{"id":19973,"date":"2026-01-07T13:38:11","date_gmt":"2026-01-07T12:38:11","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19973"},"modified":"2026-06-03T12:49:02","modified_gmt":"2026-06-03T10:49:02","slug":"deep-set-paving","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/deep-set-paving","title":{"rendered":"Deep-set paving"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Deep-set paving is a robust construction method for heavily trafficked areas in transportation and industrial environments. It combines a large overall construction depth with load-bearing, frost-resistant layers and is suitable for high wheel loads, tight maneuvering movements, and dynamic point loads. As a heavy-duty paving approach, it emphasizes durable load transfer, controlled water management, and maintainability over the life cycle. In planning, execution, maintenance, and deconstruction, the topic spans both classic civil engineering and fields such as <em><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a><\/em> and <em>special demolition<\/em>, where tools such as <strong>concrete demolition shears<\/strong> or <strong>hydraulic wedge splitters<\/strong> can be used for material-conserving interventions.<\/p>\n<h2>Definition: What is meant by deep-set paving?<\/h2>\n<p>Deep-set paving is a paving construction with a significantly increased total structural depth compared with conventional pavements. It consists of pavers (concrete or natural stone), a bedding layer, usually several base courses, and a sufficiently thick frost protection layer. Deep-set paving is selected where very high loads, frequent shunting movements, or sensitive subgrades are present, for example on industrial yards, container handling areas, logistics and storage yards, fire service access roads with high axle loads, or at rail sidings. Depending on requirements, the structure can be unbound (permeable) or partially or fully bound; decisive factors are load assumptions, frost resistance, drainage, and the condition of the subsoil. Typical paver thicknesses and joint concepts are chosen according to the shear and point loads to be expected, resistance to de-icing agents and fuels, and the intended maintenance strategy.<\/p>\n<h2>Layer structure and design principles<\/h2>\n<p>Deep-set paving follows the principle of load-transferring, water-conducting layers: pavers form the wearing course, beneath lies the bedding (typically 3-5&nbsp;cm), followed by one or more base courses (unbound or hydraulically bound) and a frost protection layer. The structural depth can &#8211; depending on use and ground conditions &#8211; reach from 60&nbsp;cm to over 1.0&nbsp;m. Critical are uniform compaction, a functioning slope or drainage concept, and durable joints. In bound variants, mortar bedding and joints are used; unbound constructions rely on suitable gradations for bedding and base courses to combine load-bearing capacity and permeability. Edge restraints secure interlock and prevent edge displacement. For reliable performance, detailing must limit water ingress into the bedding, secure interlock under repeated braking and steering, and ensure compatibility of materials across all layers.<\/p>\n<h2>Load assumptions, use categories, and typical applications<\/h2>\n<p>Deep-set pavements are dimensioned for high and very high demands. Load assumptions include repeated heavy wheel loads, dynamic amplification, and concentrated point loads; design is guided by traffic categories, operating cycles, and environmental exposure. Typical applications are industrial and plant traffic, transshipment areas, utility and service areas, as well as crane pads with concentrated point loads.<\/p>\n<ul>\n<li>Heavy-traffic and maneuvering areas with shear loading (forklifts, reach stackers, tractor-trailers)<\/li>\n<li>Fire and rescue routes with high axle loads<\/li>\n<li>Port and terminal areas with dynamic point loads<\/li>\n<li>Industrial yards with mixed surfacings, transitions to <em>concrete slab<\/em> areas or rails<\/li>\n<li>Waste management and recycling depots with frequent loading cycles and leachate control<\/li>\n<li>Airside or maintenance aprons where low rutting and high flatness are required<\/li>\n<\/ul>\n<h2>Planning and design<\/h2>\n<p>Design and detailing are governed by service life, wheel and point loads, frost and water regimes, and the sensitivity of the subsoil. Early coordination of material selection, drainage, and joint design prevents later damage. Investigations of subsoil variability, compatibility of unbound and bound layers, and provisions for staged maintenance should be integrated into the specification and quality plan; where infiltration is intended, hydraulic verification and pollutant control are required.<\/p>\n<h3>Subsoil and frost resistance<\/h3>\n<p>The bearing capacity of the subsoil (e.g., via <em>load plate test<\/em>) and its frost susceptibility determine thickness and composition of the base courses. In frost-prone locations, sufficiently thick capillary-breaking layers must be provided; in cohesive soils, <em>geotextile<\/em> separation or reinforcement layers help. Target stiffness values and minimum compaction levels should be defined for each layer to avoid differential settlements, and soft spots must be identified and remediated before paving.<\/p>\n<h3>Drainage and slope<\/h3>\n<p>Functioning drainage is central. Unbound constructions require permeable base courses and controlled discharge; bound constructions rely on designed slopes and point drainage. Channels, inlets, and shafts must be integrated flush with the surface; joints in their vicinity must be secured against washout. Depending on the operational context, surface crossfalls should reliably evacuate water, while internal drainage layers and filter-stable interfaces prevent fines migration and freeze-thaw damage.<\/p>\n<h3>Edge restraints and transitions<\/h3>\n<p>Curbs, edging strips, and supports prevent edge migration. Transitions to concrete pavements, rails, or hall floor joints must be detailed to safely accommodate differential settlements, shear, and water. Movement joints and restraint points must be provided constructively. Bearing and support details at covers, rails, and upstands should be designed for the governing wheel loads, and arris protection or chamfers can reduce edge spalling in high-shear zones.<\/p>\n<h2>Materials and joints<\/h2>\n<p>The choice of materials influences load-bearing behavior, wear, and maintenance. Resistance to abrasion, de-icing agents, fuels, and temperature cycling should be verified, alongside surface texture requirements for slip resistance and cleanability in industrial operations.<\/p>\n<h3>Pavers<\/h3>\n<ul>\n<li>Concrete pavers: dimensionally stable, precise edges, suitable for heavy-duty areas; surface selection according to slip resistance and wear; thickness and laying pattern selected to ensure interlock under repeated shear<\/li>\n<li>Natural stone pavers: high compressive strength and abrasion resistance; suitable for extreme point loads and representative areas; require precise bedding and jointing to limit rocking and edge damage<\/li>\n<\/ul>\n<h3>Bedding and base courses<\/h3>\n<ul>\n<li>Unbound: highly permeable with suitable particle size distribution; constant bedding thickness, avoid overcompaction; filter-stable contact to base course to prevent fines migration<\/li>\n<li>Bound: mortar bedding and joints for high shear forces; careful bond and controlled water management are required; ensure compatibility of bedding, joint mortar, and paver surface to minimize cracking and debonding<\/li>\n<\/ul>\n<h3>Joint material<\/h3>\n<p>Joints must be fully filled, shear-resistant, and refillable. In unbound systems, stable, washout-resistant materials are proven; in bound systems, suitable mortars must be used that withstand thermal and chemical influences. Joint width tolerances, refill intervals, and cleaning procedures should be defined to maintain interlock and minimize water ingress.<\/p>\n<h2>Execution: construction sequence and quality assurance<\/h2>\n<ol>\n<li>Preparation of the formation level, drainage components, and edge restraints, including proof rolling and remediation of soft spots<\/li>\n<li>Placement and compaction of frost protection and base courses with documented compaction, layer thickness control, and verification of filter stability<\/li>\n<li>Striking off the bedding, laying the pavers in the specified pattern, maintaining constant bedding thickness and approved bond patterns<\/li>\n<li>Filling the joints, controlled vibration, refilling joints, and initial cleaning without washing out fines<\/li>\n<li>Acceptance with flatness, joint, and <em>load-bearing capacity<\/em> checks, including documentation and as-built records<\/li>\n<\/ol>\n<h3>Tolerances and details<\/h3>\n<p>Flatness, slope, and joint widths must be maintained; components such as manhole covers and channels must be supported for the design loads and integrated flush. Early opening to traffic must be avoided until bedding and joints are sufficiently stable. Where saw cuts, inserts, or penetrations are necessary, cut edges and joint terminations should be sealed or detailed to prevent water and fines intrusion.<\/p>\n<h2>Maintenance, rehabilitation, and deconstruction<\/h2>\n<p>Deep-set pavements are fundamentally maintenance-friendly: pavers can be lifted individually, bedding replaced, and base courses partially supplemented. In bound systems or in areas with concrete edge beams, bearing ledges, and doweled transitions, material-appropriate <em>deconstruction<\/em> techniques are required. Planned maintenance cycles with joint topping-up, targeted re-compaction of unbound layers, and replacement of damaged units increase service life and limit whole-area interventions.<\/p>\n<h3>Selective opening and partial renewal<\/h3>\n<ul>\n<li>Unbound areas: lift pavers, inspect bedding, replace contaminated zones, relay; re-compact base courses locally and reinstate joints to the specified degree of fill<\/li>\n<li>Bound areas: cut mortar joints with low dust, release pavers with minimal damage; process edge elements with low vibration; ensure curing and protection of reinstated mortar joints before reopening<\/li>\n<\/ul>\n<h3>Use of suitable tools in deconstruction<\/h3>\n<p>In the context of <em>concrete demolition<\/em> and <em>special demolition<\/em>, different tool-based methods are considered depending on the component. <strong>Concrete demolition shears<\/strong> enable controlled removal of concrete edge beams, bearing ledges, and foundation heads in the vicinity of deep-set pavements. <strong>Hydraulic wedge splitters<\/strong> and <strong>rock wedge splitters<\/strong> are suitable for low-vibration splitting, for example when releasing massive curbs, opening concrete elements in sensitive areas, or splitting oversized natural stones; in these contexts, tools like <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> can be applied. <strong>Hydraulic power packs<\/strong> serve as the energy source, typically via <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a>. Where <strong>reinforcement<\/strong>, embedded parts, or profiles are exposed, <strong>hydraulic shear<\/strong> or <strong>steel shear<\/strong> can be used to cut steel. These approaches also support activities in <em>building gutting<\/em> and <em>concrete cutting<\/em> as well as in <em>special demolition<\/em> with strict limits on vibration, noise, and dust; effective dust suppression and water management should be provided.<\/p>\n<h2>Interfaces to application areas<\/h2>\n<p>Deep-set pavements intersect several application areas: when replacing or strengthening surfaces, <em>concrete demolition<\/em> and <em>special demolition<\/em> are often required on edge beams and foundations; in the <em>building gutting<\/em> and <em>concrete cutting<\/em> of industrial sites, paving fields are opened selectively. In portal and forecourt zones of <em>rock excavation<\/em> and <em>tunnel construction<\/em>, deep-founded paving can form the transition to civil engineering structures. Material sourcing for natural stone pavers is in the context of <em>natural stone extraction<\/em>. Special boundary conditions &#8211; such as in facilities with sensitive media &#8211; lead to <em>special demolition<\/em>, where controlled, low-vibration working methods are decisive. Interfaces with rails, hall slabs, and drainage lines must be detailed to remain watertight and shear-resistant under operational loading.<\/p>\n<h2>Common damage patterns and prevention<\/h2>\n<ul>\n<li>Rutting and edge offset: caused by insufficient bearing capacity or shear loading; remedy through sufficient layer thicknesses, suitable laying patterns, and stable edge restraints<\/li>\n<li>Joint loss and washout: the result of inadequate joint maintenance or incorrect gradations; remedy with stable joint material and regular refilling<\/li>\n<li>Pumping and water accumulation: insufficient drainage; remedy through permeable base courses, slope, and functioning inlets<\/li>\n<li>Frost heave: missing or too thin frost protection layer; remedy through capillary-breaking layers and protection against saturation<\/li>\n<li>Settlement at utility crossings and in backfill zones: prevent with layerwise compaction, geosynthetic reinforcement where required, and controlled reinstatement<\/li>\n<\/ul>\n<h2>Safety, environment, and recycling<\/h2>\n<p>Dust and noise reduction, water management, and source-separated sorting are essential aspects in construction and deconstruction. Pavers can often be reused; mineral layers can &#8211; after suitability testing &#8211; be kept in the cycle. Work must be carried out in accordance with applicable technical rules, environmental requirements, and <em>occupational safety<\/em> regulations; legal requirements must be reviewed on a project-by-project basis and, in case of doubt, professionally assessed. Resource-efficient designs with recycled aggregates, low-dust working methods, and careful handling of process water and fines support sustainability targets.<\/p>\n<h2>Practical metrics and control<\/h2>\n<ul>\n<li>Flatness and slope: functional surface drainage, no ponding<\/li>\n<li>Joint widths and degree of fill: uniform, shear-resistant, refillable<\/li>\n<li>Compaction levels: documented for each layer, avoid differential settlements<\/li>\n<li>Load-bearing capacity: verification by suitable test methods; if necessary, re-compaction or layer strengthening<\/li>\n<li>Permeability and drainage: proof of infiltration or discharge capacity consistent with the design intent<\/li>\n<li>Material conformity: grading curves, moisture content, and durability verified against specification<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Deep-set paving is a robust construction method for heavily trafficked areas in transportation and industrial environments. It combines a large overall construction depth with load-bearing, frost-resistant layers and is suitable for high wheel loads, tight maneuvering movements, and dynamic point loads. As a heavy-duty paving approach, it emphasizes durable load <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deep-set-paving\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19973","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deep-Set Paving - Industrial Pavement Design<\/title>\n<meta name=\"description\" content=\"Robust \u2713 construction method for heavy-duty pavements - Deep-set paving for high loads, frost resistance &amp; drainage.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deep-set-paving\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deep-Set Paving - Industrial Pavement Design\" \/>\n<meta property=\"og:description\" content=\"Robust \u2713 construction method for heavy-duty pavements - Deep-set paving for high loads, frost resistance &amp; drainage.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/deep-set-paving\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-03T10:49:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-set-paving\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-set-paving\",\"name\":\"Deep-Set Paving - Industrial Pavement Design\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-07T12:38:11+00:00\",\"dateModified\":\"2026-06-03T10:49:02+00:00\",\"description\":\"Robust \u2713 construction method for heavy-duty pavements - Deep-set paving for high loads, frost resistance & drainage.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-set-paving#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-set-paving\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-set-paving#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deep-set paving\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deep-Set Paving - Industrial Pavement Design","description":"Robust \u2713 construction method for heavy-duty pavements - Deep-set paving for high loads, frost resistance & drainage.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/deep-set-paving","og_locale":"en_US","og_type":"article","og_title":"Deep-Set Paving - Industrial Pavement Design","og_description":"Robust \u2713 construction method for heavy-duty pavements - Deep-set paving for high loads, frost resistance & drainage.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/deep-set-paving","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-03T10:49:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/deep-set-paving","url":"https:\/\/www.darda.de\/en\/knowledge\/deep-set-paving","name":"Deep-Set Paving - Industrial Pavement Design","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-07T12:38:11+00:00","dateModified":"2026-06-03T10:49:02+00:00","description":"Robust \u2713 construction method for heavy-duty pavements - Deep-set paving for high loads, frost resistance & drainage.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/deep-set-paving#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/deep-set-paving"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/deep-set-paving#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Deep-set paving"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19973","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19973"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19973\/revisions"}],"predecessor-version":[{"id":28016,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19973\/revisions\/28016"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19973"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}