{"id":19948,"date":"2026-01-05T09:13:21","date_gmt":"2026-01-05T08:13:21","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19948"},"modified":"2026-06-02T11:36:02","modified_gmt":"2026-06-02T09:36:02","slug":"gas-station-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/gas-station-demolition","title":{"rendered":"Gas station demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The gas station demolition requires a precise interplay of engineering, environmental protection, and safety. The goal is the orderly decommissioning and removal of all system components &#8211; from dispensers and pipelines to underground or aboveground storage tanks &#8211; as well as the proper handling of construction materials and contaminated materials. The focus is on controlled cutting and demolition methods with low vibration, low spark generation, and high process reliability. Equipment and method types established in the fields of <em>concrete demolition and special demolition<\/em> or <em>strip-out and cutting<\/em> are particularly relevant here; these include, among others, concrete demolition shears as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> from Darda GmbH. In practice, a structured risk assessment, clear method statements, and seamless documentation ensure traceability, reduced emissions, and reliable scheduling.<\/p>\n<h2>Definition: What is meant by gas station demolition?<\/h2>\n<p>Gas station demolition refers to the orderly dismantling and removal of gas station facilities that are no longer needed for operations. This includes emptying, cleaning, and gas-free clearance of tanks, safely separating pipelines, dismantling components such as dispensers or oil separators, as well as the demolition of foundations, pavements, and shaft structures. Demolition typically includes proper disposal and recycling of metals and concrete and &#8211; if necessary &#8211; the remediation of contaminated soils. Technically, gas station demolition is a subfield of <em>concrete demolition and special demolition<\/em> and adjoins work in <em>strip-out and cutting<\/em>. Selective dismantling and source-separated material streams support high recovery rates and compliant disposal.<\/p>\n<h2>Process and phases in demolishing a gas station<\/h2>\n<p>A structured process minimizes risks and ensures compliance with environmental and occupational safety. In practice, gas station demolition is divided into several phases with clear interfaces between technology, disposal, and documentation. Early utility locating, traffic and site logistics, and a lifting plan for heavy components increase process reliability.<\/p>\n<h3>1. Survey and deconstruction concept<\/h3>\n<p>Survey of all system components (tanks, lines, separators, foundations), subsoil and contaminated sites indications, utility plans. Based on the results, a deconstruction concept is created with method selection, protective measures, material flow, and haulage logistics. For concrete and steel components, concrete demolition shears and rock and concrete splitters are often specified to work with low vibration. Where necessary, pre-weakening cuts and temporary shoring are defined to control break lines and protect adjacent structures.<\/p>\n<h3>2. Decommissioning and gas-free clearance<\/h3>\n<p>Empty, clean, establish gas-free conditions, and perform clearance measurements. In explosion-hazard areas, spark-reduced, hydraulic cutting and splitting techniques offer advantages. Cold cutting methods on the tank shell and avoiding open flame cutting serve explosion protection. Depending on conditions, forced ventilation, inertization, and continuous atmosphere monitoring are established before any cutting or segmentation.<\/p>\n<h3>3. Dismantling the aboveground installations<\/h3>\n<p>Removal of dispensers, price masts, shafts, concrete pedestals, and pavement surfacing. Concrete demolition shears separate reinforced elements; rock and concrete splitters break down massive blocks in a controlled, low-vibration manner &#8211; an advantage in sensitive environments. A selective sequence enables clean fraction separation and reduces rework at the sorting stage.<\/p>\n<h3>4. Removal and segmentation of the tanks<\/h3>\n<p>Aboveground and underground tanks are lifted out after gas-free clearance or segmented on site. For segmentation, spark-reduced tank cutters or mechanical methods are suitable. Steel shears, combination shears, and Multi Cutters cut through walls, fittings, and peripheral components made of steel and non-ferrous metals. Confined-space rules and a documented lifting plan help manage residual risks during extraction and transport.<\/p>\n<h3>5. Pipelines, separators, shaft structures<\/h3>\n<p>Removal and separation of piping as well as extraction of oil separators and drainage equipment. For concrete and reinforced concrete structures, concrete demolition shears have proven effective; for compact, thick-walled components, splitting cylinders enable controlled crack propagation. Lines are blinded or capped, flushed if required, and documented for disposal routing.<\/p>\n<h3>6. Foundation demolition, soil management, and backfilling<\/h3>\n<p>Demolition of foundations and slabs, soil replacement where anomalies are detected, recovery of mineral materials after classification. Completion is the proper backfilling and compaction, accompanied by tests and documentation. Where indicated, separation layers or geotextiles and staged compaction ensure load-bearing capacity and long-term settlement control.<\/p>\n<h2>Technologies and tools in gas station demolition<\/h2>\n<p>Gas station demolition requires highly controllable methods that minimize emissions and allow precise material separation. Hydraulic tools from Darda GmbH are frequently used in these work steps &#8211; no heat, high cutting and splitting performance, and precisely metered force. Compact, mobile power sources and long hose lines enable access in confined areas while keeping ignition sources away from risk zones.<\/p>\n<h3>Concrete demolition shears for foundations, pedestals, and pavements<\/h3>\n<p><strong>Concrete demolition shears<\/strong> cut reinforced concrete with minimal sparking. They grip precisely at edges, cracks, and pre-weakening cuts. This allows pump islands, concrete pedestals for dispensers, and shaft walls to be released step by step and in a controlled manner. In <em>concrete demolition and special demolition<\/em>, this reduces vibration input into the subsoil and protects adjacent lines. The defined cutting action simplifies subsequent reinforcement recovery.<\/p>\n<h3>Rock and concrete splitters for low-vibration demolition<\/h3>\n<p><strong>Rock and concrete splitters<\/strong> as well as stone splitting cylinders work via mechanical expansion in boreholes. The resulting splitting pressure produces controlled cracks without impact and without thermal effects. Ideal for thick foundations, beams, and tight edge distances, for example in <em>special operations<\/em> scenarios with sensitive surroundings or adjacent facilities in operation. The absence of percussive loads supports work near utilities and active structures.<\/p>\n<h3>Tank cutters for cold separation cuts<\/h3>\n<p><strong>Tank cutters<\/strong> enable spark-reduced, cold cuts on tank shells, manways, and attachments. The material-friendly operation supports explosion protection and gas-free conditions. This is particularly relevant when segmentation is necessary before transport. Defined cut geometry and chip management improve downstream handling and transport safety.<\/p>\n<h3>Steel shears, Multi Cutters, and combination shears<\/h3>\n<p>Piping, fittings, beams, and enclosures are precisely separated with <strong>steel shears<\/strong> and <strong>Multi Cutters<\/strong>. <strong>Combination shears<\/strong> combine cutting and crushing &#8211; useful with mixed materials in <em>strip-out and cutting<\/em>. The controlled cutting edge reduces secondary damage to remaining structures. Short, uniform sections streamline loading and recycling.<\/p>\n<h3>Hydraulic power packs as the power source<\/h3>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\"><strong>Hydraulic power packs<\/strong><\/a> supply the tools with constant power. They are designed for mobile use, allow long hose lines, and support work in areas with limited power supply. The combination of power pack and attachment ensures reproducible cutting and splitting results. Noise-dampened operation and remote placement reduce exposure at the workface.<\/p>\n<h2>Safety, explosion protection, and environmental protection<\/h2>\n<p>In gas station demolition, safety and environmental protection are paramount. Measures are defined for the specific site and are intended to minimize risks, without constituting legal advice.<\/p>\n<ul>\n<li><strong>Explosion protection:<\/strong> Establish gas-free conditions, perform clearance measurements, and monitor. Cold cutting methods and hydraulic splitting techniques reduce potential ignition sources.<\/li>\n<li><strong>Emissions:<\/strong> Reduce dust (e.g., by wetting), limit noise and vibration. Concrete demolition shears and splitters operate with low emissions and low vibration.<\/li>\n<li><strong>Media handling:<\/strong> Extract residual materials, document leakage tests, provide containment systems.<\/li>\n<li><strong>Soil protection:<\/strong> Use seals and protective mats, promptly remove contaminated materials, cover during precipitation.<\/li>\n<li><strong>Work organization:<\/strong> Exclusion zones, transport routes, emergency and rescue plan, qualified personnel.<\/li>\n<li><strong>Permit-to-work management:<\/strong> Define hot work, confined-space entry, lockout-tagout, and lifting operations with clear approvals and responsibilities.<\/li>\n<li><strong>PPE and decontamination:<\/strong> Specify task-appropriate PPE and set up decon points to prevent cross-contamination of clean areas.<\/li>\n<\/ul>\n<h2>Material separation, recycling, and disposal<\/h2>\n<p>Clean material separation improves recovery rates and reduces disposal costs. It starts at the source &#8211; directly during cutting, splitting, and dismantling. Proper labeling and container management prevent mixing and support auditable waste streams.<\/p>\n<ol>\n<li><strong>Metals:<\/strong> Tank plates, pipelines, fittings, and reinforcement as single-grade fractions. Steel shears and Multi Cutters enable short, homogeneous cut pieces for transport.<\/li>\n<li><strong>Mineral materials:<\/strong> Concrete and masonry fractions are separated by quality. Concrete demolition shears allow targeted exposure of reinforcement; rock and concrete splitters produce large, controlled fragments.<\/li>\n<li><strong>Hazardous substance residues:<\/strong> Sludges, filter materials, and contaminated soil are collected separately and disposed of in accordance with applicable requirements.<\/li>\n<\/ol>\n<p>Documented weighing notes, consignment references, and disposal certificates provide traceability across all material streams.<\/p>\n<h2>UST and AST: Particular challenges<\/h2>\n<p>Underground (UST) and aboveground tanks (AST) present different technical and safety requirements.<\/p>\n<h3>Underground tanks (UST)<\/h3>\n<p>Exposing, stabilizing the excavation pit, and releasing the tank from its bedding are key steps. Splitters can help with encased foundation elements without disturbing adjacent utilities. When lifting, segmented disassembly supports the process if space is limited. Buoyancy control, trench access safety, and continuous gas monitoring mitigate typical UST risks.<\/p>\n<h3>Aboveground tanks (AST)<\/h3>\n<p>ASTs are often cut in sections. Tank cutters and steel shears structure the sequence of cuts. Spark-reduced methods and continuous atmosphere measurements increase process safety. Temporary supports and a defined cutting pattern keep deformations predictable.<\/p>\n<h2>Planning, permits, and documentation<\/h2>\n<p>Demolition work at gas stations usually involves permit-relevant topics. Responsibilities and requirements may vary regionally. Common documents include an overarching demolition plan, evidence of gas-free conditions, disposal certificates, test protocols, and ongoing site documentation. Legal questions must be evaluated in general; binding statements for individual cases are not possible here. Digital daily logs with photos, measurement records, and material flow data strengthen transparency and acceptance criteria.<\/p>\n<h3>Quality assurance<\/h3>\n<p>Control points such as gas-free measurement protocols, welding or cutting records, material consignment notes, and compaction tests document the construction process. For concrete and steel separation work, standardized work instructions with concrete demolition shears, splitters, steel shears, and tank cutters provide a reliable basis. Measured vibration, dust, and noise logs &#8211; combined with defined thresholds &#8211; enable corrective action during operations.<\/p>\n<h2>Typical application scenarios and practical aspects<\/h2>\n<p>In urban locations, limited space, residents, and traffic concerns play a major role. Low-vibration methods, such as splitting technology, and pinpoint work with concrete demolition shears help protect utilities, cable routes, and neighboring foundations. In <em>special operations<\/em>, for example with partial operation continuing in adjacent areas, short cycles and spark-reduced cuts are crucial. On industrial sites, steel shears and Multi Cutters facilitate the separation of large-diameter pipelines and beams. Seasonal constraints, night work windows, and stakeholder communication can further influence method selection and sequencing.<\/p>\n<h2>Selection criteria for methods and tools<\/h2>\n<p>The choice of method depends on component thickness, reinforcement level, material mix, vibration limits, and environmental conditions. Concrete demolition shears play to their strengths on reinforced components; rock and concrete splitters excel on massive, crackable cross-sections. Tank cutters, steel shears, combination shears, and Multi Cutters address the various metal components. <strong>Hydraulic power packs<\/strong> deliver the required energy &#8211; mobile, controlled, and adaptable to the task at hand.<\/p>\n<ul>\n<li>Access and working room, including lifting and transport routes<\/li>\n<li>Proximity to sensitive receptors (residents, utilities, active facilities)<\/li>\n<li>Permitting constraints and monitoring requirements<\/li>\n<li>Available power supply and logistics for tool deployment<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The gas station demolition requires a precise interplay of engineering, environmental protection, and safety. The goal is the orderly decommissioning and removal of all system components &#8211; from dispensers and pipelines to underground or aboveground storage tanks &#8211; as well as the proper handling of construction materials and contaminated materials. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/gas-station-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19948","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gas Station Demolition &amp; Decommissioning Process<\/title>\n<meta name=\"description\" content=\"Expert gas station demolition \u2713 facility decommissioning with cold cutting, tank removal &amp; environmental compliance.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/gas-station-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gas Station Demolition &amp; Decommissioning Process\" \/>\n<meta property=\"og:description\" content=\"Expert gas station demolition \u2713 facility decommissioning with cold cutting, tank removal &amp; environmental compliance.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/gas-station-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-02T09:36:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/gas-station-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/gas-station-demolition\",\"name\":\"Gas Station Demolition & Decommissioning Process\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-05T08:13:21+00:00\",\"dateModified\":\"2026-06-02T09:36:02+00:00\",\"description\":\"Expert gas station demolition \u2713 facility decommissioning with cold cutting, tank removal & environmental compliance.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/gas-station-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/gas-station-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/gas-station-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Gas station demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gas Station Demolition & Decommissioning Process","description":"Expert gas station demolition \u2713 facility decommissioning with cold cutting, tank removal & environmental compliance.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/gas-station-demolition","og_locale":"en_US","og_type":"article","og_title":"Gas Station Demolition & Decommissioning Process","og_description":"Expert gas station demolition \u2713 facility decommissioning with cold cutting, tank removal & environmental compliance.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/gas-station-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-02T09:36:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/gas-station-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/gas-station-demolition","name":"Gas Station Demolition & Decommissioning Process","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-05T08:13:21+00:00","dateModified":"2026-06-02T09:36:02+00:00","description":"Expert gas station demolition \u2713 facility decommissioning with cold cutting, tank removal & environmental compliance.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/gas-station-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/gas-station-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/gas-station-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Gas station demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19948","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19948"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19948\/revisions"}],"predecessor-version":[{"id":27980,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19948\/revisions\/27980"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19948"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}