{"id":19989,"date":"2026-01-08T16:58:03","date_gmt":"2026-01-08T15:58:03","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19989"},"modified":"2026-06-04T15:17:03","modified_gmt":"2026-06-04T13:17:03","slug":"transport-logistics","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/transport-logistics","title":{"rendered":"Transport logistics"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Transport logistics is the linking element between planning, material flow and deployment on the construction site. In the context of concrete demolition, special demolition, rock excavation, tunnel construction and natural stone extraction, it ensures that tools, power units and accessories are available at the point of use at the right time, in the right quantity and in the right condition. This includes organizing heavy and sensitive components such as <em>concrete demolition shear<\/em>, <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong>, hydraulic power pack, hydraulic shear, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a>, steel shear, tank cutters and rock wedge splitter &#8211; including their safe packaging, load securing and internal transport into hard-to-access areas. In addition, transparent communication with site management, early consideration of statutory obligations and a controlled return flow of equipment and consumables create a closed loop that reduces errors and interfaces.<\/p>\n<h2>Definition: What is meant by transport logistics?<\/h2>\n<p>Transport logistics refers to the holistic planning, control, execution and monitoring of goods movements between procurement, warehouse, production, assembly or construction site and return. The goal is the economical, on-time and safe relocation of products and operating supplies in compliance with technical, organizational and legal framework conditions. In the application fields of concrete demolition, building gutting and concrete cutting, rock excavation, tunnel construction and special demolition, transport logistics covers supra-regional shipping (road, rail, water, air) as well as the \u201clast mile\u201d to the actual point of use &#8211; for example in shafts, tunnel bores, intermediate floors or cordoned deconstruction zones. It also includes reverse logistics with cleaning, inspection and routing into maintenance, ensuring closed documentation and traceability across all stages.<\/p>\n<h2>Tasks, processes and building blocks of transport logistics<\/h2>\n<p>Tasks range from dispatching, route planning and packaging concepts through handling to construction logistics. Core processes include demand determination, scheduling, selection of suitable means of transport, building stable loading units, <em>load securing<\/em>, documentation, tracking and handover including function check. Essential building blocks are suitable load carriers (pallets, mesh boxes, crates), clear labeling (serial numbers, tool IDs), standardized interfaces (e.g. anchorage points) and defined delivery time windows. For Darda GmbH tools such as stone splitter and concrete splitter, concrete demolition shear, hydraulic power pack, hydraulic shear, Multi Cutters, steel shear, tank cutters and rock wedge splitter this means: lifting in line with weight and center of gravity, protection of sensitive surfaces, reliable transport locks, media handling (hydraulic fluid, hydraulic hose line, hydraulic connection) and a safe flow back into maintenance and spare parts supply. Where oversized or heavy loads are involved, pre-notification, access permits and, if required, escort and crane coordination are integral parts of the process.<\/p>\n<ul>\n<li><strong>Risk assessment and method statements<\/strong> are prepared prior to dispatch to define lifting methods, exclusion zones and responsibilities.<\/li>\n<li><strong>Pre-dispatch checks<\/strong> verify completeness, transport locks, capping of connections and cleanliness to avoid contamination on site.<\/li>\n<li><strong>Communication plans<\/strong> clarify contact persons, time windows and fallback procedures for delays or access constraints.<\/li>\n<\/ul>\n<h2>Value-adding role of transport logistics in demolition and deconstruction<\/h2>\n<p>Well-coordinated transport logistics shortens setup times, reduces downtime and increases occupational safety. Coordinated delivery time windows and prepared unloading points relieve the construction site. This is particularly relevant for heavy or unwieldy equipment such as concrete demolition shear, steel shear or tank cutters, whose delivery and positioning often require crane operations, lifting devices and secured access routes. In natural stone extraction and rock excavation, takt-accurate supply with rock wedge splitter and hydraulic power pack improves the utilization of work cycles, while in tunnel construction the route logistics with restricted profiles and limited time windows demands precise takt planning. Consistent standards for loading units, clear signage of drop zones and a defined go-no-go logic at the gate prevent rework and minimize crane idle times.<\/p>\n<h3>Interfaces with procurement, warehousing and deployment planning<\/h3>\n<p>Transport logistics links demand planning with warehousing and deployment control. Dispatching, goods receipt and order picking ensure that complete sets &#8211; for example stone splitter and concrete splitter with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">the appropriate hydraulic power units<\/a>, hoses, protective caps and tools &#8211; are ready as a loading unit. Transfer points and responsibilities must be clearly defined: from shipping via the carrier to the crane operator or crew leader at the point of use. Digital pick lists, barcode scans and photographed handovers enhance completeness, while return slips and condition reports accelerate refurbishment and replenishment.<\/p>\n<ul>\n<li>Define a single point of contact for each transfer step and confirm time windows in writing.<\/li>\n<li>Use checklists for handover including visual inspection, serial number match and confirmation of depressurized states.<\/li>\n<li>Record deviations and damages immediately with photos and assign corrective actions.<\/li>\n<\/ul>\n<h2>Transport requirements for concrete demolition shear and stone splitter and concrete splitter<\/h2>\n<p>For these tools, robust packaging, safe gripping and lifting options as well as protection for blades, jaws, cylinders and lines are crucial. Hydraulic connections must be capped, hoses routed without tension and transported depressurized. Weight, center of gravity and possible residual energies must be taken into account when selecting the lifting gear. For stage transports &#8211; for example from the truck to the floor during building gutting &#8211; load-bearing interim depots, stair-transport aids or compact lifting devices help to safely pass bottlenecks, low ceiling heights and sensitive floor coverings. Clear center-of-gravity marking, removable parts secured against loss and protective padding at pinch points reduce risk during handling and positioning.<\/p>\n<h3>Packaging and loading units<\/h3>\n<ul>\n<li>Select suitable load carriers (industrial pallets, mesh boxes, wooden crates with internal padding)<\/li>\n<li>Protect edges, cutting edges and grippers with protective covers<\/li>\n<li>Use transport locks on moving parts, protect operating handles and sensors<\/li>\n<li>Cap hydraulic connections, include leakage protection material<\/li>\n<li>Bundle complete sets (tool, power units, hose bundles, operating manuals, accessories)<\/li>\n<li>Add moisture and shock indicators where appropriate to document handling quality<\/li>\n<li>Use corrosion protection for longer storage or maritime routes and seal crates against dust ingress<\/li>\n<\/ul>\n<h3>Load securing and lifting points<\/h3>\n<p>Securing is carried out as a form-fit and\/or force-fit. Lashing points, lifting eyes and lifting lugs must be used without damaging components. An adequate number and load capacity of lashing equipment must be provided; chains, straps and edge protectors must be checked for condition. Lifting gear (e.g. spreader beams) supports a favorable lifting angle and prevents swinging. Craneable units are correspondingly marked and prepared to allow safe unhooking. Anti-slip mats increase friction, tag lines help control orientation and a short test lift verifies balance before full hoisting.<\/p>\n<ul>\n<li>Verify identification and load rating of all lifting accessories before use<\/li>\n<li>Protect hoses and sensitive surfaces under lashings with suitable edge protectors<\/li>\n<li>Maintain minimum lashing angles and avoid chafing through route planning of belts and chains<\/li>\n<\/ul>\n<h3>Hazardous goods and operating supplies<\/h3>\n<p>Hydraulic power pack may contain fluids. For packaging, transport and storage of such operating supplies, general regulations apply depending on the contents and must be observed carefully. A competent review of the applicable rules and suitable labeling help minimize risks, including aspects of hazardous goods (ADR). Safety data sheets, spill kits, secondary containment and proper ventilation during transport and storage reduce environmental and health risks.<\/p>\n<h2>Construction logistics: last mile and in-plant transport<\/h2>\n<p>From unloading onward, construction logistics determines speed and safety. Access routes, load capacities, ramps, elevators and crane hook heights must be clarified in advance. In tunnel construction, tight radii, gradients, ventilation and limited turning options affect takt planning. In existing buildings, staircases, slab loads and restricted times shape the material flow. Clear routing, buffer zones and unambiguous transfer organization reduce waiting times and crane idle times. Traffic marshals, route signage and pre-booked lifting slots prevent conflicts with other trades and keep sensitive areas free.<\/p>\n<h3>Tunnel construction and rock excavation<\/h3>\n<p>Long supply routes and limited cross-sections require compact loading units and robust packaging. Dust and moisture demand sealed containers and easily accessible carrying points. The temporary setup of transshipment points along the heading shortens travel times and supports the continuous use of stone splitter and concrete splitter as well as rock wedge splitter. Lighting, ventilation scheduling and communication via radio complement the material flow and increase operational stability in restricted profiles.<\/p>\n<h3>Building gutting and concrete cutting in existing buildings<\/h3>\n<p>For building gutting, floor-by-floor logistics, separation from user areas and noise control are key. Deliveries often occur in time windows with lifting devices and staff on standby. Stair transports require non-slip aids, short carry intervals and consistent securing of concrete demolition shear, hydraulic shear or Multi Cutters against unintentional opening. Elevator bookings, protective floor coverings and dust containment measures ensure safe transport paths through sensitive areas.<\/p>\n<h2>Hydraulic power pack and hose management<\/h2>\n<p>Hydraulic power pack must be transported so that ventilation openings remain free and controls are protected. Hose bundles are rolled, secured with kink protection and capped at the ends. Clear labeling facilitates rapid commissioning. Depressurized states and clean couplings prevent consequential damage and shorten setup times. For storage and longer transports, protect against UV exposure and heat, and check filters, protective caps and frames for secure seating.<\/p>\n<h2>Hydraulic shear, Multi Cutters, steel shear and tank cutters: specifics<\/h2>\n<p>Cutting tools have exposed cutting edges and joints. Protective covers, fixations and transport locks prevent damage and injury. Depending on the application, tank cutters may entail special requirements for cleaning, degassing and labeling; the applicable regulations must be observed carefully. For steel shear, mass, center of gravity and lever points must be defined before lifting to avoid collisions and swinging. Blade guards, locking pins and secured operating levers reduce inadvertent movements during handling and positioning.<\/p>\n<h2>Planning guide: step by step to a safe and economical transport chain<\/h2>\n<ol>\n<li>Clarify demand: which tools (e.g. concrete demolition shear, stone splitter and concrete splitter), which accessories, which deployment dates?<\/li>\n<li>Record weights, dimensions, centers of gravity and lifting points; define lifting and lashing equipment.<\/li>\n<li>Define the packaging concept: load carriers, protective measures, transport locks, media handling.<\/li>\n<li>Route and time planning: access routes, delivery time windows, crane operations, handling points, buffer zones.<\/li>\n<li>Create and document the load securing concept; clarify responsibilities.<\/li>\n<li>Prepare shipping documents and labeling; assign ID and serial numbers.<\/li>\n<li>Handover on the construction site with visual inspection and completeness check; function test after release.<\/li>\n<li>Organize return transport, cleaning, inspections and routing into maintenance\/spare parts supply.<\/li>\n<li>Brief involved personnel on lifting plan, exclusion zones and emergency procedures before unloading.<\/li>\n<li>Capture deviations and lessons learned to continuously improve packaging and routing concepts.<\/li>\n<\/ol>\n<h2>Documents, labeling and traceability<\/h2>\n<p>Clean documentation accelerates processes: packing lists, handover records and clear identification marks support goods receipt, assembly and service. Serial numbers, tool IDs and batch information facilitate the allocation of spare parts. Scans during loading and unloading create transparency regarding location, condition and complete sets &#8211; for example when hydraulic power pack, hoses and rock wedge splitter are scheduled together. Photo evidence at each transfer point and standardized proof-of-delivery increase accountability and reduce clarification loops.<\/p>\n<h2>Sustainability and cost impact<\/h2>\n<p>Reusable packaging, consolidated transports and optimized routes reduce emissions and costs. Robust, standardized loading units reduce damage, lower waste and speed up handling. Realistic takt planning avoids idle times for cranes and staff &#8211; especially with heavy tools such as steel shear and tank cutters. Emission tracking per shipment and closed-loop returnable packaging systems improve the environmental balance and provide cost transparency over the full equipment life cycle.<\/p>\n<h2>Digital support and KPIs<\/h2>\n<p>Dispatching tools, shipment tracking and barcode\/QR-based processes increase transparency and on-time performance. Key figures include delivery reliability, circulation times, damage rates and crane idle times. In practice, a simple traffic-light logic for delivery time windows helps identify bottlenecks early and initiate countermeasures. Geo-fencing, automated arrival notifications and sensor-based condition monitoring of loading units add real-time visibility for critical deliveries.<\/p>\n<ul>\n<li><strong>On-time performance<\/strong>: share of deliveries within the agreed time window<\/li>\n<li><strong>Damage rate<\/strong>: documented damages per 100 shipments, with root-cause coding<\/li>\n<li><strong>Turnaround time<\/strong>: time from order release to handover and from pickup to reintegration into maintenance<\/li>\n<li><strong>Crane idle time<\/strong>: minutes of waiting due to missing material or unclear handover<\/li>\n<\/ul>\n<h2>Risk management and emergency concepts<\/h2>\n<p>Weather, closures, technical defects or short-term plan changes require alternatives. Emergency contacts, replacement vehicles, additional lifting devices and flexible buffer times increase robustness. Careful assessment of legal requirements and regular training on load securing and handling operating supplies reduce day-to-day risks. Scenario plans for winter conditions, access restrictions or equipment failures, including predefined detours and substitute lifting points, keep the transport chain controllable.<\/p>\n<h2>Quality assurance and handover<\/h2>\n<p>During handover, packaging, transport locks, connections and completeness are checked. Damage is documented, storage areas are kept clear and commissioning is prepared. A clear division of tasks between logistics, site management and executing crew accelerates the start of work with concrete demolition shear, stone splitter and concrete splitter, hydraulic shear and other tools from Darda GmbH. Defined acceptance criteria, photographed condition and a documented release for operation establish a reliable baseline for safe use and rapid troubleshooting if issues arise.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Transport logistics is the linking element between planning, material flow and deployment on the construction site. In the context of concrete demolition, special demolition, rock excavation, tunnel construction and natural stone extraction, it ensures that tools, power units and accessories are available at the point of use at the right <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/transport-logistics\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19989","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Transport Logistics for Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Construction-focused transport logistics \u2713 safe, on-time delivery for demolition, tunneling &amp; rock excavation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/transport-logistics\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Transport Logistics for Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Construction-focused transport logistics \u2713 safe, on-time delivery for demolition, tunneling &amp; rock excavation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/transport-logistics\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-04T13:17:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/transport-logistics\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/transport-logistics\",\"name\":\"Transport Logistics for Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-08T15:58:03+00:00\",\"dateModified\":\"2026-06-04T13:17:03+00:00\",\"description\":\"Construction-focused transport logistics \u2713 safe, on-time delivery for demolition, tunneling & rock excavation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/transport-logistics#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/transport-logistics\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/transport-logistics#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Transport logistics\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Transport Logistics for Construction & Demolition","description":"Construction-focused transport logistics \u2713 safe, on-time delivery for demolition, tunneling & rock excavation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/transport-logistics","og_locale":"en_US","og_type":"article","og_title":"Transport Logistics for Construction & Demolition","og_description":"Construction-focused transport logistics \u2713 safe, on-time delivery for demolition, tunneling & rock excavation.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/transport-logistics","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-04T13:17:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/transport-logistics","url":"https:\/\/www.darda.de\/en\/knowledge\/transport-logistics","name":"Transport Logistics for Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-08T15:58:03+00:00","dateModified":"2026-06-04T13:17:03+00:00","description":"Construction-focused transport logistics \u2713 safe, on-time delivery for demolition, tunneling & rock excavation.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/transport-logistics#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/transport-logistics"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/transport-logistics#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Transport logistics"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19989","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19989"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19989\/revisions"}],"predecessor-version":[{"id":28060,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19989\/revisions\/28060"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}