{"id":19922,"date":"2026-01-01T10:31:06","date_gmt":"2026-01-01T09:31:06","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19922"},"modified":"2026-05-30T09:52:02","modified_gmt":"2026-05-30T07:52:02","slug":"stepped-foundation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/stepped-foundation","title":{"rendered":"Stepped foundation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A stepped foundation is a proven foundation solution for structures on sloped terrain, at grade breaks, or when different foundation depths need to be sensibly connected. The stepped configuration enables uniform load transfer into competent subsoil, reduces earthworks at great depth, and facilitates adaptation to existing structures. In planning, execution, repair, and deconstruction, the precise processing of concrete plays a central role. In sensitive areas &#8211; such as the selective removal of individual foundation steps in existing structures &#8211; low-vibration methods are frequently used, for which <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers for precise removal<\/a><\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters for low-vibration work<\/a><\/strong> are suitable. In this way, stepped foundations can be constructed, adapted, or deconstructed in a controlled manner without unnecessarily affecting adjacent components. Robust outcomes depend on coordinated structural and geotechnical design, clear construction sequencing, and careful documentation of interfaces and joints.<\/p>\n<h2>Definition: What is meant by a stepped foundation?<\/h2>\n<p>A stepped foundation is a <em>graduated foundation<\/em> made of plain or reinforced concrete whose sole level is offset at discrete elevations. The individual steps follow the terrain or different founding depths so that loads from walls, columns, or machines are introduced evenly into the ground. Compared to a continuously horizontal foundation, stepping reduces earthworks, ensures frost protection in cold regions, and enables tie-ins to existing foundations. Stepped foundations are used in building and structural engineering, for example for retaining walls, underpinning, and hillside developments. They are common in both new construction and existing buildings and can be detailed so that shear forces at the steps are safely transferred. In practice, the term is also used synonymously with <em>stepped footing<\/em> or <em>bench footing<\/em>, depending on regional usage.<\/p>\n<h2>Configuration and design principles of a stepped foundation<\/h2>\n<p>The design principle is based on gradually adapting the foundation base to the topography or to different load and founding requirements. Each step has a tread width and a riser height. The goal is to keep bearing pressures below allowable soil parameters, to resist shear forces at the offsets, and to limit cracking. Continuity of reinforcement across the steps, dedicated shear reinforcement, as well as sufficiently long <em>rebar lap splices<\/em> and interlock zones contribute to load-bearing capacity and serviceability. Where required, <em>shear keys<\/em>, roughened interfaces, and dowels increase sliding resistance and improve the transfer of interface shear.<\/p>\n<h3>Design and load transfer<\/h3>\n<p>Design is performed considering vertical and horizontal loads, settlements, soil parameters, and construction stages. Steps create defined shear joints that must be secured constructively. Load transfer is ensured through sufficiently large step widths, adequate foundation thickness, and interlock with the ground.<\/p>\n<ul>\n<li>Determine and adhere to soil bearing capacity and allowable bearing pressures<\/li>\n<li>Frost-safe founding depths, especially at the deeper steps<\/li>\n<li>Provide reinforcement to secure shear and bending actions at steps<\/li>\n<li>Consider crack width limitation for exposure and service conditions<\/li>\n<li>Verify sliding safety and overturning stability, including interface friction and keying<\/li>\n<li>Detail construction joints, waterstops at step joints, and corrosion protection for dowels<\/li>\n<\/ul>\n<h3>Formwork, reinforcement, and concreting<\/h3>\n<p>The formwork produces clean step offsets; reinforcement is to be continuous across the steps, often with hanging and shear reinforcement. Concreting can be carried out in sections. Important are proper compaction, avoiding honeycombing at step edges, and rough, possibly toothed contact surfaces between pour segments. Controlled sequencing limits cold joints, while adequate curing and temperature management reduce early-age cracking at re-entrant corners and risers.<\/p>\n<h2>Typical use cases<\/h2>\n<p>Stepped foundations are used where structural, geotechnical, or operational requirements call for different founding levels. The following situations are particularly relevant in practice:<\/p>\n<ul>\n<li>Hillside development and grade breaks under strip or wall foundations<\/li>\n<li>Underpinning and tie-ins in existing structures with sectional stepping<\/li>\n<li>Foundations for retaining walls, abutments, and support structures in transportation and hydraulic engineering<\/li>\n<li>Machine and power unit foundations where installation levels differ<\/li>\n<li>Stepped grade beams beneath masonry or precast wall lines with varying elevations<\/li>\n<\/ul>\n<p>On projects with complex deconstruction or adaptation tasks &#8211; such as in concrete demolition and special demolition or during building gutting and cutting &#8211; the stepped configuration facilitates the controlled separation of load paths. In such scenarios, <strong>concrete pulverizers<\/strong> are often used for the gentle removal of foundation edges, as well as <strong>hydraulic splitters<\/strong> for low-vibration separation work. Temporary support concepts and vibration limits should be defined in advance to protect adjacent structures and installations.<\/p>\n<h2>Execution in existing structures: underpinning and tie-in<\/h2>\n<p>Underpinning is often constructed as stepped foundations. A sectional approach is common to ensure that the existing structure is adequately supported at all times. Short sections are excavated in sequence, underpinned, and tied integrally into the existing structure.<\/p>\n<ol>\n<li>Define section lengths sufficient for formwork, reinforcement, and concreting<\/li>\n<li>Unload and temporarily shore the existing structure<\/li>\n<li>Excavate and carefully expose the bearing zone<\/li>\n<li>Targeted concrete removal at existing edges to create load-bearing contact surfaces<\/li>\n<li>Construct the foundation step with interlock and continuous reinforcement<\/li>\n<li>Cure the concrete, proceed stepwise to the next section, backfill, and provide drainage<\/li>\n<li>Monitor settlements and crack widths during and after each section to verify performance<\/li>\n<\/ol>\n<p>For precise exposure and low-vibration removal, <strong>hydraulic splitters<\/strong> are suitable; they initiate tensile cracks in a targeted manner and thereby create separation joints. <strong>Concrete pulverizers<\/strong> enable controlled nibbling of edges without introducing large-scale vibration. In confined workspaces, compact hydraulic tools in combination with <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Power units<\/a><\/strong> are advantageous, especially during building gutting. Water and slurry management, debris logistics, and access routes must be planned to maintain clean interfaces and safe workflows.<\/p>\n<h2>Deconstruction and processing of stepped foundations<\/h2>\n<p>The deconstruction of stepped foundations presents particular demands, as offsets can foster notch effects and unintended fracture lines. A controlled approach reduces risks to adjacent components and utilities. Segmenting by predefined crack or cut lines, careful lifting or secondary sizing, and separation of reinforcement and concrete improve safety and recycling quality.<\/p>\n<h3>Low-vibration methods<\/h3>\n<p>Where vibrations must be avoided &#8211; such as near sensitive equipment, in hospitals, laboratories, or listed structures &#8211; <strong>hydraulic splitters<\/strong> have proven effective. They produce defined split joints along which the steps are divided into manageable segments. <strong>Concrete pulverizers<\/strong> securely grip these segments and further size them for haul-off. <em>The advantage lies in reduced noise and dust emissions as well as high interface control.<\/em> Where necessary, reinforcement can be pre-cut or exposed to avoid tearing and spalling at the split face.<\/p>\n<h3>Selective deconstruction in interior areas<\/h3>\n<p>During gutting and cutting, short setup times, low tool weight, and the ability to work in tight spaces are decisive. Hydraulically driven tools can be supplied by <strong>hydraulic power units<\/strong> and enable a coordinated interplay of gripping, crushing, splitting, and cutting. To separate the reinforcement, combination shears, multi cutters, or <strong>steel shears<\/strong> can be used where required by the deconstruction section. In special operations &#8211; such as adjacent steel structures &#8211; the safe separation of metallic built-in components is part of work preparation. Pre-drilled relief holes or kerfs at corners help to control crack propagation.<\/p>\n<ul>\n<li>Noise and vibration reduction protects the existing structure and ongoing use<\/li>\n<li>Controlled removal rates limit consequential damage<\/li>\n<li>Combining splitting, pulverizer work, and cutting increases precision<\/li>\n<li>Optimized segment sizes improve handling, safety, and waste stream segregation<\/li>\n<\/ul>\n<h2>Waterproofing, drainage, and durability<\/h2>\n<p>Steps create potential weak points against water. Thoughtful waterproofing and drainage are therefore essential. Capillary breaks, horizontal and vertical waterproofing, and functioning <strong>drainage layer<\/strong> must be planned so that step edges remain protected over the long term. In water-exposed areas, suitable waterstops or joint sheets are to be provided to secure the step joints. Treads should be graded to shed water, surface runoff must be directed away from risers, and detailing should prevent water pockets at offsets.<\/p>\n<h3>Material selection and exposure conditions<\/h3>\n<p>Material selection is based on exposure and use. In zones exposed to frost and de-icing salts, suitable concrete mixes with sufficient frost-de-icing salt resistance are required. In chemically aggressive soils, corresponding resistances must be observed. Crack width limitation and proper curing support durability. Adequate concrete cover, sealing of construction joints, and, where appropriate, protective coatings contribute to long-term performance.<\/p>\n<h2>Safety and work preparation<\/h2>\n<p>Work on a stepped foundation requires careful planning. Load redistributions must be calculated in advance, the <strong>excavation pit<\/strong> must be secured, and work areas must be protected against <strong>undermining<\/strong> or <strong>landslide<\/strong>. For deconstruction, place separation cuts and split lines to avoid uncontrolled breakout. Personal protective equipment, dust and noise control, and safe <strong>hydraulic connection<\/strong> are mandatory. Legal requirements and technical rules must be checked for each project; binding statements cannot be replaced here. Instrumentation for vibration, noise, and settlement monitoring increases planning reliability.<\/p>\n<ul>\n<li>Clarify structural boundary conditions and construction stages<\/li>\n<li>Define temporary shoring and section sequences<\/li>\n<li>Locate, secure, and isolate utility lines<\/li>\n<li>Align equipment selection with space, floor load-bearing capacity, and emission limits<\/li>\n<li>Define exclusion zones, lifting plans, and load paths for transport and removal<\/li>\n<\/ul>\n<h2>Quality assurance and control<\/h2>\n<p>For reliable performance of the stepped foundation, flatness, geometry, and bearing conditions must be checked. Visual inspections of step edges, <strong>leakage test<\/strong> for waterproofing, and documentation of pour sections help prevent later damage. In deconstruction, defined break edges, complete recording of work steps, and separate handling of material streams support high process safety. Survey-based as-built checks and, where relevant, pull-out tests for dowels or anchors provide additional verification.<\/p>\n<h2>Planning and detailing notes<\/h2>\n<p>The geometry of the steps should be chosen to limit shear stresses, distribute contact pressures uniformly, and avoid edge spalling. Long, shallow steps are generally more favorable than short, high offsets. At corners and offsets, additional reinforcement detailing is required. Connections to rising components need sufficient anchorage lengths and appropriate joint solutions. Functional surface runoff and drainage prevent water accumulation on steps. Good practice includes moderate riser heights relative to footing thickness, generous treads for bearing redistribution, and smooth force flow at transitions to avoid stress concentrations.<\/p>\n<h3>Interfaces with excavation pit shoring and rock<\/h3>\n<p>With rock contact, the founding base is often stepped into the in-situ rock. Here, targeted rock removal using <strong>hydraulic splitters<\/strong> can produce smooth, defined contact surfaces. In projects with <strong>rock excavation<\/strong> and <strong>tunnel construction<\/strong>, stepped base preparation supports load redistribution and facilitates the creation of slip-resistant interlocks. Bearing surfaces must be cleaned of loose particles and weak layers to ensure reliable contact.<\/p>\n<h2>Terminology and differentiation<\/h2>\n<p>The stepped foundation differs from a continuous strip foundation in that the foundation base runs with offsets. Compared to deep foundations such as piles, load transfer is planar and near the surface. Underpinning is frequently executed with stepping to transfer existing loads into competent depths. In industrial and infrastructure projects, stepped foundations can be combined with pedestals, plinths, and corbels where different installation levels or machine bearings are required. For adjustments or the selective deconstruction of individual steps, <strong>concrete pulverizers<\/strong> are effective for controlled sizing and <strong>hydraulic splitters<\/strong> for defined separation. Depending on region and discipline, the solution may also be referred to as a <em>stepped footing<\/em> or <em>bench footing<\/em>, always with the same functional intent of staged load transfer.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A stepped foundation is a proven foundation solution for structures on sloped terrain, at grade breaks, or when different foundation depths need to be sensibly connected. The stepped configuration enables uniform load transfer into competent subsoil, reduces earthworks at great depth, and facilitates adaptation to existing structures. In planning, execution, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stepped-foundation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19922","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stepped Foundation in Concrete Construction<\/title>\n<meta name=\"description\" content=\"Practical guide \u2713 to stepped foundation for sloped sites &amp; tie-ins - design, reinforcement, drainage, low-vibration work.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stepped-foundation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stepped Foundation in Concrete Construction\" \/>\n<meta property=\"og:description\" content=\"Practical guide \u2713 to stepped foundation for sloped sites &amp; tie-ins - design, reinforcement, drainage, low-vibration work.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/stepped-foundation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-30T07:52:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stepped-foundation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stepped-foundation\",\"name\":\"Stepped Foundation in Concrete Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-01T09:31:06+00:00\",\"dateModified\":\"2026-05-30T07:52:02+00:00\",\"description\":\"Practical guide \u2713 to stepped foundation for sloped sites & tie-ins - design, reinforcement, drainage, low-vibration work.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stepped-foundation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stepped-foundation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stepped-foundation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Stepped foundation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stepped Foundation in Concrete Construction","description":"Practical guide \u2713 to stepped foundation for sloped sites & tie-ins - design, reinforcement, drainage, low-vibration work.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/stepped-foundation","og_locale":"en_US","og_type":"article","og_title":"Stepped Foundation in Concrete Construction","og_description":"Practical guide \u2713 to stepped foundation for sloped sites & tie-ins - design, reinforcement, drainage, low-vibration work.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/stepped-foundation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-30T07:52:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/stepped-foundation","url":"https:\/\/www.darda.de\/en\/knowledge\/stepped-foundation","name":"Stepped Foundation in Concrete Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-01T09:31:06+00:00","dateModified":"2026-05-30T07:52:02+00:00","description":"Practical guide \u2713 to stepped foundation for sloped sites & tie-ins - design, reinforcement, drainage, low-vibration work.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/stepped-foundation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/stepped-foundation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/stepped-foundation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Stepped foundation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19922","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19922"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19922\/revisions"}],"predecessor-version":[{"id":27923,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19922\/revisions\/27923"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19922"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}