{"id":19972,"date":"2026-01-07T08:18:26","date_gmt":"2026-01-07T07:18:26","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19972"},"modified":"2026-06-03T15:50:03","modified_gmt":"2026-06-03T13:50:03","slug":"deep-foundation-pile","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/deep-foundation-pile","title":{"rendered":"Deep foundation pile"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A deep foundation pile is a load-bearing element of a deep foundation that transfers structural loads into greater depths of the subsoil. Over a structure\u2019s life cycle, the deep foundation pile appears not only in design and construction, but also in deconstruction, repair, and repurposing. Especially where pile heads must be exposed, trimmed, or piles selectively removed in existing structures, low-vibration and low-impact methods are required. In the context of Darda GmbH, the focus is primarily on <strong>concrete pulverizers<\/strong> as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\"><strong>rock and concrete splitters<\/strong><\/a>, which have proven themselves in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\"><em>concrete demolition and special deconstruction<\/em><\/a>, in <em>strip-out and cutting<\/em>, in <em>rock excavation and tunnel construction<\/em>, and in <em>special operations<\/em>. In practice, the emphasis is on precise, low-noise pile head exposure, controlled trimming, and selective pile removal in confined or sensitive environments.<\/p>\n<h2>Definition: What is meant by a deep foundation pile?<\/h2>\n<p>A deep foundation pile is a slender, elongated foundation element that transfers vertical and, where applicable, horizontal loads and moments from a structure into competent ground. Load transfer occurs via <em>shaft friction<\/em> along the pile surface, via <em>end bearing<\/em> at the pile toe, or by a combination of both mechanisms. Deep foundation piles are made of concrete, steel, or timber; commonly used types include <strong>bored piles<\/strong>, <strong>driven piles<\/strong>, <strong>micropiles<\/strong>, and <strong>full-displacement piles<\/strong>. They mobilize the capacity of deeper soil layers and minimize settlement in soft or heterogeneous soils. In addition to axial compression, uplift (tension) and lateral resistance are relevant, with performance governed by construction quality, ground conditions, and detailing at the pile head connection.<\/p>\n<h2>Configuration, materials, and types<\/h2>\n<p>Deep foundation piles differ in construction method, material, and cross-section. Bored piles are drilled and concreted in place, often with a reinforcement cage and, where necessary, casing. Driven piles are installed as precast elements or casing pipes and densify the ground. Micropiles (mini piles) have small diameters and are suitable for confined spaces or additional underpinning. Materials are typically reinforced concrete, steel (e.g., tubes, H-sections), or timber in special cases. After curing, pile heads are trimmed to the design elevation; the reinforcement is exposed and rigidly connected to the bearing element. Variants such as <em>continuous flight auger<\/em> (CFA\/auger-cast) piles and partially or fully <em>displacement piles<\/em> extend the toolbox, while steel piles may require defined corrosion allowances or coatings depending on exposure class.<\/p>\n<h2>Load behavior and design<\/h2>\n<p>The load behavior of a deep foundation pile is governed by the interaction of subsoil and pile stiffness. In design, ultimate limit states (uplift, compression, shear, bending) and serviceability limit states (settlement, deformation) are considered. Pile groups and pile caps distribute loads but influence shaft friction due to group effects. Negative skin friction can occur in settlement-prone layers and must be accounted for. Verification covers ground parameters, pile lengths, diameters, reinforcement, minimum cover, and buckling resistance, especially for slender micropiles. Cyclic actions from traffic, waves, or machinery and lateral response (often modeled with p-y or comparable approaches) may control design in specific projects.<\/p>\n<h3>Load transfer mechanisms<\/h3>\n<ul>\n<li>Shaft friction in cohesive and non-cohesive soils; dependent on roughness and effective stress level.<\/li>\n<li>End bearing when seated on competent layers or rock at depth; important for short, stocky piles.<\/li>\n<li>Horizontal loads and moments via subgrade reactions; governing under wind or seismic action as well as for harbor and bridge piles.<\/li>\n<li>Uplift resistance through bond and, where applicable, toe contribution; detailing of reinforcement and bond length is decisive.<\/li>\n<li>Cyclic loading effects that may reduce frictional resistance; mitigation via construction control and appropriate safety formats.<\/li>\n<\/ul>\n<h2>Construction methods and sequences<\/h2>\n<p>Execution follows a defined sequence: setting up the drilling or piling rig, creating the borehole or driving the element, placing reinforcement, concreting or grouting, curing time, and then pile head formation. In rock, a rock socket (underreaming or roughening) is often created to improve end bearing and shear transfer. Continuous quality control (verticality, bore cleanliness, concrete workability, grout pressure) and complete production records support reliable capacity and serviceability.<\/p>\n<h3>Bored pile<\/h3>\n<ul>\n<li>Drilling with support fluid or casing, cleaning the base, installing the reinforcement cage, concreting via tremie pipe.<\/li>\n<li>In rock: pre-breaking, roughening, or underreaming the base; locally, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\"><strong>rock splitters<\/strong><\/a> and <strong>rock and concrete splitters<\/strong> can be used to fine-tune sockets for precise fit of inserts.<\/li>\n<li>Maintain a continuous head of fresh concrete during placement, monitor return flow and spoil, and document tremie embedment and withdrawal.<\/li>\n<\/ul>\n<h3>Driven pile and full-displacement pile<\/h3>\n<ul>\n<li>Installation by driving, pressing, or vibrating; soil is laterally displaced and compacted.<\/li>\n<li>Steel sections or tubes may be subsequently filled and grouted; completion with a pile head plate and starter reinforcement.<\/li>\n<li>Establish driving criteria and records (e.g., blows per penetration interval), and verify alignment and cut-off tolerances.<\/li>\n<\/ul>\n<h2>Pile head formation, exposure, and trimming<\/h2>\n<p>Precisely trimming the pile head to the design elevation is critical for a rigid connection to the bearing element. In sensitive environments with strict vibration and noise limits, hydraulic methods have advantages. Defined cut-off tolerances, adequate reinforcement exposure length, and a flat, sound bearing surface are essential for reliable force transmission.<\/p>\n<h3>Procedure<\/h3>\n<ol>\n<li>Expose the pile head and remove weak concrete above the design elevation.<\/li>\n<li>Trim concrete down to the sound zone, <em>expose the reinforcement<\/em>, and create a flat bearing surface.<\/li>\n<li>Prepare the bearing element (blinding layer, grout, reinforcement connection).<\/li>\n<li>Document cut-off level, exposure quality, and interface treatment for quality records.<\/li>\n<\/ol>\n<h3>Tools and equipment combinations<\/h3>\n<ul>\n<li><strong>Concrete pulverizers<\/strong> for controlled biting and shaping of the pile head, especially in <em>strip-out and cutting<\/em> as well as <em>concrete demolition and special deconstruction<\/em>.<\/li>\n<li><strong>Rock and concrete splitters<\/strong> for low-vibration separation of thick sections, e.g., in heavily reinforced bored pile heads.<\/li>\n<li><strong>Hydraulic power packs<\/strong> to supply the tools; sufficient flow rate, pressure, and robust energy management are essential on confined sites.<\/li>\n<li><strong>Steel shears<\/strong> or <strong>Multi Cutters<\/strong> for targeted cutting of exposed reinforcement, casing tubes, or steel sections.<\/li>\n<li>Accessories for dust suppression and splash protection where trimming occurs in enclosed or operational areas.<\/li>\n<\/ul>\n<h2>Deconstruction of deep foundation piles and selective demolition<\/h2>\n<p>During deconstruction, piles are removed partially (e.g., only the head zone) or completely. Reasons include repurposing, conflicts with new excavations, or removing pile heads above utilities. Selective methods minimize risks to adjacent structures and utilities. Sequencing typically isolates elements, removes concrete in controlled steps, and frees reinforcement for cutting and extraction.<\/p>\n<h3>Typical steps in existing structures<\/h3>\n<ul>\n<li>Surveying, locating utilities and existing piles, defining cut interfaces.<\/li>\n<li>Creating saw cuts or split lines, controlled removal using <strong>concrete pulverizers<\/strong> or splitting techniques.<\/li>\n<li>Cutting reinforcement and steel components with <strong>steel shears<\/strong> or <strong>Multi Cutters<\/strong>.<\/li>\n<li>Hoisting, sorting, and disposing of materials with defined waste streams and protection of adjacent assets.<\/li>\n<\/ul>\n<h2>Deep foundation piles in rock and in tunnel construction<\/h2>\n<p>In rock, piles transfer loads via end bearing or are installed as grouted micropiles. When forming pile bases, creating underreams, or removing obstructions, <strong>rock splitters<\/strong> provide a low-vibration complement to drilling and chiseling. In <em>rock excavation and tunnel construction<\/em>, confined space, dust suppression, and controlled fracture patterns are decisive-an application field for compact hydraulic tools with matching power supply from <strong>hydraulic power packs<\/strong>. Water management, ventilation, and careful staging reduce overbreak and improve safety.<\/p>\n<h2>Quality assurance, testing, and documentation<\/h2>\n<p>Pile foundations are qualified via suitability, production, and test piles. Static pile load tests, dynamic tests, and integrity tests (e.g., low-strain) serve verification. During execution, concreting records, measurement data for drilling and base cleaning, and information on grout pressures must be documented. For pile head formation, complete documentation of trim elevations, reinforcement condition, and exposure quality is recommended. Where required, advanced integrity methods (e.g., cross-hole sonic or thermal profiling) may supplement conventional testing to confirm continuity and toe conditions.<\/p>\n<h3>Acceptance criteria and monitoring<\/h3>\n<ul>\n<li>Defined acceptance criteria for settlement, capacity, and lateral performance based on the design model and test results.<\/li>\n<li>On-site monitoring of vibrations, noise, and dust during trimming and deconstruction with threshold values and response actions.<\/li>\n<\/ul>\n<h2>Environmental, vibration, and noise control<\/h2>\n<p>Especially in inner-city projects, vibrations, airborne noise, and dust must be kept to low emissions. Hydraulically operated <strong>concrete pulverizers<\/strong> and <strong>rock and concrete splitters<\/strong> contribute to controlled, quiet removal. Water misting, point extraction, and organized material logistics reduce dust. Legal requirements and local provisions must always be checked for each project; statements here can only be general and are not binding. Measured control (e.g., peak particle velocity, noise levels) supports compliance and timely adjustment of methods.<\/p>\n<h2>Occupational safety and organization<\/h2>\n<p>For all work on deep foundation piles, safe load handling, stable excavations, and edge fall protection are paramount. Hydraulic hoses and couplings must be checked before use, and depressurization ensured during tool changes. Cutting areas at reinforcement must be safeguarded; sparks and crushing hazards are to be avoided. Coordination of lifting devices, drilling rigs, and handheld tools is organized through clear communication channels and unambiguous task allocation. Exclusion zones, proper tool selection for the carrier, and secure storage of removed segments reduce secondary risks.<\/p>\n<h2>Planning notes for existing structures, underpinning, and repurposing<\/h2>\n<p>Underpinning using micropiles supplements existing foundations when loads increase or excavations weaken the structure. Pile head positions should be checked early for clashes with new transfer beams and utilities. For trimming and exposure, it is advisable to plan for hydraulic methods, especially when neighboring buildings are sensitive. In <em>special operations<\/em> with limited access, a modular combination of <strong>hydraulic power packs<\/strong>, <strong>concrete pulverizers<\/strong>, and <strong>Multi Cutters<\/strong> can simplify the workflow. Early coordination of access routes, staging areas, and power supply simplifies logistics and shortens intervention times.<\/p>\n<h2>Typical pitfalls and practical solutions<\/h2>\n<ul>\n<li>Insufficiently cleaned pile base: risk to capacity-mitigation via documented base cleaning and, if in rock, pre-breaking with splitting techniques.<\/li>\n<li>Poorly defined pile head: unfavorable load transfer-ensure controlled trimming, flatness, and proper reinforcement exposure.<\/li>\n<li>Excessive vibrations in existing structures: switch to hydraulic, low-vibration methods, e.g., splitting instead of hammering.<\/li>\n<li>Rebar remnants in the load path: cut selectively with <strong>steel shears<\/strong>, remove burrs.<\/li>\n<li>Premature trimming before adequate curing: risk of microcracking and impaired bond-adhere to specified curing times.<\/li>\n<li>Insufficient clearance for tooling and lifting: plan working envelopes and lifting points at design stage and verify on site.<\/li>\n<\/ul>\n<h2>Application areas in the context of deep foundation piles<\/h2>\n<p>The interface between deep foundation piles and demolition technology spans multiple application areas:<\/p>\n<ul>\n<li><strong>Concrete demolition and special deconstruction<\/strong>: pile head removal, partial deconstruction of pile groups, exposing and adjusting connection zones with <strong>concrete pulverizers<\/strong>.<\/li>\n<li><strong>Strip-out and cutting<\/strong>: selective removal of pile remnants below slabs-on-grade, cutting casing tubes with <strong>Multi Cutters<\/strong> or <strong>steel shears<\/strong>.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: strengthening pile bases or removing obstructions using <strong>rock and concrete splitters<\/strong>.<\/li>\n<li><strong>Natural stone extraction<\/strong>: a peripheral topic for pile foundations in quarry areas, e.g., when creating platforms via pile caps and in rocky ground.<\/li>\n<li><strong>Special operations<\/strong>: work in sensitive neighborhoods, facilities with operating constraints, or underground, where compact hydraulic tools are advantageous.<\/li>\n<\/ul>\n<h2>Standards guidance and documents<\/h2>\n<p>European and national standards, along with supplementary recommendations, exist for the planning, execution, and testing of pile foundations. They provide frameworks for design, execution tolerances, test procedures, and documentation. They must be selected and applied project-specifically; legally binding requirements cannot be conclusively presented here. In addition, project specifications may stipulate enhanced test regimes, materials provisions, and documentation templates that take precedence on site.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A deep foundation pile is a load-bearing element of a deep foundation that transfers structural loads into greater depths of the subsoil. Over a structure\u2019s life cycle, the deep foundation pile appears not only in design and construction, but also in deconstruction, repair, and repurposing. Especially where pile heads must <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deep-foundation-pile\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19972","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deep Foundation Pile - Definition, Types &amp; Methods<\/title>\n<meta name=\"description\" content=\"Geotechnical guide to the deep foundation pile - types &amp; loads, design \u2713 construction and testing.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deep-foundation-pile\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deep Foundation Pile - Definition, Types &amp; Methods\" \/>\n<meta property=\"og:description\" content=\"Geotechnical guide to the deep foundation pile - types &amp; loads, design \u2713 construction and testing.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/deep-foundation-pile\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-03T13:50:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-foundation-pile\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-foundation-pile\",\"name\":\"Deep Foundation Pile - Definition, Types & Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-07T07:18:26+00:00\",\"dateModified\":\"2026-06-03T13:50:03+00:00\",\"description\":\"Geotechnical guide to the deep foundation pile - types & loads, design \u2713 construction and testing.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-foundation-pile#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-foundation-pile\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-foundation-pile#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deep foundation pile\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deep Foundation Pile - Definition, Types & Methods","description":"Geotechnical guide to the deep foundation pile - types & loads, design \u2713 construction and testing.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/deep-foundation-pile","og_locale":"en_US","og_type":"article","og_title":"Deep Foundation Pile - Definition, Types & Methods","og_description":"Geotechnical guide to the deep foundation pile - types & loads, design \u2713 construction and testing.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/deep-foundation-pile","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-03T13:50:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/deep-foundation-pile","url":"https:\/\/www.darda.de\/en\/knowledge\/deep-foundation-pile","name":"Deep Foundation Pile - Definition, Types & Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-07T07:18:26+00:00","dateModified":"2026-06-03T13:50:03+00:00","description":"Geotechnical guide to the deep foundation pile - types & loads, design \u2713 construction and testing.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/deep-foundation-pile#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/deep-foundation-pile"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/deep-foundation-pile#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Deep foundation pile"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19972","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19972"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19972\/revisions"}],"predecessor-version":[{"id":28032,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19972\/revisions\/28032"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19972"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}