{"id":19940,"date":"2026-01-03T14:22:52","date_gmt":"2026-01-03T13:22:52","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19940"},"modified":"2026-06-01T17:33:02","modified_gmt":"2026-06-01T15:33:02","slug":"takt-basement","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/takt-basement","title":{"rendered":"Takt basement"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The term <strong>Takt Basement<\/strong> originates from takt planning in construction and describes a lead-ahead work and buffer zone, often in the basement level or a closed-off building section. In demolition and deconstruction projects, a Takt Basement stabilizes material and process flow by bundling preparatory works, <em>demolition separation<\/em>, and construction logistics. Especially in inner-city projects, sensitive existing buildings, and tight site conditions, the Takt Basement enables low-emission, low vibration levels, and predictable operations &#8211; for example with concrete pulverizers or stone and concrete <em>hydraulic splitter (wedge)<\/em> devices from Darda GmbH, such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>. This promotes <strong>selective deconstruction<\/strong> with high separation precision and reliably paces the overall process for <em>concrete demolition<\/em>, building gutting as well as <em>concrete separation\/cutting<\/em> and splitting works. Clear interfaces, coordinated material handovers, and minimized disturbance windows strengthen takt reliability and reduce rework.<\/p>\n<h2>Definition: What is meant by a Takt Basement?<\/h2>\n<p>A Takt Basement is a deliberately arranged lead-ahead zone within a structure, usually on a lower level, where work steps take place ahead of or in parallel with the main takt chain. It serves as a buffer for variability, as a pilot area for testing methods, and as a place for preparatory activities such as separating, downsizing, <em>demolition sorting<\/em>, and packaging of construction materials. In demolition and deconstruction projects, components are often pre-dismantled here with low noise and vibrations &#8211; for example through <em>hydraulic crushing<\/em> with a concrete pulverizer or through <em>controlled splitting<\/em> with stone and concrete hydraulic splitter (wedge) devices. The goal is a continuous takt flow on the other levels, fewer waiting times, lower disruption potential, and precise control of material streams.<\/p>\n<ul>\n<li><strong>Typical activities<\/strong>: separating and downsizing components, <em>demolition sorting<\/em>, contamination checks, packaging and labeling for removal.<\/li>\n<li><strong>Process stabilization<\/strong>: piloting drilling patterns, tool trials, and cycle time validation before rollout to other levels.<\/li>\n<li><strong>Interface management<\/strong>: defined handover points to logistics and subsequent takts with documented acceptance criteria.<\/li>\n<\/ul>\n<h2>Tasks and benefits of a Takt Basement in demolition<\/h2>\n<p>A Takt Basement acts as a robust forezone: it decouples varying work steps from the main takt, reduces construction logistics conflicts, concentrates noise and dust emissions in a well-shieldable area, and increases the utilization of downstream takts. Especially in selective deconstruction, it improves the type purity of materials because component separation and cutting can be carried out under controlled conditions. This positively impacts schedule and cost reliability, <em>occupational safety<\/em>, as well as reuse and <em>recycling rate<\/em>.<\/p>\n<ul>\n<li><strong>Predictability<\/strong>: fewer idle times through buffer capacity and tested sequences.<\/li>\n<li><strong>Quality<\/strong>: higher separation precision and documented material streams for reuse and recycling.<\/li>\n<li><strong>Emission control<\/strong>: reduced peak noise and vibrations through method selection and shielding.<\/li>\n<li><strong>Safety<\/strong>: clear zoning and standardized work procedures reduce incident probability.<\/li>\n<\/ul>\n<h2>Background: Takt planning in the demolition and deconstruction process<\/h2>\n<p>In takt planning, projects are divided into spatially and technically well-defined takt areas. Each crew works on one section per takt time. The Takt Basement typically runs ahead or in parallel and serves as a <strong>buffer and work preparation area<\/strong>. This cushions bottlenecks: if component separation above is delayed, the Takt Basement can continue to work ahead, pre-dismantle components, and keep material flows stable. This logic is particularly effective in <em>concrete demolition<\/em> and special deconstruction because material strength, reinforcement levels, and building accessibility can vary greatly. Aligning the forezone with structural sequence and logistics time slots ensures that upstream and downstream processes stay synchronized despite variability.<\/p>\n<h2>Planning and setup of a Takt Basement<\/h2>\n<h3>Areas, routes, loads<\/h3>\n<p>The area is zoned so that delivery, processing, intermediate storage, and removal have separate routes. Check the <em>load-bearing capacity<\/em> of slabs, <em>load transfer<\/em> to walls and columns, as well as escape routes at an early stage. Mobile work areas are organized with clear routing and buffer areas.<\/p>\n<ul>\n<li>Separate pedestrian and machine routes with physical guidance and signage.<\/li>\n<li>Verify allowable loads, impact points, and temporary shoring where needed.<\/li>\n<li>Define staging areas with marked zones and standardized container positions.<\/li>\n<\/ul>\n<h3>Power and hydraulics supply<\/h3>\n<p><em>Hydraulic power pack<\/em> units (see <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>) are placed to minimize vibrations, hoses are neatly routed and protected from damage. Power supply and <em>compressed air supply<\/em> are organized with well-accessible shut-off and test points. Media routing is kept as short as possible to minimize pressure losses and trip hazards. Quick couplings, hose rupture safeguards, and drip trays reduce risks and simplify maintenance.<\/p>\n<ul>\n<li>Protect hose runs against abrasion and sharp edges; avoid pinch points at doors and stairs.<\/li>\n<li>Provide spill kits and absorbents near coupling points; implement regular tightness checks.<\/li>\n<li>Plan heat dissipation and airflow to prevent overheating and noise build-up.<\/li>\n<\/ul>\n<h3>Emission control: noise, dust, vibrations<\/h3>\n<p>By using <strong>non-percussive<\/strong> methods &#8211; such as concrete pulverizers or stone and concrete hydraulic splitter (wedge) devices &#8211; noise peaks and vibration levels can be reduced. Dust is limited by water misting, extraction, and wet separation. Coverings, enclosures, and acoustic damping complement measures in the basement area, supported by dust suppression and, where needed, a dust extraction plant.<\/p>\n<ul>\n<li><strong>Noise<\/strong>: acoustic barriers, encapsulation of power packs, and time-window management.<\/li>\n<li><strong>Dust<\/strong>: pre-wetting, local extraction, negative-pressure zones, and regular cleaning cycles.<\/li>\n<li><strong>Vibrations<\/strong>: non-percussive tools, staged splitting, and monitoring against limit values.<\/li>\n<\/ul>\n<h3>Material flow management and circular economy<\/h3>\n<p>Fractions such as concrete, masonry, reinforcing steel, wood, and plastics are recorded as single-grade streams in the Takt Basement. Shorter transport routes and organized container service increase the <em>recycling rate<\/em>. Markings and accompanying documentation ensure traceability. Digital labels and weighbridge data can be linked to batches to verify purity and destinations, while contamination is minimized through strict in-zone rules.<\/p>\n<ul>\n<li>Container coding with fraction, origin area, and date for consistent traceability.<\/li>\n<li>Clear rejection criteria to avoid mixing and to protect downstream recycling quality.<\/li>\n<li>Documented handovers between crews and logistics with standardized checklists.<\/li>\n<\/ul>\n<h3>Safety and permits<\/h3>\n<p>Safety concepts consider fire protection and explosion protection, escape routes, ventilation, lighting, and access rules. Structural analysis and vibration limit values must be checked project-specifically. Legal requirements may vary by project; compliance always follows the generally accepted rules of technology and local regulations. Permit-to-work systems, lockout-tagout for services, and toolbox briefings consolidate operational safety.<\/p>\n<ul>\n<li>Define permit classes for hot work, confined spaces, and energy isolation.<\/li>\n<li>Ensure fresh air supply and continuous monitoring in enclosed sections where required.<\/li>\n<li>Maintain clear evacuation signage and lighting even during staged closures.<\/li>\n<\/ul>\n<h2>Tools and methods in the Takt Basement<\/h2>\n<h3>Concrete pulverizers: controlled downsizing of reinforced concrete<\/h3>\n<p>Concrete pulverizers from Darda GmbH are suitable for low-vibration breaking of reinforced components. They reduce noise peaks, preserve surrounding load-bearing structures, and produce manageable piece sizes. For exposed reinforcing steel, steel shear or combination shears are additionally used to separate reinforcement efficiently. Interchangeable jaw sets and secondary crushing strategies improve throughput and fragment geometry for downstream handling.<\/p>\n<h3>Stone and concrete splitters: quiet splitting technology for massive cross-sections<\/h3>\n<p>Stone and concrete <em>hydraulic wedge splitter<\/em> devices from Darda GmbH act via splitting cylinders inserted into boreholes. This produces defined cracks along the drilling pattern. The method is particularly suitable for thick components, foundations, <em>abutment<\/em>s, or in sensitive areas where vibrations must be avoided &#8211; such as in existing basements, adjacent to active plant, or in hospital environments.<\/p>\n<ul>\n<li>Advantages: directional crack guidance, minimal stray impact, no flying debris under correct setup.<\/li>\n<li>Planning: borehole spacing and depth are matched to cross-section, reinforcement, and desired split line.<\/li>\n<li>Integration: pre-splitting in the Takt Basement stabilizes removal cycles on upper levels.<\/li>\n<\/ul>\n<h3>Hydraulic power packs: supply and integration<\/h3>\n<p><em>Hydraulic power pack<\/em> units provide the required energy for pulverizers, splitting cylinders, and multi cutters. In the Takt Basement, packs are placed so that waste heat is dissipated, <em>noise emission<\/em> is damped, and maintenance paths remain unobstructed. Regular <em>leakage test<\/em>s and functional checks are part of takt control and <em>operational safety<\/em>. Energy use, hose routing, and noise shielding are coordinated with logistics to prevent conflicts.<\/p>\n<ul>\n<li>Acoustic enclosures or baffles to lower background noise in shielded zones.<\/li>\n<li>Ducting or extraction of hot air to avoid heat build-up in confined areas.<\/li>\n<li>Emergency stops and visible pressure gauges at defined access points.<\/li>\n<\/ul>\n<h3>Combination shears, multi cutters, and steel shears<\/h3>\n<p>Combination shears and multi cutters cover changing tasks in the Takt Basement &#8211; from cutting light steel sections to processing lines and reinforcement bundles. <em>Steel shear<\/em>s are used for reinforcing bars, lattice girders, and sections. Selection depends on material thickness, accessibility, and the required cut quality. Blade geometry, opening width, and tool weight are aligned with the piece spectrum and handling constraints.<\/p>\n<h3>Tank cutters for special operations<\/h3>\n<p>For cutting containers and tanks in specially secured zones, tank cutting tools are used. Draining, gas-free status, ventilation, and spark control are priorities. Such <em>tank demolition<\/em> tasks are performed only under appropriate protective measures and coordinated work permits.<\/p>\n<ul>\n<li>Verify inerting or gas-free certificate and continuous atmosphere monitoring where applicable.<\/li>\n<li>Implement hot-work permit, fire watch, and suitable extinguishing media.<\/li>\n<li>Plan sectioning sequence, support points, and fall-prevention for cut parts.<\/li>\n<\/ul>\n<h2>Application areas and typical scenarios<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In specialized deconstruction, the Takt Basement serves as a prefabrication and separation area for massive components. Concrete pulverizers reduce component sizes; splitter devices open thick cross-sections. Downstream takts can then remove components quickly and continue residual works without interruption. Method selection is adapted to reinforcement content, access, and target emission limits to keep adjacent operations stable.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>During building gutting, interior trades, installations, and light partition walls are removed. The Takt Basement functions as a sorting and cutting zone. Multi cutters, combination shears, and steel shears enable rapid separation of metal components before the main takts follow. Early removal of interfering installations reduces clashes and accelerates subsequent takts.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In underground projects, an equivalent lead-ahead area &#8211; functionally corresponding to the Takt Basement &#8211; can be set up for low-emission rock release with splitting cylinders, as in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>. Low vibrations and controlled crack guidance are advantages in sensitive geological and structural environments.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In the extraction process, analogous forezones can prepare the splitting of natural stone. With a defined drilling pattern and splitting technology, the material flow is smoothed, single-grade separation and dimensional accuracy increase, and subsequent takts operate more stably. The result is predictable block geometry with fewer corrective cuts.<\/p>\n<h3>Special operations<\/h3>\n<p>In plant areas or infrastructure under ongoing operations, work can be consolidated in secured forezones. This reduces emissions and risks for live operations while the main takts proceed as planned. Time-window planning and clear changeover routines keep interfaces safe and punctual.<\/p>\n<h2>Flow in takt: From forezone to takt area<\/h2>\n<ol>\n<li>Lead-ahead in the Takt Basement: component separation, pre-crushing, sorting, packaging.<\/li>\n<li>Material outflow: defined routes, coordinated lifting device and conveying means, clear handover points.<\/li>\n<li>Subsequent takts: deconstruction on the levels, removal of structure-relevant components in an adapted sequence.<\/li>\n<li>Feedback: insights from the Takt Basement feed into takt time, drilling patterns, and tool selection.<\/li>\n<\/ol>\n<p>Visual management, standardized handovers, and short control loops link the forezone with the main takt to maintain stable throughput despite variability.<\/p>\n<h2>Metrics, takt time, and buffer control<\/h2>\n<p>Takt times are derived from real performance values and reviewed regularly. An appropriate buffer in the Takt Basement &#8211; in time and space &#8211; compensates for variability. Metrics such as piece sizes per takt, average setup times, disturbance rate, and material throughput make process progress visible and support control.<\/p>\n<ul>\n<li><strong>Output<\/strong>: pieces per takt, weight per shift, and buffer fill level.<\/li>\n<li><strong>Stability<\/strong>: disturbance minutes, changeover times, and on-time handovers.<\/li>\n<li><strong>Quality<\/strong>: purity rates, rework share, and deviation against drilling or cut plans.<\/li>\n<li><strong>Emissions<\/strong>: spot measurements for noise and vibrations in relation to limit values.<\/li>\n<\/ul>\n<h2>Avoiding typical pitfalls<\/h2>\n<ul>\n<li>Unclear zoning: missing separation of processing, storage, and removal.<\/li>\n<li>Underestimated emissions: insufficient dust and noise mitigation in the basement area.<\/li>\n<li>Hydraulic bottleneck: power packs placed poorly, line routes too long, maintenance neglected.<\/li>\n<li>Lack of feedback: takt times not adjusted to actual performance.<\/li>\n<li>Imprecise component separation: pieces too large, unsuitable tools, insufficient single-grade separation.<\/li>\n<\/ul>\n<h2>Practice-oriented selection of methods<\/h2>\n<p>The choice between concrete pulverizer, stone and concrete hydraulic wedge splitter, steel shear, or combination shear depends on component thickness, reinforcement, accessibility, and the required emission limits. <em>Concrete pulverizers<\/em> are advantageous for reinforced concrete with moderate cross-sections. <em>Hydraulic wedge splitter<\/em> devices show their strengths with massive cross-sections or sensitive surroundings. Steel shears and multi cutters complement the process for metallic components. Careful takt planning connects these methods into a stable, safe, and well-controllable deconstruction process in line with takt logic, supported by robust transport logistics. Clear documentation, defined acceptance criteria, and trained crews reinforce repeatable, high-quality outcomes.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The term Takt Basement originates from takt planning in construction and describes a lead-ahead work and buffer zone, often in the basement level or a closed-off building section. In demolition and deconstruction projects, a Takt Basement stabilizes material and process flow by bundling preparatory works, demolition separation, and construction logistics. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/takt-basement\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19940","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Takt Basement in Demolition - Takt Planning Buffer<\/title>\n<meta name=\"description\" content=\"Lead-ahead zone in takt planning for demolition explained \u2713 Takt Basement boosts low-noise workflows.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/takt-basement\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Takt Basement in Demolition - Takt Planning Buffer\" \/>\n<meta property=\"og:description\" content=\"Lead-ahead zone in takt planning for demolition explained \u2713 Takt Basement boosts low-noise workflows.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/takt-basement\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-01T15:33:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/takt-basement\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/takt-basement\",\"name\":\"Takt Basement in Demolition - Takt Planning Buffer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-03T13:22:52+00:00\",\"dateModified\":\"2026-06-01T15:33:02+00:00\",\"description\":\"Lead-ahead zone in takt planning for demolition explained \u2713 Takt Basement boosts low-noise workflows.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/takt-basement#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/takt-basement\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/takt-basement#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Takt basement\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Takt Basement in Demolition - Takt Planning Buffer","description":"Lead-ahead zone in takt planning for demolition explained \u2713 Takt Basement boosts low-noise workflows.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/takt-basement","og_locale":"en_US","og_type":"article","og_title":"Takt Basement in Demolition - Takt Planning Buffer","og_description":"Lead-ahead zone in takt planning for demolition explained \u2713 Takt Basement boosts low-noise workflows.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/takt-basement","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-01T15:33:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/takt-basement","url":"https:\/\/www.darda.de\/en\/knowledge\/takt-basement","name":"Takt Basement in Demolition - Takt Planning Buffer","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-03T13:22:52+00:00","dateModified":"2026-06-01T15:33:02+00:00","description":"Lead-ahead zone in takt planning for demolition explained \u2713 Takt Basement boosts low-noise workflows.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/takt-basement#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/takt-basement"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/takt-basement#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Takt basement"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19940","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19940"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19940\/revisions"}],"predecessor-version":[{"id":27974,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19940\/revisions\/27974"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}