{"id":19942,"date":"2026-01-03T08:17:34","date_gmt":"2026-01-03T07:17:34","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19942"},"modified":"2026-09-12T19:53:29","modified_gmt":"2026-09-12T17:53:29","slug":"dam-construction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/dam-construction","title":{"rendered":"Dam construction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Dams are complex engineering structures for storing, diverting, and controlling water. Their construction integrates geotechnical engineering, mass concrete, hydraulic steelwork, water resources management, and asset operation. Controlled interventions in rock and concrete are crucial for planning and execution-for example, rock removal for the foundation, creating construction joints, or repairs to concrete components. In these steps, precise, low-vibration methods such as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> and <strong>concrete pulverizers<\/strong> are frequently used; they operate in conjunction with <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Power Units<\/a><\/em> and play a central role in dam construction with respect to safety, quality, and workflow. In sensitive site conditions, controlled splitting and cutting support compliance with emission limits and enable accurate, repeatable results under tight access and scheduling constraints.<\/p>\n<h2>Definition: What is meant by dam construction?<\/h2>\n<p>Dam construction refers to the planning, erection, repair, and retrofit of structures that run across a valley or watercourse to impound, regulate, or divert water. These include dams and weirs with components such as the embankment body, dam wall, spillway, bottom outlet, foundation and inspection galleries, and operating installations. Dam construction covers the entire project cycle-from geological investigation and foundation works through concrete construction and hydraulic steelwork to operation, monitoring, and later specialist deconstruction. Typical functional objectives include flood risk reduction, water supply, irrigation, navigation improvement, and energy generation via hydropower installations in the broader system context.<\/p>\n<ul>\n<li><strong>Project scope<\/strong>: site selection, permitting, detailed design, construction, commissioning, operation, and deconstruction.<\/li>\n<li><strong>Key interfaces<\/strong>: geology and geotechnics, structural and hydraulic design, environmental protection, and asset management.<\/li>\n<li><strong>Performance criteria<\/strong>: hydraulic capacity, structural safety, watertightness, operability, and maintainability across the life cycle.<\/li>\n<\/ul>\n<h2>Structure types and construction methods in dam construction<\/h2>\n<p>Dams are built as gravity, arch, or buttress concrete dams, as well as earth and rockfill dams with an impervious core or internal sealing. The choice of structure depends on topography, geology, hydrological loads, material availability, and schedule. Regardless of the system, precise rock and concrete work is required: exposing and profiling rock at the abutments, forming the contact joint, installing drains and grout curtains, making joint cuts, concrete edges, and fitting embedded components. In all these phases, controlled cutting and splitting methods are needed to achieve tight tolerances with low vibration and to protect adjacent works and instrumentation.<\/p>\n<ul>\n<li><strong>Concrete dams<\/strong>: gravity, arch, and buttress solutions optimized for load paths and site geometry.<\/li>\n<li><strong>Earthfill and rockfill dams<\/strong>: zoned embankments with cores or internal sealing systems coordinated with foundation treatment.<\/li>\n<li><strong>Construction method selection<\/strong>: driven by foundation class, construction logistics, and required phasing under river diversion conditions.<\/li>\n<\/ul>\n<h2>Geotechnics and rock removal: controlled splitting instead of blasting<\/h2>\n<p>The quality of the foundation determines a dam\u2019s durability. In the area of <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a><\/strong>, it is essential to free rock blocks to precise dimensions, level the contact joint, and avoid voids. <strong>Hydraulic wedge splitters and concrete splitters<\/strong> as well as <em>hydraulic wedge splitter<\/em> cylinders enable non-explosive rock release along defined split lines. This reduces vibrations and protects sensitive structures such as existing works, instrumentation points, or natural habitats. Splitting techniques also support profile-true construction of galleries, shafts, and recesses for embedded parts. Integrated drainage control, grout curtain installation, and verification of discontinuity treatment improve long-term stability and seepage performance.<\/p>\n<ul>\n<li><strong>Advantages over blasting<\/strong>: lower vibration and airborne sound, defined split geometry, reduced flyrock risk, and simplified permitting in sensitive zones.<\/li>\n<li><strong>Process control<\/strong>: staged splitting along mapped discontinuities, preconditioning drill patterns, and systematic clean-out of the contact surface.<\/li>\n<li><strong>Monitoring<\/strong>: recording peak particle velocity and displacement at critical points to confirm compliance with threshold values.<\/li>\n<\/ul>\n<h3>Use in hard-to-access areas<\/h3>\n<p>In steep terrain or confined excavations, equipment access is often restricted. Compact splitting technology with suitable energy supply from <em>hydraulic power packs<\/em> can be deployed in a targeted manner here-for example, when reprofiling abutments or enlarging inspection passages. This <strong>special operations<\/strong> context requires careful sequencing so that dewatering, occupational safety, and material logistics interlock smoothly. Modular tooling, short hose runs, and staged transport concepts facilitate safe handling on narrow benches, scaffolds, and within shafts.<\/p>\n<h3>Noise and vibration management<\/h3>\n<p>When working near sensitive infrastructure or in protected areas, project-specific limits for dust, noise and vibration must be met. Vibration and airborne-sound effects of splitting must be measured or predicted against a defined alternative for the same task. Effects on instruments, existing structures and compliance depend on the project-specific limits and conditions. Typical measures include baseline surveys of existing conditions, continuous vibration logging at control points, and acoustic shielding or time-window management for operations.<\/p>\n<ul>\n<li><strong>Control measures<\/strong>: real-time PPV monitoring, dust suppression via misting, and localized barriers to limit airborne noise.<\/li>\n<li><strong>Documentation<\/strong>: event logs linked to measured values and locations for transparent verification.<\/li>\n<\/ul>\n<h2>Concrete works on dams: new build, modification, and deconstruction<\/h2>\n<p>In the mass concrete of dam walls, weirs, and associated components, precise separation cuts, opening components, and <strong>concrete demolition and specialist deconstruction<\/strong> are regularly required-for example, for joint adjustments, edge formation, local recesses, or repairs. <strong>Concrete pulverizers<\/strong> enable controlled downsizing of concrete with defined piece size and limited crack propagation. <em>Combination shears<\/em> and <em>Multi Cutters<\/em> handle the separation of reinforcement, anchor bars, or smaller steel sections, while <em>hydraulic power packs<\/em> provide the required energy. Clean joint preparation, dimensional control, and debris management are essential to maintain watertightness, durability, and constructability for subsequent pours and installations.<\/p>\n<ul>\n<li><strong>Typical operations<\/strong>: removal of laitance and defective zones, exposing keys and joints, and cutting openings for galleries and ducts.<\/li>\n<li><strong>Quality focus<\/strong>: targeted piece sizing for crane handling, limited microcracking, and adherence to specified surface roughness.<\/li>\n<\/ul>\n<h3>Specialist deconstruction during repairs<\/h3>\n<p>Selective interventions are required when renewing embedded parts, modifying the spillway, or adding cut-off walls. Concrete pulverizers and splitting techniques allow removal of individual concrete layers without damaging adjacent components. This way, existing joints can be exposed, ducts opened, or anchor heads made accessible-with high control over removal rates and component geometry. Where reinforcement density is high, pre-cutting or staged exposure with shears improves accuracy and reduces secondary damage.<\/p>\n<h3>Strip-out and cutting in galleries<\/h3>\n<p>In inspection and maintenance galleries, cross-section enlargements, utility retrofits, and opening niches are typical tasks of <strong>strip-out and cutting<\/strong>. Handheld or compact hydraulic shears and cutters work safely and efficiently here, especially when access and ventilation are limited. Planning should include ventilation concepts, lighting and egress, water management, and coordinated waste routes to maintain safe, continuous workflows.<\/p>\n<h2>Hydraulic steelwork: gates, closures, and penstocks<\/h2>\n<p>Steel components such as gates, trash racks, closure segments, and penstocks are integral to dam operations. During modification, dismantling, or renewal, precise cutting of thick plates and sections is necessary. <em>Steel shears<\/em> cut sections and reinforcement, <em>Multi Cutters<\/em> cut pipes and fittings, and <em>tank cutters<\/em> are used to open large tanks or pipe sections. These methods support the safe removal of embedded items and facilitate transport through restricted access points. Edge quality, distortion control, and safe handling of residual energy in the system are critical to avoid damage to sealing surfaces and neighboring structures.<\/p>\n<h2>Construction phases: from excavation to commissioning<\/h2>\n<p>Dam construction follows a clearly structured sequence. From geological investigation through excavation support and dewatering to concrete placement and installation of hydraulic steelwork, many disciplines interlock. Controlled splitting, downsizing, and cutting accompany many phases-when exposing competent rock, working the contact joint, touching up formwork, and fitting embedded items. Before commissioning, functional tests, leak-tightness checks, and instrumentation calibration follow. Clear hold points and interface inspections ensure that each stage meets acceptance criteria prior to the next activity.<\/p>\n<ol>\n<li><strong>Excavation and foundation treatment<\/strong>: mapping, splitting, drainage installation, and grouting as required.<\/li>\n<li><strong>Structural works<\/strong>: concrete placement with joint preparation and embedded item installation, including corrective cutting where needed.<\/li>\n<li><strong>Hydraulic steelwork<\/strong>: fitting, alignment, and controlled cutting or trimming to specification.<\/li>\n<li><strong>Commissioning<\/strong>: dry and wet tests, emergency closing tests, and performance verification of monitoring systems.<\/li>\n<\/ol>\n<h2>Rehabilitation, retrofit, and operation<\/h2>\n<p>Over their service life, dams are maintained, retrofitted, or strengthened. Typical measures include adding drains, renewing gates, seismic verification with structural adaptations, or optimizing the spillway. For pinpoint interventions, <strong>concrete pulverizers<\/strong> and <strong>hydraulic wedge splitters and concrete splitters<\/strong> have proven effective, as they open components step by step and in a controlled manner. This reduces downtimes and protects adjacent areas that remain in operation. Integration with inspection data and risk-based planning helps prioritize interventions with the greatest effect on safety and availability.<\/p>\n<h2>Safety, environment, and permits<\/h2>\n<p>Safety and environmental requirements are particularly stringent in dam construction. Dust, noise, and vibration management; water quality and sediment controls; and the safe handling of hydraulic energy are integral parts of site organization. Legal requirements vary by country and project and should be considered at an early stage. Non-binding principles include working with low-emission methods, recording vibrations, and maintaining a record of protective measures and limit values. Additional controls such as turbidity monitoring downstream, spill prevention for hydraulic fluids, and emergency response drills strengthen compliance and resilience.<\/p>\n<ul>\n<li><strong>Work authorization<\/strong>: coordinated method statements, permits to work, and lockout-tagout for hydraulic and electrical systems.<\/li>\n<li><strong>Environmental safeguards<\/strong>: containment, filtration, and scheduled discharge to protect aquatic habitats and water users.<\/li>\n<\/ul>\n<h2>Logistics and energy supply for the tools<\/h2>\n<p>Hydraulically powered cutting and splitting technology requires a coordinated energy supply. <strong>Hydraulic power packs<\/strong> are matched to the tool and task in terms of pressure, flow rate, and duty cycle. Short hose runs, secure couplings, and clear start\/stop signals increase occupational safety and efficiency. In confined areas and shafts, modular power packs simplify transport and positioning. Thermal management, redundancy for critical operations, and selection of compatible hydraulic fluids contribute to reliable and low-risk tool operation.<\/p>\n<ul>\n<li><strong>Set-up<\/strong>: stable positioning, hose protection, and quick couplers with defined locking states.<\/li>\n<li><strong>Operations<\/strong>: pressure and flow checks, filter status monitoring, and documented maintenance intervals.<\/li>\n<\/ul>\n<h2>Methodology: selecting the appropriate cutting and splitting method<\/h2>\n<p>The choice of method depends on material, thickness, reinforcement content, accessibility, permissible emissions, and required sequencing. The following guiding questions help with the decision:<\/p>\n<ul>\n<li>Does the material structure allow controlled <strong>splitting<\/strong> (rock, brittle concrete), or are <strong>downsizing<\/strong>\/<strong>cutting<\/strong> more effective?<\/li>\n<li>What limits apply regarding vibration, noise, and dust-for example, near sensitive instrumentation points or existing structures?<\/li>\n<li>How are access, escape routes, and media management (hydraulics, dewatering, ventilation) organized?<\/li>\n<li>What piece size facilitates transport and reinstallation\/disposal?<\/li>\n<li>Which <em>hydraulic power packs<\/em> safely cover continuous and peak loads?<\/li>\n<li>Can pilot areas or mock-ups de-risk the sequence and confirm emissions and productivity before full-scale work?<\/li>\n<li>What documentation and acceptance criteria are needed to verify geometry, surface quality, and residual capacity?<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>Documenting separation cuts, split lines, removal volumes, and measured values (vibration, noise, dust) is a key element of quality assurance. Mock-up areas and test fields help optimize parameters such as split pressure, gripping forces, and cut sequence. The result is reproducible workflows that reliably achieve dimensional accuracy, surface quality, and schedule targets. Traceable records with photos, coordinates, and calibration data support acceptance, maintenance, and later audits.<\/p>\n<h2>Typical application examples in dam construction<\/h2>\n<ul>\n<li>Profiling rock foundations at abutments using <strong>hydraulic wedge splitters and concrete splitters<\/strong> to create a flat contact joint.<\/li>\n<li>Selective opening of concrete sections with <strong>concrete pulverizers<\/strong> for installing or renewing instrumentation points and drains.<\/li>\n<li>Dismantling and downsizing of concrete-embedded components in the spillway area with <em>combination shears<\/em> and <em>Multi Cutters<\/em> to separate reinforcement.<\/li>\n<li>Cutting steel components on gates and trash racks using <em>steel shears<\/em>; opening thick-walled pipe sections with a <em>tank cutter<\/em>.<\/li>\n<li>Work in inspection and pressure tunnels during <strong>rock excavation and tunnel construction<\/strong> with compact splitting technology and a suitable <em>hydraulic power pack<\/em>.<\/li>\n<li>Special boundary conditions in <strong>special operations<\/strong>, for example in protected areas or near sensitive buildings, using low-noise and low-vibration methods.<\/li>\n<li>Creation of recesses and block-outs for embedded parts with controlled splitting to maintain edge integrity and watertightness.<\/li>\n<li>Exposure and remediation of defective concrete zones at joints with staged pulverizing and shear separation under monitored emissions.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dams are complex engineering structures for storing, diverting, and controlling water. Their construction integrates geotechnical engineering, mass concrete, hydraulic steelwork, water resources management, and asset operation. Controlled interventions in rock and concrete are crucial for planning and execution-for example, rock removal for the foundation, creating construction joints, or repairs to <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/dam-construction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19942","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Dam Construction - Civil Engineering Guide<\/title>\n<meta name=\"description\" content=\"Explore civil engineering for dam construction \u2713 hydraulic splitting &amp; concrete works, steelwork, safety and quality.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/dam-construction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dam Construction - Civil Engineering Guide\" \/>\n<meta property=\"og:description\" content=\"Explore civil engineering for dam construction \u2713 hydraulic splitting &amp; concrete works, steelwork, safety and quality.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/dam-construction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:29+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dam-construction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dam-construction\",\"name\":\"Dam Construction - Civil Engineering Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-03T07:17:34+00:00\",\"dateModified\":\"2026-09-12T17:53:29+00:00\",\"description\":\"Explore civil engineering for dam construction \u2713 hydraulic splitting & concrete works, steelwork, safety and quality.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dam-construction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dam-construction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dam-construction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Dam construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Dam Construction - Civil Engineering Guide","description":"Explore civil engineering for dam construction \u2713 hydraulic splitting & concrete works, steelwork, safety and quality.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/dam-construction","og_locale":"en_US","og_type":"article","og_title":"Dam Construction - Civil Engineering Guide","og_description":"Explore civil engineering for dam construction \u2713 hydraulic splitting & concrete works, steelwork, safety and quality.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/dam-construction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:29+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/dam-construction","url":"https:\/\/www.darda.de\/en\/knowledge\/dam-construction","name":"Dam Construction - Civil Engineering Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-03T07:17:34+00:00","dateModified":"2026-09-12T17:53:29+00:00","description":"Explore civil engineering for dam construction \u2713 hydraulic splitting & concrete works, steelwork, safety and quality.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/dam-construction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/dam-construction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/dam-construction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Dam construction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19942","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19942"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19942\/revisions"}],"predecessor-version":[{"id":29141,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19942\/revisions\/29141"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19942"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}