{"id":19943,"date":"2026-01-03T10:26:53","date_gmt":"2026-01-03T09:26:53","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19943"},"modified":"2026-09-12T19:53:29","modified_gmt":"2026-09-12T17:53:29","slug":"tank-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tank-demolition","title":{"rendered":"Tank demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Tank demolition refers to the orderly deconstruction of above-ground and underground storage tanks made of steel, reinforced concrete, or composite materials. The goal is controlled dismantling under project-specific explosion-protection, water-protection and occupational-safety requirements\u2014from emptying and degassing through cold cutting to proper disposal and the demolition of adjacent structures such as containment basins, foundations, and shafts. In practice, explosion protection, water protection, occupational safety, and efficient workflows intersect here. Hydraulically powered tools, such as tank cutters, steel shears, concrete demolition shears, as well as stone and concrete splitters from Darda GmbH, can support <em>low-spark<\/em> and low-vibration work; dust, fumes, noise and other emissions must be assessed under the project&#8217;s ventilation and monitoring concept. In regulations and practice, this scope is also referred to as tank decommissioning for above-ground storage tanks (AST) and underground storage tanks (UST).<\/p>\n<h2>Definition: What is meant by tank demolition?<\/h2>\n<p>Tank demolition means the complete or partial decommissioning, disassembly, and removal of storage tanks including auxiliary systems (piping, insulation, manway shafts, containment basins, and foundations). Typical steps include: securing residual contents, cleaning and degassing, verifying gas-free status, section-by-section cutting of the tank shell, separating components by material type, deconstructing steel and concrete elements, declaring wastes and hauling them off, and returning the area to a defined condition. The process ranges from small heating oil tanks to chemical and fuel tanks up to large industrial structures. Depending on the medium, material, and location, methods, protective measures, and tool selection vary. Clear definitions of end states, acceptance criteria, and responsibilities underpin predictable scheduling and quality.<\/p>\n<h2>Process sequence: From shutdown to acceptance<\/h2>\n<p>A structured sequence minimizes risks and downtime. A staged approach with clear responsibilities, measurement points, and documentation has proven effective-especially for work in confined spaces and areas at risk of explosion. Defined hold points, sign-offs, and transparent release procedures reduce interfaces and increase process reliability.<\/p>\n<h2>Project preparation and hazard analysis<\/h2>\n<p>Robust planning starts with an as-built assessment: tank type and volume, material (steel, stainless steel, GRP, reinforced concrete), stored media and residues, accessible entries, structural conditions, ATEX zones, neighbors, access routes, and emergency paths. From this follows a hazard analysis with a protection concept for personnel, environment, and infrastructure. For later tool selection, wall thicknesses, stiffening rings, coatings, insulation, and attachments (stairs, platforms, piping) are critical.<\/p>\n<ul>\n<li><strong>Key planning deliverables:<\/strong> method statement and risk assessment, lifting and rigging plan, ventilation and gas-monitoring concept, waste management plan, emergency and rescue plan, interface matrix with adjacent trades.<\/li>\n<\/ul>\n<h2>Workflow at a glance: Work steps in tank demolition<\/h2>\n<ol>\n<li>Emptying and residuals management: pump out media, secure residual sludges, provide containment systems.<\/li>\n<li>Cleaning and degassing: internal cleaning according to the medium; inerting until <strong>gas-free condition<\/strong> is achieved.<\/li>\n<li>Gas testing and release: measurement logs for safe entry; continuous monitoring.<\/li>\n<li>Permit-to-work and LOTO: isolate media and energy sources, implement lock-out and tag-out, and obtain entry permits.<\/li>\n<li>Creating work openings: controlled opening of the shell-preferably low-spark.<\/li>\n<li>Segmentation: cutting the shell into transportable segments with tank cutters, steel shears, or multi cutters; removal of attachments with combination shears.<\/li>\n<li>Handling and logistics: orderly haulage, internal interfaces, sorting of material fractions.<\/li>\n<li>Waste declaration and segregation: classify, label, and containerize materials in line with transport and disposal regulations.<\/li>\n<li>Demolition of concrete components: deconstruction of foundation, containment basin, and shafts using concrete demolition shears or stone and concrete splitters; stone splitting cylinders where applicable for massive sections.<\/li>\n<li>Area reinstatement and acceptance: cleaning, any soil protection measures, documentation, and handover.<\/li>\n<\/ol>\n<h2>Cold cutting instead of sparks: Methods compared<\/h2>\n<p>In many tank projects, <em>cold cutting<\/em> is the standard to avoid ignition sources and reduce emissions. Spark and heat generation from hydraulically driven tank cutters and steel shears must be assessed for the material and operating conditions. Suitability for ATEX-adjacent areas requires a project-specific explosion-protection assessment. Multi cutters and combination shears offer flexibility with mixed materials, fittings, profiles, and pipes. Hot cutting methods (e.g., oxy-fuel, plasma) are technically possible but require additional protective measures and are often secondary in sensitive media environments. The <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> from Darda GmbH supply the necessary oil pressure and flow rate and allow adjustment to material thickness, material type, and installation conditions. In parallel, adapted extraction, misting, and shielding reduce dust, aerosols, and noise during cutting and segmentation.<\/p>\n<h2>Concrete components around tanks: Foundations, containment basins, shafts<\/h2>\n<p>The deconstruction and size reduction of containment basins, foundations, and channels is preferably performed <strong>low-vibration<\/strong>. Concrete demolition shears cut reinforced concrete in a controlled manner, reduce secondary breakage, and minimize noise &#8211; an advantage for work in existing facilities. Stone and concrete splitters apply targeted splitting force in drill holes and are suitable for thick foundation blocks where conventional breaking would cause vibrations. Stone splitting cylinders complement the toolkit for massive sections. Pre-segmentation allows selective removal of reinforcement and optimizes haul-off and recycling. With nearby utility lines, sensitive plant equipment, or asphalt layers, the adaptable hydraulic approach helps protect the surroundings. Ground-penetrating checks for reinforcement, embedded parts, and utility conflicts further reduce the risk of collateral damage.<\/p>\n<h2>Underground tanks: Expose, inert, recover<\/h2>\n<p>Buried vessels add further steps: exposing while observing utility routing, soil removal with ground protection, and excavation support where required. After emptying, the tank is cleaned and inerted before openings are created. The shell is cut into segments and recovered; alternatively, the tank can be lifted as a whole if structural and logistical conditions permit. Foundation slabs and shafts are processed with concrete demolition shears or stone and concrete splitters. At sites with rocky subsoil or anchoring, methods from rock excavation and tunnel construction are adapted, such as controlled splitting instead of impact energy. Additional attention is paid to groundwater ingress, buoyancy control, and gas migration pathways, including backfill management and proper compaction after recovery.<\/p>\n<h2>Choose tools to suit the job<\/h2>\n<p>The selection is based on material, wall thickness, accessibility, and the required emission reduction:<\/p>\n<ul>\n<li>Tank cutters: low-spark cold cutting of steel plates, large-area segmentation.<\/li>\n<li>Steel shears and combination shears: profiles, rings, manway covers, reinforcements, pipelines.<\/li>\n<li>Multi cutters: changing material combinations (metal, thin-walled concrete, composite layers).<\/li>\n<li>Concrete demolition shears: reinforced concrete at containment basins, pedestals, foundation heads.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">Hydraulic rock and concrete splitters<\/a> plus stone splitting cylinders: massive foundations, controlled crack guidance, low vibrations.<\/li>\n<li>Hydraulic power packs: demand-based output, long hose lines for work in confined and sensitive areas.<\/li>\n<li>Diamond wire saws: precise sectioning of heavily reinforced or thick-walled components where shear access is limited.<\/li>\n<\/ul>\n<h2>Occupational safety and health protection<\/h2>\n<p>Tank demolition is subject to strict requirements for explosion protection, breathing air, ventilation, and entry authorization. These include robust instruction, appropriate personal protective equipment, continuous gas monitoring, extraction or cross-ventilation, and clear communication paths. Work in confined spaces requires rescue concepts, supervision, and suitable anchorage points. Sparks, heat, noise and dust from hydraulic cutting methods depend on the tool, material and operating conditions and must be assessed for the project. Legal requirements vary by medium, location, and method; they should be reviewed early, proactively, and with attention to the specific case.<\/p>\n<ul>\n<li><strong>Core controls:<\/strong> permit-to-work with defined roles, lock-out and tag-out of media and energy, intrinsically safe lighting and tools in hazardous areas, continuous multi-gas monitoring, tested rescue equipment and standby team, and documented toolbox talks.<\/li>\n<\/ul>\n<h2>Environmental protection, waste management, and recycling<\/h2>\n<p>Residues, sludges, contaminated waters, and cleaning media must be properly captured, classified, and disposed of. Metallic tank segments are typically recycled; coatings and insulation may require separate handling. Concrete debris is separated where possible, reinforcement is stripped, and the material is processed as recycled construction material, provided the conditions allow. Containment and protection measures prevent entries into soil and water. Complete documentation of material flows-including weight tickets and disposal certificates-ensures traceability. Where relevant, soil and groundwater samples, spill berms, and vapor controls complement the protection concept.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Quality-relevant evidence includes gas-testing protocols, work permits, verification of gas-free status, readings for noise and dust, photographic documentation of work steps, delivery notes and disposal certificates, and a final condition report for the area. Regular intermediate acceptances-such as after tank segmentation or before foundation demolition-provide clarity in the process and facilitate coordination with follow-on trades. Digital photo logs, as-built sketches, and, where beneficial, 3D scans improve traceability and support handover.<\/p>\n<h2>Typical challenges and solution approaches<\/h2>\n<ul>\n<li>Confined conditions: use compact hydraulic power packs and hand-held tools with high cutting force.<\/li>\n<li>Sensitive neighbors: low-spark cold cutting, low-dust and low-noise methods, time staging.<\/li>\n<li>Unclear material history: cautious sampling, conservative assumptions, incremental openings with continuous gas testing.<\/li>\n<li>Massive foundation blocks: combination of predrilling and splitting with stone and concrete splitters, followed by targeted shear breaking.<\/li>\n<li>Corrosion or coating damage: adjusted segment sizes, reinforced lifting points, careful load handling.<\/li>\n<li>Residual product in annular spaces of double-walled tanks: controlled venting, targeted cleaning, delayed openings until measurements are stable.<\/li>\n<li>Groundwater ingress or buoyancy: temporary dewatering, ballast or anchors, and adapted recovery sequencing.<\/li>\n<li>Unmapped utilities: verification through surveys and cautious trial excavations with protective mats.<\/li>\n<\/ul>\n<h2>Application areas and interfaces in deconstruction<\/h2>\n<p>Tank demolition rarely stands alone. In practice, it ties into <strong>concrete demolition and special demolition<\/strong> when foundations, containment basins, stair systems, and cable trays are removed. In the phase <strong>strip-out and cutting<\/strong>, the focus is on pipelines, fittings, insulation, and attachments that can be efficiently removed with combination shears and multi cutters. For complex facilities with hazardous media or poor accessibility, it is a <strong>special operation<\/strong> that benefits from low-spark methods. Underground tanks also touch aspects of utility installation and earthworks; in rocky environments, experience from <strong>rock excavation and tunnel construction<\/strong> is applied, especially for controlled splitting instead of impact energy. Interfaces with remediation and reinstatement disciplines are planned early to streamline follow-on work.<\/p>\n<h2>Best practices for low-emission deconstruction<\/h2>\n<ul>\n<li>Prefer hydraulic, low-spark cutting methods; perform hot work only with an enhanced protection concept.<\/li>\n<li>Plan material flow: size segments so lifting equipment, routes, and container logistics align.<\/li>\n<li>Pre-segmentation: combine concrete demolition shears and stone and concrete splitters to expose reinforcement selectively.<\/li>\n<li>Organize ventilation and gas testing without gaps; document measurement intervals.<\/li>\n<li>Lower dust and noise emissions through adapted tool selection, cut path, and working hours.<\/li>\n<li>Apply negative-pressure extraction when opening tanks with volatile residues; use localized enclosures where feasible.<\/li>\n<li>Label and track segments and components to maintain traceability across transport and recycling.<\/li>\n<\/ul>\n<h2>Overview of materials and tank variants<\/h2>\n<p>Steel tanks dominate in industry; here, tank cutters, steel shears, and combination shears have proven effective for the shell, rings, and attachments. Reinforced concrete tanks require concrete demolition shears and, where necessary, careful pre-splitting of massive components. GRP vessels and composite systems pose demands on segmentation and waste separation; multi cutters can assist in thin-walled areas. For thick walls or double-walled systems, a coordinated strategy of predrilling, splitting, and subsequent cutting is recommended. Attachments such as cathodic protection systems, liners, and thermal insulation are addressed separately to ensure clean separation and recycling routes.<\/p>\n<h2>Planning, scheduling, and interface management<\/h2>\n<p>A realistic schedule accounts for approvals, measurements, disposal logistics, and suitable weather windows. Interfaces with adjacent trades-such as plant demolition, electrical engineering, or civil works-are coordinated early. Clear transport routes, laydown areas for segments, container locations, and emergency access reduce friction in day-to-day operations. Lead times for waste acceptance, traffic management, and any notifications to authorities or neighbors are factored in, supported by transparent communication.<\/p>\n<h2>Why hydraulic concrete demolition shears and splitters make the difference<\/h2>\n<p>In the tank environment, vibrations, dust, and sparks are particularly critical. <em>Hydraulically operated<\/em> concrete demolition shears act precisely, protect surrounding structures, and allow controlled demolition, for example on containment basins and foundation edges. Stone and concrete splitters-supplemented by stone splitting cylinders-generate defined cracks in massive sections without burdening the surroundings with impact energy. In combination with powerful hydraulic power packs from Darda GmbH, this creates a finely metered system for precise, safe, and efficient work steps in tank demolition, from selective cutting to low-vibration size reduction.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Tank demolition refers to the orderly deconstruction of above-ground and underground storage tanks made of steel, reinforced concrete, or composite materials. The goal is controlled dismantling under project-specific explosion-protection, water-protection and occupational-safety requirements\u2014from emptying and degassing through cold cutting to proper disposal and the demolition of adjacent structures such as <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tank-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19943","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tank Demolition for Industrial Storage Tanks<\/title>\n<meta name=\"description\" content=\"Safe demolition of above-ground and underground storage tanks \u2713 degassing, vapor monitoring, cold cutting and waste handling.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tank-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tank Demolition for Industrial Storage Tanks\" \/>\n<meta property=\"og:description\" content=\"Safe demolition of above-ground and underground storage tanks \u2713 degassing, vapor monitoring, cold cutting and waste handling.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tank-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:29+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tank-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tank-demolition\",\"name\":\"Tank Demolition for Industrial Storage Tanks\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-03T09:26:53+00:00\",\"dateModified\":\"2026-09-12T17:53:29+00:00\",\"description\":\"Safe demolition of above-ground and underground storage tanks \u2713 degassing, vapor monitoring, cold cutting and waste handling.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tank-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tank-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tank-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tank demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tank Demolition for Industrial Storage Tanks","description":"Safe demolition of above-ground and underground storage tanks \u2713 degassing, vapor monitoring, cold cutting and waste handling.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tank-demolition","og_locale":"en_US","og_type":"article","og_title":"Tank Demolition for Industrial Storage Tanks","og_description":"Safe demolition of above-ground and underground storage tanks \u2713 degassing, vapor monitoring, cold cutting and waste handling.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tank-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:29+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tank-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/tank-demolition","name":"Tank Demolition for Industrial Storage Tanks","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-03T09:26:53+00:00","dateModified":"2026-09-12T17:53:29+00:00","description":"Safe demolition of above-ground and underground storage tanks \u2713 degassing, vapor monitoring, cold cutting and waste handling.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tank-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tank-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tank-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tank demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19943","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19943"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19943\/revisions"}],"predecessor-version":[{"id":29142,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19943\/revisions\/29142"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19943"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}