{"id":19986,"date":"2026-01-08T08:34:03","date_gmt":"2026-01-08T07:34:03","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19986"},"modified":"2026-06-04T17:40:02","modified_gmt":"2026-06-04T15:40:02","slug":"ready-mix-concrete-plant","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/ready-mix-concrete-plant","title":{"rendered":"Ready-mix concrete plant"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A ready-mix concrete plant is the heart of supplying construction sites with standardized fresh concrete. Aggregates, cement, water, and admixtures are precisely metered, mixed, and then delivered just in time to the placement site by truck mixers. In practice, the topic involves not only new construction and concreting, but also the deconstruction loop: Selective concrete demolition with tools from Darda GmbH, for example with <strong>concrete pulverizers<\/strong> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, delivers single-grade concrete rubble that can flow back as recycled aggregate into the ready-mix concrete plant. In this way, production, logistics, quality assurance, and circular economy are connected into a continuous process &#8211; from the mix design to the sustainable use of building materials. When designed accordingly, this integration reduces primary raw material demand and supports consistent environmental documentation across the value chain.<\/p>\n<h2>Definition: What is meant by a ready-mix concrete plant?<\/h2>\n<p>A ready-mix concrete plant (also known as a batching plant) is an industrial facility for producing fresh concrete according to standardized mix designs. Production takes place in batches or continuously in mixers; raw materials are dosed gravimetrically or volumetrically and controlled using moisture measurement and automated control systems. The plant performs factory production control, documents delivery notes and quality data, and organizes delivery of the fresh concrete by truck mixer or by concrete pump to the construction site. It is distinct from a precast plant, which fabricates concrete elements in a factory setting.<\/p>\n<ul>\n<li><strong>Typical performance indicators<\/strong>: hourly capacity, batching accuracy and tolerance, cycle time per batch, moisture correction strategy, share of returned concrete, and availability of alternative binders or RC content.<\/li>\n<\/ul>\n<h2>Configuration and processes in the ready-mix concrete plant<\/h2>\n<p>A modern ready-mix concrete plant comprises aggregate storage (bins\/silos for sand, crushed stone, and gravel), cement silos, dosing and weighing units, water and admixture stations, mixers, discharge hoppers, and truck mixer stations. The control system coordinates mix designs, batch sizes, and mixing times. <strong>Key steps:<\/strong><\/p>\n<ul>\n<li>Acceptance and storage of aggregates with control of moisture and particle size distribution<\/li>\n<li>Dosing of cement, water, admixtures (e.g., superplasticizer, retarder, air-entraining agent) and, if applicable, additions (e.g., fly ash)<\/li>\n<li>Mixing in planetary, countercurrent, or twin-shaft mixers with defined mixing energy<\/li>\n<li>Fresh concrete testing (workability, temperature, optionally air content) and documentation<\/li>\n<li>Loading into truck mixers, dispatching, and on-time delivery to the placement site<\/li>\n<\/ul>\n<p><em>Optional modules<\/em> such as aggregate heating or cooling, ice plants, fiber dosing units, and color systems stabilize rheology across seasons and broaden the portfolio of deliverable concretes.<\/p>\n<h2>Quality assurance, standards, and mix control<\/h2>\n<p>Ready-mix concrete is produced in accordance with applicable standards and regulations. It is usually specified by strength classes, consistency classes, and exposure classes. Factory production control monitors raw materials, scale calibration, moisture corrections, mixing times, and tests on fresh and hardened concrete. <strong>Key aspects:<\/strong><\/p>\n<ul>\n<li><strong>Mix design management<\/strong>: Variations in raw materials (moisture, particle shape, gradation) are compensated in the control system.<\/li>\n<li><strong>Consistency<\/strong>: From stiff to flowable (e.g., F2 to F6), depending on placement method and element geometry.<\/li>\n<li><strong>Exposure classes<\/strong>: Demands from exposure (e.g., frost and de-icing salt resistance) determine cement type, w\/c ratio, and air-void content.<\/li>\n<li><strong>Testing<\/strong>: Fresh concrete tests, cube\/cylinder tests, and continuous documentation.<\/li>\n<li><strong>Traceability<\/strong>: Batch IDs, time stamps, and automated logs enable audits and back-analysis in case of deviations.<\/li>\n<li><strong>RC integration<\/strong>: Defined recycled aggregate content is qualified via preliminary testing and monitored for impurities and fines.<\/li>\n<\/ul>\n<h3>Resource control and digital control rooms<\/h3>\n<p>Modern control rooms manage batch sequences, monitor energy and water balances, and ensure traceability. Interfaces to dispatching and site planning minimize waiting times and downtime.<\/p>\n<ul>\n<li><em>Dashboards<\/em> with KPIs on cycle time, mixer fill factor, and rejects<\/li>\n<li><em>Automated alerts<\/em> for moisture drifts, temperature thresholds, or dosing anomalies<\/li>\n<li><em>Data exchange<\/em> with invoicing and quality databases for end-to-end documentation<\/li>\n<\/ul>\n<h2>Circular economy: From deconstruction back to the ready-mix concrete plant<\/h2>\n<p>Selective deconstruction lays the foundation for high-quality recycled concrete. If concrete and steel components are cleanly separated during concrete demolition, recycled aggregates (RC material) can flow back into production in a defined manner. A controlled, low-vibration approach pays off here:<\/p>\n<ul>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete demolition and special deconstruction<\/a><\/strong>: <em>concrete pulverizers<\/em> separate reinforced concrete in a controlled manner, reduce noise and vibration, and facilitate the removal of reinforcing steel.<\/li>\n<li><strong>Strip-out and cutting<\/strong>: <em>rock and concrete splitters<\/em> open elements along controlled crack lines and enable single-grade separation of layer structures.<\/li>\n<li><strong>Special deployments<\/strong>: In sensitive areas (hospitals, laboratory buildings), low-noise methods help secure material flows for the ready-mix concrete plant without detours.<\/li>\n<\/ul>\n<p>The quality of RC aggregates depends on the purity of the concrete rubble. Tools such as combination shears and steel shears support separation of the reinforcement. The fewer foreign substances present, the more stable the mix control in the plant and the more reliable the fresh concrete properties. Pre-qualification of sources and on-site segregation further reduce variability in grading and fines.<\/p>\n<h2>Applications and typical interfaces with the ready-mix concrete plant<\/h2>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<p>When deconstructing massive elements, <strong>concrete pulverizers<\/strong> and <strong>rock and concrete splitters<\/strong> ensure step-by-step breakup into defined fractions. After processing, the resulting material can be returned to the ready-mix concrete plant as RC aggregate. This closes the materials loop without compromising mix fidelity.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In early deconstruction phases, non-load-bearing layers are removed, followed by controlled openings in load-bearing cores. Precise cutting and splitting produce homogeneous concrete fractions that the ready-mix concrete plant can more easily convert into consistent gradations.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In tunnel construction, two worlds meet: rock-mechanical excavation and subsequent supply with shotcrete or pumpable concrete. A ready-mix concrete plant delivers ductile, pumpable mixes with tuned aggregate gradation. Where low-vibration openings are required, <em>rock wedge splitters<\/em> assist in advance excavation; in parallel, the plant provides consistent concrete properties for lining and stabilization. This aligns with <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Excavated material from quarries can\u2014after suitability testing\u2014partly serve as aggregate. Consistency of particle sizes and fines content is crucial for stable mixes in the ready-mix concrete plant.<\/p>\n<h3>Special deployments<\/h3>\n<p>For work in vibration-sensitive zones (listed building fabric, laboratory environments), low-vibration demolition methods using <em>concrete pulverizers<\/em> or <em>rock and concrete splitters<\/em> are advantageous. They facilitate single-grade collection and reduce rework during processing for the ready-mix concrete plant.<\/p>\n<h2>Logistics, pacing, and site coordination<\/h2>\n<p>Ready-mix concrete is time-critical. From mixer discharge to compaction, the clock and hydration are running. <strong>Core elements of logistics:<\/strong><\/p>\n<ol>\n<li><strong>Dispatch<\/strong>: Matching batch sizes and arrival intervals to placement rate and pump capacity.<\/li>\n<li><strong>Travel times<\/strong>: Optimized routes and buffer batches prevent loss of consistency.<\/li>\n<li><strong>Weather<\/strong>: Temperature management (summer\/heat, winter\/frost) via mix adjustments and pacing.<\/li>\n<li><strong>Interfaces<\/strong>: Coordination with the concrete pump, placement crew, and curing.<\/li>\n<li><strong>Contingencies<\/strong>: Standby capacity, washout logistics, and clear handover points for returns.<\/li>\n<\/ol>\n<p>During deconstruction phases at the same location, transport routes and safety zones must be harmonized with the demolition works. Clear separation of traffic routes for truck mixers and demolition equipment increases safety and delivery reliability. Digital slot management and geofenced access support predictable cycle times.<\/p>\n<h2>Special concretes from the ready-mix concrete plant<\/h2>\n<p>Depending on requirements, the plant supplies special mixes with defined properties:<\/p>\n<ul>\n<li>Self-compacting concrete (SCC) for densely reinforced elements<\/li>\n<li>Air-entrained concrete for freeze-thaw and de-icing salt resistance<\/li>\n<li>Early high-strength concrete for accelerated formwork cycles<\/li>\n<li>Lightweight concrete with adjusted maximum aggregate size<\/li>\n<li>Shotcrete for tunnel and slope stabilization<\/li>\n<li>Fiber-reinforced concrete with steel or polymer fibers for crack control<\/li>\n<li>Low-heat concrete for massive components with controlled temperature rise<\/li>\n<\/ul>\n<p>The suitability of RC aggregates for these concretes must be evaluated on a project-specific basis. A consistent aggregate gradation and low mortar adhesions are decisive. Trial batches and defined acceptance criteria reduce risk prior to series delivery.<\/p>\n<h2>Environmental and occupational safety in the ready-mix concrete plant<\/h2>\n<p>Dust and noise mitigation, water recirculation, and residual concrete management are key tasks. Returned concrete is washed, fines are separated, and wash water is treated. Emissions are technically limited and documented. When deconstructing plant components\u2014such as silos or steel platforms\u2014cutting torch and steel shears facilitate safe dismantling; for foundation-based components, <em>concrete pulverizers<\/em> and <em>rock and concrete splitters<\/em> support low-vibration removal.<\/p>\n<ul>\n<li><strong>Protective measures<\/strong>: Dust extraction at transfer points, acoustic enclosures, and wheel-wash stations<\/li>\n<li><strong>Water management<\/strong>: Closed loops with pH control and solids separation<\/li>\n<li><strong>Work safety<\/strong>: Traffic guidance, exclusion zones, and PPE concepts adapted to noise and dust exposure<\/li>\n<\/ul>\n<h2>Planning, tendering, and coordination with the ready-mix concrete plant<\/h2>\n<p>Clearly defined specifications are important for smooth cooperation. Typical information includes, among others, strength and exposure class, maximum aggregate size, consistency, chloride content, maximum water-cement ratio, and, where applicable, requirements for air content, pumpability, or surface finish. In addition, early coordination on delivery windows, pacing, and returned concrete concepts is recommended. Notes on legal frameworks are always to be understood generally and do not replace individual advice.<\/p>\n<ul>\n<li><strong>Project data exchange<\/strong>: Mix schedules, test regimes, placement rates, and interfaces to site logistics<\/li>\n<li><strong>Quality agreements<\/strong>: Sampling frequency, acceptance criteria, and documentation format<\/li>\n<li><strong>Sustainability options<\/strong>: RC content targets and binder concepts subject to exposure class constraints<\/li>\n<\/ul>\n<h2>Maintenance and deconstruction of plant components<\/h2>\n<p>Ready-mix concrete plants are regularly maintained and partially rebuilt. When replacing silos, platforms, and pipelines, precise cutting and separation work is required. <em>cutting torch<\/em> and <em>steel shears<\/em> support the dismantling of steel, while <em>concrete pulverizers<\/em> and <em>rock and concrete splitters<\/em> open foundation areas in a controlled manner. This minimizes downtime and enables orderly disposal or recycling of materials. Coordinated permitting, as-built documentation, and safe access planning shorten outages during conversion work.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A ready-mix concrete plant is the heart of supplying construction sites with standardized fresh concrete. Aggregates, cement, water, and admixtures are precisely metered, mixed, and then delivered just in time to the placement site by truck mixers. In practice, the topic involves not only new construction and concreting, but also <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/ready-mix-concrete-plant\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19986","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ready-Mix Concrete Plant - Definition &amp; Processes<\/title>\n<meta name=\"description\" content=\"Discover the ready-mix concrete plant as an industrial batching facility \u2713 production, logistics &amp; circular economy.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/ready-mix-concrete-plant\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ready-Mix Concrete Plant - Definition &amp; Processes\" \/>\n<meta property=\"og:description\" content=\"Discover the ready-mix concrete plant as an industrial batching facility \u2713 production, logistics &amp; circular economy.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/ready-mix-concrete-plant\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-04T15:40:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ready-mix-concrete-plant\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ready-mix-concrete-plant\",\"name\":\"Ready-Mix Concrete Plant - Definition & Processes\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-08T07:34:03+00:00\",\"dateModified\":\"2026-06-04T15:40:02+00:00\",\"description\":\"Discover the ready-mix concrete plant as an industrial batching facility \u2713 production, logistics & circular economy.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ready-mix-concrete-plant#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ready-mix-concrete-plant\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ready-mix-concrete-plant#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Ready-mix concrete plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ready-Mix Concrete Plant - Definition & Processes","description":"Discover the ready-mix concrete plant as an industrial batching facility \u2713 production, logistics & circular economy.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/ready-mix-concrete-plant","og_locale":"en_US","og_type":"article","og_title":"Ready-Mix Concrete Plant - Definition & Processes","og_description":"Discover the ready-mix concrete plant as an industrial batching facility \u2713 production, logistics & circular economy.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/ready-mix-concrete-plant","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-04T15:40:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/ready-mix-concrete-plant","url":"https:\/\/www.darda.de\/en\/knowledge\/ready-mix-concrete-plant","name":"Ready-Mix Concrete Plant - Definition & Processes","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-08T07:34:03+00:00","dateModified":"2026-06-04T15:40:02+00:00","description":"Discover the ready-mix concrete plant as an industrial batching facility \u2713 production, logistics & circular economy.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/ready-mix-concrete-plant#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/ready-mix-concrete-plant"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/ready-mix-concrete-plant#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Ready-mix concrete plant"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19986","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19986"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19986\/revisions"}],"predecessor-version":[{"id":28068,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19986\/revisions\/28068"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19986"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}