{"id":19924,"date":"2026-01-01T14:42:11","date_gmt":"2026-01-01T13:42:11","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19924"},"modified":"2026-05-30T08:11:03","modified_gmt":"2026-05-30T06:11:03","slug":"column-head","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/column-head","title":{"rendered":"Column head"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The column head is a central structural element at the interface between a column and the overlying load-bearing member such as a slab, beam, or frame girder. It determines safe load transfer, affects shear and punching capacity, and thus influences structural analysis, construction sequence, and deconstruction. In existing structures, the column head plays a special role in selective concrete demolition, in building gutting, and in special demolition. Tools such as <strong>concrete pulverizers<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> are used for precise exposure, controlled removal, and clean separation of concrete and reinforcement at the column head &#8211; low-vibration, plannable, and material-appropriate. The geometry and reinforcement detailing at this node also govern durability, inspection access, and retrofit feasibility throughout the service life.<\/p>\n<h2>Definition: What is meant by the column head?<\/h2>\n<p>The term column head refers to the <em>top zone of a column<\/em> in which loads from slabs, beams, or corbels are introduced into the column cross-section. Depending on the construction, the column head may be flush with the slab, formed as a <em>widened head (capital)<\/em>, or appear in combination with slab thickening or drop beams. In reinforced concrete structures, specific reinforcement detailing at the column head, shear and punching reinforcement, and adequate concrete cover are decisive to transfer the concentrated bearing forces safely into the column. The term is used equally in building construction, bridge construction, and industrial plants and also encompasses constructive details such as bearing corbels, filigree bearings, or mushroom-slab heads. In practice, the designation can include local thickening, haunches, and comparable bearing details that fulfill the same function.<\/p>\n<h2>Configuration and function of the column head in the load-bearing structure<\/h2>\n<p>The column head serves the load flow from the supported member into the column. Ideally, it increases the bearing area, reduces local stresses, and limits the risk of <strong>punching shear<\/strong> in flat slabs (two-way shear). Reinforcement is condensed here: transverse and flexural reinforcement are guided, anchorage lengths are observed, and shear dowels or headed studs are used where applicable. The quality of concreting, concrete compaction, and concrete curing is essential for durability. In design, strut-and-tie considerations help visualize load transfer and verify anchorage and confinement in the node region.<\/p>\n<h3>Forms and configurations<\/h3>\n<ul>\n<li>Flush column head in flat slabs with local shear reinforcement<\/li>\n<li>Widened head (capital\/mushroom head) to increase punching shear capacity<\/li>\n<li>Slab thickening or drop beam as a structural bearing<\/li>\n<li>Steel or reinforced-concrete corbels at frame joints, e.g., in bridge and industrial construction<\/li>\n<\/ul>\n<h3>Relevant actions<\/h3>\n<p>At the column head, <em>bending<\/em>, <em>shear force<\/em>, and local compressive stresses superimpose. Particular attention is required for transverse tension due to load introduction, torsion at frame corners, and fatigue under cyclic loading in traffic or machinery structures. Eccentric load introduction, dynamic effects, and seismic or accidental actions can further increase demand and affect crack control and serviceability.<\/p>\n<h3>Design and verification<\/h3>\n<ul>\n<li>Check punching shear with and without capitals and consider edge and corner columns with reduced control perimeters.<\/li>\n<li>Detail anchorage and lap lengths in congestion zones with verified clearances and concrete cover.<\/li>\n<li>Account for construction joints and early-age concrete strength in staged construction.<\/li>\n<li>Ensure robustness via alternate load paths and avoid brittle punching failure by adequate reinforcement.<\/li>\n<\/ul>\n<h2>Typical reasons for work at the column head<\/h2>\n<p>In existing buildings, conversion and deconstruction often involve interventions at the column head. Objectives include precise removal, local strengthening, or adaptations to new uses. The spectrum ranges from small-area corrections to complete removal of a capital.<\/p>\n<ul>\n<li>Concrete demolition and special demolition: targeted reduction or removal of capitals with <strong>concrete pulverizers<\/strong><\/li>\n<li>Building gutting and cutting: exposing nodes, separating embedded parts and reinforcement with <em>hydraulic shears<\/em> or <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a><\/em><\/li>\n<li>Special operations: working in tight, sensitive areas with <strong>hydraulic wedge splitters<\/strong> for low-vibration load release<\/li>\n<li>Retrofit preparation: local removal to install additional punching shear reinforcement or bearing plates<\/li>\n<li>Tolerance corrections and clearance for new service penetrations in the slab-column zone<\/li>\n<\/ul>\n<h2>Tools and methods for the selective deconstruction of column heads<\/h2>\n<p>The choice of method depends on structural analysis, accessibility, environmental requirements, and the desired cut accuracy. Hydraulic methods enable controlled element removal with predictable forces and low emissions.<\/p>\n<ul>\n<li>Selection criteria: residual load paths, required precision at interfaces, available working room and access, permissible emissions, and disposal logistics.<\/li>\n<li>Interface management: define target geometries, tolerances, and surface roughness for subsequent strengthening or new connections.<\/li>\n<\/ul>\n<h3>Concrete pulverizers for direct concrete removal<\/h3>\n<p><strong>Concrete pulverizers<\/strong> crush concrete locally between their jaws, break mortar bridges, and expose reinforcement. Advantages include lower dust generation compared with cut-off operations, precise work at edges, and the ability to separate concrete and steel during removal. At the column head, a sequential approach has proven effective: break edges, remove layer by layer, successively expose reinforcement, and cut it in a controlled manner. Careful staging avoids unintended bar overstress and maintains temporary stability until final separation.<\/p>\n<h3>Hydraulic wedge splitters for low-vibration removal<\/h3>\n<p><strong>Hydraulic wedge splitters<\/strong> work with hydraulically expanding wedges. After drilling small core holes, they generate <em>tension-free splitting forces<\/em> within the element, opening massive regions of the column head in a controlled manner. The method is particularly suitable in buildings with sensitive use, where adjacent components have a crack risk, or where strict vibration limits apply. Optimized hole spacing, sequence control, and dust suppression via wet drilling increase efficiency and minimize emissions.<\/p>\n<h3>Supplementary tools<\/h3>\n<ul>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> supply pulverizers, splitters, and shears with the required power and enable mobile or stationary operation.<\/li>\n<li><strong>Steel shears<\/strong> and <strong>hydraulic shears<\/strong> cut exposed reinforcement, mounting rails, or embedded parts.<\/li>\n<li><em>Multi Cutters<\/em> assist with mixed materials, e.g., embedded steel sections, conduits, or sheet-metal covers.<\/li>\n<li>Core drilling rigs create precise boreholes for wedge splitters, anchors, and monitoring instrumentation.<\/li>\n<\/ul>\n<h2>Workflow: From exposure to removal<\/h2>\n<ol>\n<li>Survey: Review drawings, assess member thicknesses, concrete strength, and reinforcement layout; document measurable boundary conditions and risks.<\/li>\n<li>Load management: Temporarily shore components, secure load paths, cordon off work areas, and provide fall protection and fragment shielding.<\/li>\n<li>Marking and protection: Mark deconstruction zones, protect adjacent components, and minimize potential vibration paths.<\/li>\n<li>Exposure: Use <strong>concrete pulverizers<\/strong> to remove concrete at edges and faces, make reinforcement visible, and identify utilities.<\/li>\n<li>Release massive parts: For thick capitals, perform core drilling and use <strong>hydraulic wedge splitters<\/strong> to relieve and open segments with minimal stress.<\/li>\n<li>Separation: Cut exposed reinforcement with <strong>steel shears<\/strong> or <strong>hydraulic shears<\/strong>; place elements in an orderly manner.<\/li>\n<li>Logistics: Secure, lift, and transport segments; coordinate <strong>hydraulic power packs<\/strong> and tool changes.<\/li>\n<li>Finishing: Clean edges, produce target contours, and prepare surfaces for strengthening or new connections.<\/li>\n<li>Quality control and documentation: Verify geometry and surface condition, record as-built status, and release the area for subsequent trades.<\/li>\n<\/ol>\n<h2>Damage patterns and diagnostics at the column head<\/h2>\n<p>Common indicators include diagonal cracks as signs of shear and punching demand, spalling at edges, traces of reinforcement corrosion, or settlement cracks. Before interventions, a <em>condition-based assessment<\/em> is helpful: visual inspection, rebound hammer tests, potential mapping, or spot openings provide indications of compressive strength, depth of concrete carbonation, and reinforcement position.<\/p>\n<ul>\n<li>Typical root causes: insufficient punching reinforcement, inadequate anchorage, weak construction joints, low concrete quality or poor compaction, and aggressive exposure leading to corrosion.<\/li>\n<li>Diagnostic aids: cover meters, small-area openings, and, where justified, nondestructive testing to refine the structural model.<\/li>\n<\/ul>\n<h3>Implications for deconstruction<\/h3>\n<p>Weakened zones require smaller work steps and, where appropriate, priority for low-vibration techniques. Corroded reinforcement can fail suddenly under load; temporary safeguards and a cautious removal sequence are therefore advisable. Where cracks indicate water ingress, pre-sealing and controlled drainage prevent secondary damage during works.<\/p>\n<h2>Specific boundary conditions in sensitive environments<\/h2>\n<p>In hospitals, laboratories, data centers, or listed buildings, noise, dust, and vibration are key concerns. <strong>Hydraulic wedge splitters<\/strong> reduce vibrations, <strong>concrete pulverizers<\/strong> minimize sparks and large-area dust generation. Where space is limited, compact hydraulic tools with high power density are advantageous. Work windows, zoning, and continuous monitoring help maintain operations in adjacent areas.<\/p>\n<h3>Minimizing emissions<\/h3>\n<ul>\n<li>Dust: dust extraction, binding agents, and wet methods<\/li>\n<li>Noise: damping pads, stagger noisy steps<\/li>\n<li>Vibration: prefer splitting methods, keep load changes low<\/li>\n<li>Control: set monitoring points and track limits<\/li>\n<li>Water management: collect slurry, filter and dispose in accordance with regulations<\/li>\n<li>Air quality: use suitable filtration classes and maintain negative pressure where required<\/li>\n<\/ul>\n<h2>Occupational safety and planning<\/h2>\n<p>Safe workplaces, coordinated lifting and securing equipment, and clear communication are prerequisites. Hydraulic forces are predictable but must be built up and released in a controlled manner. Temporary shoring, defined separation cuts, and secured areas help avoid uncontrolled failures. Notes are general and do not replace project-specific planning.<\/p>\n<ul>\n<li>Key hazards: falling fragments, pinch points at tool jaws, unintended load transfer, and pressurized fluid risks.<\/li>\n<li>Controls: exclusion zones, lockout of hydraulic systems, verified lifting points, and stepwise depressurization protocols.<\/li>\n<\/ul>\n<h2>Material separation, recycling, and documentation<\/h2>\n<p>Clean separation of concrete and steel increases the recycling rate. <strong>Concrete pulverizers<\/strong> facilitate exposing reinforcement, <strong>steel shears<\/strong> downsize bars for removal. Batch-wise documentation of demolition materials and proof of waste streams support sustainability goals. Minimizing contamination at the source simplifies downstream sorting and improves recovery quality.<\/p>\n<h2>Relation to other application areas<\/h2>\n<p>Column heads do not occur only in building construction. Bearing zones with concentrated load transfer are also typical in bridge piers, parking structures, industrial plants, and tunnel construction. Techniques from <em>rock excavation and tunnel construction<\/em> &#8211; particularly controlled splitting of massive elements &#8211; can be transferred to the deconstruction of column heads. In special operations with complex reinforcement or restricted access, the combination of <strong>hydraulic wedge splitters<\/strong>, <strong>concrete pulverizers<\/strong>, and suitable <strong>hydraulic power packs<\/strong> has proven effective.<\/p>\n<h2>Planning aspects for new construction, conversion, and deconstruction<\/h2>\n<p>Even at the design stage, the geometry and reinforcement of the column head influence future construction and deconstruction effort. Clear reinforcement guidance, defined bearing areas, and accessible joints make later adaptations easier. For conversions, a deconstruction concept with sequence planning, selection of suitable hydraulic tools, and logistics for material separation and removal is recommended.<\/p>\n<ul>\n<li>Design for deconstruction: provide readable reinforcement layouts, avoid unnecessary congestion, and plan feasible access for tools.<\/li>\n<li>Interface definition: specify target roughness and tolerances at nodes to support future strengthening measures.<\/li>\n<li>Documentation: retain as-built data to accelerate diagnostics, risk assessment, and method selection in later interventions.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The column head is a central structural element at the interface between a column and the overlying load-bearing member such as a slab, beam, or frame girder. It determines safe load transfer, affects shear and punching capacity, and thus influences structural analysis, construction sequence, and deconstruction. In existing structures, the <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/column-head\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19924","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Column Head in Reinforced Concrete - Design &amp; Uses<\/title>\n<meta name=\"description\" content=\"Structural guide to the column head in reinforced concrete \u2713 load transfer, punching shear &amp; design and deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/column-head\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Column Head in Reinforced Concrete - Design &amp; Uses\" \/>\n<meta property=\"og:description\" content=\"Structural guide to the column head in reinforced concrete \u2713 load transfer, punching shear &amp; design and deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/column-head\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-30T06:11:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-head\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-head\",\"name\":\"Column Head in Reinforced Concrete - Design & Uses\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-01T13:42:11+00:00\",\"dateModified\":\"2026-05-30T06:11:03+00:00\",\"description\":\"Structural guide to the column head in reinforced concrete \u2713 load transfer, punching shear & design and deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-head#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-head\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/column-head#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Column head\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Column Head in Reinforced Concrete - Design & Uses","description":"Structural guide to the column head in reinforced concrete \u2713 load transfer, punching shear & design and deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/column-head","og_locale":"en_US","og_type":"article","og_title":"Column Head in Reinforced Concrete - Design & Uses","og_description":"Structural guide to the column head in reinforced concrete \u2713 load transfer, punching shear & design and deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/column-head","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-30T06:11:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/column-head","url":"https:\/\/www.darda.de\/en\/knowledge\/column-head","name":"Column Head in Reinforced Concrete - Design & Uses","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-01T13:42:11+00:00","dateModified":"2026-05-30T06:11:03+00:00","description":"Structural guide to the column head in reinforced concrete \u2713 load transfer, punching shear & design and deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/column-head#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/column-head"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/column-head#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Column head"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19924","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19924"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19924\/revisions"}],"predecessor-version":[{"id":27919,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19924\/revisions\/27919"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}