{"id":19933,"date":"2026-01-02T08:17:26","date_gmt":"2026-01-02T07:17:26","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19933"},"modified":"2026-06-01T13:10:03","modified_gmt":"2026-06-01T11:10:03","slug":"sawdust-filter","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/sawdust-filter","title":{"rendered":"Sawdust filter"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Sawdust filters are simple, robust filtration solutions that use a bed of wood chips or sawdust to remove solids, sludges, and, in part, oily constituents from water or aqueous media. In construction and deconstruction projects-especially in <strong>concrete demolition<\/strong>, strip-out and cutting, as well as in rock excavation and <strong>tunnel construction<\/strong>-waterborne fines (cement flour, rock flour, drilling sludges) are generated. A well-designed sawdust filter can serve as a mobile pre- or intermediate stage to reduce the contaminant load, increase occupational safety, and relieve downstream systems. In processes using <strong>concrete demolition shears<\/strong> or <strong>hydraulic wedge splitters<\/strong>, predominantly dry fractures occur; nevertheless, accompanying wet cutting or core drilling, cleaning, and cooling processes with water or emulsions may be required-and a sawdust filter is suitable as a pragmatic, temporary filtration stage for these as well. In practice, such filters are used to reduce turbidity and suspended solids before interim storage, reuse, or discharge, helping to stabilize overall process reliability.<\/p>\n<h2>Definition: What is meant by a sawdust filter?<\/h2>\n<p>A sawdust filter is a <em>bulk-media filter bed<\/em> made of sawdust or wood chips through which contaminated water is passed in gravity or low-pressure mode. Separation is achieved by sieving, depth filtration, and the formation of a filter cake on the surface. The aim is to reduce filterable substances (suspended solids, fine particles, sludges) and-depending on design and wood type-a limited binding of dispersed oil droplets. Sawdust filters are used either stationary or mobile in boxes, trays, or filter trenches and are often combined with additional stages such as settling basins, nonwoven filters, or sand filters. As a biodegradable medium, wood is readily available and cost effective; however, it is not suitable for removing dissolved substances such as salts, dissolved metals, or surfactants without additional treatment stages.<\/p>\n<h2>How a sawdust filter works and is built<\/h2>\n<p>The effectiveness of a sawdust filter is based on a combination of mechanical particle retention and depth filtration in the fibrous, porous medium. A uniformly installed filter bed creates defined flow paths in which particles adhere to the wood fibers by inertia, interception, and diffusion. Over operating time, a filter cake forms that improves fine separation but increases pressure loss. Typical superficial velocities are kept low to moderate so that the bed does not channel or erode; uniform distribution at the inlet is essential for consistent performance across the full filter area.<\/p>\n<h3>Typical components and layer sequence<\/h3>\n<ul>\n<li>Inlet section with a calming feed (distributor plate or impact surface) to avoid channeling.<\/li>\n<li>Filter bed of sawdust\/wood chips with adapted particle size and moderate compaction.<\/li>\n<li>Support layer (e.g., coarse chips) and sublayer (grid, perforated plate, or nonwoven) to prevent media carryout.<\/li>\n<li>Outlet zone with optional sampling and backflow prevention.<\/li>\n<li>Overflow or emergency bypass to prevent resuspension during peak inflows.<\/li>\n<\/ul>\n<h3>Filtration mechanisms at a glance<\/h3>\n<ul>\n<li><strong>Sieving:<\/strong> Retention of coarser particles at the bed surface.<\/li>\n<li><strong>Depth filtration:<\/strong> Capture of fine solids within the pore space of the sawdust.<\/li>\n<li><strong>Filter cake formation:<\/strong> Improves separation efficiency but increases flow resistance.<\/li>\n<li><strong>Adsorptive effects:<\/strong> Wood fibers can bind emulsified oil droplets to a limited extent.<\/li>\n<\/ul>\n<h3>Influencing factors<\/h3>\n<ul>\n<li>Particle size distribution and solids concentration of the suspension.<\/li>\n<li>Filter bed height and density, chip size, wood species, moisture content.<\/li>\n<li>Flow rate, residence time, and uniform distribution across the filter area.<\/li>\n<li>Temperature as well as viscosity and pH of the water.<\/li>\n<li>Presence of surfactants or emulsifiers that stabilize oil droplets and reduce separability.<\/li>\n<\/ul>\n<h2>Applications in concrete demolition, deconstruction, and tunnel construction<\/h2>\n<p>In the context of <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a><\/strong>, <strong>strip-out and cutting<\/strong>, as well as <strong>rock excavation and tunnel construction<\/strong>, the sawdust filter supports construction logistics for water and sludges. It provides a low-complexity solution to reduce fine particles before water is interim-stored, further treated, or disposed of. Different material streams arise depending on the process chain:<\/p>\n<h3>Wet cutting and core drilling<\/h3>\n<p>Cut-off grinding, wire sawing, or core drilling generate cement and rock fines bound with water. A sawdust filter as a pre-stage after a settling tank reduces residual turbidity and can significantly relieve downstream nonwoven or sand filtration. Where space is tight or discharge limits are strict, staged operation with controlled flow and sampling points increases compliance predictability.<\/p>\n<h3>Demolition with concrete demolition shears and hydraulic wedge splitters<\/h3>\n<p>These methods primarily produce dry breakage. With accompanying cleaning, wet dust suppression, or wet processing of crushed material, contaminated water can still occur. Here, the sawdust filter serves as a flexible, quickly deployable station, for example in a filter box or a filter trench. Skid-mounted units enable relocation between work areas without interrupting adjacent trades.<\/p>\n<h3>Rock excavation, tunnel, and shotcrete environments<\/h3>\n<p>In excavation and stabilization work, turbidity from rock flour and shotcrete fines is typical. Mobile sawdust filters help remove sediments from flushing and cleaning waters, especially where space constraints require compact, modular solutions. Integrating a settling step upfront minimizes premature clogging and extends media life in high-fines slurries.<\/p>\n<h2>Relevance to Darda GmbH tools and processes<\/h2>\n<p>Hydraulically operated tools such as <strong>concrete demolition shears<\/strong>, <strong>hydraulic wedge splitters<\/strong>, <em>rock splitting cylinders<\/em>, <em>combination shears<\/em>, <em>Multi Cutters<\/em>, <em>concrete demolition shears<\/em>, <em>steel shears<\/em>, and <em>tank cutters<\/em> are used in the above application areas. While these tools themselves are designed for controlled, precise material separation and size reduction, the sawdust filter is an element of surrounding process management:<\/p>\n<ul>\n<li>In mixed processes where wet cutting or drilling is also performed, filtration reduces the fine load in the recirculating or waste water.<\/li>\n<li>In building deconstruction, a sawdust filter helps cleanly separate solids from cleaning and rinsing operations, for example after the use of concrete demolition shears on reinforced components.<\/li>\n<li>In tunnel or special operations with limited infrastructure, a mobile filter bed allows rapid adaptation to varying flow rates.<\/li>\n<\/ul>\n<p>Hydraulic power packs are operated with properly conditioned hydraulic oil; sawdust filters are not intended for this purpose. They belong in the site\u2019s water\/sludge treatment-this separation of systems is essential for quality and safety. Clear labelling of circuits and physically separated handling areas prevent mix-ups between hydraulic oils and construction wastewater.<\/p>\n<h2>Design and sizing on the construction site<\/h2>\n<p>Design is based on the mix of solids load, the targeted separation efficiency, and a practical maintenance interval. The following points have proven effective:<\/p>\n<h3>Filter bed and geometry<\/h3>\n<ul>\n<li>Filter bed height in practice often ranges from 20 to 60 cm; coarser chips on top, finer sawdust beneath.<\/li>\n<li>Adequate filter area to reduce surface loading and avoid channeling.<\/li>\n<li>Load-bearing sublayer (grid\/nonwoven) so that no washout occurs into the outlet.<\/li>\n<li>Use only untreated wood; avoid painted, glued, or chemically treated residues.<\/li>\n<\/ul>\n<h3>Hydraulic loading<\/h3>\n<ul>\n<li>Constant, calm feed; avoid shock loads.<\/li>\n<li>Select the flow rate so that residence time in the filter bed is adequate and the surface does not tear.<\/li>\n<li>Monitor pressure loss regularly; a significant increase signals partial or full media replacement.<\/li>\n<li>As a rule of thumb, operate at low superficial velocities to limit shear at the surface and sustain cake stability.<\/li>\n<\/ul>\n<h3>Process chain<\/h3>\n<ol>\n<li>Primary clarification\/settling (reduction of coarse sediments).<\/li>\n<li>Sawdust filter as depth filtration to reduce fines.<\/li>\n<li>Optional polishing stage (nonwoven\/sand\/cartridge) if required.<\/li>\n<\/ol>\n<p><em>Indicative performance targets:<\/em> depending on influent quality and configuration, substantial reductions in suspended solids and turbidity are achievable; verification is recommended via sampling before and after the sawdust stage.<\/p>\n<h2>Operation, maintenance, and disposal<\/h2>\n<p>Structured operation is important for stable performance. A short start-up check, regular visual inspections, and defined replacement intervals help ensure filtration quality. Recording flow, differential level, and turbidity trends supports proactive maintenance.<\/p>\n<h3>Commissioning<\/h3>\n<ul>\n<li>Install the filter bed uniformly and compact moderately, avoiding channels.<\/li>\n<li>Pre-wetting can stabilize the inlet and minimize dust emissions.<\/li>\n<li>Run at a reduced flow for the first minutes until a homogeneous filter cake forms.<\/li>\n<li>Check all seals and overflows to exclude bypass along walls and fittings.<\/li>\n<\/ul>\n<h3>Maintenance<\/h3>\n<ul>\n<li>Visual inspection of the surface; when clogged, remove the top layer and replenish.<\/li>\n<li>Full media replacement after defined operating hours or with high pressure loss.<\/li>\n<li>Clean or replace the support layer and sublayer if carryout is observed.<\/li>\n<li>Store spare media dry and protected; keep used media temporarily contained to prevent leachate.<\/li>\n<\/ul>\n<h3>Disposal<\/h3>\n<p>The resulting filter cake and spent sawdust contain bound fine particles and possibly traces of oils. Disposal must follow local regulations. Different disposal routes may be considered depending on contamination. Binding case-by-case evaluations are required; these notes are of a general nature. Where oil traces are present, consider classifying the waste accordingly and prevent uncontrolled composting or uncontrolled drying in open areas.<\/p>\n<h2>Quality, safety, and environmental aspects<\/h2>\n<p>Using wood as a filter medium offers advantageous properties but requires attention to safety and environmental aspects.<\/p>\n<ul>\n<li><strong>Fire protection:<\/strong> Dry wood chips are combustible. Store away from ignition sources; be aware of possible self-ignition when in contact with oils.<\/li>\n<li><strong>Occupational safety:<\/strong> Minimize dust during media changes; use appropriate personal protective equipment.<\/li>\n<li><strong>Environment:<\/strong> Discharges from construction sites must comply with applicable limits and guidelines. pH adjustment and additional treatment stages may be required.<\/li>\n<li><strong>Documentation:<\/strong> Logs of flow rates, replacement times, and visual findings improve traceability and planning.<\/li>\n<li><strong>Material behavior:<\/strong> Wood can release color and natural extracts; monitor appearance and odor, and adjust the process chain if required.<\/li>\n<\/ul>\n<h2>Alternative filter concepts and useful combinations<\/h2>\n<p>Depending on load and targets, the sawdust filter can be used alone or in combination:<\/p>\n<ul>\n<li>Settling basins or lamella clarifiers for coarse solids reduction.<\/li>\n<li>Geotextiles\/nonwoven filters for final polishing.<\/li>\n<li>Sand and multi-layer filters for stable continuous loads.<\/li>\n<li>Flocculation\/precipitation where very fine, colloidal particles dominate.<\/li>\n<li>Oil separator stages where relevant amounts of free oils are present.<\/li>\n<li>Containerized bag or cartridge filters for peak-load events and rapid deployment.<\/li>\n<\/ul>\n<h2>Practice-oriented planning: checklist for implementation<\/h2>\n<ol>\n<li>Determine the load: flow rate, solids load, particle size, potential oil content.<\/li>\n<li>Define the process chain: pre-separation &#8211; sawdust filter &#8211; optional polishing stage.<\/li>\n<li>Specify the filter bed: layer thickness, chip sizes, support layer and sublayer.<\/li>\n<li>Define hydraulics: uniform feed, overflows, sampling points.<\/li>\n<li>Set operation: inspections, replacement intervals, documentation.<\/li>\n<li>Clarify disposal: routes for filter cake and spent media in line with local requirements.<\/li>\n<\/ol>\n<h2>Technical notes for use with concrete demolition shears and hydraulic wedge splitters<\/h2>\n<p>Where <strong>concrete demolition shears<\/strong> and <strong>hydraulic wedge splitters<\/strong> are used, only small amounts of water arise, but relevant fine fractions are generated during subsequent rinsing, cleaning, or wet sweeping. A sawdust filter is a <em>low-threshold solution<\/em> that requires no complex infrastructure and integrates well into mobile deconstruction setups. On combined sites with cutting operations, it can serve as a central collection and pre-filtration station to simplify the changeover between trades. Placement on level ground with protected drainage paths, clear signage, and easy access for media replacement accelerates routines and reduces downtime.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Sawdust filters are simple, robust filtration solutions that use a bed of wood chips or sawdust to remove solids, sludges, and, in part, oily constituents from water or aqueous media. In construction and deconstruction projects-especially in concrete demolition, strip-out and cutting, as well as in rock excavation and tunnel construction-waterborne <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sawdust-filter\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19933","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sawdust Filter for Construction Wastewater<\/title>\n<meta name=\"description\" content=\"Efficient water filtration with sawdust filter for construction sites \u2713 Remove fines, sludge &amp; oil traces safely.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sawdust-filter\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sawdust Filter for Construction Wastewater\" \/>\n<meta property=\"og:description\" content=\"Efficient water filtration with sawdust filter for construction sites \u2713 Remove fines, sludge &amp; oil traces safely.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/sawdust-filter\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-01T11:10:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sawdust-filter\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sawdust-filter\",\"name\":\"Sawdust Filter for Construction Wastewater\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-02T07:17:26+00:00\",\"dateModified\":\"2026-06-01T11:10:03+00:00\",\"description\":\"Efficient water filtration with sawdust filter for construction sites \u2713 Remove fines, sludge & oil traces safely.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sawdust-filter#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sawdust-filter\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sawdust-filter#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Sawdust filter\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sawdust Filter for Construction Wastewater","description":"Efficient water filtration with sawdust filter for construction sites \u2713 Remove fines, sludge & oil traces safely.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/sawdust-filter","og_locale":"en_US","og_type":"article","og_title":"Sawdust Filter for Construction Wastewater","og_description":"Efficient water filtration with sawdust filter for construction sites \u2713 Remove fines, sludge & oil traces safely.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/sawdust-filter","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-01T11:10:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/sawdust-filter","url":"https:\/\/www.darda.de\/en\/knowledge\/sawdust-filter","name":"Sawdust Filter for Construction Wastewater","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-02T07:17:26+00:00","dateModified":"2026-06-01T11:10:03+00:00","description":"Efficient water filtration with sawdust filter for construction sites \u2713 Remove fines, sludge & oil traces safely.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/sawdust-filter#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/sawdust-filter"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/sawdust-filter#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Sawdust filter"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19933","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19933"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19933\/revisions"}],"predecessor-version":[{"id":27954,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19933\/revisions\/27954"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19933"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}