{"id":19935,"date":"2026-01-03T15:44:11","date_gmt":"2026-01-03T14:44:11","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19935"},"modified":"2026-09-12T19:53:29","modified_gmt":"2026-09-12T17:53:29","slug":"column-formwork","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/column-formwork","title":{"rendered":"Column formwork"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Column formwork shapes the geometric form of columns and piers from fresh concrete. It is a core component of shell construction and influences the load-bearing capacity, dimensional accuracy, and surface quality of circular columns, rectangular columns, or complex special cross-sections. Over a structure\u2019s life cycle, interfaces with repair and deconstruction arise: wherever columns are adjusted, partially removed, or selectively supplemented, controlled, low-vibration methods are used, for example with a concrete pulverizer or a hydraulic wedge splitter from Darda GmbH. This closes the loop between proper formwork, precise concreting, and material-conserving intervention in existing structures. Early coordination of geometry, reinforcement detailing, and pour sequence supports constructability and long-term maintainability.<\/p>\n<h2>Definition: What is meant by column formwork?<\/h2>\n<p>Column formwork refers to temporary or stay-in-place form parts that enclose fresh concrete for columns and piers in a dimensionally stable manner during placing, concrete compaction, and hardening. They take up the approximately hydrostatic formwork pressure, secure the position of the reinforcement, define edges, radii, and exposed-concrete surfaces, and transfer loads via formwork anchor, straps, and bracing into the support scaffold or the ground. Depending on the task, modular system formwork, formwork tubes, segmented curved panels, or customized formwork made of wood, steel, or fiber-reinforced composite are used. After hardening, stripping is usually carried out; with stay-in-place systems the formwork remains in the component and may contribute structurally.<\/p>\n<ul>\n<li><strong>Core functions:<\/strong> shape retention under pressure, positional stability of reinforcement, control of edges and radii, targeted surface texture, and safe load transfer into the temporary support system.<\/li>\n<li><strong>Interfaces:<\/strong> coordination with tolerances of connecting elements, embedments, and subsequent trades to minimize rework.<\/li>\n<li><strong>Lifecycle aspect:<\/strong> choice of reusable systems reduces waste and supports repeatable surface quality.<\/li>\n<\/ul>\n<h2>Design, types, and materials of column formwork<\/h2>\n<p>Column formwork differs by cross-section shape, material, reusability, and required surface. Round formwork (e.g., tubes) produces cylindrical cross-sections; segmented system formwork creates rectangular and special shapes. Wood and wood-based materials are flexible and adaptable, steel and aluminum formwork are robust and precise, fiber-reinforced plastics save weight. The choice depends on loads, tolerances, concreting rate, exposed-concrete class, and construction sequence.<\/p>\n<ul>\n<li><strong>Selection criteria:<\/strong> target cross-section and height, expected formwork pressure, permissible deflection, and tie spacing.<\/li>\n<li><strong>Reusability and cycle time:<\/strong> number of reuses, cleaning effort, and repairability of facings.<\/li>\n<li><strong>Surface requirements:<\/strong> texture, joint layout, tie-hole grid, and compatibility with release agents.<\/li>\n<li><strong>Site constraints:<\/strong> crane availability, access widths, and permissible element weights for manual handling.<\/li>\n<\/ul>\n<h2>Planning and design: loads, tolerances, surface<\/h2>\n<p>The design of column formwork is guided by formwork pressure, the stiffness of the elements, and the uptake of horizontal and vertical loads. Decisive factors are the concrete mix, temperature, compaction method, and concreting rate. At the same time, dimensional tolerances, joint layout, anchor points, and the desired exposed-concrete quality must be considered. Precise work planning reduces rework and later interventions on the component.<\/p>\n<ul>\n<li><strong>Planning deliverables:<\/strong> formwork drawings with tie locations, bracing concept, pour plan with lift heights, and curing concept.<\/li>\n<li><strong>Tolerance management:<\/strong> reference axes, control dimensions at base and head, and inspection points for verticality and twist.<\/li>\n<li><strong>Quality targets:<\/strong> agreed surface class, joint rhythm, and acceptance criteria for bug holes and tie marks.<\/li>\n<\/ul>\n<h3>Formwork pressure and concreting rate<\/h3>\n<p>During concreting, fresh concrete acts as an approximately hydrostatic pressure. Increased placing rates, low temperatures, or high flowability raise formwork pressure. Load-bearing anchors, dimensionally stable formwork sheathing, and adequately sized bracing limit deformations and prevent bulging. A coordinated concreting rate, defined lift heights, and appropriate concrete compaction ensure <em>homogeneous<\/em> surfaces. Trial placements or mock-ups help calibrate rate, vibration, and release agent.<\/p>\n<h3>Anchoring, bracing, and stability<\/h3>\n<p>Anchor points and straps transfer loads into support scaffolds or temporary brackets. Eccentric loads from cantilevering column heads or brackets must be captured in the structural analysis. Wind loads and vibrations on tight construction sites require additional bracing and a clear assembly sequence. A stable column base with an adjustable base plate prevents tipping.<\/p>\n<ul>\n<li>Confirm tie capacities and edge distances; use backing plates where required.<\/li>\n<li>Pre-tension straps uniformly and verify torque or tension where applicable.<\/li>\n<li>Include secondary bracing for wind and accidental impacts in access zones.<\/li>\n<li>Secure temporary openings and recesses to avoid local instabilities.<\/li>\n<\/ul>\n<h3>Exposed concrete and formwork sheathing<\/h3>\n<p>For exposed-concrete surfaces, the formwork sheathing, joint pattern, and spacers determine the appearance. Absorbent facings change the pore structure; non-absorbent surfaces promote uniform appearances. Release agents must be applied sparingly and evenly to avoid stains and bug holes. Clean reinforcement layers ensure sufficient cover and prevent print-through.<\/p>\n<ul>\n<li>Define tie-hole grid and seam positions in alignment with fa\u00e7ade rhythms.<\/li>\n<li>Coordinate facing orientation to control grain direction and light reflection.<\/li>\n<li>Limit reuse counts of facings for consistent tone and texture.<\/li>\n<li>Use compatible spacers and cones to avoid discoloration.<\/li>\n<\/ul>\n<h2>Assembly, concreting, and stripping<\/h2>\n<p>An orderly construction sequence reduces risks and rework. The work steps include surveying, pre-assembly, alignment, reinforcement installation, closing the formwork, concreting with compaction, curing, and stripping.<\/p>\n<ol>\n<li>Survey and set out axes, control elevations, and base plates.<\/li>\n<li>Pre-assemble panels or tubes, check squareness, and align to datum.<\/li>\n<li>Install and tie reinforcement with spacers and embedments.<\/li>\n<li>Close the formwork, install ties and bracing, and seal joints.<\/li>\n<li>Place concrete in lifts, compact appropriately, and monitor pressure.<\/li>\n<li>Apply curing measures immediately after finishing.<\/li>\n<li>Strip in stages after sufficient strength and perform after-treatment.<\/li>\n<\/ol>\n<h3>Assembly sequence and fit<\/h3>\n<p>Before closing, the reinforcement, embedded parts, and anchors must be fully checked. Butt joints, sealing tapes, and radii must fit precisely; tolerances at the foundation and connecting components should be compensated early. The column head receives a defined bedding joint or a cone to transfer loads into beams or slabs.<\/p>\n<ul>\n<li>Verify verticality and plumb lines on at least two faces.<\/li>\n<li>Check cover dimensions at corners and around couplers.<\/li>\n<li>Seal penetrations and butt joints against grout loss.<\/li>\n<li>Record as-built tie locations for later patching and acceptance.<\/li>\n<\/ul>\n<h3>Occupational safety<\/h3>\n<p>Assembly and concreting work require safe access, fall protection, and load transfer for materials and personnel. Lifting devices must match load capacity and attachment points. Where space is restricted, organized storage areas prevent crushing and tripping hazards. Notes on noise emission and dust exposure during rework must be observed.<\/p>\n<ul>\n<li>Provide working platforms, guardrails, and defined attachment points.<\/li>\n<li>Use certified lifting gear and conduct pre-use inspections.<\/li>\n<li>Plan exclusion zones during pours and stripping.<\/li>\n<li>Specify PPE for vibration, noise, and dust where rework occurs.<\/li>\n<\/ul>\n<h3>Stripping and after-treatment<\/h3>\n<p>Stripping takes place after sufficient hardening; exact times depend on temperature, cement type, and component dimensions. When releasing, point stresses must be avoided to prevent edge spalling. Subsequent treatments such as reworking edges, re-dressing chamfers, or closing anchor points are carried out in a controlled manner to protect the surface.<\/p>\n<ul>\n<li>Assess strength by maturity or test cubes before removing ties and bracing.<\/li>\n<li>Start stripping at low-stress areas and use broad support to avoid imprints.<\/li>\n<li>Execute surface repairs with matched mortars and defined curing.<\/li>\n<li>Document patch locations and finishing processes for handover.<\/li>\n<\/ul>\n<h2>Interfaces with deconstruction: selectively processing columns<\/h2>\n<p>In existing structures, columns often need to be adapted: heads are shortened, cross-sections are subsequently altered, or added layers are removed. Here, <strong>low-vibration<\/strong> and precise methods are essential to protect adjacent components and maintain ongoing use. Concrete pulverizers from Darda GmbH enable selective material removal at edges and heads; hydraulic wedge splitters create controlled crack patterns inside before surfaces are removed.<\/p>\n<p>Prior to intervention, condition surveys and reinforcement detection reduce uncertainty. Defined work zones, dust capture, and water management ensure low-emission processing and protect finishes in use.<\/p>\n<h3>Splitting instead of hammering<\/h3>\n<p>Hydraulic wedge splitters, such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, apply internal splitting forces that create directed joints. This technique is suitable for separating shells, build-ups, or partial areas of columns with low vibration and reduced dust generation. In sensitive environments such as hospitals or existing office spaces, this is an advantage.<\/p>\n<h3>Controlled breaking with concrete pulverizers<\/h3>\n<p>Concrete pulverizers from Darda GmbH work locally with high bite force and allow the removal of column edges, the forming of chamfers, or the adjustment of column heads. Through step-by-step removal, the layout of reinforcement layers remains visible, helping to avoid damage to load-bearing steel bars. Supplementary misting and local extraction reduce airborne dust and improve visibility.<\/p>\n<h3>Cutting reinforcement<\/h3>\n<p>Exposed reinforcement is cut with a steel shear, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">high-performance multi cutters<\/a>, or combination shears. A material-appropriate cut minimizes sparks and noise. For thick steel jackets or special profiles, devices with high cutting force are used, depending on the situation. A hydraulic power pack from Darda GmbH reliably supplies the tools with energy, with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">reliable hydraulic power units<\/a> selected depending on the situation.<\/p>\n<ul>\n<li>Protect remaining bars with guards or spacers during cutting.<\/li>\n<li>Collect offcuts and swarf promptly to keep workflows clear.<\/li>\n<li>Coordinate permits where hot work or spark containment is required.<\/li>\n<\/ul>\n<h2>Fields of application at a glance<\/h2>\n<p>From construction to deconstruction, column formwork touches numerous fields of work. The interfaces with typical areas of application show which methods have proven themselves.<\/p>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>When removing existing columns or partial cross-sections, defined separation cuts and controlled breaking are required. The combination of splitting and pulverizer work reduces vibration and protects adjacent components. Residual cross-sections remain deliberately in place until temporary shoring is in effect.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>In building gutting, residual formwork, build-ups, or claddings are removed from columns. Low-noise processes and <em>low-dust<\/em> working methods are central here. After opening claddings, the selective use of concrete pulverizers allows precise exposure of connection points.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Round cross-sections are common in underground construction. When connecting column foundations to rock or modifying crown-support columns, work is often carried out with low vibration to avoid settlements. Splitters are suitable for releasing contact surfaces at the rock\/concrete interface in a controlled manner.<\/p>\n<h3>Special operations<\/h3>\n<p>Dense inner-city sites, monument protection, or ongoing operations require low-emission and compact solutions. Tools from Darda GmbH can be used as a handheld tool and enable work in confined spaces, for example to remove column jackets or notch corbels.<\/p>\n<h2>Quality assurance and typical defect patterns<\/h2>\n<p>Care in planning and execution prevents later rework. Typical problems and countermeasures can be addressed early.<\/p>\n<ul>\n<li>Bulging of the formwork: reduce concreting rate, adjust bracing and anchor spacing.<\/li>\n<li>Misalignment at butt joints: precise alignment, strong connectors, marked joint grid.<\/li>\n<li>Honeycombing and gravel pockets: continuous concrete compaction, suitable consistency, adapted lift heights.<\/li>\n<li>Spalled edges: robust chamfer strips, careful stripping, early after-treatment.<\/li>\n<li>Irregular joint pattern: check formwork sheathing in advance, coordinate pacing and element widths.<\/li>\n<li>Tie-hole tearing or cones stuck: align pull direction, use release sleeves, avoid premature loading.<\/li>\n<li>Visible reinforcement print-through: ensure cover with correct spacers and limit vibration at edges.<\/li>\n<li>Color shading or streaks: consistent facing type, controlled release agent, uniform curing.<\/li>\n<\/ul>\n<h2>Sustainability and resource conservation<\/h2>\n<p>Reusable formwork, optimized concrete mixes, and lower reject rates reduce material consumption. In deconstruction, <strong>precise<\/strong>, selective methods reduce the waste mix and facilitate the separation of concrete and reinforcement. Hydraulic wedge splitters and concrete pulverizers enable targeted removal with lower energy and water demand than large-area impact methods.<\/p>\n<ul>\n<li>Plan for reuse cycles and standardized panel widths to minimize cutting waste.<\/li>\n<li>Use durable facings and repair kits to extend service life.<\/li>\n<li>Optimize lifting logistics to reduce idle times and energy demand.<\/li>\n<li>Separate materials at source to improve recycling quality.<\/li>\n<\/ul>\n<h2>Documentation and framework conditions<\/h2>\n<p>Depending on the project, relevant standards and guidelines apply to planning, execution, and control. Measurement logs, concreting reports, and approvals document the construction process. Information on load assumptions, formwork pressure, anchor forces, and surface classes should be recorded in a comprehensible way. Legal requirements must be reviewed on a project-specific basis; references to them are fundamentally non-binding.<\/p>\n<ul>\n<li><strong>Project records:<\/strong> inspection checklists, tie logs, curing records, and stripping releases.<\/li>\n<li><strong>Controls:<\/strong> calibrated measuring tools, documented torque checks, and acceptance of mock-ups where required.<\/li>\n<li><strong>Handover:<\/strong> as-built data on tie locations, repair spots, and surface evaluations for facility records.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Column formwork shapes the geometric form of columns and piers from fresh concrete. It is a core component of shell construction and influences the load-bearing capacity, dimensional accuracy, and surface quality of circular columns, rectangular columns, or complex special cross-sections. Over a structure\u2019s life cycle, interfaces with repair and deconstruction <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/column-formwork\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19935","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Column Formwork for Concrete - Design &amp; Planning<\/title>\n<meta name=\"description\" content=\"Learn about column formwork for concrete columns \u2713 design, pressure, exposed surfaces &amp; safe assembly.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/column-formwork\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Column Formwork for Concrete - Design &amp; Planning\" \/>\n<meta property=\"og:description\" content=\"Learn about column formwork for concrete columns \u2713 design, pressure, exposed surfaces &amp; safe assembly.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/column-formwork\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:29+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-formwork\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-formwork\",\"name\":\"Column Formwork for Concrete - Design & Planning\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-03T14:44:11+00:00\",\"dateModified\":\"2026-09-12T17:53:29+00:00\",\"description\":\"Learn about column formwork for concrete columns \u2713 design, pressure, exposed surfaces & safe assembly.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-formwork#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-formwork\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-formwork#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Column formwork\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Column Formwork for Concrete - Design & Planning","description":"Learn about column formwork for concrete columns \u2713 design, pressure, exposed surfaces & safe assembly.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/column-formwork","og_locale":"en_US","og_type":"article","og_title":"Column Formwork for Concrete - Design & Planning","og_description":"Learn about column formwork for concrete columns \u2713 design, pressure, exposed surfaces & safe assembly.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/column-formwork","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:29+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/column-formwork","url":"https:\/\/www.darda.de\/en\/knowledge\/column-formwork","name":"Column Formwork for Concrete - Design & Planning","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-03T14:44:11+00:00","dateModified":"2026-09-12T17:53:29+00:00","description":"Learn about column formwork for concrete columns \u2713 design, pressure, exposed surfaces & safe assembly.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/column-formwork#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/column-formwork"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/column-formwork#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Column formwork"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19935","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19935"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19935\/revisions"}],"predecessor-version":[{"id":29325,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19935\/revisions\/29325"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}