{"id":19974,"date":"2026-01-07T09:17:16","date_gmt":"2026-01-07T08:17:16","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19974"},"modified":"2026-06-03T11:41:03","modified_gmt":"2026-06-03T09:41:03","slug":"soil-stabilization","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/soil-stabilization","title":{"rendered":"Soil stabilization"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Soil stabilization consolidates all measures that permanently or temporarily stabilize excavation pits, slopes, rock cuttings and underground voids against deformation, failure and water ingress. It links geotechnical engineering, structural analysis and construction execution. In practice, it often touches selective deconstruction of existing structures &#8211; for example when upgrading excavation support systems, producing anchor heads or removing concrete cover. In this context, low-vibration tools from Darda GmbH such as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> and <strong>concrete demolition shears<\/strong> are used to work precisely, in a controlled manner and with low vibration. The approach emphasizes safety, predictable performance and compliance with project-specific constraints.<\/p>\n<h2>Definition: What is meant by soil stabilization?<\/h2>\n<p>Soil stabilization refers to the entirety of technical procedures for ensuring stability in soil and rock below grade. These include temporary excavation pit support, permanent retaining structures, underpinning and base slab protections as well as rock anchors, soil nails, injection bodies, bored piles and anchors. The aim is to transfer earth and water pressures in a controlled way, to limit deformations and to preserve the serviceability of adjacent structures. The measures range from shotcrete-reinforced nail walls to sheet pile and secant pile walls up to tie-back anchoring systems; they are often supplemented by dewatering and drainage. Ground improvement methods such as grouting, jet grouting or compaction can be combined with structural elements to achieve the required performance.<\/p>\n<h2>Methods and systems of soil stabilization at a glance<\/h2>\n<p>Depending on subsoil, depth, neighboring buildings and groundwater conditions, different systems are used: support walls (sheet pile wall, secant pile wall, diaphragm wall), tie-back anchoring (temporary and permanent anchors), soil nails with shotcrete, micropiles, injection bodies for ground improvement, underpinning and base sealing\/uplift protection. The choice of system follows geotechnical investigations, design in accordance with applicable standards and a construction sequence that considers the interaction of excavation, support and deconstruction.<\/p>\n<ul>\n<li><strong>Key selection factors<\/strong>: geometry and excavation depth, groundwater regime and permeability, required water tightness, displacement tolerance of adjacent structures, access constraints and construction logistics, environmental limits on noise, vibration and dust, and life-cycle considerations.<\/li>\n<\/ul>\n<h2>Objectives, boundary conditions and design principles<\/h2>\n<p>The primary objectives of soil stabilization are ensuring stability and limiting deformations. Secondary objectives include construction operations aspects such as construction time, noise, vibration, dust and maintaining adjacent uses. The basis of design comprises geotechnical parameters (e.g., effective shear strength, settlement modulus), groundwater levels, construction stages as well as partial safety factors and verifications according to the limit state concept. Typical verifications concern global stability, the load-bearing capacity of individual elements (anchors, piles, nails), vibration and shock impacts, deformations and water pressure. Monitoring (inclinometer readings, settlement points, anchor force measurements) accompanies critical construction phases. The observational method with defined trigger levels and adaptation rules is frequently employed to manage residual uncertainties.<\/p>\n<ul>\n<li><strong>Typical performance criteria<\/strong>: ultimate limit state and serviceability limit state checks, basal heave and piping verification, uplift and flotation checks for base slabs, allowable deflection and settlement envelopes for adjacent structures, and watertightness targets for cut-off and retaining systems.<\/li>\n<li><strong>Instrumentation and thresholds<\/strong>: inclinometer and extensometer profiles, piezometers for pore pressure, survey prisms and settlement points, and load cells on anchors with clearly defined alert and alarm values.<\/li>\n<\/ul>\n<h2>Excavation support systems<\/h2>\n<h3>Support walls<\/h3>\n<p>Sheet pile, bored pile and diaphragm walls take up earth pressure and water loads. They are often supplemented by wales, bracing or anchors. Requirements can include <em>structural resistance<\/em>, <em>deformation control<\/em> and <em>water tightness<\/em> at joints and penetrations. When strengthening or modifying wall crowns, wales and connection details, targeted concrete removal is required. <em>Concrete demolition shears<\/em> enable controlled removal of concrete without impairing adjacent components. If massive components must be opened without blasting techniques, <em>rock and concrete splitters<\/em> act with low vibrations in tension in predrilled core holes &#8211; suitable for urban locations and sensitive existing structures.<\/p>\n<h3>Tie-back systems<\/h3>\n<p>Temporary or permanent anchors transfer loads from the support into competent soil layers or rock. Construction sequence: drilling, cleaning, installation of strands\/bars, grouting, curing, proof loading and activation. Proper definition of free length, bond length and corrosion protection is essential. For exposing anchor heads, adapting anchor plates or removing surplus concrete, hand-held hydraulic tools powered by <strong>hydraulic power packs<\/strong> from Darda GmbH are common. <strong>Concrete demolition shears<\/strong> reduce flying debris; <strong>steel shears<\/strong> or <strong>combination shears<\/strong> cut reinforcement and sheet pile connections, while <strong>Multi Cutters<\/strong> cut precisely in mixed materials. Proof tests and lock-off procedures require clean bearing surfaces and documented acceptance.<\/p>\n<h3>Soil nails and shotcrete<\/h3>\n<p>Soil nails stabilize slopes and excavation walls; shotcrete distributes loads and protects the ground. In rocky sections, nails are anchored in the rock by injection bodies. For pinpoint opening of inspection and injection locations on shotcrete shells, finely controllable removal tools are helpful. Here, <em>concrete demolition shears<\/em> and compact <em>rock splitting cylinders<\/em> are predestined to create local relief without disturbing the overall system. Shotcrete quality, including layer thickness, reinforcement exposure and curing, should be verified by routine checks.<\/p>\n<h3>Micropiles and underpinning elements<\/h3>\n<p>Micropiles serve as small-diameter, high-capacity elements for temporary bracing nodes, wale supports and underpinning works. Their advantages include installation in restricted access and compatibility with staged excavation. Selective trimming of pile heads and interfaces is typically performed with <em>concrete demolition shears<\/em>; where larger sections are to be opened, <em>rock and concrete splitters<\/em> provide controlled, low-vibration separation.<\/p>\n<h2>Rock excavation, tunnel construction and tunnel face support<\/h2>\n<p>In rock environments, soil stabilization focuses on controlling joints, bedding planes and groundwater. Measures: systematic rock bolts, dowels, anchors, shotcrete, lattice girders, drainage and, where necessary, grouting. During advance and during the removal of temporary supports, low-vibration removal is advantageous. <strong>Rock and concrete splitters<\/strong> from Darda GmbH enable rock detachment along defined borehole lines, reducing the risk of loose blocks and protecting adjacent structures. <strong>Concrete demolition shears<\/strong> are used for deconstruction and adjustment of shotcrete calottes, exposing anchor plates or removing concrete noses before permanent linings are installed. The method contributes to minimized overbreak, precise reprofiling and safer face and crown works.<\/p>\n<h2>Underpinning and base slab protection<\/h2>\n<p>When lowering excavation pit bottoms next to existing foundations, underpinning is required. Common methods are staged underpinning with micropiles, shotcrete and injections. A base protection addresses uplift and hydraulic heave, for example by sealing slabs, injection curtains or pile grids. Precise interventions in existing concrete &#8211; for example to create construction joints, load transfer elements or inspection openings &#8211; are carried out with low vibration using <em>concrete demolition shears<\/em> and <em>rock and concrete splitters<\/em> to minimize settlements on the existing structure. Heave and piping checks, pore pressure control and stepwise verification of settlements are integral to execution.<\/p>\n<h2>Planning, construction sequence and monitoring<\/h2>\n<ul>\n<li>Site investigation: boreholes, laboratory tests, groundwater movement and hydrogeological framework conditions; mapping of structures and utilities; assessment of construction-induced risks.<\/li>\n<li>Design: verification of stability and serviceability for all construction stages; consideration of phases and modification steps; definition of trigger levels and contingency measures following the observational method.<\/li>\n<li>Execution: sequential excavation with timely support; quality control of drilling, grouting and anchor testing; verification of shotcrete thickness, reinforcement cover and joint detailing.<\/li>\n<li>Monitoring: inclinometers, settlement monitoring points, crack monitoring and load cells on anchors; adaptive measures management and documented responses to threshold exceedance.<\/li>\n<li>Deconstruction\/adjustment: selective removal and trimming of concrete and steel elements with hydraulic tools; documented approvals; waste sorting and temporary works sign-off.<\/li>\n<li>Permits and coordination: interface management with neighboring properties and public space; alignment with environmental, vibration and noise requirements; clear method statements and toolbox talks.<\/li>\n<\/ul>\n<h2>Tools for selective removal in soil stabilization<\/h2>\n<p>The transition between support construction and deconstruction is fluid: openings are made, edges are reprofiled, anchor heads are exposed, shotcrete layers are adjusted or temporary bracing is removed. The following tool principles have become established around Darda GmbH for this:<\/p>\n<ul>\n<li><strong>Concrete demolition shears<\/strong>: targeted concrete removal without impact, suitable for exposing reinforcement, anchor plates and connection details; reduces vibrations and microcracking.<\/li>\n<li><strong>Rock and concrete splitters<\/strong>: controlled non-explosive splitting by hydraulic tensile stress in the borehole; ideal for opening massive concrete members, relieving rock and working in sensitive zones.<\/li>\n<li><strong>Hydraulic power packs<\/strong>: mobile power supply for hand-held tools; important for continuous output in confined excavation pits.<\/li>\n<li><strong>Combination shears \/ Multi Cutters<\/strong>: separating mixed-material members (concrete with reinforcement, excavation struts).<\/li>\n<li><strong>Steel shears<\/strong>: trimming bracing profiles, tie rods, reinforcement and anchor strands (after release and in accordance with the work instruction).<\/li>\n<\/ul>\n<p><em>Tool selection criteria<\/em> include material strength and thickness, reinforcement ratio, required edge quality, access and visibility, and constraints on noise, vibration and debris.<\/p>\n<h2>Application areas and typical tasks<\/h2>\n<ul>\n<li><strong>Concrete demolition and special deconstruction<\/strong>: adjusting support heads, removing temporary concreting aids, opening anchor heads. <em>Concrete demolition shears<\/em> and <em>rock and concrete splitters<\/em> minimize vibrations near sensitive existing buildings.<\/li>\n<li><strong>Strip-out and cutting<\/strong>: creating openings for anchor drilling, utilities and drainage; cutting steel beams and bracing with <em>steel shears<\/em> or <em>combination shears<\/em>.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: local rock loosening, exposing anchorage zones, reprofiling. Hydraulic splitting acts gently on the material and in a controlled manner.<\/li>\n<li><strong>Natural stone extraction<\/strong>: transferred principles from quarrying (splitting instead of blasting) support low-vibration block release and defined edges.<\/li>\n<li><strong>Special operations<\/strong>: work under restricted access, in noise-sensitive zones or with high requirements for freedom from flying debris; hand-held hydraulic systems are advantageous here.<\/li>\n<li><strong>Interfaces to shafts and utility corridors<\/strong>: precise trimming for sealing details, joint preparation and connection of liners and penetrations.<\/li>\n<\/ul>\n<h2>Low vibration, low dust, controlled: reasons for hydraulic splitting and shears<\/h2>\n<p>In the context of soil stabilization there are several reasons for hydraulic splitting and shear tools: low vibrations, fewer secondary damages, precise force application, reduced noise and good controllability of removal performance. This increases safety in tight excavation pits, facilitates work on existing support structures and helps to comply with limits on vibrations and emissions.<\/p>\n<ul>\n<li><strong>Risk reduction<\/strong>: minimized peak particle velocity at adjacent structures and sensitive equipment.<\/li>\n<li><strong>Quality<\/strong>: clean edges with limited microcracking and improved interface preparation for subsequent works.<\/li>\n<li><strong>Environment<\/strong>: less airborne dust and lower noise, supporting site emission targets and neighborhood protection.<\/li>\n<li><strong>Productivity<\/strong>: repeatable removal rates and precise contours reduce rework and accelerates handovers.<\/li>\n<\/ul>\n<h2>Site practice: work sequence when exposing an anchor head<\/h2>\n<ol>\n<li>Secure the surroundings and release the work area; check load conditions.<\/li>\n<li>Mark the removal contour; choose suitable tools (e.g., <em>concrete demolition shears<\/em> for cover concrete, <em>steel shears<\/em> for reinforcement).<\/li>\n<li>Implement protection and control: cover neighboring surfaces, install dust suppression and spatter shields; set up collection trays for slurry and debris.<\/li>\n<li>Stepwise removal of the cover concrete down to the anchor plate; avoid impact energy.<\/li>\n<li>Create\/adjust the required bearing surfaces; deburr and clean the contact surfaces.<\/li>\n<li>Verification: dimensional check of plate seating, visual inspection of corrosion protection and documentation of torque or lock-off as required.<\/li>\n<li>Documentation and handover for testing or stressing operations; controlled reclosing if provided.<\/li>\n<\/ol>\n<h2>Typical sources of error and proven practices<\/h2>\n<ul>\n<li>Insufficient ground investigation leads to wrong decisions regarding system selection and anchor lengths. Early, meaningful investigation is essential.<\/li>\n<li>Underestimation of deformations in construction stages. Stage-by-stage design and monitoring are mandatory.<\/li>\n<li>Excessive impact energy during removal near critical details. <strong>Concrete demolition shears<\/strong> and <strong>rock and concrete splitters<\/strong> reduce the risk.<\/li>\n<li>Lack of coordination between support construction and building services. Plan openings and utility routing early.<\/li>\n<li>Unclear releases when cutting bracing\/anchors. Cut only after documented unloading and instruction.<\/li>\n<li>Inadequate groundwater control and pore pressure management. Verify basal heave, uplift and inflow assumptions on site and adapt measures.<\/li>\n<li>Insufficient corrosion protection or sealing at penetrations. Specify and inspect details consistently, including repairs after adjustments.<\/li>\n<\/ul>\n<h2>Normative and organizational notes<\/h2>\n<p>The planning and execution of soil stabilization are guided by recognized rules of technology and relevant standards in geotechnics and special foundation engineering. These include codes for excavation pits, pile foundations, anchors, soil nails, underpinning and shotcrete as well as requirements for occupational safety, vibrations and emissions control. The specific application is project-specific; compliance with applicable regulations and official requirements lies with the responsible designers and contractors. Acceptance procedures for anchors and nails, proof and performance tests, watertightness checks, as-built documentation and monitoring reports form part of the quality record.<\/p>\n<h2>Material selection and durability<\/h2>\n<p>For permanent stabilization, corrosion protection, fatigue and inspection are decisive. Concrete quality, reinforcement, anchor corrosion protection and grouting quality determine service life. During deconstruction of temporary elements, material-appropriate separation and sorting are crucial for recycling and disposal. Hydraulic cutting and splitting technology supports a clean separation of concrete, steel and rock. Exposure classes, crack width control and detailing for inspectability should be aligned with the intended design life; interfaces and mixed-material joints require attention to avoid galvanic effects and ingress paths.<\/p>\n<h2>Sustainability aspects<\/h2>\n<p>Resource conservation starts with system selection and continues during deconstruction: minimizing vibrations protects neighboring structures, low-dust and low-noise procedures relieve the surroundings. Selective removal with <em>concrete demolition shears<\/em> facilitates material purity; hydraulic splitting often allows smaller intervention areas and reduces consequential damage. Optimized temporary works, reduced overbreak and careful waste segregation support lower embodied impacts and efficient site logistics.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Soil stabilization consolidates all measures that permanently or temporarily stabilize excavation pits, slopes, rock cuttings and underground voids against deformation, failure and water ingress. It links geotechnical engineering, structural analysis and construction execution. In practice, it often touches selective deconstruction of existing structures &#8211; for example when upgrading excavation support <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/soil-stabilization\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19974","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Soil Stabilization - Excavations &amp; Retaining Walls<\/title>\n<meta name=\"description\" content=\"Discover geotechnical soil stabilization \u2713 methods for excavation support, retaining walls &amp; anchors.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/soil-stabilization\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Soil Stabilization - Excavations &amp; Retaining Walls\" \/>\n<meta property=\"og:description\" content=\"Discover geotechnical soil stabilization \u2713 methods for excavation support, retaining walls &amp; anchors.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/soil-stabilization\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-03T09:41:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-stabilization\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-stabilization\",\"name\":\"Soil Stabilization - Excavations & Retaining Walls\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-07T08:17:16+00:00\",\"dateModified\":\"2026-06-03T09:41:03+00:00\",\"description\":\"Discover geotechnical soil stabilization \u2713 methods for excavation support, retaining walls & anchors.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-stabilization#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-stabilization\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-stabilization#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Soil stabilization\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Soil Stabilization - Excavations & Retaining Walls","description":"Discover geotechnical soil stabilization \u2713 methods for excavation support, retaining walls & anchors.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/soil-stabilization","og_locale":"en_US","og_type":"article","og_title":"Soil Stabilization - Excavations & Retaining Walls","og_description":"Discover geotechnical soil stabilization \u2713 methods for excavation support, retaining walls & anchors.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/soil-stabilization","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-03T09:41:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/soil-stabilization","url":"https:\/\/www.darda.de\/en\/knowledge\/soil-stabilization","name":"Soil Stabilization - Excavations & Retaining Walls","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-07T08:17:16+00:00","dateModified":"2026-06-03T09:41:03+00:00","description":"Discover geotechnical soil stabilization \u2713 methods for excavation support, retaining walls & anchors.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/soil-stabilization#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/soil-stabilization"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/soil-stabilization#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Soil stabilization"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19974","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19974"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19974\/revisions"}],"predecessor-version":[{"id":28012,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19974\/revisions\/28012"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19974"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}