{"id":19957,"date":"2026-01-05T09:58:46","date_gmt":"2026-01-05T08:58:46","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19957"},"modified":"2026-06-02T08:40:03","modified_gmt":"2026-06-02T06:40:03","slug":"partial-deconstruction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/partial-deconstruction","title":{"rendered":"Partial deconstruction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Partial deconstruction is the precise, controlled removal of individual components or building sections while preserving the remainder of the structure. It combines technical precision with a considerate approach to keep interventions low-vibration, low-dust, and material-specific. Central methods include <strong>concrete breaking with concrete demolition shears<\/strong> as well as the <strong>splitting release with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> from Darda GmbH. They enable selective work in densely built environments, in existing structures, in industrial plants, and in tunnel construction. Typical objectives include exact interfaces for refurbishment, preservation of serviceability, and adherence to stringent environmental thresholds for dust, noise, and vibration.<\/p>\n<h2>Definition: What is meant by partial deconstruction?<\/h2>\n<p>Partial deconstruction refers to the <em>targeted dismantling<\/em> of components, structural zones, or plant parts while other areas remain untouched and continue to be used or are strengthened later. The aim is a <strong>selective separation<\/strong> of materials (e.g., concrete, reinforcement steel, masonry, natural stone, metals) while minimizing influence on the structural system, surroundings, and users. In contrast to full demolition, interventions are smaller in scale, more planning-intensive, and often associated with <em>limits on vibration, noise, and dust<\/em>. Hydraulic tools such as concrete demolition shears, rock splitters, and combination shears from Darda GmbH are proven means to open, separate, or downsize components in a controlled manner. In practice, partial deconstruction is also understood as <em>selective dismantling<\/em> or <em>controlled deconstruction<\/em> that is backed by an engineering survey, method statements, and measurable acceptance criteria.<\/p>\n<h2>Planning and sequence in partial deconstruction<\/h2>\n<p>Successful partial deconstruction starts with a detailed analysis and proceeds via precise sequence planning to safe execution. The earlier the selection of methods and tools is set, the better logistics, occupational safety, and material separation can be aligned. A robust plan defines load paths, execution tolerances, monitoring methods, and hold points for verification.<\/p>\n<h3>Existing-structure survey and preliminary investigations<\/h3>\n<ul>\n<li>Recording of building data, load paths, reinforcement layouts, and material qualities<\/li>\n<li>Assessment of vibration sensitivities (neighboring buildings, plants, utilities)<\/li>\n<li>Identification of potential disruptive substances and components containing hazardous materials; proper procedures according to the current state of the art<\/li>\n<li>Definition of protection zones, access routes, and openings for transport and disposal<\/li>\n<li>Use of non-destructive testing and selective exposure to validate assumptions on reinforcement and material condition<\/li>\n<li>Digital capture where useful, e.g., 3D scans or surveyed as-built data for exact positioning of openings<\/li>\n<\/ul>\n<h3>Deconstruction concept and sequence<\/h3>\n<ol>\n<li>Definition of the intervention area and the permissible effects on the existing structure<\/li>\n<li>Selection of methods: <strong>concrete demolition shear<\/strong> for low-shock, controlled crushing; <strong>rock and concrete splitters<\/strong> for low-vibration separations; <em>combination shears<\/em> and <em>steel shears<\/em> for reinforcement and sections<\/li>\n<li>Temporary safeguards (shoring, underpinning, protective scaffolds)<\/li>\n<li>Material separation and interim storage (concrete, steel, masonry, natural stone, metals)<\/li>\n<li>Ongoing control of dimensional accuracy, vibrations, and dust generation<\/li>\n<li>Logistics and access constraints including lifting options, hose routing, and waste removal paths<\/li>\n<li>Definition of hold points, stop criteria, and emergency procedures for unplanned findings or exceedances<\/li>\n<\/ol>\n<h3>Permits, monitoring, and coordination<\/h3>\n<ul>\n<li>Coordination of working time windows, interfaces with operations, and shutdowns of utilities<\/li>\n<li>Project-specific permits and notifications related to noise, dust, vibration, and waste handling<\/li>\n<li>Monitoring concept with threshold values, alarm levels, and reporting intervals<\/li>\n<li>Communication plan for stakeholders and neighboring properties to manage sensitivities<\/li>\n<\/ul>\n<h2>Fields of application: Where partial deconstruction is particularly useful<\/h2>\n<p>Partial deconstruction is established in many <strong>application areas<\/strong> of Darda GmbH. It is particularly suitable where occupancy must be maintained, tolerances are tight, or sensitive structures and finishes are to be preserved.<\/p>\n<ul>\n<li><strong>Concrete demolition and special deconstruction:<\/strong> Opening slabs, removing wall panels, trimming upstands, partial foundation deconstruction<\/li>\n<li><strong>Strip-out and cutting:<\/strong> Removal of non-load-bearing components, selective openings for services and building systems<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> Wedging, profile corrections, and low-vibration enlargements using rock splitters<\/li>\n<li><strong>Natural stone extraction:<\/strong> Gentle release of blocks and structural surfaces without blasting effects<\/li>\n<li><strong>Special operations:<\/strong> Work in sensitive facility areas, e.g., during ongoing operations or with restricted access<\/li>\n<li><strong>Bridge and infrastructure adaptations:<\/strong> Local thickening removal, bearing replacement zones, and abutment adjustments with strict vibration limits<\/li>\n<li><strong>Healthcare and laboratory environments:<\/strong> Targeted interventions under cleanliness and continuity constraints<\/li>\n<\/ul>\n<h2>Methods and tools: precise, low-vibration, material-specific<\/h2>\n<p>The choice of tool determines quality, speed, and safety. Hydraulic drives via <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/strong> from Darda GmbH provide the energy for compact hand-held systems that have proven themselves in existing structures. Selection considers cross-section thickness, reinforcement density, access and clearances, and the permissible effects on adjacent components.<\/p>\n<h3>Concrete demolition shears<\/h3>\n<p>Concrete demolition shears crush concrete in a controlled manner by high compressive forces at the component edge or at predrilled starting points. Advantages include low vibration, short response times, and good control over crack propagation and breakout size. Typical applications are nibbling edges, opening slab fields, and selectively removing concrete cover over reinforcement, which is then cut with <em>steel shears<\/em> or <em>combination shears<\/em>. With appropriate staging and bite sequences, precise openings with clean edges can be achieved without continuous saw cutting.<\/p>\n<h3>Rock and concrete splitters<\/h3>\n<p>Rock splitter cylinders are used in core drill holes. By hydraulic expansion, they induce tensile stresses in the material and split it with low vibration. The method is suitable for massive members such as foundations, heavily reinforced walls, and for <strong>rock excavation in tunnel construction<\/strong> where blasting alternatives are required. The low vibration protects the existing structure and the surroundings. Effective results depend on a suitable drilling pattern, hole diameter and depth matching the splitter, and a staged expansion sequence to steer crack lines.<\/p>\n<h3>Combination shears, Multi Cutters, and steel shears<\/h3>\n<p>Depending on cross-section and location, <em>combination shears<\/em>, <em>Multi Cutters<\/em>, and <em>steel shears<\/em> from Darda GmbH are used to cut reinforcing steel, sections, lines, and beams. They ideally complement concrete demolition shears: After removing the concrete cover, reinforcement is cleanly cut, which facilitates <strong>demolition sorting<\/strong>. The tools enable controlled, often spark-reduced cutting in confined spaces with high dimensional accuracy.<\/p>\n<h3>Concrete demolition shears vs. splitting technique<\/h3>\n<ul>\n<li><strong>Concrete demolition shear:<\/strong> fast material removal, good edge accuracy, advantageous for exposed-concrete openings and controlled deconstruction steps<\/li>\n<li><strong>Splitters:<\/strong> minimal vibration, suitable for massive components, sensitive existing structures, or blasting-related restrictions<\/li>\n<li><strong>Hybrid sequences:<\/strong> combine splitting for primary separation with shears for edge conditioning and reinforcement cutting<\/li>\n<\/ul>\n<h2>Material separation and circular economy in partial deconstruction<\/h2>\n<p>Selective deconstruction is a key to <em>Urban Mining<\/em> and resource management. By combining the concrete demolition shear (for defined break edges) and shears (for reinforcement), clear fractions are created. Rock and concrete splitters favor large, single-grade pieces and reduce fines. High-quality separation supports reuse and recycling routes, contributes to lower disposal costs, and improves documentation for sustainability targets.<\/p>\n<h3>Sorting and recovery<\/h3>\n<ul>\n<li>Separate collection of concrete, masonry, natural stone, reinforcing steel, and non-ferrous metals<\/li>\n<li>Reduction of contamination through clean cuts and defined fracture zones<\/li>\n<li>Optimized logistics thanks to on-site downsizing into manageable piece sizes<\/li>\n<li>Optional on-site crushing of concrete to graded recycled aggregates where permitted<\/li>\n<\/ul>\n<h3>Dust, noise, and vibration mitigation<\/h3>\n<ul>\n<li>Water mist or localized wetting at fracture points<\/li>\n<li>Use of splitting methods where vibration limits are tight<\/li>\n<li>Gentle sequencing: small bite sequences with the concrete demolition shear instead of large-area impacts<\/li>\n<li>Local enclosures and negative-pressure zones for sensitive areas; use of real-time monitors where thresholds are strict<\/li>\n<\/ul>\n<h2>Construction sequence in existing structures: sequences and interfaces<\/h2>\n<p>A well-coordinated sequence avoids downtime and minimizes risks in existing structures. Interfaces with structural temporary works, building services, and operations must be synchronized to maintain stability and functionality throughout.<\/p>\n<ol>\n<li>Set up the construction site, implement protection and partitioning measures<\/li>\n<li>Expose separation joints, mark cutting and splitting points<\/li>\n<li>Preparatory drill holes for rock splitter cylinders where splitting is planned<\/li>\n<li>Removal with the concrete demolition shear in defined stages, with reinforcement cut in parallel using shears<\/li>\n<li>Interim inspections, surveying, and adjustment of deconstruction edges<\/li>\n<li>Clearing, sorting, and haulage of the fractions<\/li>\n<li>Final cleaning of work areas, verification measurements, and release for follow-on trades<\/li>\n<li>Update of as-built information and closeout of monitoring records<\/li>\n<\/ol>\n<h2>Special deployments and sensitive environments<\/h2>\n<p>In industrial plants or during the deconstruction of tanks and vessels, <strong>tank cutters<\/strong> and shear tools from Darda GmbH are established means. With restricted access, in tunnels, or in heritage-sensitive areas, <em>compact, hydraulic hand-held tools<\/em> offer advantages: They operate quietly, with low vibration, and enable precise interventions with high dimensional accuracy. Where ignition risks or cleanliness requirements apply, method choices and tool selection are aligned with project-specific protection concepts.<\/p>\n<h3>Rock removal and tunnel construction<\/h3>\n<p>Rock splitter cylinders allow profile corrections, niches, and cross-section adjustments without blasting-induced vibration. This protects surrounding structures, infrastructures, and installations. The method is widely applied in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a> where low-vibration requirements are strict. Phased drilling and staged expansion help to limit overbreak and achieve accurate profiles.<\/p>\n<h2>Quality assurance, limits, and risks<\/h2>\n<p>Partial deconstruction requires continuous control. Measurements of vibrations, dust, and noise, as well as deformation checks on load-bearing components, support execution. Limits arise with heavily prestressed reinforcement, concealed cavities, or unclear load redistributions. In such cases, adapted sequences, provisional safeguards, and a renewed choice of tools (concrete demolition shear vs. splitter) are advisable. Quality is managed via an inspection and test plan with acceptance criteria for geometry, roughness, residual vibration, and cleanliness of interfaces.<\/p>\n<h3>Documentation<\/h3>\n<ul>\n<li>Photo documentation of separation points, reinforcement cuts, and safeguards<\/li>\n<li>Evidence of material fractions for disposal and recovery<\/li>\n<li>Logging of measurement data and adjustments in the process<\/li>\n<li>Digital markups or model updates to reflect executed openings and changes<\/li>\n<\/ul>\n<h2>Occupational safety and legal notes<\/h2>\n<p>Work in partial deconstruction is carried out in accordance with the relevant rules of the art, manufacturer\u2019s instructions, and company protection concepts. Measures for fall protection, load support, isolation of utilities, fire and explosion protection, as well as dust and noise protection must be planned project-specifically. Legal requirements may vary depending on location and scope; early coordination with specialist planners and the competent authorities is recommended. The information provided is general and not intended as case-specific advice. Additional attention is required for silica dust exposure control, hydraulic hose integrity, tool-specific training, and lockout procedures on adjacent systems.<\/p>\n<h2>Practical tips for efficient partial deconstruction<\/h2>\n<ul>\n<li>Early choice between <strong>concrete demolition shear<\/strong> and <strong>splitter<\/strong> depending on component thickness, reinforcement content, and surroundings<\/li>\n<li>Small, plannable removal steps instead of large-area interventions<\/li>\n<li>Lay out drilling patterns for splitter cylinders so fracture lines meet existing joints<\/li>\n<li>Expose reinforcement (e.g., locally) to make it visible, then cut<\/li>\n<li>Match hydraulic power packs to adequate flow rate and hose runs<\/li>\n<li>Organize material flow and fraction bins close to the intervention area<\/li>\n<li>Use mock-ups or pilot areas to validate bite size, drilling pattern, and sequence<\/li>\n<li>Stage waste removal to keep work fronts free and minimize secondary handling<\/li>\n<li>Keep spare wedge sets, blades, and hoses available to avoid downtime<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Partial deconstruction is the precise, controlled removal of individual components or building sections while preserving the remainder of the structure. It combines technical precision with a considerate approach to keep interventions low-vibration, low-dust, and material-specific. Central methods include concrete breaking with concrete demolition shears as well as the splitting release <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/partial-deconstruction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19957","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Partial Deconstruction | Selective Demolition<\/title>\n<meta name=\"description\" content=\"Discover partial deconstruction \u2713 the construction method for selective, low-vibration dismantling of concrete &amp; steel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/partial-deconstruction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Partial Deconstruction | Selective Demolition\" \/>\n<meta property=\"og:description\" content=\"Discover partial deconstruction \u2713 the construction method for selective, low-vibration dismantling of concrete &amp; steel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/partial-deconstruction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-02T06:40:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/partial-deconstruction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/partial-deconstruction\",\"name\":\"Partial Deconstruction | Selective Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-05T08:58:46+00:00\",\"dateModified\":\"2026-06-02T06:40:03+00:00\",\"description\":\"Discover partial deconstruction \u2713 the construction method for selective, low-vibration dismantling of concrete & steel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/partial-deconstruction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/partial-deconstruction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/partial-deconstruction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Partial deconstruction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Partial Deconstruction | Selective Demolition","description":"Discover partial deconstruction \u2713 the construction method for selective, low-vibration dismantling of concrete & steel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/partial-deconstruction","og_locale":"en_US","og_type":"article","og_title":"Partial Deconstruction | Selective Demolition","og_description":"Discover partial deconstruction \u2713 the construction method for selective, low-vibration dismantling of concrete & steel.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/partial-deconstruction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-02T06:40:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/partial-deconstruction","url":"https:\/\/www.darda.de\/en\/knowledge\/partial-deconstruction","name":"Partial Deconstruction | Selective Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-05T08:58:46+00:00","dateModified":"2026-06-02T06:40:03+00:00","description":"Discover partial deconstruction \u2713 the construction method for selective, low-vibration dismantling of concrete & steel.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/partial-deconstruction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/partial-deconstruction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/partial-deconstruction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Partial deconstruction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19957","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19957"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19957\/revisions"}],"predecessor-version":[{"id":27978,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19957\/revisions\/27978"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19957"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}