{"id":19954,"date":"2026-01-05T15:24:13","date_gmt":"2026-01-05T14:24:13","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19954"},"modified":"2026-09-12T19:53:31","modified_gmt":"2026-09-12T17:53:31","slug":"tar-remediation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tar-remediation","title":{"rendered":"Tar remediation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Tar remediation encompasses the safe investigation, removal, and disposal of tar-containing construction materials in traffic areas, buildings, and industrial facilities. The goal is to identify polycyclic aromatic hydrocarbons (PAHs) in tar-containing asphalt, old waterproofing, joint sealants, or coatings in a professional manner and to extract them from the structure with low emissions. In practice, tar remediation is often combined with selective deconstruction: concrete is opened, components are separated cold, and contaminated layers are collected separately. Hydraulic demolition tools from Darda GmbH such as <em>concrete demolition shears<\/em> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete hydraulic splitters<\/a> help to avoid sparks, heat, and unnecessary dust generation &#8211; an advantage in sensitive areas such as building gutting, <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, as well as special operations in inner-city environments or facilities with elevated emission protection. Early segregation of contaminated and non-contaminated fractions reduces rework, disposal costs, and project risk.<\/p>\n<h2>Definition: What is meant by tar remediation?<\/h2>\n<p>Tar remediation refers to the entirety of technical, organizational, and construction-operational measures for identifying, separating, removing, and disposing of tar-containing construction materials. Tar (coal tar) is a by-product of coal gasification and coke production and is fundamentally different from bitumen; it contains high levels of PAHs, several of which are classified as carcinogenic. Tar-containing materials were used until the late 1970s, including in asphalt wearing courses, bridge and parking deck waterproofing, joint sealing compounds, primers, adhesives, and damp-proof courses. Proper tar remediation pursues three core objectives: protection of workers and surroundings, avoidance of emissions, and legally compliant demolition separation with subsequent proper disposal. Typically, this includes preliminary investigation, sampling with laboratory-supported assessment (for example GC-MS based PAH analytics), hazard analysis, a remediation and deconstruction plan, and seamless documentation. Clearly assigned responsibilities and competent site supervision support compliance throughout all phases.<\/p>\n<h2>Origin and typical locations of tar-containing materials<\/h2>\n<p>Tar-containing materials are found in numerous structures and traffic areas, often hidden under more recent layers or composite build-ups. Clues are provided by year of construction, usage history, and the appearance of the layers. Typical locations include:<\/p>\n<ul>\n<li>Old asphalt with tar-containing binders in traffic areas, yard pavements, plant areas, and ramps<\/li>\n<li>Joint sealing compounds and joint tapes in concrete roadways, hall floors, silo slabs, and bridge expansion joints<\/li>\n<li>Bridge, parking deck, and tunnel waterproofing of older structures<\/li>\n<li>Tar-containing coatings, barrier layers, primers, and adhesives in technical rooms, basements, and industrial halls<\/li>\n<li>Industrial plant components such as storage tanks, piping, and containment trays with tar- or pitch-containing residues<\/li>\n<li>Legacy flat roof systems with tar-based waterproofing felts or mastics in older building stock<\/li>\n<li>Mastic asphalt screeds and underlayments in warehouses and workshops of earlier construction periods<\/li>\n<\/ul>\n<p>Clear identification is not achieved by visual inspection alone. If suspected, a systematic investigation concept with indicative and confirmatory samples is recommended, since tar-containing and bituminous layers can occur in composite. Typical field indicators include a characteristic phenolic odor, black-brown fracture surfaces, and in some cases UV fluorescence of extracts; however, only laboratory analytics provide certainty and guide classification. The results determine separation cuts, deconstruction methods, and the subsequent disposal route.<\/p>\n<h2>Planning and sequence of tar remediation<\/h2>\n<p>Robust planning links pollutant investigation, structural-technical analysis, and construction sequencing. The following steps have proven their worth:<\/p>\n<ol>\n<li>Preliminary investigation and records: year of construction, conversions, historical uses, possible contaminated sites<\/li>\n<li>Sampling and assessment: position, thickness, and quality of the tar-containing layers in the composite<\/li>\n<li>Hazard analysis: work methods, emission and exposure scenarios, protective measures<\/li>\n<li>Remediation and deconstruction plan: separation cut guidance, sequence, construction logistics, material flow<\/li>\n<li>Site setup: protective enclosure, ventilation, dust and emissions management, access and cleaning zones<\/li>\n<li>Execution: selective deconstruction, material-pure separation, labeled intermediate storage<\/li>\n<li>Documentation and evidence: quantities, origin, analyses, disposal routes<\/li>\n<\/ol>\n<p>As part of selective deconstruction, <strong>cold and low-spark separation<\/strong> has proven effective. Hydraulically operated tools from Darda GmbH allow controlled opening of concrete and exposure of contaminated layers without using thermal procedures. Practical levers include small-scale mock-ups for process validation, digital layer mapping for precise separation cuts, and early coordination with disposal facilities to secure capacity.<\/p>\n<h2>Mechanical methods in deconstruction: cold, low-spark, selective<\/h2>\n<p>Tar-containing materials react sensitively to heating and strong abrasion. Therefore, methods that minimize heat, dust, and fumes are preferred. Hydraulic demolition technology enables precise work in buildings, tunnels, and on traffic areas, with predictable break lines and reduced secondary damage compared to thermal cutting or high-speed grinding.<\/p>\n<h3>Concrete demolition shears in the selective deconstruction of tar-affected components<\/h3>\n<p><em>Concrete demolition shears<\/em> from Darda GmbH separate concrete in a targeted manner and produce crushed segments with limited crack propagation. This is helpful when tar-containing waterproofing or joint sealants in solid construction need to be exposed or separated. With concrete demolition shears you can:<\/p>\n<ul>\n<li>Remove slab edges, upstands, and concrete layers above tar-containing strata in a controlled way<\/li>\n<li>Expose reinforcement for subsequent cold cutting<\/li>\n<li>Fragment components into manageable segments without thermal procedures<\/li>\n<\/ul>\n<p>Pre-scoring and staged shearing reduce unintended crack growth and support clean, material-pure separation.<\/p>\n<h3>Rock and concrete hydraulic splitters for composite build-ups<\/h3>\n<p><em>Rock and concrete hydraulic splitters<\/em> with matching <em>splitting cylinders<\/em> open concrete and composite build-ups by controlled spreading. The method exhibits <strong>low vibration levels<\/strong> and is suitable for releasing layer packages above tar-containing waterproofing, creating separation joints, or separating massive components without cutting sparks. In tunnel and bridge areas with sensitive surroundings, this technique reduces secondary damage and emissions. Directional drilling patterns and adapted splitting forces enable reproducible results in confined spaces.<\/p>\n<h3>Steel shears and Multi Cutters for reinforcement and built-in components<\/h3>\n<p>In the course of tar remediation, reinforcement, built-in components, railings, or pipes must be separated with minimal sparking. <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel shears<\/a><\/em> and <em>Multi Cutters<\/em> from Darda GmbH cut metallic components cold. This is particularly advantageous in interior spaces, shafts, or special operations where fumes and sparks must be avoided. Selecting jaw geometries suited to profiles and rebar diameters improves cut quality and speed.<\/p>\n<h3>Combination shears for heterogeneous deconstruction tasks<\/h3>\n<p><em>Combination shears<\/em> combine cutting and crushing, enabling efficient processing of mixed components. At transitions between concrete, masonry, and asphalt composites, the versatile working method supports clean separation of contaminated from uncontaminated portions. Sequential switching between functions limits tool changes and shortens cycle times.<\/p>\n<h3>Tank cutters in the decommissioning of tar-carrying systems<\/h3>\n<p>Where tar, pitch, or tar-containing residues are found in tanks or pipelines, decommissioning with <em>tank cutters<\/em> under strict emissions control is possible. Cold, controlled opening facilitates safe emptying, cleaning, and disassembly of components prior to disposal. Gas monitoring and inerting concepts are advisable where explosive atmospheres cannot be excluded.<\/p>\n<h3>Hydraulic power packs as the energy source<\/h3>\n<p>The tools mentioned are powered by <em>hydraulic power packs<\/em> from Darda GmbH. Depending on the site environment, electrically or otherwise powered units are used to balance performance, mobility, and emission protection. Low-noise configurations and exhaust-free operation are beneficial for enclosed areas and night-time work windows.<\/p>\n<h2>Occupational safety and emissions control<\/h2>\n<p>Tar remediation requires consistent protection of people and the environment. Measures are based on local conditions and the outcome of the hazard analysis. The focus is on:<\/p>\n<ul>\n<li>Protective enclosure of the work area and orderly airflow control with adequate ventilation<\/li>\n<li>Effective dust suppression and vapor minimization through <strong>cold<\/strong> and <strong>low-spark<\/strong> methods, local dust extraction, and adapted working speed<\/li>\n<li>Wet suppression only where compatible with material and process<\/li>\n<li>Appropriate safety equipment and regulated cleaning of work equipment<\/li>\n<li>Clean material flow, clear labeling, and tight, durable packaging<\/li>\n<li>Defined decontamination routes with personnel and equipment checkpoints<\/li>\n<li>Continuous monitoring of ambient air and work area pressure differentials where enclosures are used<\/li>\n<\/ul>\n<p>Legal requirements may vary regionally. It is advisable to incorporate the applicable regulations and official requirements into planning at an early stage. Role-specific instruction, medical surveillance where required, and documented toolbox talks strengthen implementation quality.<\/p>\n<h2>Disposal and recycling of tar-containing materials<\/h2>\n<p>Tar-containing construction materials are generally collected separately from non-contaminated material. Purity and traceability are crucial. Typical steps include:<\/p>\n<ul>\n<li>Separate removal of tar-containing layers and clean concrete or asphalt portions<\/li>\n<li>Intermediate storage on sealed surfaces with weather protection and labeling<\/li>\n<li>Analytics to confirm classification<\/li>\n<li>Transport to suitable facilities for energy recovery or material recycling in accordance with local provisions<\/li>\n<li>Chain-of-custody documentation from sampling through acceptance at the receiving facility<\/li>\n<\/ul>\n<p>Early coordination of disposal routes prevents logistical bottlenecks and facilitates construction scheduling. Careful documentation supports evidence and compliance. Depending on approval, thermal treatment or bound applications in defined layers can be options; acceptance criteria must be verified case by case.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Quality assurance begins with the investigation and ends with the final documentation. Key elements are sampling plans, photo documentation, weight tickets, layer records, and clearances after cleaning. Accompanying air or surface measurements can &#8211; where provided &#8211; demonstrate the effectiveness of protective measures.<\/p>\n<ul>\n<li>Calibrated measuring equipment and traceable sampling procedures<\/li>\n<li>Change management for deviations, including documented corrective actions<\/li>\n<li>Final acceptance protocol with as-built layer maps and disposal confirmations<\/li>\n<\/ul>\n<h2>Special application areas and boundary conditions<\/h2>\n<p>In <strong>concrete demolition and special demolition<\/strong>, precise separation cuts and a contaminant-oriented sequence of work steps are crucial. Here, hydraulic <em>concrete demolition shears<\/em> and <em>rock and concrete hydraulic splitters<\/em> score through controlled opening of the structure. For <strong>building gutting and cutting<\/strong> in buildings, low-spark <em>steel shears<\/em>, <em>Multi Cutters<\/em>, and <em>combination shears<\/em> facilitate safe separation of reinforcement, profiles, and built-in components.<\/p>\n<p>In <strong>rock excavation and tunnel construction<\/strong>, tar-containing waterproofing and joint materials occur in older structures. Low vibration levels, limited headroom, and high requirements for emission protection argue for cold, hydraulic methods. In <strong>special operations<\/strong> &#8211; for example in sensitive production areas or densely built inner cities &#8211; quiet, low-vibration methods and compact equipment are advantageous. Time windows, access constraints, and neighboring uses should be integrated into planning to minimize disruption.<\/p>\n<h2>Avoiding common mistakes<\/h2>\n<ul>\n<li>Insufficient investigation: tar-containing partial areas are overlooked and mixed with uncontaminated material<\/li>\n<li>Thermal or spark-intensive methods: increased emissions and avoidable hazards<\/li>\n<li>Lack of separation cuts: composite build-ups cannot be cleanly separated<\/li>\n<li>Unclear material logistics: mixing in intermediate storage or during transport<\/li>\n<li>Underestimated boundary conditions: tight spaces, height, load capacity, and access are not considered early enough<\/li>\n<li>Missing coordination with disposal facilities: acceptance criteria and capacities are not secured in time<\/li>\n<li>Inadequate enclosure and airflow management: fugitive emissions compromise protection goals<\/li>\n<\/ul>\n<h2>Selection criteria for tools and equipment<\/h2>\n<p>The choice of equipment depends on component thickness, composite build-up, degree of reinforcement, accessibility, and emission requirements. The following criteria provide guidance:<\/p>\n<ul>\n<li><strong>Component geometry:<\/strong> reachability, working space, required opening cross-section<\/li>\n<li><strong>Material mix:<\/strong> concrete, asphalt composite, masonry, built-in components<\/li>\n<li><strong>Emissions management:<\/strong> low sparking, heat generation, dust generation<\/li>\n<li><strong>Power requirement:<\/strong> selection of suitable <em>hydraulic power packs<\/em> and tool combinations, with adequate drive power<\/li>\n<li><strong>Logistics:<\/strong> weight, transport routes, setup areas, power supply and construction logistics<\/li>\n<li><strong>Noise and vibration limits:<\/strong> site-specific constraints and neighborhood protection<\/li>\n<li><strong>Process control:<\/strong> compatibility with enclosures, extraction points, and monitoring setups<\/li>\n<\/ul>\n<p>In many cases, a combination of <em>concrete demolition shears<\/em>, <em>rock and concrete hydraulic splitters<\/em>, <em>steel shears<\/em> or <em>Multi Cutters<\/em>, and &#8211; during plant decommissioning &#8211; <em>tank cutters<\/em> is appropriate. Aligning the equipment with the sequence of work steps improves safety, quality, and cost-effectiveness of the deconstruction. Pilot areas and stepwise scaling reduce risk and support predictable productivity.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Tar remediation encompasses the safe investigation, removal, and disposal of tar-containing construction materials in traffic areas, buildings, and industrial facilities. The goal is to identify polycyclic aromatic hydrocarbons (PAHs) in tar-containing asphalt, old waterproofing, joint sealants, or coatings in a professional manner and to extract them from the structure with <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tar-remediation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19954","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tar Remediation for Asphalt, Concrete &amp; Buildings<\/title>\n<meta name=\"description\" content=\"Complete tar remediation for asphalt and waterproofing \u2713 Safe PAH analysis, cold low-spark removal &amp; proper disposal.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tar-remediation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tar Remediation for Asphalt, Concrete &amp; Buildings\" \/>\n<meta property=\"og:description\" content=\"Complete tar remediation for asphalt and waterproofing \u2713 Safe PAH analysis, cold low-spark removal &amp; proper disposal.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tar-remediation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:31+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tar-remediation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tar-remediation\",\"name\":\"Tar Remediation for Asphalt, Concrete & Buildings\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-05T14:24:13+00:00\",\"dateModified\":\"2026-09-12T17:53:31+00:00\",\"description\":\"Complete tar remediation for asphalt and waterproofing \u2713 Safe PAH analysis, cold low-spark removal & proper disposal.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tar-remediation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tar-remediation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tar-remediation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tar remediation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tar Remediation for Asphalt, Concrete & Buildings","description":"Complete tar remediation for asphalt and waterproofing \u2713 Safe PAH analysis, cold low-spark removal & proper disposal.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tar-remediation","og_locale":"en_US","og_type":"article","og_title":"Tar Remediation for Asphalt, Concrete & Buildings","og_description":"Complete tar remediation for asphalt and waterproofing \u2713 Safe PAH analysis, cold low-spark removal & proper disposal.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tar-remediation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:31+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tar-remediation","url":"https:\/\/www.darda.de\/en\/knowledge\/tar-remediation","name":"Tar Remediation for Asphalt, Concrete & Buildings","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-05T14:24:13+00:00","dateModified":"2026-09-12T17:53:31+00:00","description":"Complete tar remediation for asphalt and waterproofing \u2713 Safe PAH analysis, cold low-spark removal & proper disposal.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tar-remediation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tar-remediation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tar-remediation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tar remediation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19954","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19954"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19954\/revisions"}],"predecessor-version":[{"id":29326,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19954\/revisions\/29326"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}