{"id":19934,"date":"2026-01-02T15:46:54","date_gmt":"2026-01-02T14:46:54","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19934"},"modified":"2026-06-01T15:45:04","modified_gmt":"2026-06-01T13:45:04","slug":"dust-extraction-for-sawdust","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/dust-extraction-for-sawdust","title":{"rendered":"Dust extraction for sawdust"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Dust extraction refers to the targeted capture, transport, and separation of wood chips and wood dust that arise during cutting, sawing, milling, or sanding. On construction sites and in workshops, it serves health protection, cleanliness, and process reliability. In the application areas of gutting and cutting as well as selective deconstruction, in addition to mineral dusts, large volumes of wood chips from formwork, substructures, or fit-out components frequently occur. Planning the chip extraction must therefore be coordinated with workflows and tools, for example when concrete demolition shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, or other hydraulic tools from Darda GmbH are used in the same section. For coherent results, <strong>source capture, short intake paths, and airtight interfaces<\/strong> should be aligned with tool geometry and sequence of work.<\/p>\n<h2>Definition: What is meant by dust extraction for sawdust?<\/h2>\n<p>Dust extraction for sawdust means the <strong>at-source capture<\/strong> of wood chips and wood dust directly at the point of generation, and their conveyance through ducting to a separation system. The aim is to reduce the concentration of inhalable and respirable dust fractions in the breathing zone, minimize fire and explosion hazards, and keep workplaces clean. In contrast to general room ventilation, dust extraction works with sufficient negative pressure, defined flow velocities, and suitable filtration technology (e.g., cyclone pre-separator plus cartridge or bag filter) to reliably retain both coarse chips and fine dust. Where exhaust air is recirculated, <em>filtration performance and leakage tightness<\/em> must be verified so that no re-entry into the working zone occurs.<\/p>\n<h2>Design and operating principles of dust extraction systems for sawdust<\/h2>\n<p>A reliable dust extraction setup typically consists of capture elements (hoods, saw blade guards, extraction arms), flexible hoses or ductwork, a fan or suction unit, a separation system (cyclone, filter), and dust-tight collection (bags, containers, big bags). The decisive factor is <em>source capture<\/em>: the closer the hood sits to the kerf and the more aerodynamically it is designed, the lower the required volumetric flow. Pre-separators relieve the fine filters; automatic cleaning (e.g., compressed-air pulse) keeps the differential pressure stable. A demand-controlled drive reduces energy consumption and noise. Smooth interior surfaces, <strong>minimized leakage<\/strong>, and conductive components further improve performance and operational safety.<\/p>\n<h2>Key parameters and sizing: air volume, negative pressure, flow velocity<\/h2>\n<p>Sizing is based on the amount of chips generated and the capture velocity required. For hand-held and table saws, velocities at the hood opening of about 20-30 m\/s are often targeted, and 20-25 m\/s in main ducts to prevent deposits. Sufficient negative pressure ensures leakage is minimized. Long hose runs, tight radii, and unnecessary fittings increase pressure loss &#8211; and should be limited. Filter areas must be selected so that the air-to-cloth ratio remains low and cleaning is effective. Reliable operation also requires <strong>adequate make-up air<\/strong> to maintain stable flow directions and to avoid backflow from adjacent rooms.<\/p>\n<h3>Capture on circular saws, reciprocating saws, and miter saws<\/h3>\n<p>Mobile extractors with a suitable filter class (in practice often M, and H for high fine-dust fractions) have proven effective. With reciprocating saws and chain saws, installing aerodynamically favorable hoods is challenging; encapsulating setups and a combination of point extraction and negative-pressure zones help here. In gutting projects, additional mineral fine dust is produced &#8211; this must be clearly distinguished from wood dust and, where necessary, captured with separate technology. <em>Tool-integrated ports, short hoses, and automatic filter cleaning<\/em> enhance capture efficiency and reduce downtime due to clogging.<\/p>\n<h2>Interfaces with demolition and deconstruction: working with hydraulic cutting technology<\/h2>\n<p>In gutting and cutting phases, wood is often removed separately before mineral components are processed with concrete demolition shears or stone and concrete splitters. <strong>Smart workflow planning<\/strong> lowers emission levels: first extract and clear chip sources, then proceed with hydraulic tools. Hydraulic power packs, such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">portable hydraulic power units<\/a>, should be placed outside chip streams so that cooling fans do not draw in chips. Route planning, partitions, and negative-pressure areas prevent chips from reaching areas where, for example, steel shears or tank cutters are used. Consistent <em>housekeeping and zoning<\/em> reduce cross-contamination and re-entrainment.<\/p>\n<h3>Concrete demolition shears working alongside dust extraction<\/h3>\n<p>Concrete demolition shears produce hardly any chips when crushing compared to wood sawing, but they do generate mineral fragments. To avoid <em>resuspension<\/em>, work on cleaned, chip-free surfaces. For parallel operations, separate work zones, staggered scheduling, and consistent cleaning of traffic routes are effective. Where sensible, low-flow misting on mineral break lines can further suppress loose particulates without introducing excess moisture into chip streams.<\/p>\n<h3>Stone and concrete splitters in interior applications<\/h3>\n<p>Splitting concrete reduces the need for dust-generating cutting. Where formwork timber or timber substructures still need to be removed, a mobile dust extraction unit with a short intake path is recommended. The result is a lower-emission construction site, which is particularly advantageous in sensitive environments &#8211; such as gutting in occupied buildings. In addition, reduced <strong>vibration and noise<\/strong> from splitting supports a more tolerable working environment.<\/p>\n<h2>Health protection, fire, and explosion protection with wood dust<\/h2>\n<p>Wood dust can irritate the respiratory tract and, with prolonged exposure, cause health issues. Fine fractions remain airborne longer, settle on surfaces, and, with oxygen, form a potentially explosive mixture. A careful concept includes reducing ignition sources, a conductive design and grounding of the system, regular cleaning, and low-dust emptying of collection containers. General requirements can vary by project; binding assessments are the responsibility of the competent specialist bodies.<\/p>\n<ul>\n<li>Prioritize low-spark working methods and separate hot works spatially and temporally<\/li>\n<li>Use equipotential bonding, conductive hoses, and components<\/li>\n<li>Consistently avoid dust deposits on surfaces and bind them with moisture<\/li>\n<li>Ensure dust-tight disposal; change containers in good time<\/li>\n<li>Where applicable, use equipment suitable for potentially explosive atmospheres and antistatic filter media<\/li>\n<\/ul>\n<h2>Filtration technology and separation methods<\/h2>\n<p>Cyclone separators effectively pre-separate coarse chips and reduce the load on fine filters. Cartridge and bag filters retain fine dust; automatic cleaning stabilizes differential pressure. For damp chips or mixed fractions, wet separators can be sensible. Airtight execution of all interfaces and <strong>monitored filtration<\/strong> via differential pressure measurement are important. Exhaust air should be routed so that no recirculation into work areas occurs. If recirculation is unavoidable, <em>filter class, leak testing, and monitoring<\/em> must be aligned with the intended use and local requirements.<\/p>\n<h3>Maintenance, cleaning, and hygiene<\/h3>\n<p>Regular visual inspections, leak tests, and scheduled filter changes ensure performance. Damp wood chips can be microbiologically contaminated; standing deposits and condensation must be avoided. Cleaning should be as low-dust as possible &#8211; dry sweeping is not suitable. Documented maintenance, functional checks of pulse cleaning, and simple on-site tests (e.g., smoke tests) increase reliability and transparency.<\/p>\n<h2>Energy efficiency and control technology<\/h2>\n<p>Variable frequency drives adapt the air volume to the opened extraction points. Damper positions and demand-driven control reduce power draw and noise. Short duct runs, smooth interiors, and streamlined fittings lower pressure losses. A well-planned system runs not only quieter but also more efficiently. Automatic start-stop via tool signal and <strong>standby strategies<\/strong> minimize idle operation without compromising capture.<\/p>\n<h2>Mobile and stationary solutions<\/h2>\n<p>On temporary construction sites during gutting, mobile dust extractors with robust chassis and impact-resistant ducting are practical. In prefabrication or longer project phases, stationary dust extraction plant with a central filter offers high operational reliability and facilitates disposal. Hybrid configurations &#8211; mobile pre-separators with a central fine filter &#8211; are often a good solution in confined existing buildings. Interfaces for <em>quick-change containers<\/em> and level monitoring accelerate logistics and reduce spillage.<\/p>\n<h2>Capture at hard-to-reach interfaces<\/h2>\n<p>On OSB, particleboard, or solid timber elements in shafts, ceiling voids, and niches, direct hoods are often not possible. Enclosures, plastic-sheet partitions, and negative-pressure areas with controlled supply and exhaust limit dispersion. With oscillating multi-tools, narrow, tracking nozzles help; short, smooth hoses improve entrainment. Where access is constrained, <strong>modular containment<\/strong> with zipper doors and pressure monitoring supports consistent capture.<\/p>\n<h2>Material flow, logistics, and disposal<\/h2>\n<p>Sawdust and chips are collected in bags, big bags, or containers. <em>Source-segregated separation<\/em> increases recovery options; chips with adherent materials (paint, plaster residues, composites) must be handled separately. Briquetting compacts the volume. Disposal routes depend on local requirements; a legal case-by-case review remains necessary. Moisture content and foreign material share influence briquetting viability, explosion protection measures, and hygiene concepts.<\/p>\n<h2>Planning around hydraulic power packs and hose systems<\/h2>\n<p>Hydraulic power packs must be positioned so that intake and cooling air remain free of chips. Airflows should be directed away from the units; cables and hydraulic hoses must be protected from chip deposits to prevent slip hazards and mechanical damage. Organized route planning and regular wet cleaning improve occupational safety. Clear signage, cable bridges, and <em>defined walkways<\/em> further reduce interference between extraction and hydraulic operations.<\/p>\n<h2>Acoustics and work environment<\/h2>\n<p>Extraction systems can emit noise. Silencers, resilient mountings, and demand-appropriate rotational speed reduce exposure. In sensitive areas &#8211; such as work in existing buildings &#8211; a combination of quieter dust extraction and scheduling alongside lower-noise hydraulic operations helps. Additional measures like <strong>acoustic enclosures<\/strong> for fans and strategic placement away from reflective surfaces can lower sound levels significantly.<\/p>\n<h2>Typical pitfalls and practical countermeasures<\/h2>\n<p>Common issues include insufficient air volume at the hood, overly long hoses, too many tight bends, or unsuitable hood geometry. Missing grounding promotes electrostatic charging. Overfilled collection containers increase differential pressure and reduce performance. Clear sizing, short duct runs, regular checks, and a filter matched to the process provide remedies. Also critical are <em>insufficient make-up air<\/em> and open doors or windows that disrupt capture airflow.<\/p>\n<h2>Terminology: wood chips, mineral dust, and the influence of tool selection<\/h2>\n<p>Wood dust differs significantly from silica-bearing mineral dust from concrete or natural stone. While for wood chips the focus is primarily on dust extraction and fire protection, mineral fine dust often requires additional measures such as wet cutting or high-performance dust extractors with a high filter class. Using concrete demolition shears and stone and concrete splitters predominantly produces fragments rather than fine dust and can therefore reduce dust generation. For mixed deconstruction tasks, a separate consideration of wood and mineral fractions is recommended. Selecting the <strong>least dust-intensive<\/strong> tool for each step reduces overall emissions and simplifies extraction.<\/p>\n<h2>Practical guide for gutting and cutting with dust extraction<\/h2>\n<ol>\n<li>Assess the work area: identify materials, quantities, accessibility, and emission sources<\/li>\n<li>Select the capture concept: define hoods, hose routing, air volumes, and filtration technology<\/li>\n<li>Coordinate workflows: schedule wood operations with extraction before mineral demolition steps<\/li>\n<li>Plan logistics: collection containers, route planning, segregated disposal<\/li>\n<li>Implement safety: grounding, ignition source management, team training<\/li>\n<li>Monitoring and care: check differential pressure, clean filters, clean surfaces with low-dust methods<\/li>\n<li>Verify effectiveness: document airflows and cleanliness, and optimize based on measured data<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dust extraction refers to the targeted capture, transport, and separation of wood chips and wood dust that arise during cutting, sawing, milling, or sanding. On construction sites and in workshops, it serves health protection, cleanliness, and process reliability. In the application areas of gutting and cutting as well as selective <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/dust-extraction-for-sawdust\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19934","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Dust Extraction for Sawdust - Systems &amp; Safety<\/title>\n<meta name=\"description\" content=\"Practical guide to dust extraction for sawdust in workshops &amp; construction, boosting \u2713 safety, cleanliness &amp; efficiency.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/dust-extraction-for-sawdust\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dust Extraction for Sawdust - Systems &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Practical guide to dust extraction for sawdust in workshops &amp; construction, boosting \u2713 safety, cleanliness &amp; efficiency.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/dust-extraction-for-sawdust\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-01T13:45:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dust-extraction-for-sawdust\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dust-extraction-for-sawdust\",\"name\":\"Dust Extraction for Sawdust - Systems & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-02T14:46:54+00:00\",\"dateModified\":\"2026-06-01T13:45:04+00:00\",\"description\":\"Practical guide to dust extraction for sawdust in workshops & construction, boosting \u2713 safety, cleanliness & efficiency.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dust-extraction-for-sawdust#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dust-extraction-for-sawdust\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dust-extraction-for-sawdust#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Dust extraction for sawdust\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Dust Extraction for Sawdust - Systems & Safety","description":"Practical guide to dust extraction for sawdust in workshops & construction, boosting \u2713 safety, cleanliness & efficiency.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/dust-extraction-for-sawdust","og_locale":"en_US","og_type":"article","og_title":"Dust Extraction for Sawdust - Systems & Safety","og_description":"Practical guide to dust extraction for sawdust in workshops & construction, boosting \u2713 safety, cleanliness & efficiency.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/dust-extraction-for-sawdust","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-01T13:45:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/dust-extraction-for-sawdust","url":"https:\/\/www.darda.de\/en\/knowledge\/dust-extraction-for-sawdust","name":"Dust Extraction for Sawdust - Systems & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-02T14:46:54+00:00","dateModified":"2026-06-01T13:45:04+00:00","description":"Practical guide to dust extraction for sawdust in workshops & construction, boosting \u2713 safety, cleanliness & efficiency.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/dust-extraction-for-sawdust#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/dust-extraction-for-sawdust"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/dust-extraction-for-sawdust#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Dust extraction for sawdust"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19934","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19934"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19934\/revisions"}],"predecessor-version":[{"id":27962,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19934\/revisions\/27962"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}