{"id":19930,"date":"2026-01-02T16:44:38","date_gmt":"2026-01-02T15:44:38","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19930"},"modified":"2026-05-30T08:01:03","modified_gmt":"2026-05-30T06:01:03","slug":"sump-pump","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/sump-pump","title":{"rendered":"Sump pump"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Sump pumps ensure controlled removal of water, wastewater, and slurries on construction sites, in tunnel excavation, during deconstruction work, and in quarries. Wherever concrete is structurally separated, cut, or blasted &#8211; such as with concrete demolition shear, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, or rock splitting cylinders by Darda GmbH &#8211; water inflows, cooling and drilling water, as well as fine sediments occur. A properly sized sump pump keeps work areas dry, protects machines and components from moisture damage, and ensures safe, precise working conditions. Effective dewatering also reduces slip hazards and helps limit the spread of fine particulates in compliance with local environmental rules.<\/p>\n<h2>Definition: What is a sump pump?<\/h2>\n<p>A sump pump is usually a submersible wastewater pump that conveys water and aqueous media from a collection pit (pump sump), either automatically or manually controlled. Typical features include compact designs with electric or hydraulic drive, an automatic level switch (float), and an impeller suitable for solids. Sump pumps are used for dewatering excavations, shafts, basements, tunnels, and production areas where water is temporarily collected and must be continuously removed. Depending on abrasiveness, pH, and conductivity, components are selected in corrosion and wear resistant materials such as coated aluminum, stainless steel, or hard cast iron.<\/p>\n<h2>How sump pumps work and their types<\/h2>\n<p>Sump pumps operate according to the centrifugal pump principle: a rotating impeller sets the medium in motion and generates discharge pressure. Depending on the medium, solids content, and place of use, design, materials, and drive vary. Key selection factors include hydraulic efficiency, permissible solids content, and thermal limits for continuous or intermittent duty.<\/p>\n<h3>Types and media<\/h3>\n<ul>\n<li>Drainage and clear water: low-level intake, small solids passage, high flow rate at moderate head.<\/li>\n<li>Dirty water: enlarged passage, more robust housing, resistant to sand\/gravel and fine aggregates.<\/li>\n<li>Sludge\/slurries: vortex or channel impellers, optionally with agitator, wear-resistant materials (e.g., hard cast iron, elastomer linings).<\/li>\n<li>Chemically aggressive or saline media: corrosion-resistant materials, sealed cable entries, and, where appropriate, sacrificial anodes.<\/li>\n<\/ul>\n<h3>Drives<\/h3>\n<ul>\n<li>Electric (single- or three-phase): common, efficient, to be operated with RCD\/GFCI protection; consider inrush current and voltage drop on long cable runs, and ensure adequate motor protection.<\/li>\n<li>Hydraulic: compact, pressure-waterproof, suitable for wet, power-free areas; the energy can be provided via hydraulic power pack units already present on Darda GmbH construction sites (observe the specifications for flow rate and pressure). Monitor oil cooling capacity and return backpressure.<\/li>\n<\/ul>\n<h3>Impeller and sealing technology<\/h3>\n<ul>\n<li>Impellers: vortex (low clogging), channel (higher efficiency), free-flow (good solids handling).<\/li>\n<li>Seals: double mechanical seal with oil chamber, cable entry with strain relief, corrosion-protected materials.<\/li>\n<li>Wear protection: hard-facing, replaceable wear plates, and adjustable clearances for sustained performance.<\/li>\n<li>Monitoring: optional moisture probes in the seal chamber and thermal protection increase reliability.<\/li>\n<\/ul>\n<h2>Use in concrete demolition, specialized deconstruction, and strip-out<\/h2>\n<p>In demolition projects, the sump pump provides dry bearing surfaces, safe access, and a clear view of separation joints. When working with <strong>concrete demolition shear<\/strong>, a low water level enables clean gripping and cutting operations; corrosion risks on reinforcement and tools are reduced. In strip-out and during wet cutting (e.g., wire or wall saws), a pump sump collects cooling water and fine slurry and discharges both in a controlled manner. When working with <strong>rock and concrete splitters<\/strong>, dewatering supports targeted crack formation, as standing water can impair wedge travel and visibility of separation lines. Mobile sump trays and low-profile suction solutions help achieve minimal residual water levels for precise interventions.<\/p>\n<h3>Typical application scenarios<\/h3>\n<ul>\n<li>Lowering puddles and seepage water in partial areas to provide stable positions for Darda GmbH hydraulic power packs and hose routing.<\/li>\n<li>Controlled removal of drilling and cooling water so that cutting, breaking, and splitting can proceed without slippage or contamination issues.<\/li>\n<li>Intermediate buffering and pumping of slurries into sedimentation tanks (legal requirements for discharge must be observed).<\/li>\n<li>Bypass pumping during core drilling and wall or wire saw cuts to prevent flooding of adjacent work zones.<\/li>\n<\/ul>\n<h2>Rock demolition, tunnel construction, and natural stone extraction: water management at the workface<\/h2>\n<p>Groundwater and joint water frequently occur in tunnel excavation and rock removal. Sump pumps ensure dewatering at the face, in niches, and forefields. In <em><a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a><\/em>, robust, low-clogging pumps with sufficient head are required, often with redundant configuration. In <em>natural stone extraction<\/em>, pumps are positioned in floor sumps to keep rain and inflow water away from extraction areas and to avoid uncontrolled washout of chippings and fines. For work with rock splitting cylinders and Multi Cutters from Darda GmbH, moderated water management facilitates precise positioning and safe operation. Given long discharge routes in tunnels, ensure adequate head for static lift and friction losses; duty &#8211; standby arrangements with alarmed changeover are common.<\/p>\n<h2>Sizing: flow rate, head, and solids passage<\/h2>\n<p>Sizing starts with the hydraulic characteristics and media properties. The goal is a pump that reliably handles peak inflows without continuously operating at the limit. Beyond peak design, duty cycles, expected sediment load, and acceptable residual water levels should be defined to avoid oversizing or premature wear.<\/p>\n<h3>Key parameters<\/h3>\n<ul>\n<li>Flow rate (Q): sum of inflows (rain, groundwater, process water) plus safety margin.<\/li>\n<li>Head (H): static height difference from sump water level to discharge point plus friction losses in hose\/pipe, bends, and fittings.<\/li>\n<li>Solids passage: maximum particle size in the medium, fiber content, density of suspended solids.<\/li>\n<li>Medium: abrasiveness (sand, cement fines), pH (e.g., fresh concrete water), temperature.<\/li>\n<\/ul>\n<h3>Practical approach<\/h3>\n<ol>\n<li>Determine inflow volumes (precipitation, infiltration, process water) and define load spectra.<\/li>\n<li>Establish the pipeline route; record lengths and fittings, add friction losses.<\/li>\n<li>Select the pump based on Q\/H curves; set the operating point in the efficient range (mid-curve).<\/li>\n<li>Check solids compatibility and materials for abrasion; if necessary, provide wear protection.<\/li>\n<li>Plan a check valve and venting to avoid backflow and air locking.<\/li>\n<li>Document assumptions and provide an operating margin for abnormal events.<\/li>\n<\/ol>\n<h3>Worked example<\/h3>\n<p>Inflow Q = 12 m\u00b3\/h from mixed groundwater and cutting water. Static lift = 15 m; measured friction losses at the planned hose length and fittings = 6 m. Required H \u2248 21 m. Select a pump delivering at least 12 to 15 m\u00b3\/h at 21 m head, with solids passage \u2265 10 mm and abrasion-resistant internals. Use a DN50 discharge hose to limit velocity and friction losses.<\/p>\n<h2>Power supply and hydraulic power packs<\/h2>\n<p>Where no mains supply is available or electricity would be critical from a safety standpoint, hydraulically driven sump pumps are an option. On construction sites where <strong>hydraulic power pack<\/strong> units from Darda GmbH are already available for tools (see <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units for tools<\/a>), media conveyance can be combined with hydraulic submersible pumps &#8211; provided flow rate, pressure, and return line are compatible and the operating limits of the power packs are observed. This solution can simplify line routing and reduce electrical effort. In general: carefully match circuit data of the power pack and the pump and use only approved couplings\/hoses. Where flammable atmospheres are possible, eliminating electrical equipment at the pump head can reduce ignition sources within the sump.<\/p>\n<h3>Compatibility checklist<\/h3>\n<ul>\n<li>Hydraulic flow and pressure match the pump&#8217;s operating window; observe permissible backpressure on the return.<\/li>\n<li>Oil cooling capacity covers continuous load; temperature limits respected.<\/li>\n<li>Filtration grade suitable for pump clearances; contamination control in quick couplings.<\/li>\n<li>Return line routing is unrestricted and securely fixed; avoid kinks and crushing.<\/li>\n<li>Emergency stop and interlocks integrate with the site system; pressure relief valves set correctly.<\/li>\n<\/ul>\n<h2>Installation in the pump sump and line routing<\/h2>\n<p>Good installation increases operational reliability and minimizes failures.<\/p>\n<h3>Planning and execution<\/h3>\n<ul>\n<li>Size the pump sump: sufficient volume to reduce short-cycling; provide a calm zone on the inlet side for sedimentation.<\/li>\n<li>Level the installation surface, keep the intake zone clear (screen\/pedestal), observe minimum submergence to prevent dry running.<\/li>\n<li>Arrange the float switch with free movement; set switching hysteresis to avoid short cycles.<\/li>\n<li>Install the discharge line with check valve, venting, and frost-proof sections; avoid chafing points.<\/li>\n<li>Do not undersize hose\/pipe diameter to reduce friction losses and energy demand.<\/li>\n<li>Provide safe lifting points and, if needed, a guide rail or chain for removal under load.<\/li>\n<\/ul>\n<h2>Operation, safety, and environmental protection<\/h2>\n<p>Safety and environmental protection go hand in hand in dewatering operations. Electric pumps must be operated via suitable protective devices (e.g., RCD\/GFCI); route cables and plugs dry and mechanically protected. In areas with a potentially explosive atmosphere (e.g., during tank work), only appropriately approved devices may be used; an assessment of the situation is essential. <em>Discharges into the sewer system or receiving waters are only permitted in accordance with local regulations<\/em>; slurries and concrete fines must be pretreated (e.g., sedimentation, pH neutralization). Avoid dry running as it damages seals; provide dry-run protection if necessary.<\/p>\n<h3>Environmental measures<\/h3>\n<ul>\n<li>Dimension sedimentation tanks by retention time and solids load; use baffles to calm inflow.<\/li>\n<li>Control pH of alkaline process water via CO\u2082 injection or dosing systems where permitted.<\/li>\n<li>Apply filter socks or lamella separators for fine particles if discharge limits are strict.<\/li>\n<li>Keep spill kits and absorbents available; protect drains with booms and screens during maintenance.<\/li>\n<\/ul>\n<h2>Maintenance and troubleshooting<\/h2>\n<p>Regular inspections ensure availability and extend service life.<\/p>\n<h3>Maintenance routines<\/h3>\n<ul>\n<li>Visual inspection: housing, seals, cables, couplings, float.<\/li>\n<li>Functional test: start-up, shutdown, check valve, flow.<\/li>\n<li>Cleaning: remove fibers and sediment from screens, intake zone, and impeller chamber.<\/li>\n<li>Wear check: inspect impeller clearance, bearing noise, and seal oil (if present).<\/li>\n<li>Intervals: base service on operating hours and medium abrasiveness; stock critical spare parts.<\/li>\n<\/ul>\n<h3>Typical faults and remedies<\/h3>\n<ul>\n<li>Clogging: remove fibrous materials\/sediments; if necessary, switch to a vortex impeller.<\/li>\n<li>Air locking: vent the line, avoid high points, provide air release.<\/li>\n<li>Insufficient output: check friction losses, choose a larger diameter, shorten the line.<\/li>\n<li>Backflow: check the check valve, optimize installation position.<\/li>\n<li>Overheating: ensure media flow, exclude dry running, adjust duty cycle.<\/li>\n<li>Hydraulic drive cavitation or noise: verify oil supply, filter cleanliness, and relief valve settings.<\/li>\n<\/ul>\n<h2>Interfaces with Darda GmbH equipment on site<\/h2>\n<p>In interaction with Darda GmbH tools, the sump pump supports smooth operations:<\/p>\n<ul>\n<li><strong>concrete demolition shear<\/strong>: clear, low-water joints reduce slip and visibility issues; component contours remain recognizable.<\/li>\n<li><strong>rock and concrete splitters<\/strong> and rock splitting cylinders: dry wedge and drill holes increase process stability.<\/li>\n<li>Combination shears, Multi Cutters, steel shears: safe standing areas and dry paths protect operators and hydraulic hoses.<\/li>\n<li>Tank cutters: residual liquids must be drained in a controlled manner before starting; depending on the medium, special safety requirements may apply.<\/li>\n<li><strong>hydraulic power pack<\/strong>: where permitted, hydraulic submersible pumps can be supplied via existing power packs; parameter matching is mandatory.<\/li>\n<li>Core drills and wire or wall saws: continuous low-level intake stabilizes cutting accuracy and reduces rework.<\/li>\n<\/ul>\n<h2>Common mistakes and how to avoid them<\/h2>\n<ul>\n<li>Sump pit too small: leads to frequent cycling and increased wear &#8211; provide sufficient volume.<\/li>\n<li>Inadequate solids passage: causes clogging &#8211; perform media analysis before selection.<\/li>\n<li>Underestimated head: reduces performance &#8211; estimate friction losses realistically.<\/li>\n<li>Missing check valve: causes backflow &#8211; install the valve close to the pump.<\/li>\n<li>Blocked float: ensure free movement &#8211; check cable routing and internal fixtures.<\/li>\n<li>Direct discharge of slurries: allow settling first &#8211; provide sedimentation\/filtration.<\/li>\n<li>No redundancy for critical inflows: use duty &#8211; standby concepts with alarms.<\/li>\n<\/ul>\n<h2>Documentation and monitoring<\/h2>\n<p>An operating log with runtimes, maintenance, and faults provides transparency. Counters, level sensors, and acoustic\/visual alarms increase operational safety, especially for night and tunnel work. With critical inflows, redundancy (standby pump, emergency power, or alternative energy supply) is advisable to reliably safeguard continuous operation of Darda GmbH equipment &#8211; from concrete demolition to natural stone extraction. Where permitted, adding telemetry for level, flow, and vibration enables trend analysis and predictive maintenance planning.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Sump pumps ensure controlled removal of water, wastewater, and slurries on construction sites, in tunnel excavation, during deconstruction work, and in quarries. Wherever concrete is structurally separated, cut, or blasted &#8211; such as with concrete demolition shear, rock and concrete splitters, or rock splitting cylinders by Darda GmbH &#8211; water <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sump-pump\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19930","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sump Pump for Construction, Tunneling &amp; Quarries<\/title>\n<meta name=\"description\" content=\"Reliable dewatering for construction &amp; tunnels with sump pump solutions \u2713 sizing tips, wastewater &amp; slurry, safe work.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sump-pump\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sump Pump for Construction, Tunneling &amp; Quarries\" \/>\n<meta property=\"og:description\" content=\"Reliable dewatering for construction &amp; tunnels with sump pump solutions \u2713 sizing tips, wastewater &amp; slurry, safe work.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/sump-pump\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-30T06:01:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sump-pump\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sump-pump\",\"name\":\"Sump Pump for Construction, Tunneling & Quarries\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-02T15:44:38+00:00\",\"dateModified\":\"2026-05-30T06:01:03+00:00\",\"description\":\"Reliable dewatering for construction & tunnels with sump pump solutions \u2713 sizing tips, wastewater & slurry, safe work.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sump-pump#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sump-pump\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sump-pump#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Sump pump\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sump Pump for Construction, Tunneling & Quarries","description":"Reliable dewatering for construction & tunnels with sump pump solutions \u2713 sizing tips, wastewater & slurry, safe work.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/sump-pump","og_locale":"en_US","og_type":"article","og_title":"Sump Pump for Construction, Tunneling & Quarries","og_description":"Reliable dewatering for construction & tunnels with sump pump solutions \u2713 sizing tips, wastewater & slurry, safe work.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/sump-pump","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-30T06:01:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/sump-pump","url":"https:\/\/www.darda.de\/en\/knowledge\/sump-pump","name":"Sump Pump for Construction, Tunneling & Quarries","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-02T15:44:38+00:00","dateModified":"2026-05-30T06:01:03+00:00","description":"Reliable dewatering for construction & tunnels with sump pump solutions \u2713 sizing tips, wastewater & slurry, safe work.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/sump-pump#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/sump-pump"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/sump-pump#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Sump pump"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19930","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19930"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19930\/revisions"}],"predecessor-version":[{"id":27917,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19930\/revisions\/27917"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19930"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}