{"id":19932,"date":"2026-01-02T13:58:57","date_gmt":"2026-01-02T12:58:57","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19932"},"modified":"2026-06-01T15:29:03","modified_gmt":"2026-06-01T13:29:03","slug":"sawtooth-foundation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/sawtooth-foundation","title":{"rendered":"Sawtooth foundation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A sawtooth foundation is a special type of concrete <strong>foundation<\/strong> whose contact surfaces with the subsoil or adjacent structural elements are <em>toothed<\/em> or formed with a sawtooth profile. This interlocking increases shear and tensile capacity and enables the safe transfer of horizontal loads and uplift forces. In deconstruction, this design is often encountered as a massive, heavily reinforced component. For controlled, low-vibration demolition, methods are required that respect load paths, deliberately guide cracks, and cut reinforcement cleanly. Tools such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">Darda concrete crushers<\/a> from Darda GmbH play a central role here. In practice, this enables <strong>selective separation<\/strong> with reduced nuisance emissions in confined, operational environments.<\/p>\n<h2>Definition: What is meant by a sawtooth foundation?<\/h2>\n<p>A sawtooth foundation is a (reinforced) concrete <strong>foundation<\/strong> whose contact surfaces with the ground, abutments, or topping layers are provided with a <strong>saber-tooth<\/strong> or <strong>sawtooth geometry<\/strong>. The teeth act as shear keys and enhance the interlock with soil or rock. As a result, horizontal forces, cyclic actions, and tensile forces are reliably transmitted without relying solely on friction or dowel action. Typical applications include mast and plant foundations, crane runways, machine foundations, retaining structures, noise barriers, or anchored members on sloped terrain. The configuration is executed in cast-in-place concrete or as prefabrication with a subsequent grouted joint. Where appropriate, <em>keyways<\/em> and surface roughening are combined to achieve a robust <strong>shear connection<\/strong> while maintaining constructability and quality control.<\/p>\n<h2>Configuration and structural behavior<\/h2>\n<p>The toothed profile provides positive interlock that minimizes slip and mobilizes shear reserves. Typically, the following components are present:<\/p>\n<ul>\n<li><strong>Foundation body<\/strong> made of normal concrete or steel fiber reinforced concrete, often in high strength classes to reduce dimensions.<\/li>\n<li><strong>Reinforcement<\/strong> with enhanced shear reinforcement in tooth areas as well as crack width control under cyclic loading.<\/li>\n<li><strong>Shear teeth<\/strong> as inclined or stepped profiles, executed in the soil bed, in rock, or in a topping layer.<\/li>\n<li><strong>Waterproofing\/drainage<\/strong> to prevent frost heave and the washout of fine soils between the teeth.<\/li>\n<li><strong>Tolerances and bedding<\/strong> with grout or mortar to ensure full-surface contact, avoid point bearing, and limit stress concentrations at tooth tips.<\/li>\n<\/ul>\n<p>Load transfer combines arching in compression, shear interlock, and frictional components. For rock interfaces, the tooth profile is often executed with <em>pre-slotting<\/em> or a roughened contour; in soil, the tooth geometry provides stabilization against horizontal thrust and uplift. Where reinforcement crosses the interface, the dowel effect contributes to residual capacity, subject to serviceability limits and fatigue verification.<\/p>\n<h2>Structural detailing and materials<\/h2>\n<p>Execution follows the general rules of concrete construction (e.g., Eurocode-based standards). Typical aspects include:<\/p>\n<ul>\n<li><strong>Geometry<\/strong>: Tooth heights and lengths are selected so that shear stresses remain below allowable values and notch stresses are limited.<\/li>\n<li><strong>Concrete<\/strong>: Freeze-thaw and de-icing salt resistance in exposed locations; if necessary, admixtures to minimize water uptake.<\/li>\n<li><strong>Reinforcement<\/strong>: Local strengthening at tooth tips, adequate anchorage lengths, and cover appropriate for corrosion protection.<\/li>\n<li><strong>Joint<\/strong>: For subsequent topping layers, a high-strength grout ensures full-surface load transfer.<\/li>\n<li><strong>Formwork and finishing<\/strong>: Defined surface roughness in the tooth flanks and controlled demolding prevent unintended smoothing that would reduce interlock.<\/li>\n<\/ul>\n<h2>Geotechnical integration and boundary conditions<\/h2>\n<p>Performance strongly depends on interaction with soil or rock. Key points:<\/p>\n<ul>\n<li><strong>Subsoil<\/strong>: Grain size distribution, stiffness, and groundwater conditions influence friction and wedging between teeth.<\/li>\n<li><strong>Rock contact<\/strong>: Roughness, bedding, and fracturing govern the positive interlock; injection options can improve the interlocking effect.<\/li>\n<li><strong>Drainage<\/strong>: Reliable drainage prevents uplift and erosion.<\/li>\n<li><strong>Settlements<\/strong>: Differential settlements must be limited by design for elongated, toothed foundations.<\/li>\n<li><strong>Seismic and cyclic effects<\/strong>: Cyclic degradation, liquefaction potential, and transient pore pressures alter shear transfer and require specific checks.<\/li>\n<\/ul>\n<h2>Typical applications and requirements<\/h2>\n<p>Sawtooth foundations are used where <em>horizontal<\/em> or <em>cyclic<\/em> loads govern and sliding failure must be avoided. Examples from practice include sites with wind and braking loads, machinery with dynamic excitation, or abutments with varying earth pressure conditions. Over the life cycle, tasks range from repair to deconstruction-often under tight space constraints and in sensitive environments. Compliance with applicable design and execution standards, as well as documentation of interface quality, is essential.<\/p>\n<h2>Deconstruction concept: low-vibration, selective, and safe<\/h2>\n<p>When deconstructing a sawtooth foundation, the focus is on the controlled separation of the strongly interlocked contact faces. A proven approach is <strong>mechanical, low-vibration fragmentation<\/strong> in defined segments:<\/p>\n<ol>\n<li><strong>Expose<\/strong> the foundation contours, document the tooth profile and reinforcement layout.<\/li>\n<li><strong>Pre-cut<\/strong> component edges; saw cuts for crack guidance and segmentation.<\/li>\n<li><strong>Split<\/strong> with <strong>stone and concrete splitters<\/strong> or <strong>stone splitting cylinders<\/strong> from Darda GmbH to create controlled crack flanks along planned separation planes-low-vibration and precise.<\/li>\n<li><strong>Grip and crush<\/strong> the released pieces with <strong>concrete crushers<\/strong>; reinforcement is selectively exposed and cut to length.<\/li>\n<li><strong>Steel severing<\/strong> in depth with <strong>Multi Cutters<\/strong>, <strong>steel shears<\/strong>, or-for thick-walled hollow sections-with <strong>tank cutters<\/strong>, provided conductive and explosion-safe conditions are ensured.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Modular hydraulic power units<\/a> from Darda GmbH provide the tools with the required pressure and flow; modular systems facilitate staged operations.<\/li>\n<\/ol>\n<p>The result is a <em>selective<\/em> deconstruction with reduced vibrations and low noise emissions-an advantage in densely built-up areas and where adjacent structures remain in use. Clean interfaces also support high-quality separation of concrete and steel for recycling.<\/p>\n<h2>Method selection in the context of application areas<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>Massive, interlocked foundations benefit from a combination of <strong>splitting techniques<\/strong> and <strong>shear processing<\/strong>. Teeth can be released from the composite step by step while deliberately controlling the remaining load-bearing capacity of the structure.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Where sawtooth foundations lie beneath halls or machinery, headroom and load limits restrict equipment choice. <strong>Concrete crushers<\/strong> on compact <strong>carrier machines<\/strong> and hand-held <strong>stone and concrete splitters<\/strong> are advantageous here.<\/p>\n<h3>Rock demolition and tunneling<\/h3>\n<p>If the tooth profile is cut into rock, the tasks resemble rock removal. Crack induction with splitting cylinders and subsequent lifting of blocks reduces risks at joints and third-party installations.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>The logic of <em>controlled crack guidance<\/em> corresponds to quarrying methods: splitting forces steer cracks along weakness zones before crushers and shears make the pieces manageable.<\/p>\n<p>Selection is guided by accessibility, residual load paths, and target fragment sizes so that splitting, cutting, and crushing form a coherent, low-emission workflow.<\/p>\n<h2>Step-by-step procedure in the project<\/h2>\n<ol>\n<li><strong>Existing-condition survey<\/strong>: Drawings, reinforcement layout, tooth depth, subsoil data, utilities, and neighboring development.<\/li>\n<li><strong>Exposure<\/strong>: Probing at tooth flanks; define stages and crane positions.<\/li>\n<li><strong>Separation cuts<\/strong>: Sawing\/milling for crack steering; plan dust and water management.<\/li>\n<li><strong>Splitting<\/strong>: Position the <strong>stone and concrete splitters<\/strong> in drill holes or existing joints; release successively.<\/li>\n<li><strong>Fragmentation<\/strong>: <strong>Concrete crushers<\/strong> for concrete, <strong>Multi Cutters<\/strong> and <strong>steel shears<\/strong> for reinforcement and embedded parts.<\/li>\n<li><strong>Separation<\/strong>: Prepare clean fractions (concrete, reinforcement, embedded parts) for recycling.<\/li>\n<li><strong>Documentation<\/strong>: Ongoing control of vibrations, noise, and dust; disposal records.<\/li>\n<li><strong>Backfilling and reinstatement<\/strong>: Controlled backfill, compaction, and surface restoration with attention to drainage continuity.<\/li>\n<li><strong>Final verification<\/strong>: Acceptance, as-built documentation, and confirmation of compliance with vibration and noise criteria.<\/li>\n<\/ol>\n<h2>Decision criteria for technology selection<\/h2>\n<ul>\n<li><strong>Component thickness and tooth geometry<\/strong>: Greater tooth depths favor splitting over large-area milling.<\/li>\n<li><strong>Reinforcement density<\/strong>: High steel content supports a combined use of splitting and crushers\/shears.<\/li>\n<li><strong>Accessibility<\/strong>: Constrained conditions require compact tools; modular <strong>hydraulic power packs<\/strong> facilitate logistics.<\/li>\n<li><strong>Neighbor protection<\/strong>: Low-vibration and low-noise methods take priority.<\/li>\n<li><strong>Environmental and water conditions<\/strong>: Low-water processes are advantageous in sensitive soils.<\/li>\n<li><strong>Permits and time windows<\/strong>: Working-hour restrictions and approval conditions can dictate the method mix.<\/li>\n<li><strong>Recycling objectives<\/strong>: Target purity of fractions influences the degree of selective processing.<\/li>\n<\/ul>\n<h2>Damage patterns, repair, and strengthening<\/h2>\n<p>Typical findings on sawtooth foundations include cracks at tooth tips (notch effect), spalling due to freeze-thaw with de-icing salts, corrosion of edge reinforcement, or differential settlements. Measures may include:<\/p>\n<ul>\n<li><strong>Crack injections<\/strong> and reprofiling at tooth edges.<\/li>\n<li><strong>Concrete replacement<\/strong> with mineral systems for edge zones.<\/li>\n<li><strong>Additional shear keys<\/strong> or topping layers to increase shear capacity.<\/li>\n<li><strong>Steel surface protection<\/strong> and drainage improvements.<\/li>\n<li><strong>Post-installed dowels<\/strong> or anchors to reestablish shear transfer where feasible and verifiable.<\/li>\n<\/ul>\n<p>A structural assessment is required before interventions; the statements are general in nature and do not replace project-specific verifications. Where durability is critical, testing of interface roughness and bond performance provides added certainty.<\/p>\n<h2>Quality, safety, and environment<\/h2>\n<ul>\n<li><strong>Occupational safety<\/strong>: Load handling, <strong>fall protection<\/strong>, cut protection, and safe hydraulic routing are mandatory.<\/li>\n<li><strong>Emissions<\/strong>: Dust suppression, noise reduction, and vibration control protect personnel and surroundings.<\/li>\n<li><strong>Circular economy<\/strong>: Selective deconstruction enables high-quality concrete recycling and clean steel recovery.<\/li>\n<li><strong>Water and slurry management<\/strong>: Capture and treatment prevent contamination of soil and drains.<\/li>\n<li><strong>Stakeholder coordination<\/strong>: Clear communication and permit management reduce site risks.<\/li>\n<\/ul>\n<h2>Practice-oriented notes for planning and execution<\/h2>\n<ul>\n<li><strong>Sequencing<\/strong>: Release teeth in sections; always verify remaining capacities.<\/li>\n<li><strong>Drilling patterns<\/strong>: Place splitting holes so cracks propagate toward weak zones of the toothing.<\/li>\n<li><strong>Edge care<\/strong>: Early mitigation of sharp corners reduces uncontrolled spalling.<\/li>\n<li><strong>Instrumentation<\/strong>: Vibration monitoring near sensitive components; define project-specific limits.<\/li>\n<li><strong>Weather<\/strong>: Frost and standing water influence friction within the toothing and splitting behavior.<\/li>\n<li><strong>Trial areas<\/strong>: Small-scale test splits validate the crack behavior and refine hole spacing before full production.<\/li>\n<li><strong>Power management<\/strong>: Staged tool operation and buffer capacities in hydraulic systems support steady progress under constraints.<\/li>\n<\/ul>\n<h2>Reference to tools and applications of Darda GmbH<\/h2>\n<p>When working with sawtooth foundations, the benefit of <strong>targeted hydraulic force application<\/strong> becomes clear. <strong>Stone and concrete splitters<\/strong> as well as <strong>stone splitting cylinders<\/strong> from Darda GmbH generate controlled cracks in massive concrete sections without burdening the surroundings. <strong>Concrete crushers<\/strong> grip, crush, and separate concrete effectively, while <strong>Multi Cutters<\/strong>, <strong>steel shears<\/strong>, and <strong>tank cutters<\/strong> cut embedded parts and reinforcement cleanly. <strong>Hydraulic power packs<\/strong> ensure a reliable energy supply-even in stages or under restricted space conditions. In this way, the requirements from <em>concrete demolition and special deconstruction<\/em>, <em>strip-out and cutting<\/em>, <em>rock demolition and tunneling<\/em>, <em>natural stone extraction<\/em>, and <em>special operations<\/em> can be addressed appropriately.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A sawtooth foundation is a special type of concrete foundation whose contact surfaces with the subsoil or adjacent structural elements are toothed or formed with a sawtooth profile. This interlocking increases shear and tensile capacity and enables the safe transfer of horizontal loads and uplift forces. In deconstruction, this design <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sawtooth-foundation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19932","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sawtooth Foundation | Concrete Design &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Explore a sawtooth concrete foundation with toothed profile for shear &amp; uplift transfer \u2713 plus low vibration demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sawtooth-foundation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sawtooth Foundation | Concrete Design &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Explore a sawtooth concrete foundation with toothed profile for shear &amp; uplift transfer \u2713 plus low vibration demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/sawtooth-foundation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-01T13:29:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sawtooth-foundation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sawtooth-foundation\",\"name\":\"Sawtooth Foundation | Concrete Design & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-02T12:58:57+00:00\",\"dateModified\":\"2026-06-01T13:29:03+00:00\",\"description\":\"Explore a sawtooth concrete foundation with toothed profile for shear & uplift transfer \u2713 plus low vibration demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sawtooth-foundation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sawtooth-foundation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sawtooth-foundation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Sawtooth foundation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sawtooth Foundation | Concrete Design & Demolition","description":"Explore a sawtooth concrete foundation with toothed profile for shear & uplift transfer \u2713 plus low vibration demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/sawtooth-foundation","og_locale":"en_US","og_type":"article","og_title":"Sawtooth Foundation | Concrete Design & Demolition","og_description":"Explore a sawtooth concrete foundation with toothed profile for shear & uplift transfer \u2713 plus low vibration demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/sawtooth-foundation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-01T13:29:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/sawtooth-foundation","url":"https:\/\/www.darda.de\/en\/knowledge\/sawtooth-foundation","name":"Sawtooth Foundation | Concrete Design & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-02T12:58:57+00:00","dateModified":"2026-06-01T13:29:03+00:00","description":"Explore a sawtooth concrete foundation with toothed profile for shear & uplift transfer \u2713 plus low vibration demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/sawtooth-foundation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/sawtooth-foundation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/sawtooth-foundation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Sawtooth foundation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19932","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19932"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19932\/revisions"}],"predecessor-version":[{"id":27960,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19932\/revisions\/27960"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19932"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}