{"id":19994,"date":"2026-01-08T10:42:52","date_gmt":"2026-01-08T09:42:52","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19994"},"modified":"2026-09-12T19:53:34","modified_gmt":"2026-09-12T17:53:34","slug":"cut-off-grinder","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-grinder","title":{"rendered":"Cut-off grinder"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Cut-off grinders are core tools in construction, selective deconstruction, and metalworking. They serve the precise cutting of concrete, masonry, natural stone, asphalt, as well as steel sections and tanks. In complex projects they are often combined with hydraulic demolition and splitting tools to release, segment, and safely remove components in a controlled manner. For example, a cut-off grinder can be used to create joints and relief cuts in cast-on components before concrete pulverizers or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> force-controlled tools separate the section from the composite.<\/p>\n<h2>Definition: What is a cut-off grinder?<\/h2>\n<p>A cut-off grinder is a hand-held or walk-behind cutting device that severs materials using a rotating cutting disc. Power is transmitted from a motor (gasoline, electric, battery, or hydraulic) to a shaft with a flange that brings the disc up to speed. Characteristic features are the high peripheral speed of the disc, the guard, and optionally a water supply for wet cutting. Compared to an angle grinder, the cut-off grinder differs in overall size, cutting depth, guidance (frontal instead of tangential cutting), and components optimized for separation cuts. It is used in primary and finishing construction trades, in maintenance, in concrete demolition, and in specialized deconstruction.<\/p>\n<p><em>Terminology:<\/em> Depending on region and trade, cut-off grinders are also referred to as <strong>cut-off saws<\/strong>, <strong>disc cutters<\/strong>, or <strong>cutting saws<\/strong>. These terms describe the same class of high-speed separation tools.<\/p>\n<h2>Design and operating principle of a cut-off grinder<\/h2>\n<p>The basic design comprises the drive unit, gearbox or direct drive, spindle with clamping flanges, guard, handles and controls, plus an optional water fitting. On start-up the drive accelerates the cutting disc to a defined speed; the peripheral speed produces at the contact zone a combination of abrasion (with abrasive discs) or micro-cutting by diamond grains (with diamond cutting discs). The guard deflects sparks, particles, and water and limits hazards in the event of disc failure. For mineral building materials, segmented diamond cutting discs are commonly used; they cut efficiently when axial feed, rotational speed, and cooling are in balance. For steel and tanks, full-faced or <em>fiber-reinforced<\/em> cutting discs as well as <em>metal-bonded<\/em> diamond discs with different bonding are used. Cutting is performed with moderate feed and a steady angle to avoid thermal and mechanical overload of disc and material. In practice, the cut-off grinder is often used to produce relief cuts, openings, joints, and predetermined breaking edges, followed immediately by work steps with concrete pulverizers, stone and concrete splitters, steel shears, or tank cutters to separate and recover components in a material-appropriate way.<\/p>\n<p><strong>Key component details:<\/strong><\/p>\n<ul>\n<li><strong>Disc diameter and depth:<\/strong> Typical hand-held units operate with 300, 350, or 400 mm discs, yielding approximate cutting depths of 100, 125, or 150 mm respectively, depending on guard and flange design.<\/li>\n<li><strong>Arbor sizes:<\/strong> Common arbors are 20 mm and 25.4 mm; only use discs that match the arbor and flange system without adapters unless explicitly approved.<\/li>\n<li><strong>Peripheral speed:<\/strong> Diamond and abrasive discs are rated for a maximum speed; maintain compliance with the marked maximum RPM and peripheral speed. As a guide, many cutting discs are rated up to about 80 to 100 m\/s. Never exceed the disc rating.<\/li>\n<li><strong>Cooling and flushing:<\/strong> Wet cutting stabilizes temperature and removes swarf; adequate flow and clean filters are essential for consistent performance.<\/li>\n<\/ul>\n<h2>Variants and drive types<\/h2>\n<p>Cut-off grinders are available as hand-held units with side or top handle, as well as clip-on versions with a guide cart for long, straight cuts. The drive type shapes the application range and constraints:<\/p>\n<ul>\n<li><strong>Gasoline engine<\/strong>: High mobility and power, suitable for outdoor use and heavy cutting. Emissions and noise require protective measures.<\/li>\n<li><strong>Electric (mains)<\/strong>: Constant power without exhaust gases, ideal indoors with power supply; cable management and RCD\/GFCI protection must be observed.<\/li>\n<li><strong>Battery<\/strong>: Flexible and without direct exhaust emissions at the point of use; suitable for strip-out and selective deconstruction when cut lengths are limited.<\/li>\n<li><strong>Hydraulic<\/strong>: Powerful, robust, and insensitive to dust and moisture; advantageous in sensitive zones. Coordination with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> (flow\/pressure) is critical.<\/li>\n<\/ul>\n<p><strong>Application nuance:<\/strong> In confined interiors or near sensitive assets, low-emission drives and spark-minimizing techniques reduce secondary risks. For wet zones or heavy dust loads, preference often shifts to hydraulic drives due to their sealing and immunity to fine particulate ingress.<\/p>\n<h2>Cutting discs and materials<\/h2>\n<p>The choice of cutting disc determines cut quality, speed, and service life. <em>Diamond cutting discs<\/em> with a segmented rim are the standard for concrete, reinforced concrete, masonry, natural stone, and asphalt. Bond and segment height are matched to the material: hard bonds for abrasive materials (asphalt), softer bonds for hard materials (granite, high-strength concrete). For steel, sections, and tanks, <em>fiber-reinforced<\/em> or <em>metal-bonded<\/em> discs are used. Wet cutting reduces dust and cools; dry cutting requires intermittent passes to dissipate heat.<\/p>\n<p><strong>Practical selection and use:<\/strong><\/p>\n<ul>\n<li>Match the bond to the base material to maintain self-sharpening of diamond segments and a consistent kerf.<\/li>\n<li>Observe rotation arrows and maximum speed marking; incorrect rotation degrades performance and elevates risk.<\/li>\n<li>Limit lateral load and do not force curves with rigid discs; use staged relief cuts for direction changes.<\/li>\n<li>Dress glazed diamond segments briefly on an abrasive substrate to restore cutting action.<\/li>\n<\/ul>\n<h3>Cutting disc selection by material<\/h3>\n<ul>\n<li><strong>Concrete\/reinforced concrete<\/strong>: Segmented diamond discs; adjust the cut path as reinforcement is exposed. After cutting, concrete pulverizers facilitate nibbling and sorting of the separated element remnants.<\/li>\n<li><strong>Natural stone<\/strong>: Fine-segment diamond discs; low chipping tendency through steady feed.<\/li>\n<li><strong>Asphalt<\/strong>: Highly abrasive action; hard segment bond and wet cutting for service life.<\/li>\n<li><strong>Steel<\/strong>: Thin cutting discs or metal-bonded diamond discs; consider sparks and burrs on thick sections. For large segments, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">hydraulic steel shears<\/a> or combination shears are used after the starter cut.<\/li>\n<li><strong>Tanks\/vessels<\/strong>: Low-spark methods preferred; pre-cleaning and degassing where possible. Tank cutters and cut-off grinders are used in a coordinated manner.<\/li>\n<\/ul>\n<h2>Wet cutting, dust management and emissions<\/h2>\n<p><strong>Dust<\/strong> is generated especially during dry cutting in concrete, brick, and natural stone. Wet cutting with a clean water supply binds fine dust, cools the disc, and improves the cut surface. Additionally, extraction hoods, suitable filters, and consistent construction logistics help. Noise emissions and vibration are reduced by sound bearings, balanced discs, and a suitable cutting strategy. Personal protective equipment such as eye protection, hearing protection, gloves, cut protection, and respiratory protection is mandatory; selection follows the applicable occupational safety rules.<\/p>\n<h3>Water, slurry, and emission control<\/h3>\n<ul>\n<li><strong>Water flow and quality:<\/strong> Ensure continuous, clean water at the tool to prevent nozzle blockage and thermal shock; monitor flow so the kerf remains flushed without excessive run-off.<\/li>\n<li><strong>Slurry handling:<\/strong> Capture and contain cutting slurry to prevent contamination of drains and surfaces; dispose of according to site protocols.<\/li>\n<li><strong>Silica management:<\/strong> When dry cutting cannot be avoided, use high-efficiency extraction and task duration limits aligned with applicable exposure thresholds for respirable crystalline silica.<\/li>\n<li><strong>Noise and vibration:<\/strong> Choose low-noise discs where feasible and manage exposure time to control hand-arm vibration and airborne noise levels.<\/li>\n<\/ul>\n<h2>Cut planning in deconstruction<\/h2>\n<p>Good results stem from planning and sequence. Before the first cut, load-bearing behavior, material, component thickness, embedded items, and utilities are reviewed. Cuts are placed so that <em>predetermined breaking points<\/em> and load redirection act purposefully. Relief and separation cuts create space for subsequent gripping, splitting, or crushing by concrete pulverizers and stone and concrete splitters. With steel and composite members, pre- and post-cuts may be necessary before steel shears or multi cutters complete the removal.<\/p>\n<ul>\n<li><strong>Structural checks:<\/strong> Verify load paths, temporary supports, and the influence of openings on stability; document required permits and approvals.<\/li>\n<li><strong>Segment control:<\/strong> Estimate segment mass from geometry and density; define lift, support, or containment measures before final separation.<\/li>\n<li><strong>Interface risks:<\/strong> Locate reinforcement, inserts, tensioning ducts, coatings, and unknown utilities; adapt the cut sequence accordingly.<\/li>\n<\/ul>\n<h3>Typical work steps<\/h3>\n<ol>\n<li>Assess the component, mark the cut path, locate utilities.<\/li>\n<li>Select a suitable cutting disc, check the machine, test the water supply.<\/li>\n<li>Pre-cut at shallow depth, then extend to target depth.<\/li>\n<li>Make relief cuts; let edges feather out cleanly.<\/li>\n<li>Follow-up: release or nibble with concrete pulverizers; targeted splitting with stone and concrete splitters.<\/li>\n<li>Secure the segment, remove it, sort by type, and transport away.<\/li>\n<li>Document parameters and findings for quality assurance and repeatability.<\/li>\n<li>Inspect adjacent areas and reinstate protections after completion.<\/li>\n<\/ol>\n<h2>Applications<\/h2>\n<p>Cut-off grinders combine <strong>cutting precision<\/strong> with mobility. They deliver particular benefits in the following areas, often in combination with hydraulic tools:<\/p>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<p>Saw-like separation cuts define component boundaries, joints, and openings. The detached elements are then broken down by concrete pulverizers into transportable pieces. For massive sections, stone and concrete splitters are used afterwards to separate with low vibration.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Indoors, low-emission drives and wet cutting are key. Cut-off grinders create door openings, chases, and ceiling openings; combination shears or multi cutters remove embedded parts and light-gauge profiles.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>For trim cuts on lining elements, edge breakout remediation, and sampling, cut-off grinders are helpful. Larger blocks are preferably separated by splitting; here stone splitting cylinders complement the cut pattern without additional vibration.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Clean edges on rough blocks and calibration cuts are produced with diamond cutting discs. The stone is then split in a controlled manner along natural joints using splitting tools.<\/p>\n<h3>Special operations<\/h3>\n<p>In technical assistance and repair tasks, cut-off grinders provide quick access to components. In metal structures, starter cuts are made before steel shears perform the final cut. With tanks, safe working practices take priority; tank cutters and suitable cutting discs are used in a coordinated way.<\/p>\n<h2>Safety and ergonomics<\/h2>\n<p>Safe work is based on sound equipment, correct handling, and clear site organization. Before each use, inspect guard, flange, disc, water fitting, emergency stops, and handles. Choose a stable stance and keep the cutting path clear. Only feed the disc into the material after reaching rated speed; avoid binding.<\/p>\n<ul>\n<li><strong>Avoid kickback<\/strong>: Start gently, cut only with the lower half of the disc, do not pry.<\/li>\n<li><strong>Control thermal load<\/strong>: Plan pauses, use wet cutting, with dry cutting work in stages.<\/li>\n<li><strong>Disc inspection<\/strong>: Avoid cracks, imbalance, wrong rotation direction, and worn flanges.<\/li>\n<li><strong>Secure the surroundings<\/strong>: Consider sparks, water run-off, and falling segments; ensure cordoning and communication.<\/li>\n<li><strong>Power and hydraulics<\/strong>: Route cables and hoses to prevent trip, crush, or snag hazards; confirm correct pressure and flow before load.<\/li>\n<li><strong>Tool compatibility<\/strong>: Use only discs and flanges approved for the tool and guard; never remove guards to gain depth.<\/li>\n<\/ul>\n<h2>Selection criteria and performance metrics<\/h2>\n<p>Key criteria are cutting depth, power, speed constancy, weight, vibration levels, emissions profile, and the availability of wet cutting. With hydraulic versions, pressure and flow must match the hydraulic power pack. For concrete with reinforcement, high-performance diamond discs and a machine with stable speed under load are advantageous. In dust-sensitive environments, low-emission drives and effective water supply are recommended.<\/p>\n<ul>\n<li><strong>Cutting depth vs disc size:<\/strong> Approximate net depths for 300, 350, 400 mm discs are about 100, 125, 150 mm; verify for each tool-guard combination.<\/li>\n<li><strong>Speed stability:<\/strong> Load regulation preserves peripheral speed and extends disc life while maintaining straight kerfs.<\/li>\n<li><strong>Ergonomics:<\/strong> Balanced center of gravity, low vibration, and effective anti-restart protection reduce fatigue and incidents.<\/li>\n<li><strong>Duty cycle and runtime:<\/strong> For battery or hydraulic systems, plan runtime and cooling intervals around task length and material hardness.<\/li>\n<\/ul>\n<h2>Maintenance, disc care, and operational readiness<\/h2>\n<p>Regular care increases availability and cut quality. Clean clamping flanges, store discs correctly, check for bearing noise, and clean water filters. When glazing occurs, briefly dress diamond discs in abrasive material. Inspect power and hydraulic lines for leaks and kinks, keep ignition and safety devices functional. Schedule consumables (discs, filters, fittings) in good time.<\/p>\n<ul>\n<li><strong>Fasteners and flanges:<\/strong> Check torque and contact faces; replace warped or grooved flanges.<\/li>\n<li><strong>Drive system:<\/strong> Monitor belts, gearboxes, or couplings for wear and alignment; address abnormal vibration promptly.<\/li>\n<li><strong>Guards and fittings:<\/strong> Inspect guards, nozzles, and valves; replace brittle hoses and clogged screens.<\/li>\n<li><strong>Storage:<\/strong> Keep discs dry and flat; segregate used from new stock and label by material class.<\/li>\n<\/ul>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li><strong>Wrong disc<\/strong>: Select for the material; the wrong bond reduces service life and increases cutting forces.<\/li>\n<li><strong>Overheating<\/strong>: Excessive feed or missing water leads to segment glazing and cracking.<\/li>\n<li><strong>Binding<\/strong>: Unsteady guidance and changing angles cause chipping and disc breakage.<\/li>\n<li><strong>Unclear cutting sequence<\/strong>: Without relief cuts, the kerf pinches and components break out uncontrollably; follow up in time with concrete pulverizers or splitting tools.<\/li>\n<li><strong>Exceeding disc limits<\/strong>: Using discs beyond their maximum RPM or with damaged cores significantly raises failure risk.<\/li>\n<li><strong>Attempting tight curves<\/strong>: Forcing curved paths with rigid discs leads to lateral loading and premature failure; use stepped straight cuts.<\/li>\n<\/ul>\n<h2>Resource conservation and selective deconstruction<\/h2>\n<p>Targeted separation cuts promote source-separated sorting and recycling. In combination with stone and concrete splitters and concrete pulverizers, components can be removed with low vibration, protecting adjacent structures and reducing emissions. Forward-looking cut planning reduces energy demand, extends the service life of cutting discs, and supports quality in the construction process.<\/p>\n<p><strong>Circular use and site ecology:<\/strong> Recover reinforcing steel and aggregate fractions wherever feasible; manage water and slurry to minimize environmental impact. Document disc consumption and cutting parameters to refine methods and reduce material use over successive projects.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Cut-off grinders are core tools in construction, selective deconstruction, and metalworking. They serve the precise cutting of concrete, masonry, natural stone, asphalt, as well as steel sections and tanks. In complex projects they are often combined with hydraulic demolition and splitting tools to release, segment, and safely remove components in <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cut-off-grinder\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19994","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cut-Off Grinder Guide | Concrete, Masonry &amp; Steel<\/title>\n<meta name=\"description\" content=\"Your guide to the cut-off grinder power tool \u2713 for clean cuts in concrete, masonry &amp; steel, plus disc choice and safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cut-off-grinder\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cut-Off Grinder Guide | Concrete, Masonry &amp; Steel\" \/>\n<meta property=\"og:description\" content=\"Your guide to the cut-off grinder power tool \u2713 for clean cuts in concrete, masonry &amp; steel, plus disc choice and safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/cut-off-grinder\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:34+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cut-off-grinder\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cut-off-grinder\",\"name\":\"Cut-Off Grinder Guide | Concrete, Masonry & Steel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-08T09:42:52+00:00\",\"dateModified\":\"2026-09-12T17:53:34+00:00\",\"description\":\"Your guide to the cut-off grinder power tool \u2713 for clean cuts in concrete, masonry & steel, plus disc choice and safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cut-off-grinder#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cut-off-grinder\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cut-off-grinder#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cut-off grinder\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cut-Off Grinder Guide | Concrete, Masonry & Steel","description":"Your guide to the cut-off grinder power tool \u2713 for clean cuts in concrete, masonry & steel, plus disc choice and safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-grinder","og_locale":"en_US","og_type":"article","og_title":"Cut-Off Grinder Guide | Concrete, Masonry & Steel","og_description":"Your guide to the cut-off grinder power tool \u2713 for clean cuts in concrete, masonry & steel, plus disc choice and safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-grinder","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:34+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-grinder","url":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-grinder","name":"Cut-Off Grinder Guide | Concrete, Masonry & Steel","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-08T09:42:52+00:00","dateModified":"2026-09-12T17:53:34+00:00","description":"Your guide to the cut-off grinder power tool \u2713 for clean cuts in concrete, masonry & steel, plus disc choice and safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-grinder#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/cut-off-grinder"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-grinder#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Cut-off grinder"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19994","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19994"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19994\/revisions"}],"predecessor-version":[{"id":29148,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19994\/revisions\/29148"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19994"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}