{"id":19988,"date":"2026-01-08T09:19:26","date_gmt":"2026-01-08T08:19:26","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19988"},"modified":"2026-06-04T09:42:03","modified_gmt":"2026-06-04T07:42:03","slug":"transport-rack","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/transport-rack","title":{"rendered":"Transport rack"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A transport rack is a central link between tool, machine, and logistics in day-to-day demolition, deconstruction, and quarrying operations. It protects heavy hydraulic tools, simplifies handling on the construction site, and reduces downtime. Especially for concrete demolition shears as well as rock and concrete splitters (<a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">Rock Splitters<\/a>), a suitable rack enables safe changes between work locations, orderly storage, and standards-compliant transport by crane or forklift.<\/p>\n<ul>\n<li><strong>Protects critical components<\/strong> such as cutting jaws, cylinders, and hose assemblies<\/li>\n<li><strong>Accelerates workflows<\/strong> through defined lifting and lashing points and clear staging<\/li>\n<li><strong>Supports compliance<\/strong> with company policies and applicable technical rules during crane and forklift operations<\/li>\n<\/ul>\n<h2>Definition: What is meant by a transport rack?<\/h2>\n<p>A transport rack is a load-bearing, often stackable frame construction for the safe accommodation, securing, and movement of devices or assemblies. Such a rack provides lifting and lashing points, protects exposed components such as cutting jaws, cylinders, or hydraulic lines, and permits controlled lifting, lowering, and setting down. Transport racks are tailored to the geometry and mass of the tools they carry and are designed for crane, forklift, or vehicle transport. <strong>The goal is repeatably safe, ergonomic, and material-friendly movement of the load<\/strong>, from the workshop to the point of use &#8211; for example to <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, gutting and cutting, <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, or natural stone extraction.<\/p>\n<ul>\n<li><em>Key functions<\/em>: precise fit for the tool, defined pick points, component protection, and clear identification<\/li>\n<li><em>Intended use<\/em>: lifting, securing, staging, and short-distance transport under operational conditions<\/li>\n<\/ul>\n<h2>Design and operating principle of a transport rack<\/h2>\n<p>The basic structure consists of longitudinal and transverse beams that transfer the load into the frame and receive the lifting gear. Pads, brackets, and protective strips prevent slipping and protect sensitive edges. For concrete demolition shears, for example, guide shoes, mounting consoles, and impact surfaces are positioned so that the shear self-centers in the rack. For rock and concrete splitters, there are often form-fit pockets that decouple cylinder bodies, hoses, and couplings and protect them against impacts. Crane eyes, cross-sling points, or spreader bars define the lifting path. Fork pockets and fork channels enable near-ground maneuvering. <em>Its operating principle is based on form-fit and force-fit, clearly defined lifting points, and practical guidance of the load<\/em>.<\/p>\n<ul>\n<li><strong>Crane handling<\/strong>: marked eyes for single- or multi-leg slings and spreader bars with set angles<\/li>\n<li><strong>Forklift handling<\/strong>: dimensioned fork pockets with entry chamfers and toe-guard clearances<\/li>\n<li><strong>Docking aids<\/strong>: centering ramps and stop blocks for quick, repeatable positioning<\/li>\n<\/ul>\n<h2>Typical designs and materials<\/h2>\n<p>Transport racks for hydraulic tools are usually welded steel frames. Galvanized or coated surfaces increase corrosion resistance; rubberized pads damp impacts and protect painted surfaces. Compact pallet frames are suitable for hydraulic power packs; taller portal constructions accommodate long shear arms or split cylinders. For storage, stackable racks are often used, which are safely positioned on top of one another by defined stacking pins or bearing-edge zones. <strong>The choice of materials is guided by load capacity, operating environment, and desired service life<\/strong>.<\/p>\n<ul>\n<li>Surface systems: hot-dip galvanizing, powder coating, or multi-layer paint for abrasion and corrosion protection<\/li>\n<li>Wear parts: replaceable bumpers, pads, and guides to simplify upkeep and extend service intervals<\/li>\n<li>Fasteners: captive pins and chain-secured locking bolts to prevent loss in daily use<\/li>\n<\/ul>\n<h2>Compatibility with hydraulic tools<\/h2>\n<p>For a transport rack to convince in everyday use, it must map the tool\u2019s geometry precisely. For concrete demolition shears, this concerns the support of the jaws, securing the rotation units, and routing of hydraulic hoses. With rock and concrete splitters, the split wedge, cylinder, and pressure lines must be protected against kinking. Combination shears, multi cutters, steel shears, and tank cutters require additional protective fields around cutting edges and bearing points. Hydraulic power packs benefit from racks with vibration-damping pads, cable holders, and defined crane points to relieve fluid lines.<\/p>\n<ul>\n<li><strong>Tool interfaces<\/strong>: pad spacing, contour stops, and clamp zones adapted to the specific assembly<\/li>\n<li><strong>Connection management<\/strong>: holders for hoses, cables, and caps to keep couplings clean and strain-relieved<\/li>\n<\/ul>\n<h2>Use in concrete demolition and special deconstruction<\/h2>\n<p>In lifting situations with changing attachment points, tight time windows, and high tool turnover, a suitable transport rack offers an extra level of safety. Concrete demolition shears can be secured and staged immediately after set-down without damaging the surroundings. Rock and concrete splitters reach the point of use with protected couplings. This reduces setup times, limits transport damage, and supports orderly material flows between loading zone, work area, and intermediate storage.<\/p>\n<p><em>Clear pick-point labeling and anti-swing measures<\/em> further stabilize processes where crane and forklift logistics alternate frequently.<\/p>\n<h2>Rock demolition, tunnel construction, and natural stone extraction<\/h2>\n<p>Space is tight in rock and underground environments. Transport racks must be particularly compact, tip-resistant, and easy to grip there. Split cylinders are often staged vertically with secured centering sleeves to speed insertion into boreholes. In natural stone extraction, a robust frame geometry helps to absorb sharp-edged rock contact. <em>Handles, lifting lugs, and color-marked centers of gravity support orientation in poorly lit areas<\/em>.<\/p>\n<p>Additional abrasion shields and recessed hose paths reduce snagging on uneven ground and exposed rock faces.<\/p>\n<h2>Special deployments: contaminated areas and demanding environments<\/h2>\n<p>For special deployments, such as with contaminated substances, in coastal environments, or at elevated temperatures, adapted surfaces and wipeable sealing systems are used. Smooth, easy-to-clean pads and closed pockets prevent ingress of dirt. In such conditions, clear labeling is helpful to avoid mix-ups and maintain separate logistics chains.<\/p>\n<p>Where required, stainless steel components or high-alloy fasteners increase resistance to media and humidity, while heat-resistant elastomers maintain damping performance at elevated temperatures.<\/p>\n<h2>Safety and load securing<\/h2>\n<p>Safety comes first. A transport rack defines attachment points for chains, ropes, or slings and lashing points for vehicle transport. <strong>The center of gravity should be visibly marked on the rack<\/strong> so the load does not tip when slinging. For road and plant traffic, anti-slip mats, edge protectors, and form-fit restraints are key. In general, it is advisable to observe the relevant technical rules and company policies; they provide guidance on selection, operation, and periodic inspection of load-handling attachments.<\/p>\n<ul>\n<li>Use lifting gear with adequate rated capacity and intact identification<\/li>\n<li>Attach only at designated points, respecting sling angles and edge radii<\/li>\n<li>Secure loose accessories and lock moving parts against unintended motion<\/li>\n<li>For transport on vehicles, combine lashing with form-fit bracing wherever possible<\/li>\n<\/ul>\n<h2>Sizing, load capacity, and center of gravity<\/h2>\n<p>The design is based on device weight, payload reserve, and load case. Depending on jaw width and additional adapters, concrete demolition shears can shift the center of gravity; transport racks compensate with offset lifting points or adjustable spreader bars. For rock and concrete splitters, point loads on small supports are critical. Wider, damping supports distribute forces. A clearly legible load capacity marking and documentation of the intended use are essential for safe operation.<\/p>\n<ol>\n<li>Determine mass and expected accessories and define a design reserve<\/li>\n<li>Locate the center of gravity by measurement or drawing review and mark it on the rack<\/li>\n<li>Validate with a controlled test lift at minimal height and adjust pick-point positions if necessary<\/li>\n<\/ol>\n<h2>Ergonomics and handling<\/h2>\n<p>Ergonomics begin with grip span and grasp heights. Casters are rarely the first choice in rough construction environments; robust skids with fork channels have proven themselves. Removable locking pins can be lashed to the rack so they are not lost. <em>Short, unambiguous paths<\/em> for hose bundles and cables reduce trip hazards and damage.<\/p>\n<ul>\n<li>Avoid pinch points and provide hand clearance at all access zones<\/li>\n<li>Provide anchor points for taglines to control load swing<\/li>\n<li>Use contrasting markings to highlight steps, edges, and lift points<\/li>\n<\/ul>\n<h2>Maintenance, inspection, and documentation<\/h2>\n<p>Transport racks are work equipment with a safety-relevant function. Regular visual inspections for cracks, corrosion, or deformation, as well as checks of lifting points, are advisable. Markings for year of manufacture, tare weight, and load capacity should remain legible. For legally compliant organization, internal documentation of inspection intervals and repairs is recommended, aligned with company policies and the generally accepted rules of engineering practice.<\/p>\n<ul>\n<li>Inspect weld seams, structural members, and fasteners for integrity and tightness<\/li>\n<li>Check pads, guides, and protective covers for wear and replace as needed<\/li>\n<li>Maintain coating systems, remove corrosion, and refinish damaged areas<\/li>\n<li>Retain records of inspections, repairs, and any modifications<\/li>\n<\/ul>\n<h2>Selection criteria for the right transport rack<\/h2>\n<p>Selection starts with the tool: dimensions, weight, and connection points are the basis. Then come the transport routes: crane reach, forklift width, ramp angle, and doorways. The operating environment determines surface protection and damping. For concrete demolition shears, securing the cutting areas is central; for rock and concrete splitters, protecting cylinders and hydraulic connections takes priority. With hydraulic power packs, vibration decoupling and craneability play a major role. <strong>A rack that noticeably accelerates logistics pays for itself through shorter setup times and fewer transport damages<\/strong>.<\/p>\n<ul>\n<li><strong>Geometry and fit<\/strong>: support points, clearances, and protection where forces concentrate<\/li>\n<li><strong>Handling concept<\/strong>: crane, forklift, or mixed operation with defined paths and signage<\/li>\n<li><strong>Environment<\/strong>: abrasion, moisture, temperature, and cleaning method compatibility<\/li>\n<li><strong>Lifecycle<\/strong>: reparability, availability of wear parts, and documentation<\/li>\n<\/ul>\n<h2>Practice-oriented tips for day-to-day jobsite work<\/h2>\n<h3>Proactive logistics<\/h3>\n<p>Tools should be staged in order of work steps. Markings on the rack help identify the right tool directly. Examples: concrete demolition shear for the initial selective demolition up front; rock and concrete splitter for controlled separation behind it.<\/p>\n<ul>\n<li>Reserve buffer zones for incoming and outgoing racks to avoid cross-traffic<\/li>\n<li>Apply color coding to distinguish tool families and lifting methods<\/li>\n<\/ul>\n<h3>Protect hoses and connections<\/h3>\n<p>Hydraulic lines should be routed with strain relief and fixed on solid supports. Caps and plugs seal couplings against dust so that power packs and cylinders remain clean.<\/p>\n<ul>\n<li>Keep bending radii generous and avoid contact with sharp edges<\/li>\n<li>Use holders that prevent abrasion and chafing during vibration<\/li>\n<\/ul>\n<h3>Protect sensitive components<\/h3>\n<p>Cutting edges of concrete demolition shears and multi cutters should not rest on steel. Rubber bumpers or wooden pads prevent notches and extend the service life of tool edges.<\/p>\n<ul>\n<li>Shield sensors and rotary joints from impact paths<\/li>\n<li>Position stops so that inadvertent set-down does not load fine edges<\/li>\n<\/ul>\n<h3>Clean, accessible lifting points<\/h3>\n<p>Lifting lugs and eyes must be freely accessible. Slung chains must not chafe on edges. With changing sling lengths, color markings help to avoid misuse.<\/p>\n<ul>\n<li>Remove dirt and debris from pick points before attaching the sling<\/li>\n<li>Verify identification on lifting points and document any replacements<\/li>\n<\/ul>\n<h2>Sustainability and service life<\/h2>\n<p>Durable transport racks save resources: robust constructions, replaceable bumpers, and maintenance-friendly joints extend service life. Modular designs enable adaptations when tools change. A well-maintained rack reduces the need for spare parts and lowers downtime, for example when concrete demolition shears or rock and concrete splitters rotate between projects.<\/p>\n<p>Refinishing, part standardization, and documented recertification after repairs contribute to long-term usability and predictable total cost of ownership.<\/p>\n<h2>Distinction from storage racks<\/h2>\n<p>Storage racks serve long-term keeping; transport racks serve safe movement. In practice, both functions are often combined. It is then important that the transport functions &#8211; lifting points, fork pockets, tie-down options &#8211; are clearly identifiable and adequately sized for the moving load. For workshop storage, additional support strips and drip trays can be useful, especially for hydraulic power packs.<\/p>\n<ul>\n<li>Separate pure storage zones from active staging areas whenever feasible<\/li>\n<li>Label mixed-use racks prominently with allowable transport and storage configurations<\/li>\n<\/ul>\n<h2>Relation to applications with products from Darda GmbH<\/h2>\n<p>Transport racks support safe handling of Darda GmbH products over the entire life cycle: from delivery to storage to daily changeovers on the construction site. Especially with concrete demolition shears, form-fit cradles allow fast, low-damage transport. Rock and concrete splitters benefit from shock-absorbing pads and defined hose routing. Combination shears, multi cutters, steel shears, and tank cutters additionally require edge and tip covers to keep sharp areas protected. For hydraulic power packs, compact frames with clear crane points are suitable to speed changes between workstations.<\/p>\n<p>Clear identification plates on racks and tools simplify allocation, reduce search times, and support inspection management.<\/p>\n<h2>Planning and organization in operations<\/h2>\n<p>Clear assignment of rack to tool prevents mistakes. Unambiguous labels, weight indications, and &#8211; if provided &#8211; notes on the sequence of lifting points are useful. In project phases with high takt, structured staging-area planning pays off: in- and outbound routes for forklifts, crane zones, and buffer areas. <em>The fewer re-staging moves, the lower the risk of damage<\/em>.<\/p>\n<ul>\n<li>Define responsibilities for inspection, cleaning, and readiness after each use<\/li>\n<li>Use simple checklists for handover between shifts and subcontractors<\/li>\n<li>Consider QR-based inventory tags for location and status transparency<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A transport rack is a central link between tool, machine, and logistics in day-to-day demolition, deconstruction, and quarrying operations. It protects heavy hydraulic tools, simplifies handling on the construction site, and reduces downtime. Especially for concrete demolition shears as well as rock and concrete splitters (Rock Splitters), a suitable rack <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/transport-rack\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19988","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Transport Rack for Hydraulic Demolition Tools<\/title>\n<meta name=\"description\" content=\"Protect heavy hydraulic shears &amp; splitters with a transport rack \u2713 crane &amp; forklift ready, faster changeovers.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/transport-rack\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Transport Rack for Hydraulic Demolition Tools\" \/>\n<meta property=\"og:description\" content=\"Protect heavy hydraulic shears &amp; splitters with a transport rack \u2713 crane &amp; forklift ready, faster changeovers.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/transport-rack\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-04T07:42:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/transport-rack\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/transport-rack\",\"name\":\"Transport Rack for Hydraulic Demolition Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-08T08:19:26+00:00\",\"dateModified\":\"2026-06-04T07:42:03+00:00\",\"description\":\"Protect heavy hydraulic shears & splitters with a transport rack \u2713 crane & forklift ready, faster changeovers.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/transport-rack#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/transport-rack\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/transport-rack#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Transport rack\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Transport Rack for Hydraulic Demolition Tools","description":"Protect heavy hydraulic shears & splitters with a transport rack \u2713 crane & forklift ready, faster changeovers.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/transport-rack","og_locale":"en_US","og_type":"article","og_title":"Transport Rack for Hydraulic Demolition Tools","og_description":"Protect heavy hydraulic shears & splitters with a transport rack \u2713 crane & forklift ready, faster changeovers.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/transport-rack","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-04T07:42:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/transport-rack","url":"https:\/\/www.darda.de\/en\/knowledge\/transport-rack","name":"Transport Rack for Hydraulic Demolition Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-08T08:19:26+00:00","dateModified":"2026-06-04T07:42:03+00:00","description":"Protect heavy hydraulic shears & splitters with a transport rack \u2713 crane & forklift ready, faster changeovers.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/transport-rack#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/transport-rack"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/transport-rack#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Transport rack"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19988"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19988\/revisions"}],"predecessor-version":[{"id":28044,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19988\/revisions\/28044"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}