{"id":19990,"date":"2026-01-08T12:06:49","date_gmt":"2026-01-08T11:06:49","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19990"},"modified":"2026-06-04T08:22:02","modified_gmt":"2026-06-04T06:22:02","slug":"haul-rope","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/haul-rope","title":{"rendered":"Haul rope"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A haul rope is a central work tool in demolition, deconstruction, and natural stone processing to lift, guide, or secure components safely. In practice, it links cutting and splitting processes with the controlled movement of loads. When load-bearing components are separated with concrete demolition shears or when massive blocks are loosened with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, the rope takes on the task of stabilizing parts, holding them, or setting them down in a defined manner. This enables work steps to be carried out in a coordinated, precise, and safe way &#8211; whether in concrete demolition, tunnel construction, or natural stone extraction. Proper haul rope selection and rigging reduce uncontrolled movements, minimize secondary damage, and improve cycle times in demanding site conditions.<\/p>\n<h2>Definition: What is meant by a haul rope?<\/h2>\n<p>A haul rope is understood to be a flexible, high-tensile slinging and guiding element made of wire or fiber, used for lifting, lowering, securing, guiding, or lashing loads. Common designations are wire rope, sling rope, lifting rope, or load rope; in the lashing domain, the term lashing rope is sometimes used. Haul ropes act as part of the <em>load path<\/em> between the load, the attachment point, and the lifting device (e.g., crane, winch, or sheave). Characteristic features include a defined working load limit (WLL), a construction-related minimum breaking load (MBL), and a suitable safety factor. In technical terms, <strong>WLL<\/strong> is the allowable load in regular service, derived from the <strong>MBL<\/strong> by applying an appropriate safety factor to account for use conditions. In the context of Darda GmbH, haul ropes are primarily used for the controlled movement of concrete and rock elements that were previously separated with concrete demolition shears or loosened with stone and concrete splitters. They are not to be confused with non-load-rated lines such as simple tag lines.<\/p>\n<h2>Construction and materials of haul ropes<\/h2>\n<p>Haul ropes are made of steel wires or synthetic fibers. Construction, material, and end terminations determine flexibility, breaking strength, abrasion resistance, temperature resistance, and handling. Common are swaged sleeves with thimble or spliced end loops that are connected to attachment points via shackles or eyes. Selection and design are based on the planned sling method, the edge radius, the required bending fatigue resistance, and the environmental conditions on site. Additional criteria include lay direction (right or left lay), surface finish (bright or galvanized), and the need for rotation control in free-hanging lifts.<\/p>\n<h3>Steel ropes: constructions and cores<\/h3>\n<p>Steel haul ropes consist of strands laid up into a rope. Common constructions are 6\u00d719 or 6\u00d736 (each with different wire counts per strand) as well as 7\u00d719 for increased flexibility. A <em>steel wire rope core<\/em> (IWRC) increases transverse pressure and temperature resistance, while a <em>fiber core<\/em> (FC) offers better flexibility and lubricant retention. Low-rotation or rotation-resistant ropes (e.g., 18\u00d77, 19\u00d77, 35\u00d77) reduce twist moment when lifting freely suspended loads. Compacted strands improve abrasion resistance and surface contact, which is beneficial at sharp edges and in reeving. Galvanized wires increase corrosion protection; bright (uncoated) wires provide maximum frictional grip in dry applications. Typical strengths of steel ropes are high breaking loads, low elongation, and robustness against mechanical impact &#8211; an advantage in concrete demolition and rock handling. In practice, the pairing of rope construction with suitable sheaves and terminations is decisive for fatigue life, especially under frequent bending cycles.<\/p>\n<h3>Synthetic ropes and fiber ropes<\/h3>\n<p>Fiber ropes (e.g., made of polyester, polyamide, or high-modulus fibers) excel through low self-weight, good handling, and often buoyancy. They are <em>grip-friendly<\/em> and gentle on surfaces but require edge and cut protection. Polyester is dimensionally stable and moisture resistant, polyamide offers higher elongation (useful for shock absorption), while high-modulus fibers (HMPE) provide extremely high tensile strength at very low weight. Potential drawbacks include sensitivity to UV and cutting, creep under sustained load, or temperature limits. In deconstruction, they are particularly suitable as guiding and safety ropes when weight, handling, and fast length adjustment are critical. Where heat, sparks, or sharp edges are expected, additional protective sleeves, heat shields, or the selection of a steel rope may be necessary.<\/p>\n<h2>Load handling and slinging in deconstruction<\/h2>\n<p>Safe slinging with haul ropes connects the processing of the component with the controlled movement of the load. When a concrete element is separated with concrete demolition shears, the rope stabilizes the element already during the cut. During splitting with stone and concrete splitters, a pre-rigged rope can guide the loosened block or prevent uncontrolled tipping. After release, a winch or crane takes the load and lowers it along predetermined paths. Pre-tension in the rope and defined sling angles reduce sudden load shifts; tag lines can be used to control orientation without entering the hazard zone.<\/p>\n<h3>Slinging methods<\/h3>\n<ul>\n<li>Direct attachment at a defined attachment point using a shackle or eye<\/li>\n<li>Choker hitch of a component with thimble protection at the contact point<\/li>\n<li>Basket hitch with symmetrical load distribution<\/li>\n<li>Lashing wrap to increase friction, only on suitable surfaces<\/li>\n<li>No load-bearing knots with wire ropes; for fiber ropes use only permissible knot forms<\/li>\n<li>For asymmetrical geometries, use multi-leg configurations with calculated angle and load share<\/li>\n<\/ul>\n<h3>Edge protection, reeving, and D\/d ratio<\/h3>\n<p>Sharp edges reduce load capacity. <strong>Edge protection<\/strong> (protectors, pads, battens) is mandatory when ropes run over concrete or steel edges. The ratio of sheave or roller diameter to rope diameter (D\/d) affects bending fatigue resistance: Larger reeving radii are gentler on the rope. Sheaves and shackles must be selected so that they accommodate the rope diameter and the planned angle without crushing or kinking. As a practical guideline, increasing D\/d and minimizing reverse bends typically extends service life; observe the rope maker&#8217;s recommendations for minimum sheave diameters.<\/p>\n<h2>Sizing: load capacity, safety factors, and marking<\/h2>\n<p>For haul ropes, an allowable load capacity (WLL) is derived from the minimum breaking load (MBL) and a safety factor. The safety factor accounts for uncertainties such as shock loads, angles, bending, and wear. In practice, standardized markings, end terminations, and inspection intervals apply &#8211; depending on the application. The marking on the rope or on the eye must include information on load capacity, rope construction, and manufacturer details. A systematic logbook or digital documentation makes it easier to monitor service time and discard criteria. When calculating, include configuration factors (e.g., choker or basket), sling angle factors, and reduction due to edge contact and reeving.<\/p>\n<h3>Influencing factors on load capacity<\/h3>\n<ul>\n<li>Angle: The flatter the sling angle, the higher the leg forces<\/li>\n<li>Bending: Frequent reeving and small radii reduce service life<\/li>\n<li>Temperature, humidity, chemicals: Observe material limits<\/li>\n<li>Lubrication and corrosion protection: Reduce friction, prevent corrosion<\/li>\n<li>Shock and vibratory loads: Allow generous dynamic factors<\/li>\n<li>Edge radius to rope diameter: Small radii require protection and lower allowable loads<\/li>\n<\/ul>\n<h2>Applications at a glance<\/h2>\n<p>Haul ropes connect lifting technology with cutting and splitting processes. They secure, guide, and move loads in Darda GmbH\u2019s typical application areas: from concrete demolition and strip-out to <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a> as well as natural stone extraction. The choice of rope technology is based on component geometry, concrete grade, reinforcement, edge radii, environment, and the planned workflow with tools and power units. Coordinated planning reduces re-rigging, shortens exposure times, and preserves edges and surfaces.<\/p>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<p>When separating with concrete demolition shears, the component is often already taken on a wire rope before the cut. This keeps the element\u2019s position under control and allows lowering without additional repositioning. When loosening foundations or walls with stone and concrete splitters, a pre-rigged haul rope prevents uncontrolled tilting. In specialized deconstruction scenarios, multiple attachment points are often set to hit the center of gravity and bring the component to a defined final position. Dynamic effects from rebar release and local crushing are mitigated by pre-tension, soft starts, and clear stop signals.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In selective deconstruction of smaller components, the haul rope is used as a guiding or safety element. In combination with concrete demolition shears or multi cutters, the load behavior of cut components can be damped. For complex cuts on slabs or beams, ropes stabilize edges until the remaining cross-sections are separated in a controlled manner. Short rope lengths, well-protected contact points, and defined set-down zones help avoid secondary damage in interiors.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>In tunnel construction and rock work, haul ropes are used to secure loosened blocks, guide heavy components, and operate reeving in confined geometries. In vertical shafts, a low-rotation haul rope reduces unwanted rotational moment. After loosening with stone splitting cylinders, the block is lowered along specified paths, typically over rollers or pads with a large radius. Moisture, fines, and corrosive atmospheres necessitate diligent cleaning and corrosion prevention for steel ropes.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In natural stone extraction, after splitting raw blocks, haul ropes are used to pull blocks from the face, rotate them, and set them down on bedding. Steel ropes with compacted strands are common due to abrasion resistance and transverse pressure tolerance, complemented by consistent edge protection. A coordinated process with splitting and lifting technology ensures precise, edge-sparing movements and protects the natural stone surface. Where surface quality is critical, soft intermediate layers and controlled acceleration limits further reduce chipping.<\/p>\n<h2>Accessories: attachment points and connecting elements<\/h2>\n<p>For safe integration into the workflow, shackles, thimbles, swaged sleeves, swivels, eyebolts, and defined attachment points are used. Shackles are selected to match the rope geometry to avoid crushing or over-bending. Swaged sleeves must be executed in accordance with standards; rope clips must be correctly installed and regularly inspected. Swivels are used only where rotation-free behavior is intended and the design permits it. All accessories must be load-rated, traceable, and matched to the rope diameter and the planned sling configuration.<\/p>\n<h2>Interface to Darda GmbH tools<\/h2>\n<p>The combination of rope technology with Darda GmbH tools determines jobsite safety and efficiency. Concrete demolition shears separate components while a properly sized haul rope makes the movement controllable. Stone and concrete splitters create predetermined fracture lines; ropes hold the block on axis and prevent striking movements. Combination shears, steel shears, and tank cutters require ropes for holding, guiding, or position correction of segments. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> supply energy to the tools; rope technology links the work steps with the lifting technology. Synchronizing tool feed rate and rope pre-tension avoids shock loading and protects both tools and components.<\/p>\n<h3>Typical workflow in practice<\/h3>\n<ol>\n<li>Analyze the component: geometry, reinforcement, edges, center of gravity, mass<\/li>\n<li>Plan attachment points: define rope paths, edge radii, reeving, and set-down zones<\/li>\n<li>Select haul rope: material, diameter, end termination, edge protection, accessories<\/li>\n<li>Secure: pre-rig the rope, apply pre-tension, clarify communication<\/li>\n<li>Cut\/Split: processing with concrete demolition shears or stone and concrete splitters<\/li>\n<li>Hoist\/Lower: guide the load via crane or winch along defined paths<\/li>\n<li>Set down: prepare supports, decouple the load with low pressure, release the sling<\/li>\n<\/ol>\n<p><em>Optional process assurance:<\/em> perform a short proof lift within a controlled range, verify balance, and confirm signal protocol before full transfer.<\/p>\n<h2>Safety, inspection, and maintenance<\/h2>\n<p>Safe rope applications rely on clear work instructions, suitable slings, and regular inspections. Every reeving, every angle, and every edge is deliberately planned. Loads are not moved over people, and communication between rigger, machine operator, and equipment operator is unambiguous. Training, toolbox talks, and documented pre-use checks are part of the safety system for rope operations.<\/p>\n<h3>Visual inspection and discard criteria<\/h3>\n<ul>\n<li>Broken wires, grouped wire breaks, strand breaks<\/li>\n<li>Kinks, crush damage, strand opening, corrosion pitting<\/li>\n<li>Nicks, burrs at contact points, noticeable diameter reduction<\/li>\n<li>For fiber ropes: cuts, unraveling, fuzzing, discoloration, heat or chemical damage<\/li>\n<li>Damaged swaged sleeves, thimbles, shackle pins, or threads<\/li>\n<li>Glazing, burn marks, or hard spots from heat or friction<\/li>\n<\/ul>\n<h3>Care and storage<\/h3>\n<ul>\n<li>Remove concrete dust and aggregates that act like abrasives<\/li>\n<li>Targeted lubrication of wire ropes to reduce friction and corrosion<\/li>\n<li>Store dry and shaded; no sharp edges in the storage area<\/li>\n<li>Protect from sparks and cutting tool edges at the jobsite<\/li>\n<li>Document operating time, load spectrum, and special incidents<\/li>\n<li>Wind onto suitable reels or coil in large loops to prevent set and kinks<\/li>\n<\/ul>\n<h2>Planning and costing<\/h2>\n<p>Sound planning combines component analysis, rope selection, and sling method. Load assumptions consider self-weight, friction, dynamic effects, and angle factors. For critical components, a conservative design and subdivision into manageable segments is advisable &#8211; segments that are separated with concrete demolition shears or pre-weakened with splitting technology to reduce rope forces. Costing should include protective materials, inspection time, and replacement intervals to maintain availability and avoid unplanned downtime.<\/p>\n<h3>Weight estimation of concrete elements<\/h3>\n<p>The density of normal concrete is approximately 2.3-2.5 t\/m\u00b3; reinforcement and moisture content influence the weight. Irregular geometries, voids, or embedded items must be included. The center of gravity is chosen so that the load remains in the planned orientation; if uncertain, additional auxiliary legs with lower pre-tension help to catch unforeseen tipping moments. As a simple check, estimate volume, multiply by density, then apply angle and configuration factors to verify the selected WLL with margin.<\/p>\n<h2>Work organization and communication<\/h2>\n<p>Clear agreements, defined hand signals, and an unambiguous division of roles between rigger, machine operator, and safety watch are essential elements of safe rope use. Pathways are kept clear, and the hazard zone is marked. A central point of contact coordinates cutting, splitting, lifting, and setting down so that rope forces, tool action, and machine deployment mesh precisely. Standardized radio code words and a single stop command reduce reaction time in case of anomalies.<\/p>\n<h2>Sustainability and service life<\/h2>\n<p>Properly designed and maintained haul ropes achieve a long service life. Appropriate radii, edge protection, proper storage, and well-planned deployments reduce wear and waste. Where sensible, worn components are replaced in good time to avoid consequential damage to the rope. A sustainable rope strategy reduces downtime and increases availability &#8211; an advantage for demanding workflows in concrete demolition, deconstruction, and natural stone extraction. End-of-life ropes and metal hardware should be routed to proper recycling streams to conserve resources.<\/p>\n<h2>Terminology and common misconceptions<\/h2>\n<p>Haul ropes are not universal tools. Slinging, lifting, and lashing follow different rules, even if ropes may look similar. A lifting rope is not automatically a lashing rope, and a low-rotation rope does not replace every sling chain. In interaction with concrete demolition shears or stone and concrete splitters, the correct selection of rope type, end terminations, and sling method determines the precision and safety of the entire workflow. Similarly, a guide line used solely for orientation is not a load-bearing haul rope unless it is rated and rigged accordingly.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A haul rope is a central work tool in demolition, deconstruction, and natural stone processing to lift, guide, or secure components safely. In practice, it links cutting and splitting processes with the controlled movement of loads. When load-bearing components are separated with concrete demolition shears or when massive blocks are <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/haul-rope\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19990","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Haul Rope for Concrete &amp; Rock Demolition<\/title>\n<meta name=\"description\" content=\"Learn how haul rope enables safe lifting &amp; guiding in demolition, deconstruction &amp; rock work \u2713 Uses, WLL, methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/haul-rope\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Haul Rope for Concrete &amp; Rock Demolition\" \/>\n<meta property=\"og:description\" content=\"Learn how haul rope enables safe lifting &amp; guiding in demolition, deconstruction &amp; rock work \u2713 Uses, WLL, methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/haul-rope\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-04T06:22:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/haul-rope\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/haul-rope\",\"name\":\"Haul Rope for Concrete & Rock Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-08T11:06:49+00:00\",\"dateModified\":\"2026-06-04T06:22:02+00:00\",\"description\":\"Learn how haul rope enables safe lifting & guiding in demolition, deconstruction & rock work \u2713 Uses, WLL, methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/haul-rope#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/haul-rope\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/haul-rope#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Haul rope\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Haul Rope for Concrete & Rock Demolition","description":"Learn how haul rope enables safe lifting & guiding in demolition, deconstruction & rock work \u2713 Uses, WLL, methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/haul-rope","og_locale":"en_US","og_type":"article","og_title":"Haul Rope for Concrete & Rock Demolition","og_description":"Learn how haul rope enables safe lifting & guiding in demolition, deconstruction & rock work \u2713 Uses, WLL, methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/haul-rope","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-04T06:22:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/haul-rope","url":"https:\/\/www.darda.de\/en\/knowledge\/haul-rope","name":"Haul Rope for Concrete & Rock Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-08T11:06:49+00:00","dateModified":"2026-06-04T06:22:02+00:00","description":"Learn how haul rope enables safe lifting & guiding in demolition, deconstruction & rock work \u2713 Uses, WLL, methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/haul-rope#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/haul-rope"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/haul-rope#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Haul rope"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19990","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19990"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19990\/revisions"}],"predecessor-version":[{"id":28040,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19990\/revisions\/28040"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19990"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}