{"id":19914,"date":"2026-01-01T12:06:13","date_gmt":"2026-01-01T11:06:13","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19914"},"modified":"2026-05-29T16:13:02","modified_gmt":"2026-05-29T14:13:02","slug":"road-barrier","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/road-barrier","title":{"rendered":"Road barrier"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Road barriers are a central component of the safe and orderly execution of construction and deconstruction work in the public right-of-way. They protect road users and workers, secure work areas, and enable workflows that would not be feasible or would only be possible with increased risk without barricading. In the context of <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a><\/strong>, <strong>building gutting and cutting<\/strong>, <strong>rock breakout and tunnel construction<\/strong>, <strong>natural stone extraction<\/strong>, as well as in <strong>special operations<\/strong>, they determine when and how work with concrete pulverizers, rock and concrete splitters, steel shears, or other hydraulic tools from Darda GmbH can be carried out. Properly planned, road barriers reduce congestion and accident risks, minimize noise and vibrations, and shorten closure times. In addition, well-structured temporary traffic control supports predictable logistics, reliable emergency access, and transparent compliance with official orders.<\/p>\n<h2>Definition: What is a road barrier?<\/h2>\n<p>A road barrier is the temporary or permanent <em>interruption, restriction, or guidance<\/em> of traffic on a roadway by means of barricading technology, traffic signs, and guidance devices. The objective is <strong>traffic safety<\/strong> and the creation of a protected work area. Road barriers range from full closures to partial closures with contraflow, moving work zones, or night-time closure windows. They are used for measures such as bridge deconstruction, pavement breakout, utility line construction, tunnel portal work, or rock clearing and are based on local conditions, hazard analysis, and official orders. Legal requirements may vary by region; specifications for traffic sign plans, barricading devices, protective systems, and responsibilities must generally be observed. In practice, barriers comprise a coordinated system of physical protection, signage and markings, speed management, and if required, smart warning devices to stabilize driver behavior around the site.<\/p>\n<h2>Types of road barriers and use scenarios<\/h2>\n<p>Depending on the construction task, traffic volume, and safety needs, different closure concepts are used. For deconstruction and demolition works with tools from Darda GmbH, the barrier concept is adapted to the method, e.g., for concrete-friendly, low-vibration splitting compared to impact-intensive methods. Clear definitions of exclusion zones, buffer areas, and access points ensure that plant movements, lifting paths, and material transport do not intersect with open traffic flows.<\/p>\n<h3>Full closure<\/h3>\n<p>Complete interruption of traffic on a section. Typical for bridge demolition, tunnel exit adjustments, rock stabilization with rockfall risk, or when working with a high risk of falling debris\/splinters. Often executed in short, compact time windows (e.g., night or weekend closures) to reduce overall disruption. Critical interfaces such as detour nodes and emergency routes require reinforced signage, advance warning, and on-site traffic control to prevent queue spillback.<\/p>\n<h3>Partial closure and lane reduction<\/h3>\n<p>Half-road closure with alternating traffic or reduction in the number of lanes with a temporary signal system. Suitable for shoulder works, curb and manhole repairs, breakouts, and selective concrete removal with <strong>concrete pulverizers<\/strong> when the hazard zone can be confined. Where permissible, temporary speed reduction and longitudinal protection (e.g., mobile barriers) increase residual capacity while maintaining target safety levels.<\/p>\n<h3>Moving work zone<\/h3>\n<p>Mobile, short-term closure with trailing barricading devices. Applicable to linear works such as joint rehabilitation, localized <strong>core drilling<\/strong>, or staggered use of <strong>rock wedge splitters and concrete splitters<\/strong> along the edge area. Continuous repositioning, clear vehicle signing, and synchronized radio communication between the lead and tail units are essential for uniform flow and minimal shock-wave braking.<\/p>\n<h3>Night and closure windows<\/h3>\n<p>Work during low-traffic periods to maintain daytime capacity. Particularly useful for noise-intensive or safety-critical deconstruction steps, lifting operations, and demolition of cantilever sections with concrete pulverizers. Preparatory works during live traffic and standardized shift handovers keep possession periods short and predictable.<\/p>\n<h2>Planning and approval: Traffic regulation order and traffic sign plan<\/h2>\n<p>Planning a road barrier begins with the <strong>hazard analysis<\/strong> and a tailored traffic routing concept. In many countries, work in the roadway requires official approval with a <em>traffic sign plan<\/em>. This defines, among other things, barricading devices (e.g., delineators, cones, warning lights), signage, protective systems (mobile protective walls), working widths, escape routes, and detour routing. In practice, the following sequence has proven effective:<\/p>\n<ol>\n<li>Assessment of boundary conditions: traffic volumes, bus lines, heavy goods traffic, school routes, emergency corridors, local access, construction phases.<\/li>\n<li>Hazard and emissions assessment: drop heights, splinter\/dust dispersion, noise, vibrations, utility lines, subsoil.<\/li>\n<li>Selection of construction method: low-vibration (e.g., splitting, shears) or impact-intensive; selection of tools (e.g., concrete pulverizers, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>) and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>.<\/li>\n<li>Preparation of the traffic sign plan including protective and buffer zones, impact protection, pedestrian and bicycle routing.<\/li>\n<li>Coordination with authorities, utilities, public transport, emergency services; detailed scheduling (closure windows).<\/li>\n<li>Site setup and briefing: responsibilities, communication channels, emergency plan.<\/li>\n<\/ol>\n<p>Legal requirements and responsibilities must be verified locally. The notes in this text are non-binding and do not replace official orders or project-specific planning. For robust execution, include method statements, risk assessments, a signing inventory with maintenance cycles, and escalation paths for changes and incident response.<\/p>\n<h2>Road barriers in concrete demolition and special demolition<\/h2>\n<p>In the deconstruction of bridges, retaining walls, tunnel portals, and urban structures, work and hazard areas determine the type of closure. <strong>Concrete pulverizers<\/strong> enable selective removal of component edges, brackets, and slab fields with reduced splinter formation compared to impact methods. This can reduce protection needs and shorten closure times. <strong>Rock wedge splitters and concrete splitters<\/strong> separate massive components in a controlled, low-vibration manner, protecting utility lines, adjacent buildings, and traffic infrastructure. In combination with <em>hydraulic power units<\/em>, output is adapted to the material to be split and permissible noise\/vibration limits. For reinforced elements, <em>steel shears<\/em> complement the process to cut reinforcement cleanly and condition demolition pieces safely. Where feasible, pre-weakening and systematic piece sizing reduce lifting time, crane swings over live lanes, and the need for wider exclusion zones.<\/p>\n<h3>Bridge deconstruction under traffic<\/h3>\n<p>For work on overpasses or underpasses, phased closures minimize impacts. Procedure: dismantling cantilever slabs with concrete pulverizers, splitting massive bearing zones, cutting free and lowering girders with steel shears. Support scaffolds and protective structures prevent dropping into the traffic area. Dust suppression and coverings reduce secondary hazards. Verification of load paths, redundant propping, and synchronized lifting plans with defined stop criteria increase safety and help maintain tight possession windows.<\/p>\n<h2>Techniques to reduce closure times<\/h2>\n<p>The choice of deconstruction technique has a major influence on the duration and size of a road barrier. Particularly effective are:<\/p>\n<ul>\n<li><strong>Low-vibration methods:<\/strong> Splitting with rock wedge splitters and concrete splitters reduces secondary damage and allows tighter protection zones.<\/li>\n<li><strong>Selective removal:<\/strong> Concrete pulverizers minimize detachment of uncontrolled pieces, enable small-area work, and allow short closure windows.<\/li>\n<li><strong>Preparation off traffic:<\/strong> Pre-cutting of separation cuts, relief boreholes, and pre-positioning of lifting points accelerate possession periods.<\/li>\n<li><strong>Component conditioning:<\/strong> Combining splitting and shearing creates transportable pieces without additional breakage in the traffic area.<\/li>\n<li><strong>Logistics cadence:<\/strong> Just-in-time haulage prevents congestion in the work area; material depots outside the traffic space.<\/li>\n<li><strong>Digital sequencing:<\/strong> 4D planning and standardized method statements streamline shifts and reduce changeovers.<\/li>\n<li><strong>Modular protection:<\/strong> Pre-assembled canopies, mobile barriers, and net systems shorten setup and dismantling.<\/li>\n<\/ul>\n<h2>Rock breakout and tunnel construction: Traffic routing in sensitive corridors<\/h2>\n<p>Along roads on slopes or at tunnel portals, the road barrier protects against rockfall, dust, and impacts. <strong>Rock wedge splitters<\/strong> and <strong>concrete splitters<\/strong> enable rock removal without blasting, which can offer advantages in noise, vibration, and permitting near traffic. Temporary full closures during controlled release and set-down, followed by partial closures for clearing and securing, are common tactics. In tunnels, air management, escape routes, and fire loads require special consideration in barrier planning. Geotechnical monitoring, PPV thresholds, and robust ventilation concepts maintain safety margins and operational continuity.<\/p>\n<h2>Building gutting and cutting in the street environment<\/h2>\n<p>For work on buildings directly adjacent to the roadway (e.g., fa\u00c3\u00a7ade deconstruction, opening wall panels, separating balcony slabs), <strong>combination shears<\/strong>, <strong>Multi Cutters<\/strong>, and <strong>concrete pulverizers<\/strong> are proven tools. Thanks to the compact design of hydraulic tools from Darda GmbH, work areas can be kept small. Wall and slab elements are released in a controlled way; dropping onto the carriageway is prevented by catch systems. Partial closures with pedestrian detours secure the site; short full closures only for lifting and set-down operations. Additional protection for street furniture and utilities, coupled with fine-atomized water misting, limits dust plumes and maintains visibility in mixed traffic.<\/p>\n<h2>Special operations and emergency measures<\/h2>\n<p>After accidents, storm damage, or acute structural damage, rapid road barriers are used to isolate danger zones. Tools such as <strong>steel shears<\/strong> for deformed steel sections, <strong>concrete pulverizers<\/strong> for damaged concrete elements, or <strong>cutting torch<\/strong> in special situations can help safely remove obstacles or relieve components. The specific approach depends on the situation on site and the instructions of the incident command; it requires special caution and coordinated communication between contractors, authorities, and emergency services. Clear hot-warm-cold zone definitions, evidence-secure documentation, and staged reopening minimize residual risk and follow-on disruption.<\/p>\n<h2>Construction site safety, work areas, and protective systems<\/h2>\n<p>The effectiveness of a road barrier depends on the quality of safeguarding. Key elements are adequately dimensioned <em>work and safety zones<\/em>, impact protection (e.g., mobile protective walls), clear routing for pedestrians and cyclists, and visual and acoustic warning devices. When using concrete pulverizers and splitters, protective canopies, nets, tarpaulins, and splash guards are often useful. Continuous monitoring (e.g., repositioning markers in moving work zones, checking warning lights) is mandatory. Emissions such as dust and noise are minimized by suitable methods, water misting, and adjusted working hours. Supplementary measures like speed management, glare-free lighting with sufficient uniformity, and resilient cable protection reduce incident potential in mixed traffic environments.<\/p>\n<h2>Detour, communication, and construction logistics<\/h2>\n<p>Good detour routes and active communication increase acceptance of a closure and reduce congestion. Signed detours, early announcements, municipal information channels, and coordination with public transport and residents are proven measures. For construction execution: material and equipment deliveries outside peak times, defined loading and crane areas, and a clear cadence of deconstruction steps. For work with <strong>hydraulic power units<\/strong>, hose routing and a trip-free layout within the work area must be ensured; power pack locations are selected so that noise sources are set back from the traffic area. Data-supported detour selection, real-time travel time checks, and QR-coded site information boards further enhance predictability for all stakeholders.<\/p>\n<h2>Practical guide: Eight-step sequence<\/h2>\n<p>A structured process increases safety and efficiency for road barriers in connection with demolition and deconstruction work:<\/p>\n<ol>\n<li><strong>Preliminary survey:<\/strong> Inventory of the structure, utility lines, traffic load, access, and escape routes.<\/li>\n<li><strong>Method selection:<\/strong> Decision for low-vibration methods (e.g., rock wedge splitters and concrete splitters, concrete pulverizers) or alternative methods depending on conditions, including a concise method statement.<\/li>\n<li><strong>Hazard analysis:<\/strong> Define protection zones, coverings, and drop-free dismantling routes, with quantified noise and vibration limits.<\/li>\n<li><strong>Traffic sign plan:<\/strong> Detailed development, including pedestrian\/cyclist routing, stops, and delivery traffic, plus maintenance cycles for devices and lighting.<\/li>\n<li><strong>Approval and scheduling:<\/strong> Coordinate closure windows with authorities and stakeholders, with contingency slots for weather and incidents.<\/li>\n<li><strong>Site setup:<\/strong> Install barricades, protective walls, lighting; brief the teams, verify access control, and test communications.<\/li>\n<li><strong>Execution:<\/strong> Phased deconstruction with concrete pulverizers, splitters, steel shears; continuous checking of safeguarding and adaptive lane management if permitted.<\/li>\n<li><strong>Clearing and dismantling the barrier:<\/strong> Cleaning, removal of barricading, final inspection, and documentation, including as-built traffic management records.<\/li>\n<\/ol>\n<h2>Quality characteristics of professional road barriers<\/h2>\n<p>Successful projects in the roadway are characterized by clear signage, appropriate protective systems, realistic closure windows, seamless communication, and adapted process technology. Where possible, <strong>concrete pulverizers<\/strong> and <strong>rock wedge splitters and concrete splitters<\/strong> from Darda GmbH support the goals of <em>safe, controlled, and efficient<\/em> execution by reducing noise, vibration, and splinter dispersion. This creates a working environment that equally considers traffic, residents, and construction execution.<\/p>\n<ul>\n<li><strong>Safety performance:<\/strong> No uncontrolled debris, no work-zone intrusions, and verified protection device uptime.<\/li>\n<li><strong>Operational stability:<\/strong> Predictable closure windows, minimal schedule slippage, and low queue lengths at approach links.<\/li>\n<li><strong>Environmental control:<\/strong> Compliant noise and dust values, targeted water use, and clean carriageways.<\/li>\n<li><strong>Communication quality:<\/strong> Consistent public information, coherent detour guidance, and fast incident resolution.<\/li>\n<li><strong>Documentation:<\/strong> Complete approvals, sign inventories, inspection logs, and closeout evidence for handover.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Road barriers are a central component of the safe and orderly execution of construction and deconstruction work in the public right-of-way. They protect road users and workers, secure work areas, and enable workflows that would not be feasible or would only be possible with increased risk without barricading. In the <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/road-barrier\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19914","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Road Barrier Planning for Construction Work Zones<\/title>\n<meta name=\"description\" content=\"Guide to safe traffic control in construction and demolition using road barriers \u2713 planning, types, permits.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/road-barrier\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Road Barrier Planning for Construction Work Zones\" \/>\n<meta property=\"og:description\" content=\"Guide to safe traffic control in construction and demolition using road barriers \u2713 planning, types, permits.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/road-barrier\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-29T14:13:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/road-barrier\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/road-barrier\",\"name\":\"Road Barrier Planning for Construction Work Zones\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-01T11:06:13+00:00\",\"dateModified\":\"2026-05-29T14:13:02+00:00\",\"description\":\"Guide to safe traffic control in construction and demolition using road barriers \u2713 planning, types, permits.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/road-barrier#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/road-barrier\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/road-barrier#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Road barrier\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Road Barrier Planning for Construction Work Zones","description":"Guide to safe traffic control in construction and demolition using road barriers \u2713 planning, types, permits.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/road-barrier","og_locale":"en_US","og_type":"article","og_title":"Road Barrier Planning for Construction Work Zones","og_description":"Guide to safe traffic control in construction and demolition using road barriers \u2713 planning, types, permits.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/road-barrier","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-29T14:13:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/road-barrier","url":"https:\/\/www.darda.de\/en\/knowledge\/road-barrier","name":"Road Barrier Planning for Construction Work Zones","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-01T11:06:13+00:00","dateModified":"2026-05-29T14:13:02+00:00","description":"Guide to safe traffic control in construction and demolition using road barriers \u2713 planning, types, permits.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/road-barrier#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/road-barrier"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/road-barrier#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Road barrier"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19914","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19914"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19914\/revisions"}],"predecessor-version":[{"id":27901,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19914\/revisions\/27901"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19914"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}