing use. Their controllability enables local reductions without transmitting significant impacts to adjacent walls and slabs.<\/p>\n<h3>Cutting and separating<\/h3>\n<p>Separation cuts at supports and joints protect adjacent components. For steel portions, <em>steel shear<\/em> and <em>Multi Cutters<\/em> are used. For large-format steel components in technical facilities, depending on the case, a tank cutter may be considered; suitability must be assessed professionally in each case. Depending on access and tolerances, wire or wall saws may be used to create precise interfaces; hot-work permits and spark containment are organized where flame or abrasive cutting is required.<\/p>\n<h2>Occupational and environmental protection: vibrations, noise, dust, load securing<\/h2>\n<p>In stairwells, occupational safety and building protection meet directly. Low-impact methods reduce the risk of crack formation in walls and slabs. Dust is minimized by pre-wetting, local dust extraction, and short cutting paths; if sensible, containment and negative-pressure units are used. Noise can be reduced by splitting methods and pulverizer-based removal. Load securing (shoring, rigging, interim storage) must be verified before each segment lift. These notes are general and do not replace a project-specific hazard analysis by competent persons.<\/p>\n<h3>Typical protective measures<\/h3>\n<ul>\n<li>Temporary shoring at supports and beneath landings<\/li>\n<li>Fall protection at stair openings and landing edges<\/li>\n<li>Dust management: pre-wetting, local dust extraction, avoid material drop<\/li>\n<li>Noise reduction measures via splitting and pulverizer-based methods<\/li>\n<li>Separation of pedestrian and material routes, clear signals, wide safety distance<\/li>\n<li>Encapsulation of work areas where sensitive uses continue in adjacent zones<\/li>\n<li>Rigging plan with verified load paths and defined exclusion zones<\/li>\n<\/ul>\n<h2>Construction logistics, segmentation, and material separation<\/h2>\n<p>Breaking down into manageable segments is central. Splitting patterns and pulverizer removal create piece sizes that can be moved via stairwells, freight elevator, or cranes. Early waste disposal logistics &#8211; concrete, natural stone, steel, reinforcement &#8211; reduces costs and distances. <strong>Hydraulic power packs<\/strong> are positioned so that hydraulic hose lines remain short and escape routes remain clear. Protective mats and edge guards are used along transport routes to prevent damage to floors and walls.<\/p>\n<h3>Recommendations for segmentation<\/h3>\n<ol>\n<li>Release connections in a controlled manner (cutting or splitting) while maintaining temporary support<\/li>\n<li>Divide tread fields into defined blocks with documented weights and grips<\/li>\n<li>Expose reinforcement and perform rebar cutting with secured segments<\/li>\n<li>Secure, release, and transport segments using preplanned routes<\/li>\n<li>Size reduction to transport dimensions outside sensitive areas and sort by fraction<\/li>\n<\/ol>\n<h2>Step-by-step sequence in staircase deconstruction<\/h2>\n<p>A practical sequence considers structural behavior, site operations, and emissions. The order varies by construction type but follows a recurring pattern:<\/p>\n<ol>\n<li>Preliminary investigation: load-bearing principle, reinforcement, supports, adjacent components, utility lines; if unclear, perform targeted trial openings<\/li>\n<li>Safeguards: shoring, temporary guardrail, coverings, protective wall, fire protection measures<\/li>\n<li>Separation cuts at connections, joints, and landing supports with defined tolerances<\/li>\n<li>Splitting of tread fields with <strong>hydraulic splitter (wedge)<\/strong> or <em>rock wedge splitter<\/em><\/li>\n<li>Selective removal of edges and thickenings with <strong>concrete pulverizer<\/strong><\/li>\n<li>Expose and cut reinforcement, separate material streams<\/li>\n<li>Segment-wise removal, transport, and interim storage on protected surfaces<\/li>\n<li>Finishing: clean edges, remove residual material, prepare bearing surfaces<\/li>\n<li>Documentation: proof of disposal, photo documentation, acceptance of protective measures<\/li>\n<\/ol>\n<h2>Contexts of use: from concrete demolition to special demolition<\/h2>\n<p>In <em>concrete demolition and special demolition<\/em>, low-vibration solutions take priority to avoid crack formation and secondary damage. In <em>building gutting and concrete cutting<\/em>, staircase deconstruction is often part of a sequence plan that progressively clears sections of the building. In existing buildings with sensitive uses (hospitals, schools, laboratory areas), splitting- and pulverizer-based methods offer advantages. <em>Special demolition<\/em> includes stairs in plant areas or shafts with restricted access, where compact hydraulic tools provide the necessary force without heavy equipment. Where occupancy continues, time windows and noise thresholds are coordinated with operations.<\/p>\n<h2>Tool selection and hydraulic supply<\/h2>\n<p>The choice of tools depends on the material and target size of the segments. <strong>Hydraulic splitters (wedge)<\/strong> are the first choice for gently releasing massive components; <strong>concrete pulverizers<\/strong> are efficient for selective removal, opening steps, and exposing reinforcement. <strong>Hydraulic power packs<\/strong> provide the necessary energy with a compact footprint. In addition, <em>steel shear<\/em> and <em>Multi Cutters<\/em> are used for steel components and reinforcement; <em>combination shears<\/em> combine functions in composite constructions. Matching oil flow and pressure to tool requirements optimizes performance and reduces wear.<\/p>\n<h3>Practice-oriented criteria<\/h3>\n<ul>\n<li>Component thickness and reinforcement ratio: adapt split force and pulverizer jaw opening<\/li>\n<li>Space and accessibility: optimize tool size and hose routing (hydraulic hose lines)<\/li>\n<li>Emission targets: prioritize splitting or pulverizer over percussive methods<\/li>\n<li>Logistics: align segment sizes with transport logistics and the waste management chain<\/li>\n<li>Permits and interfaces: plan for hot-work, fire watch, and coordination with building operations<\/li>\n<\/ul>\n<h2>Typical challenges and solution-oriented approaches<\/h2>\n<p>Hidden reinforcement, incomplete drawings, tight geometries, or particularly hard concretes require adjustments. For unclear reinforcement layouts, trial milling and localized pulverizer removal help. Hard concretes respond well to finely graduated splitting patterns with tight borehole spacing. In confined conditions, the combination of splitting and small-scale pulverizer removal provides sufficient manageability without endangering the structural stability of neighboring components. Potential post-tensioning or stressed elements must be ruled out or professionally released before intervention.<\/p>\n<h3>Field-proven notes<\/h3>\n<ul>\n<li>Lay out split lines to expose reinforcement in a targeted manner<\/li>\n<li>Apply the pulverizer at edges and upstands to relieve stresses<\/li>\n<li>Perform rebar cutting only after the segment has been secured<\/li>\n<li>Temporarily replace guardrails to avoid fall risks<\/li>\n<li>Pre-label and number segments to streamline handling and documentation<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>Clear documentation supports proof and project control: deconstruction concept with demolition sequence, splitting and separation-cut plans, protective measures, approvals; evidence of disposal routes; photo documentation of connections and bearing surfaces. Inspections of bearings after deconstruction (cracks, flatness, residual mortar) secure the basis for subsequent trades. Legal and normative requirements may vary by project; the aspects described here are general in nature. Updating the as-built status and recording tolerances at interfaces accelerate follow-on work and acceptance.<\/p>\n<h2>Material and resource conservation<\/h2>\n<p>Selective deconstruction creates the basis for reuse and recycling. Clean separation cuts, targeted splitting, and pulverizer-based removal increase the purity of the fractions. This reduces disposal costs and improves the carbon footprint (CO\u2082 balance) and resource efficiency. In <em>natural stone extraction<\/em>, splitting techniques are established; similar principles also support resource-conserving staircase deconstruction in existing buildings. On-site separation and short transport distances further reduce environmental impacts.<\/p>\n<h2>Checklist for project-specific staircase deconstruction<\/h2>\n<p>As an orientation for planning:<\/p>\n<ul>\n<li>Thoroughly record the existing structure: load-bearing principle, material, supports, reinforcement, utility lines<\/li>\n<li>Define the demolition sequence: separation cuts \u2192 splitting or biting \u2192 rebar cutting \u2192 transport<\/li>\n<li>Define the tool mix: <strong>hydraulic splitter (wedge)<\/strong>, <strong>concrete pulverizer<\/strong>, <em>hydraulic power pack<\/em>, if applicable <em>steel shear<\/em>\/<em>Multi Cutters<\/em>\/<em>combination shears<\/em><\/li>\n<li>Plan protective measures: shoring, dust protection, noise control, barriers, traffic routes<\/li>\n<li>Clarify logistics: segment sizes, interim storage, disposal routes, time windows<\/li>\n<li>Prepare documentation: approvals, evidence, photo logs<\/li>\n<li>Coordinate operational constraints: access control, quiet periods, and interface management with neighboring trades<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The professional deconstruction of staircases &#8211; whether concrete, natural stone, or steel &#8211; is among the most demanding tasks in existing buildings. Tight workspaces, structural constraints, noise control, dust suppression, low-vibration management, and proximity to sensitive zones in the building place high demands on planning and execution. In these scenarios, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/staircase-deconstruction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20000","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Staircase Deconstruction | Low-Vibration Methods<\/title>\n<meta name=\"description\" content=\"Pro guide to staircase deconstruction in buildings \u2713 safe, low vibration methods, cutting, splitting and logistics.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/staircase-deconstruction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Staircase Deconstruction | Low-Vibration Methods\" \/>\n<meta property=\"og:description\" content=\"Pro guide to staircase deconstruction in buildings \u2713 safe, low vibration methods, cutting, splitting and logistics.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/staircase-deconstruction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-05T07:22:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/staircase-deconstruction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/staircase-deconstruction\",\"name\":\"Staircase Deconstruction | Low-Vibration Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-09T07:18:34+00:00\",\"dateModified\":\"2026-06-05T07:22:02+00:00\",\"description\":\"Pro guide to staircase deconstruction in buildings \u2713 safe, low vibration methods, cutting, splitting and logistics.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/staircase-deconstruction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/staircase-deconstruction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/staircase-deconstruction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Staircase deconstruction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Staircase Deconstruction | Low-Vibration Methods","description":"Pro guide to staircase deconstruction in buildings \u2713 safe, low vibration methods, cutting, splitting and logistics.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/staircase-deconstruction","og_locale":"en_US","og_type":"article","og_title":"Staircase Deconstruction | Low-Vibration Methods","og_description":"Pro guide to staircase deconstruction in buildings \u2713 safe, low vibration methods, cutting, splitting and logistics.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/staircase-deconstruction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-05T07:22:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/staircase-deconstruction","url":"https:\/\/www.darda.de\/en\/knowledge\/staircase-deconstruction","name":"Staircase Deconstruction | Low-Vibration Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-09T07:18:34+00:00","dateModified":"2026-06-05T07:22:02+00:00","description":"Pro guide to staircase deconstruction in buildings \u2713 safe, low vibration methods, cutting, splitting and logistics.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/staircase-deconstruction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/staircase-deconstruction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/staircase-deconstruction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Staircase deconstruction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20000","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20000"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20000\/revisions"}],"predecessor-version":[{"id":28074,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20000\/revisions\/28074"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20000"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}