{"id":19925,"date":"2026-01-02T15:02:24","date_gmt":"2026-01-02T14:02:24","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19925"},"modified":"2026-05-30T07:25:02","modified_gmt":"2026-05-30T05:25:02","slug":"column-structural-reinforcement","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/column-structural-reinforcement","title":{"rendered":"Column structural reinforcement"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Column structural reinforcement &#8211; also rehabilitation of reinforced concrete columns or column strengthening &#8211; describes all measures used to increase or restore the load-bearing capacity, ductility, and serviceability of existing columns. It is central to work on existing structures, change of use, damage remediation, seismic upgrading, and fire protection adjustments. In practice, successful reinforcement often begins with precise, low-vibration concrete removal and the controlled exposure of the reinforcement. Here, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\"><strong>concrete pulverizers<\/strong><\/a> as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete <strong>hydraulic wedge splitters<\/strong><\/a> in combination with a <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\"><strong>hydraulic power pack<\/strong><\/a> have proven themselves, especially in sensitive environments such as <strong>special demolition<\/strong>, <strong>building gutting<\/strong>, or <strong>tunnel construction<\/strong>.<\/p>\n<p>Typical objectives include restoring structural reliability, improving deformation capacity under combined actions, and securing serviceability with minimal impact on operations. Early coordination of concept, execution sequence, and verification according to applicable codes and approvals reduces risks and rework.<\/p>\n<h2>Definition: What is meant by column structural reinforcement?<\/h2>\n<p>Column structural reinforcement means purposefully increasing reserve capacity against axial load, bending, and shear, as well as improving ductility and bond behavior. This is achieved through cross-section enlargement (jacketing), encasement with steel or fiber-reinforced polymers, local repairs (concrete repair, <em>crack injection<\/em>), additional reinforcement, prestressing, or load redistribution. The goal is a <em>durably load-bearing<\/em> and <strong>demonstrably safe<\/strong> column within the system of slabs, foundations, and connections. The choice of method depends on the existing structure, the required load increase, the construction environment, and execution conditions.<\/p>\n<ul>\n<li>Target effects often include increased transverse confinement, improved splice and lap performance, and durable corrosion protection.<\/li>\n<li>Design checks must address interaction of axial force and bending, shear and punching, anchorage, and deformation compatibility.<\/li>\n<li>Constructability and maintainability are part of the design brief where ongoing operations or confined spaces apply.<\/li>\n<\/ul>\n<h2>Causes and triggers for upgrading concrete columns<\/h2>\n<p>Columns must be reinforced when existing verifications are no longer met or boundary conditions change. Typical triggers include:<\/p>\n<ul>\n<li>Change of use with increased load, new installations, or altered load paths<\/li>\n<li>Material and aging damage: carbonation, chloride ingress, corrosion, freeze-thaw attack, alkali-silica reaction<\/li>\n<li>Cracks, spalling, crushing, local overstress, insufficient shear and splitting tensile capacity<\/li>\n<li>Fire resistance adjustments and seismic retrofit (ductility, transverse confinement)<\/li>\n<li>Changed code requirements, vertical extensions, openings in adjacent members<\/li>\n<li>As-built deviations, insufficient detailing, or construction errors revealed during assessment<\/li>\n<li>Accidental actions, impact, or differential settlement affecting alignment and load transfer<\/li>\n<\/ul>\n<h2>Methods of column structural reinforcement at a glance<\/h2>\n<p>In practice, several methods are used individually or in combination. The selection is guided by space constraints, the required increase in capacity, construction time, and intervention intensity. Low-vibration preparatory work &#8211; for example with <strong>concrete pulverizers<\/strong> or stone and concrete <strong>hydraulic wedge splitters<\/strong> &#8211; facilitates damage-free preparation and protects adjacent components. Compatibility with existing materials, reversibility where necessary, and long-term inspectability should also be considered.<\/p>\n<h3>Cross-section enlargement (jacketing with concrete or sprayed mortar)<\/h3>\n<p>The column is encased with high-strength mortar or concrete and provided with additional longitudinal and transverse reinforcement (stirrups). Advantages include high load reserves and improved transverse confinement, which is particularly effective under axial compression and bending. Requirements include a load-bearing, roughened substrate, adequate bond, dowel connections, and carefully fitted jacket reinforcement. Selective removal of damaged concrete areas can be performed in a controlled manner with <strong>concrete pulverizers<\/strong>; defined grooves or planned separation cuts for reinforcement connections can be created with low vibration using stone and concrete <strong>hydraulic wedge splitters<\/strong>. This method is robust and fire-resistant; the increased footprint and added weight must be coordinated with clearances and foundations.<\/p>\n<h3>Steel jacketing and collars<\/h3>\n<p>Steel plate jackets or segmented shells improve transverse confinement and can significantly increase compressive capacity. They require precise fit-up, corrosion protection, and, if necessary, a grouted gap for load transfer. In confined conditions, reinforcement and embedded parts are often exposed with combination shears or multi cutters, while a <strong>steel shear<\/strong> is used for cutting steel profiles and for <strong>rebar cutting<\/strong>. Connections and venting for grout must be detailed to avoid trapped air and ensure composite action.<\/p>\n<h3>Fiber-reinforced polymer wrapping (CFRP\/GFRP)<\/h3>\n<p>Fiber laminates or fabrics increase transverse confinement and improve ductility. Effectiveness depends on coverage, fiber orientation, and application details (corner rounding, anchorage zones). Surface preparation requires low-dust, uniform removal and edge rounding &#8211; here the precise use of <strong>concrete pulverizers<\/strong> provides reproducible edge geometry. FRP systems contribute little to axial load without complementary measures and may require UV and fire protection layers; substrate moisture and temperature control are critical during installation.<\/p>\n<h3>Local repairs, bond, and connection details<\/h3>\n<p>Crack injection, concrete repair, and retrofitting stirrups\/longitudinal bars in connection zones improve structural behavior. To create connections, holes are drilled and round bars or threaded rods are bonded in. For opening the concrete cover and removing unsound concrete, controlled tools with a <strong>hydraulic power pack<\/strong> are appropriate to minimize vibrations. Edge distances, embedment depths, and curing regimes must follow the respective system specifications to achieve reliable bond.<\/p>\n<h3>Prestressing and load redistribution<\/h3>\n<p>External tendons, head plates, or temporary auxiliary structures can redistribute loads to relieve the column or deliberately activate it. Execution requires precise force control and monitoring, particularly in combination with jackets. Long-term losses, anchorage seating, and staged stressing procedures must be defined and documented.<\/p>\n<h2>Preparation and execution: from concept to acceptance<\/h2>\n<p>A structured approach reduces risks and costs. In existing buildings, a low-vibration, low-dust, and segmented workflow, as is common in building gutting, <strong>concrete demolition<\/strong>, and <strong>special demolition<\/strong>, has proven effective.<\/p>\n<h3>As-built survey and diagnosis<\/h3>\n<ul>\n<li>Review documents, update the structural model, determine loads<\/li>\n<li>Material investigations: strength, carbonation, chlorides, reinforcement location<\/li>\n<li>Damage mapping, cracks, spalling, moisture and corrosion indicators<\/li>\n<li>Non-destructive testing and scanning to locate embedded services and verify reinforcement layouts<\/li>\n<\/ul>\n<h3>Concept and design<\/h3>\n<ul>\n<li>Define target parameters (capacity, ductility, serviceability, fire resistance)<\/li>\n<li>Select the method considering construction sequence, space needs, and fire protection<\/li>\n<li>Verifications for the column, joints, foundations, and load redistribution<\/li>\n<li>Trial areas or mock-ups where application sensitivity is high (e.g., FRP or grout injection)<\/li>\n<\/ul>\n<h3>Site preparation and temporary shoring<\/h3>\n<ul>\n<li>Load isolation, temporary props, defined unloading<\/li>\n<li>Protective measures for adjacent components and utilities<\/li>\n<li>Logistics for <strong>hydraulic power packs<\/strong> and tools in confined areas<\/li>\n<li>Definition of vibration and noise thresholds, monitoring points, and access routes<\/li>\n<\/ul>\n<h3>Selective removal and surface preparation<\/h3>\n<p>Damaged or carbonated concrete is removed step by step, reinforcement is exposed and cleaned. <strong>Concrete pulverizers<\/strong> enable controlled fracture edges without extensive microcracking. Stone and concrete <strong>hydraulic wedge splitters<\/strong> create defined separation joints, for example to detach corbels or for bearing adjustments. Vibrations remain low, which is advantageous in sensitive areas such as <strong>rock breakout<\/strong> and <strong>tunnel construction<\/strong> or in special assignments.<\/p>\n<h3>Installation of the reinforcement<\/h3>\n<ul>\n<li>Install jacket reinforcement, place bond anchors\/dowels, formwork and grouting<\/li>\n<li>Mount steel shells, arrange grout channels, corrosion protection<\/li>\n<li>Apply FRP systems (substrate, resin system, curing, anchorage zones)<\/li>\n<li>Control curing environment (temperature, humidity) and protect fresh work from shock or vibration<\/li>\n<\/ul>\n<h3>Quality assurance and documentation<\/h3>\n<ul>\n<li>Pull-off adhesion tests, visual inspection of reinforcement, layer thickness control<\/li>\n<li>Concrete\/mortar tests, compression and bond tests<\/li>\n<li>As-built documentation with measurements and photo logs<\/li>\n<li>Third-party witnessing or special inspections where required by approvals or project specifications<\/li>\n<\/ul>\n<h3>Coordination and permits<\/h3>\n<ul>\n<li>Permit management for load-bearing interventions and temporary traffic or operations adjustments<\/li>\n<li>Interface planning with building services and fire safety management<\/li>\n<li>Communication of cut-over dates and hold points for inspections and acceptances<\/li>\n<\/ul>\n<h2>Fields of application and practical interfaces<\/h2>\n<p>Column structural reinforcement intersects multiple trades. In the following areas, specific requirements and proven procedures apply:<\/p>\n<ul>\n<li><strong>Concrete demolition<\/strong> and <strong>special demolition<\/strong>: Selective removal and ergonomic partial deconstruction with <strong>concrete pulverizers<\/strong>, splitting methods to separate load-bearing nodes without vibration; <strong>steel shear<\/strong> for <strong>rebar cutting<\/strong><\/li>\n<li><strong>Building gutting<\/strong> and cutting: Opening shafts, removing column heads, producing grooves for jacket reinforcement; use of multi cutters and combination shears for embedded parts<\/li>\n<li><strong>Rock breakout<\/strong> and <strong>tunnel construction<\/strong>: Work in confined spaces with high requirements on controllability of interventions; stone and concrete <strong>hydraulic wedge splitters<\/strong> for defined separation joints<\/li>\n<li><strong>Natural stone extraction<\/strong> and historic fabric: Careful intervention on natural stone piers or masonry columns using splitting techniques with minimal edge-zone impact<\/li>\n<li>Special assignments: Project- and environment-dependent requirements for noise, dust, access, and segmentation of components<\/li>\n<\/ul>\n<h2>Material selection and design aspects (general)<\/h2>\n<p>The choice between jacketing, steel encasement, or fiber reinforcement depends on the required increase in capacity, ductility, space constraints, and construction duration. Jackets provide high compressive capacity and transverse confinement, steel shells are slender and robust, FRP excels where space and weight are limited. Design and detailing (corner radii, stirrup spacing, anchorage lengths) are decisive. For fire protection requirements, suitable cover or fire protection systems must be considered.<\/p>\n<p>Further criteria include constructability in staged traffic or building operations, moisture management during curing, and sustainability aspects such as minimizing waste and enabling future inspection or replacement of protective layers.<\/p>\n<h2>Occupational safety and environmental protection<\/h2>\n<p>Work on load-bearing columns requires careful planning and project-appropriate safeguarding. This includes temporary <strong>shoring<\/strong>, regulated load isolation, dust and <strong>noise control<\/strong>, and a coordinated emergency plan. Hydraulic tools are used as intended and inspected regularly; personnel are trained. Legal requirements must be reviewed on a project basis; information here is general and non-binding.<\/p>\n<ul>\n<li>Control respirable crystalline silica through wet methods, local extraction, and suitable respiratory protection.<\/li>\n<li>Inspect and protect hydraulic hoses, fittings, and power units to prevent leaks and hose-burst incidents.<\/li>\n<li>Define lockout-tagout procedures for adjacent mechanical or electrical systems prior to cutting.<\/li>\n<\/ul>\n<h2>Failure patterns and how to avoid them<\/h2>\n<ul>\n<li>Insufficient preparation: poor substrate bond, missing corner rounding for FRP &#8211; Remedy: defined, uniform removal with suitable tools<\/li>\n<li>Incomplete transverse confinement: stirrup spacing too large, insufficient laps &#8211; Remedy: consistent detailing, quality assurance<\/li>\n<li>Missing load redistribution: deformations during execution &#8211; Remedy: temporary <strong>shoring<\/strong> and controlled unloading<\/li>\n<li>Poor bond: unsuitable grout\/resin systems &#8211; Remedy: coordinated systems, tests, trial areas<\/li>\n<li>Improper sequencing: load transfer before curing or premature removal of props &#8211; Remedy: enforce hold points and curing times<\/li>\n<\/ul>\n<h2>Low-vibration preparation with concrete pulverizers and splitting technology<\/h2>\n<p>The quality of column structural reinforcement stands and falls with the preparation. <strong>Concrete pulverizers<\/strong> enable selective removal right up to the reinforcement, clean edges, and low collateral damage &#8211; ideal for existing slabs, sensitive installations, and downtown buildings. Stone and concrete <strong>hydraulic wedge splitters<\/strong> create controlled separation joints, subdivide massive cross-sections into manageable segments, and allow load redistribution during construction. <strong>Hydraulic power packs<\/strong> supply these tools with the required energy. For embedded parts and steel cuts, combination shears, multi cutters, and a <strong>steel shear<\/strong> are used.<\/p>\n<p>Low-vibration methods help comply with noise windows, protect sensitive equipment, and reduce the risk of microcracking that could impair bond. Segmented working and clear waste logistics support clean and safe operations.<\/p>\n<h2>Fire protection and seismic aspects<\/h2>\n<p>With increased fire protection requirements, reinforcement cover and the protective effect of the jacket are decisive. Steel shells require suitable protection, and FRP systems must be assessed with respect to fire protection. For seismic retrofits, the focus is on increasing ductility through transverse confinement, secure anchorage, and control of connection points. Segmented operations and defined joint creation, for example via splitting technology, facilitate controlled execution.<\/p>\n<ul>\n<li>Fire: verify cover, continuity of passive protection, and temperature resistance of resins and anchors.<\/li>\n<li>Seismic: ensure confinement in plastic hinge regions, adequate development of longitudinal reinforcement, and robust load paths to diaphragms and foundations.<\/li>\n<\/ul>\n<h2>Life cycle, monitoring, and maintenance<\/h2>\n<p>After reinforcement, regular inspections, moisture management, and <strong>corrosion protection<\/strong> ensure durability. Monitoring (crack widths, settlements) supports in-service assessment. Complete construction documentation facilitates later interventions or further upgrades.<\/p>\n<ul>\n<li>Inspection intervals are defined by exposure class and use; triggers include unusual vibration, leakage, or crack pattern changes.<\/li>\n<li>Maintain protective coatings and sealants, renew as needed, and document all interventions.<\/li>\n<li>Plan for accessible inspection points on jackets and anchors to enable targeted condition checks.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Column structural reinforcement &#8211; also rehabilitation of reinforced concrete columns or column strengthening &#8211; describes all measures used to increase or restore the load-bearing capacity, ductility, and serviceability of existing columns. It is central to work on existing structures, change of use, damage remediation, seismic upgrading, and fire protection adjustments. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/column-structural-reinforcement\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19925","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Column Structural Reinforcement | Concrete Repair<\/title>\n<meta name=\"description\" content=\"Strengthen concrete columns for higher capacity and ductility with column structural reinforcement \u2713 Seismic and fire.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/column-structural-reinforcement\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Column Structural Reinforcement | Concrete Repair\" \/>\n<meta property=\"og:description\" content=\"Strengthen concrete columns for higher capacity and ductility with column structural reinforcement \u2713 Seismic and fire.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/column-structural-reinforcement\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-30T05:25:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-structural-reinforcement\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-structural-reinforcement\",\"name\":\"Column Structural Reinforcement | Concrete Repair\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-02T14:02:24+00:00\",\"dateModified\":\"2026-05-30T05:25:02+00:00\",\"description\":\"Strengthen concrete columns for higher capacity and ductility with column structural reinforcement \u2713 Seismic and fire.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-structural-reinforcement#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-structural-reinforcement\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-structural-reinforcement#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Column structural reinforcement\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Column Structural Reinforcement | Concrete Repair","description":"Strengthen concrete columns for higher capacity and ductility with column structural reinforcement \u2713 Seismic and fire.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/column-structural-reinforcement","og_locale":"en_US","og_type":"article","og_title":"Column Structural Reinforcement | Concrete Repair","og_description":"Strengthen concrete columns for higher capacity and ductility with column structural reinforcement \u2713 Seismic and fire.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/column-structural-reinforcement","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-30T05:25:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/column-structural-reinforcement","url":"https:\/\/www.darda.de\/en\/knowledge\/column-structural-reinforcement","name":"Column Structural Reinforcement | Concrete Repair","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-02T14:02:24+00:00","dateModified":"2026-05-30T05:25:02+00:00","description":"Strengthen concrete columns for higher capacity and ductility with column structural reinforcement \u2713 Seismic and fire.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/column-structural-reinforcement#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/column-structural-reinforcement"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/column-structural-reinforcement#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Column structural reinforcement"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19925","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19925"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19925\/revisions"}],"predecessor-version":[{"id":27915,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19925\/revisions\/27915"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19925"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}