{"id":19970,"date":"2026-01-06T14:42:16","date_gmt":"2026-01-06T13:42:16","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19970"},"modified":"2026-06-03T08:13:03","modified_gmt":"2026-06-03T06:13:03","slug":"deep-drainage","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/deep-drainage","title":{"rendered":"Deep drainage"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Deep drainage forms the underground backbone for conveying wastewater and stormwater from buildings, industrial facilities, and traffic areas. It comprises pipelines, shafts, and structures below finished grade as well as the associated construction and rehabilitation methods in the ground. In planning, construction, and repair, classical <em>civil engineering (underground works)<\/em>, <strong>sewer construction works<\/strong>, and selective <strong>concrete demolition<\/strong> intersect. Where existing shafts must be opened, foundation breakthroughs created, or rock formations along the alignment loosened, controlled, low-vibration methods are used &#8211; for example with concrete pulverizers or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> in combination with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">suitable hydraulic power units<\/a>. This interplay is particularly relevant in sensitive environments, in densely built inner-city areas, and when working on existing structures.<\/p>\n<p>Deep drainage thus links hydraulic performance with constructability and selective deconstruction. Proper method selection supports schedule reliability, protects adjacent assets, and ensures long-term serviceability of the <strong>underground sewer network<\/strong>.<\/p>\n<h2>Definition: What is meant by deep drainage?<\/h2>\n<p>Deep drainage refers to the entirety of all <em>underground<\/em> drainage facilities for the orderly conveyance of wastewater and stormwater. These include base pipelines, connection lines, inspection shafts and control shafts, drop shafts, backwater valves, sump pumps, and drainage systems. The systems are installed at sufficient depth to remain frost-free, operate with a defined gradient, and stay watertight over the long term. Materials range from concrete and reinforced concrete to vitrified clay and plastic pipes; selection is based on hydraulic, structural, and chemical requirements as well as the subsoil and the tie-in elevation to the public sewer. In addition, the procedures for execution and quality assurance &#8211; earthworks, shoring, bedding, compaction, leakage tests, and channel\/invert testing &#8211; are part of the deep drainage domain.<\/p>\n<p>Functionally, deep drainage distinguishes between <strong>gravity sewers<\/strong> with self-cleansing gradients and <strong>pressure lines<\/strong> (force mains) driven by pumps. Key performance criteria include infiltration and inflow control, resistance to external loads, and operational accessibility for cleaning and inspection. Interfaces to surface drainage and stormwater management must be hydraulically coordinated to avoid surcharge and backwater.<\/p>\n<h2>Interfaces between deep drainage and selective deconstruction<\/h2>\n<p>Where deep drainage ties into existing structures, an interface to <strong>concrete demolition and special demolition<\/strong> arises. Typical examples include opening and enlarging inspection shafts, creating foundation breakthroughs for new base lines, removing damaged manhole rings, trimming channel inverts, or the controlled opening of sewer crowns. In these situations, concrete pulverizers prove their worth for precise removal of reinforced components, and hydraulic wedge splitters for low-vibration opening of massive cross-sections or for loosening rock in the pipe trench. The gentle working method protects existing utilities, reduces low vibration levels in the neighborhood, and lowers the risk of secondary damage &#8211; crucial in inner-city projects, for sensitive infrastructure, and in <em>special deployments<\/em>.<\/p>\n<ul>\n<li>Dimensional accuracy when creating cutouts and penetrations for new connections.<\/li>\n<li>Selective exposure of reinforcement with minimal collateral damage to adjacent components.<\/li>\n<li>Reduction of secondary emissions (noise, vibration, dust) in confined and sensitive environments.<\/li>\n<\/ul>\n<h2>Planning and configuration of deep drainage systems<\/h2>\n<p>Robust deep drainage follows hydraulic design, geotechnical boundary conditions, and recognized rules of practice. Central building blocks are the gradient, pipe sizing, choice of materials, shaft spacing, bedding, and the ability to inspect and maintain.<\/p>\n<h3>Alignment, gradient, and hydraulics<\/h3>\n<p>Base lines are laid with a continuous, consistent gradient to avoid deposits and ensure reliable conveyance during rainfall events. A load-bearing, low-settlement subsoil with coordinated bedding and compaction is just as important as adequate pipe stiffness. At gradient drops, drop shafts provide energy-dissipating guidance; at shallow depths, modest bends and accessible shafts are crucial for future cleaning and rehabilitation.<\/p>\n<ul>\n<li>Target self-cleansing velocities and minimum gradients to limit sedimentation in long runs.<\/li>\n<li>Verify hydraulic performance for design storms and surcharge scenarios, including backwater impacts.<\/li>\n<li>Coordinate shaft spacing with cleaning technology and anticipated maintenance intervals.<\/li>\n<\/ul>\n<h3>Shafts and structures<\/h3>\n<p>Inspection shafts enable changes in direction, gradient drops, and control. Shaft bases with shaped inverts ensure self-cleansing flow. When modifying existing systems, manhole rings are often selectively removed or openings retrofitted &#8211; here, concrete pulverizers are used for ring-by-ring removal and hydraulic wedge splitters for dimensionally accurate enlargement of breakthroughs. In confined excavations with adjacent buildings, the low-vibration approach is particularly advantageous.<\/p>\n<h3>Materials, corrosion, and watertightness<\/h3>\n<p>Material selection considers abrasion from grit, biogenic corrosion (e.g., H2S), external chemical exposure, and joint integrity. Durable systems combine suitable pipe materials with resistant gaskets, corrosion protection in the crown zone, and <strong>wATERTIGHT<\/strong> joints over the structure&#8217;s service life. Where aggressive media are expected, linings or coatings and appropriately graded bedding minimize degradation risks.<\/p>\n<h2>Construction methods in the ground: excavation, shoring, and installation<\/h2>\n<p>Installation is carried out in open trenches or &#8211; for undisturbed surfaces &#8211; using trenchless methods. In open trenches, subsoil, groundwater, and traffic conditions determine the choice of shoring. The goal is a stable excavation with a dry working area and a defined formation.<\/p>\n<h3>Trench shoring and groundwater<\/h3>\n<p>Depending on depth and soil, lightweight shoring systems, slide rail shoring, or soldier pile walls are used. With groundwater present, temporary groundwater lowering is required with the least possible impact on the surroundings. In rocky or boulder-rich soils, hydraulic wedge splitters facilitate controlled loosening without blasting works &#8211; an advantage in densely built areas and in <em>rock excavation and tunnel construction<\/em> where sensitivity to noise and vibration is high.<\/p>\n<h3>Tie-in to existing systems and connection works<\/h3>\n<p>Connecting to existing pipelines requires precise opening and creation of pipe connections. When penetrating foundation beams or girders, selective demolition methods are needed: concrete pulverizers for reinforced components, supplemented by hydraulic shear (demolition shear) for reinforcing steel. Hydraulic power packs provide the necessary force in a compact package &#8211; helpful in narrow shafts.<\/p>\n<h3>Bedding, backfill, and compaction<\/h3>\n<p>Uniform bedding distributes loads and limits deformation. Granular bedding and surround are placed in layers, compacted to the specified density, and kept clean of oversized particles that could point-load the pipe. Backfill is executed in lifts with controlled moisture to achieve the target degree of compaction while preventing flotation in high groundwater conditions.<\/p>\n<ul>\n<li>Define bedding thickness and grain size distribution according to pipe stiffness and soil class.<\/li>\n<li>Compact symmetrically on both sides of the pipe to avoid displacement and ovalization.<\/li>\n<li>Use geotextile separation where native soils risk contaminating the bedding layer.<\/li>\n<\/ul>\n<h2>Inspection, rehabilitation, and deconstruction in deep drainage<\/h2>\n<p>Regular inspections, condition classification, and a coordinated rehabilitation strategy ensure durability. Depending on the damage pattern, trenchless methods (e.g., liners) or open-cut replacement are used. When structures below grade are selectively deconstructed, protecting the surroundings takes priority.<\/p>\n<h3>Selective concrete demolition below finished grade<\/h3>\n<p>For removing manhole heads, enlarging access openings, or taking out defective inverts, concrete pulverizers are well-suited thanks to their controlled, low-splinter working principle. Hydraulic wedge splitters create defined crack patterns in massive components and enable non-destructive release of large blocks. In combination with combination shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a>, and steel shear, reinforcement and mixed materials can be separated efficiently &#8211; a typical use case in <strong>building gutting and concrete cutting<\/strong> as well as in <strong>concrete demolition and special demolition<\/strong>.<\/p>\n<h3>Testing and acceptance criteria<\/h3>\n<p>Acceptance typically includes leakage testing with air or water, dimensional checks, and CCTV inspection of joints, inverts, and laterals. Mandrel tests in flexible pipelines verify deformation limits, while load tests and monitoring of settlement confirm geotechnical performance. All results are compiled in a traceable dossier for handover and future asset management.<\/p>\n<h2>Challenges: confined spaces, protection of existing assets, and safety<\/h2>\n<p>Work in shafts and trenches entails specific requirements for occupational safety, rescue routes, ventilation, and handling potential hazardous substances (e.g., biogases). In addition, neighboring buildings, utility lines, and traffic must be protected. Low-vibration methods, low-dust working practices, and careful handling of arising material support environmental protection and construction quality. The use of compact, hydraulically powered tools eases access in tight conditions.<\/p>\n<h3>Environmental protection and emissions<\/h3>\n<p>Dust suppression, noise mitigation, and vibration monitoring reduce impacts on residents and sensitive facilities. Water management with proper treatment of pumped groundwater and sediment control prevents turbidity and contamination. Segregated material streams enable recycling of concrete and metals while ensuring compliant disposal of contaminated soils.<\/p>\n<h2>Technology overview: tools and methods for underground deconstruction<\/h2>\n<p>In practice, the following tool categories have proven themselves where deep drainage and selective demolition coincide:<\/p>\n<ul>\n<li>Concrete pulverizers for precise deconstruction of shaft walls, covers, and foundation breakthroughs with controlled material removal.<\/li>\n<li>Hydraulic wedge splitters for inducing cracks and releasing massive components or rock, particularly suitable in sensitive neighborhoods.<\/li>\n<li>Hydraulic power packs as mobile power units for operating tools in shafts, trenches, and tunnels.<\/li>\n<li>Combination shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a>, and steel shear for cutting reinforcement, grating, and built-in components.<\/li>\n<\/ul>\n<p>Selection depends on component thickness, degree of reinforcement, accessibility, and the requirements for vibration, noise, and dust. The goal is a reproducible, safe working method with minimal impact on the surroundings.<\/p>\n<p>Complementary selection factors include available carrier equipment, hose routing in tight shafts, and control over splitting pressure. Operator training and a clear tool matrix support efficient and safe execution.<\/p>\n<h2>Typical use cases across application areas<\/h2>\n<ol>\n<li>Concrete demolition and special demolition: Opening inspection shafts, removing manhole heads, selective removal of defective inverts &#8211; preferably with concrete pulverizers.<\/li>\n<li>Building gutting and concrete cutting: Creating foundation breakthroughs for new base lines and removing inserts; a combination of concrete pulverizer, steel shear, and supplementary cutting methods.<\/li>\n<li>Rock excavation and tunnel construction: Clearing alignments in rocky subsoil using hydraulic wedge splitters &#8211; low-vibration and dimensionally accurate.<\/li>\n<li>Natural stone extraction: Extracting and sizing natural stone for manhole covers or surrounding construction tasks; controlled splitting supports dimensional accuracy.<\/li>\n<li>Special deployments: Work in sensitive areas such as hospitals, laboratories, or heritage sites where emissions and vibrations are strictly limited.<\/li>\n<\/ol>\n<h2>Quality assurance and documentation<\/h2>\n<p>Durability depends on careful bedding, defined compaction, and tight joints. In addition, condition reports, measurement logs, and photo documentation create transparency &#8211; from the excavation through installation to the closed trench. For selective deconstruction below finished grade, continuous barricading, checking the stability of the shoring, and tracking material flows (concrete, soil, reinforcement) are essential.<\/p>\n<ul>\n<li>Document leakage tests, deformation checks, and CCTV results in standardized formats for long-term traceability.<\/li>\n<li>Record groundwater management, disposal pathways, and recycling quotas in compliance with permit conditions.<\/li>\n<li>Monitor settlements and adjacent structures during and after backfilling to safeguard existing assets.<\/li>\n<\/ul>\n<h2>Practical recommendations for planning and execution<\/h2>\n<ul>\n<li>Plan early interface coordination between sewer construction works and deconstruction technology; size access routes and work areas.<\/li>\n<li>On-site component assessment: material, reinforcement ratio, thickness, and stress state determine the tool choice.<\/li>\n<li>Evaluate vibration, noise, and dust in advance; prioritize low-emission methods such as dust suppression and low vibration levels.<\/li>\n<li>Plan for safe handling of groundwater and soil; document installation and removal of shoring elements with regard to settlements.<\/li>\n<li>Review work and rescue concepts for working in shafts and trenches comprehensively within the team, focusing on occupational safety.<\/li>\n<li>Define acceptance criteria early, including leakage testing, CCTV scope, and documentation standards for handover.<\/li>\n<li>Schedule maintenance access and cleaning logistics during design to ensure life-cycle performance of the deep drainage system.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Deep drainage forms the underground backbone for conveying wastewater and stormwater from buildings, industrial facilities, and traffic areas. It comprises pipelines, shafts, and structures below finished grade as well as the associated construction and rehabilitation methods in the ground. In planning, construction, and repair, classical civil engineering (underground works), sewer <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deep-drainage\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19970","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deep Drainage for Sewer &amp; Stormwater<\/title>\n<meta name=\"description\" content=\"Master deep drainage for underground sewer and stormwater systems \u2713 covering design, low vibration methods and safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deep-drainage\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deep Drainage for Sewer &amp; Stormwater\" \/>\n<meta property=\"og:description\" content=\"Master deep drainage for underground sewer and stormwater systems \u2713 covering design, low vibration methods and safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/deep-drainage\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-03T06:13:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-drainage\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-drainage\",\"name\":\"Deep Drainage for Sewer & Stormwater\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-06T13:42:16+00:00\",\"dateModified\":\"2026-06-03T06:13:03+00:00\",\"description\":\"Master deep drainage for underground sewer and stormwater systems \u2713 covering design, low vibration methods and safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-drainage#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-drainage\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deep-drainage#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deep drainage\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deep Drainage for Sewer & Stormwater","description":"Master deep drainage for underground sewer and stormwater systems \u2713 covering design, low vibration methods and safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/deep-drainage","og_locale":"en_US","og_type":"article","og_title":"Deep Drainage for Sewer & Stormwater","og_description":"Master deep drainage for underground sewer and stormwater systems \u2713 covering design, low vibration methods and safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/deep-drainage","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-03T06:13:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/deep-drainage","url":"https:\/\/www.darda.de\/en\/knowledge\/deep-drainage","name":"Deep Drainage for Sewer & Stormwater","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-06T13:42:16+00:00","dateModified":"2026-06-03T06:13:03+00:00","description":"Master deep drainage for underground sewer and stormwater systems \u2713 covering design, low vibration methods and safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/deep-drainage#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/deep-drainage"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/deep-drainage#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Deep drainage"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19970","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19970"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19970\/revisions"}],"predecessor-version":[{"id":28010,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19970\/revisions\/28010"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}