{"id":19912,"date":"2025-12-31T12:13:42","date_gmt":"2025-12-31T11:13:42","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19912"},"modified":"2026-05-29T11:57:03","modified_gmt":"2026-05-29T09:57:03","slug":"road-expansion","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/road-expansion","title":{"rendered":"Road expansion"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Road expansion refers to the structural renewal, strengthening, or widening of existing roads. It includes the rehabilitation of asphalt and concrete pavements, the upgrading of junctions, the adjustment of drainage and utility infrastructure, as well as measures on bridges, edge restraints, and noise barrier systems. Especially in existing structures, controlled demolition, low vibration levels, and clean demolition separation are important. Depending on the construction phase and surroundings, precise hydraulic tools are used, such as <strong>concrete demolition shears<\/strong> for selective concrete demolition or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> for low-vibration opening of massive components. In this context, Darda GmbH stands for application-oriented solutions in concrete demolition and special deconstruction, in rock demolition and tunnel construction, as well as for special operations with tight site constraints. In practice, the objectives combine capacity, durability, and safety with reduced construction impacts; high purity in material separation supports recycling and lowers transport volumes and CO\u2082 emissions. Methods with low vibration and precisely directed forces help maintain the serviceability of adjacent structures and utilities during the works.<\/p>\n<h2>Definition: What is meant by road expansion?<\/h2>\n<p>Road expansion refers to measures to improve the performance and traffic safety of an existing road. This includes renewal of the pavement structure, replacement or strengthening of base layers, widening of the carriageway, installation of bicycle and bus lanes, renewal of curb-and-gutter systems, and partial demolition and reconstruction of adjacent structures such as retaining walls and bridge caps. Unlike pure maintenance, road expansion intervenes in the structure of the road and can structurally change alignments, layer thicknesses, or materials. Planning generally follows technical regulations but is defined on a project-specific basis and is subject to legal frameworks that may vary by project. Depending on targets, expansion may be a geometric widening or a strengthening within the existing footprint, frequently combined with drainage upgrades, barrier systems, and multimodal facilities.<\/p>\n<h2>Construction methods, terminology and phases in road expansion<\/h2>\n<p>Road expansion follows a structured sequence from existing-condition survey to acceptance. Key phases are traffic control and protection, selective deconstruction, earthworks and utility line works, reconstruction of the pavement structure, and equipment\/marking works. For the deconstruction of concrete and reinforced-concrete parts, curb foundations, bridge caps, channel slabs, or noise barrier foundations, different methods are chosen depending on environmental conditions. <em>Concrete demolition shears<\/em> allow controlled biting of concrete with simultaneous separation of reinforcement. <em>Rock and concrete splitters<\/em> create a defined splitting effect via drill holes or joints with low noise and vibration. Both methods are particularly suitable in inner-city upgrades, for work near sensitive utilities, or in night work windows. Hydraulic power packs supply the tools with the necessary working pressure and oil flow; sizing is based on drive power, duty cycle, and mobility on the construction site. Interfaces with traffic phases, temporary works, and utility diversions are planned in advance so that construction windows are used efficiently and risks are minimized.<\/p>\n<h2>Planning, permitting and traffic control<\/h2>\n<p>Robust execution planning takes into account as-built documents, utility plans, subsoil conditions, traffic volumes, and construction phases. Traffic control orders and protection of the work zones must be clarified early. In sensitive areas (schools, hospitals, listed buildings, proximity to water bodies), emissions such as noise, dust, and vibrations receive particular attention. Methods with low damage potential for adjacent structures &#8211; such as low-vibration splitting techniques or targeted concrete biting with shears &#8211; support compliance with these requirements. Legal requirements and permits must be reviewed on a project-specific basis; statements here are general and do not replace case-by-case assessment.<\/p>\n<ul>\n<li><strong>Key planning deliverables<\/strong>: traffic management plan, method statements, vibration and noise forecasts, waste and recycling concept, emergency and rescue plan, and utility clearance documentation.<\/li>\n<li><strong>Risk controls<\/strong>: staged work zones, separation of pedestrian and vehicle movements, defined hold points for inspections, and contingency options for adverse weather.<\/li>\n<\/ul>\n<h2>Road structure: layers and materials<\/h2>\n<p>The pavement structure consists of functionally coordinated layers. Their condition largely determines the type of expansion and the methods selected for deconstruction and reconstruction.<\/p>\n<ul>\n<li><strong>Subgrade\/formation<\/strong>: In-situ soil, improved as necessary; bearing capacity and moisture sensitivity govern layer thicknesses and temporary trafficability.<\/li>\n<li><strong>Frost protection layer<\/strong>: Unbound base layer to prevent frost heave, also acts as a leveling layer and for load distribution.<\/li>\n<li><strong>Base layers<\/strong>: Unbound (crushed stone\/chippings) or bound (asphalt base course, hydraulically bound layers), carry the main share of loads.<\/li>\n<li><strong>Binder course<\/strong>: Asphalt intermediate layer for force transfer between base layer and surface course.<\/li>\n<li><strong>Surface course<\/strong>: Asphalt concrete, stone mastic asphalt, or concrete surface; determines skid resistance, evenness, and noise emission.<\/li>\n<li><strong>Curb-and-gutter systems<\/strong>: Precast concrete elements and foundation concretes for edge restraint and drainage.<\/li>\n<li><strong>Concrete pavements<\/strong>: Slabs with dowels and anchors; special requirements for joint-adjacent deconstruction methods and reinforcement separation.<\/li>\n<li><strong>Geosynthetics<\/strong>: Geotextiles and geogrids as separation, filtration, or reinforcement layers to stabilize subgrades and extend service life.<\/li>\n<\/ul>\n<h2>Methods and construction phases in detail<\/h2>\n<h3>Existing-condition survey and material concept<\/h3>\n<p>Before starting, trial investigations clarify layer build-up, material grades, joint layout, and reinforcement contents. The recycling and disposal concept is based on this. Early definition of material separation (asphalt, concrete, reinforcing steel, soil) reduces costs and transports. Non-destructive testing and sampling (e.g., coring, ground penetrating radar, plate load or FWD tests, and if needed chloride content in concrete) refine the method selection and acceptance criteria.<\/p>\n<h3>Selective deconstruction and material separation<\/h3>\n<p>When deconstructing concrete pavements, edge beams, and foundations, <strong>concrete demolition shears<\/strong> support the pure separation of concrete and steel, for example on bridge caps, curb foundations, or massive manhole heads. <strong>Rock and concrete splitters<\/strong> open thick components or slabs with low vibration &#8211; advantageous near utilities, in constrained city centers, and for night work. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel shears<\/a> and multi cutters efficiently separate guardrails, railings, and recovered reinforcing steel. Hydraulic power packs supply these tools as required. Pre-sawing along joints and edges limits spalling, targeted misting reduces dust, and defined bite sequences maintain component stability until full release.<\/p>\n<h3>Earthworks and utility line works<\/h3>\n<p>The upgrade often includes rebuilding base layers, cable and drainage trenches, and replacement of contaminated soils. In rocky subsoil, <em>rock splitting cylinders<\/em> and <em>rock and concrete splitters<\/em> can produce trenches with low vibration when milling or blasting are not an option. Utility locating, trial pits, and coordination of service outages are planned to reduce clashes and unplanned interruptions.<\/p>\n<h3>Reconstruction of the pavement structure<\/h3>\n<p>After preparing the formation, unbound layers are placed, followed by hydraulically bound layers if applicable, then asphalt or concrete surfaces. Evenness, compaction, and joints are subject to testing. Curb-and-gutter systems are set to the correct elevation, inlets are adjusted, marking and equipment complete the measure. For asphalt, bond coats, temperature windows, and compaction targets are specified; for concrete, curing regimes, saw-cut timing, and joint sealing ensure performance.<\/p>\n<h3>Temporary works and safeguarding of structures<\/h3>\n<p>Adjacent structures, slopes, and traffic must be safeguarded throughout the works. This includes shoring, trench support, temporary edge restraints, and controlled decoupling cuts at structural connections. Monitoring with crack gauges or vibration limits protects sensitive assets during deconstruction and reconstruction.<\/p>\n<h2>Tools and equipment: selection and application<\/h2>\n<ul>\n<li><strong>Concrete demolition shears<\/strong>: For selective concrete demolition on bridge caps, edge beams, pavement slab edges, foundations of noise barriers and masts. Suitable for reinforced components, reduce secondary breakage, and facilitate steel separation.<\/li>\n<li><strong>Rock and concrete splitters<\/strong>: For controlled splitting of massive concrete and natural stone components, e.g., pavement slabs, foundation blocks, root protection structures, or rock cuttings along the alignment. Low vibration and noise emissions.<\/li>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power packs<\/a><\/strong>: Supply carrier-mounted or handheld tools with working pressure and oil flow. Selection based on power demand, duty cycle, mobility, and energy supply in the work section.<\/li>\n<li><strong>Combination shears<\/strong> and <strong>multi cutters<\/strong>: For mixed materials, e.g., when deconstructing safety barriers, railings, beams, and reinforced components in a single operation.<\/li>\n<li><strong>Steel shears<\/strong>: For reinforcing steel, anchors, guardrails, and beam sections; accelerate pure material separation.<\/li>\n<li><strong>Rock splitting cylinders<\/strong>: For geological cuttings, slope reductions, or tunnel headings in the course of bypasses and realignments.<\/li>\n<li><strong>Tank cutters<\/strong>: Rare in road expansion projects but relevant at legacy sites (e.g., removal of underground tanks in junction rebuilds). Use requires special safety measures and expertise.<\/li>\n<li><strong>Hose protection and quick-couplers with safety lock<\/strong>: Reduce damage and hydraulic hazards, especially in confined work zones and where traffic passes close by.<\/li>\n<li><strong>Dust suppression and debris control<\/strong>: Water nozzles, local shielding, and debris nets limit emissions and protect adjacent carriageways and structures.<\/li>\n<\/ul>\n<h2>Rock excavation, cuttings and tunnels in road expansion<\/h2>\n<p>Alignment shifts or widenings in hilly and alpine terrain lead to rock cuttings. Where blasting is excluded for safety or permitting reasons, <strong>rock and concrete splitters<\/strong> and <strong>rock splitting cylinders<\/strong> enable controlled removal. In tunnel construction, precise, low-vibration methods are required to protect adjacent buildings and avoid settlements. These tasks fall into the application areas of rock demolition and tunnel construction, as well as special operations. Borehole layout, splitting sequence, and relief cuts are planned to control crack propagation, while temporary stabilization of cut faces maintains slope safety during staging.<\/p>\n<h2>Noise, vibrations, dust: environmental and neighborhood protection<\/h2>\n<p>In urban road expansion, emissions must be minimized. Methods with limited vibration transmission, targeted material removal, and low impact energy &#8211; such as splitting or biting with shears &#8211; support compliance with guideline values. Low-dust working methods, localized misting, shielding, and a well-thought-out logistics concept reduce nuisances. Water and soil protection must be observed; escaping operating fluids must be avoided and promptly contained in the event of an incident. Requirements are project-specific and must be checked in general. Predictive assessments and compliance monitoring (e.g., spot measurements, vibration logs) provide transparency and enable timely corrective action.<\/p>\n<h2>Performance specification and tendering<\/h2>\n<p>For a robust tender, methods and target values are described functionally. Important key parameters include concrete strength, component thicknesses, reinforcement ratio, permissible vibration and noise limits, available work space, time windows, and required purity of material fractions. For hydraulic tools, parameters such as splitting force, jaw opening, cutting force, operating pressure, oil flow, tool weight, and accessibility (horizontal\/overhead) help. Brands are usually not specified; instead, performance requirements are described that can generally be met with tools from Darda GmbH, provided they are technically suitable. Trial sections, hold points, and key performance indicators for deconstruction rates, purity of fractions, and surface preparation quality improve comparability and quality control.<\/p>\n<h2>Occupational safety and health protection<\/h2>\n<p>Safe operation of hydraulic tools requires training, appropriate PPE, and clear process planning. Hazards from crushing, cutting, hydraulic pressure, flying debris, and noise must be reduced by organizational and technical means. Fall protection must be provided for work on bridges or slopes. Near utilities, locating and utility clearances are mandatory. Legally binding requirements must be observed on a project-specific basis; the notes here are general.<\/p>\n<ul>\n<li><strong>PPE<\/strong>: eye and face protection, hearing protection, cut-resistant gloves, safety footwear, and high-visibility clothing.<\/li>\n<li><strong>Hydraulic safety<\/strong>: pressure testing, leak checks, and controlled depressurization before coupling or maintenance.<\/li>\n<li><strong>Workplace setup<\/strong>: exclusion zones, catch platforms or mats, and clear signaling in mixed traffic environments.<\/li>\n<\/ul>\n<h2>Typical use cases in road expansion<\/h2>\n<ul>\n<li>Demolition of bridge caps and edge beams with <strong>concrete demolition shears<\/strong>, separate recovery of reinforcement.<\/li>\n<li>Deconstruction of curb and gutter foundations during bus stop rebuilds with <strong>concrete demolition shears<\/strong> or <strong>rock and concrete splitters<\/strong> in sensitive neighborhoods.<\/li>\n<li>Opening thick concrete pavement slabs along joints by splitting; subsequent sorting of dowels with steel shears.<\/li>\n<li>Construction of cable and drainage trenches in rocky subsoil with <strong>rock splitting cylinders<\/strong> when milling or blasting are not feasible.<\/li>\n<li>Deconstruction of foundations for noise barriers or masts with controlled biting and splitting in confined work zones.<\/li>\n<li>Special operation: recovery and cutting of steel components (guardrails, beams) with <strong>multi cutters<\/strong> and <strong>steel shears<\/strong>.<\/li>\n<li>Exposure for joint replacement or dowel bar retrofit by targeted splitting and shearing with minimal collateral damage.<\/li>\n<li>Selective removal around embedded utilities where low-vibration techniques avoid service disruptions.<\/li>\n<\/ul>\n<h2>Measurable criteria for selecting the method<\/h2>\n<ol>\n<li>Available work space, accessibility, and bearing capacity of surfaces.<\/li>\n<li>Permissible vibrations and noise limits in the surroundings.<\/li>\n<li>Time windows (night\/weekend work), sequencing, and logistics.<\/li>\n<li>Component thicknesses, concrete strengths, reinforcement contents.<\/li>\n<li>Material separation and recycling qualities (RC construction materials).<\/li>\n<li>Proximity to utilities, structural connections, and suspected hazardous substances.<\/li>\n<li>Hydraulic capacity on site (hydraulic power packs, power supply).<\/li>\n<li>Occupational safety, fall and crush hazards.<\/li>\n<li>Weather, temperature, and moisture influence on methods.<\/li>\n<li>Overall ecology: transports, CO\u2082, reuse of material flows.<\/li>\n<li>Need for temporary supports and safeguarding of adjacent structures.<\/li>\n<\/ol>\n<h2>Limits and alternatives<\/h2>\n<p>Not every method is suitable for every construction task. Very heavy reinforcement, extremely high-strength concrete, or large component thicknesses may require additional steps (sawing, drilling, pre-cutting). Alternatives include ultra-high-pressure water jetting, milling, sawing and <em>core drilling<\/em> technology, or &#8211; in exceptional cases and under strict conditions &#8211; blasting. The choice depends on environmental conditions, schedule, and environmental requirements. A project-specific assessment is essential. Combining methods in sequence (e.g., pre-sawing joints, splitting, then shearing reinforcement) often delivers the best balance of quality, speed, and low emissions.<\/p>\n<h2>Documentation and quality assurance<\/h2>\n<p>Essential verifications concern material separation, disposal routes, compaction degrees, evenness, skid resistance, and joint quality. Photographic construction documentation, test protocols, and as-built documentation ensure transparency. During deconstruction, complete recording of material flows supports recyclability &#8211; especially when <strong>concrete demolition shears<\/strong> and <strong>rock and concrete splitters<\/strong> enable pure separation. Time-stamped monitoring data for vibrations and dust, pre-condition surveys of adjacent assets, and digital logs of hydraulic tool parameters strengthen traceability and acceptance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Road expansion refers to the structural renewal, strengthening, or widening of existing roads. It includes the rehabilitation of asphalt and concrete pavements, the upgrading of junctions, the adjustment of drainage and utility infrastructure, as well as measures on bridges, edge restraints, and noise barrier systems. Especially in existing structures, controlled <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/road-expansion\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19912","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Road Expansion - Construction Methods &amp; Tools<\/title>\n<meta name=\"description\" content=\"Explore road expansion \u2713 upgrade road infrastructure for capacity &amp; safety with widening and low vibration methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/road-expansion\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Road Expansion - Construction Methods &amp; Tools\" \/>\n<meta property=\"og:description\" content=\"Explore road expansion \u2713 upgrade road infrastructure for capacity &amp; safety with widening and low vibration methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/road-expansion\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-29T09:57:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/road-expansion\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/road-expansion\",\"name\":\"Road Expansion - Construction Methods & Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-31T11:13:42+00:00\",\"dateModified\":\"2026-05-29T09:57:03+00:00\",\"description\":\"Explore road expansion \u2713 upgrade road infrastructure for capacity & safety with widening and low vibration methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/road-expansion#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/road-expansion\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/road-expansion#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Road expansion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Road Expansion - Construction Methods & Tools","description":"Explore road expansion \u2713 upgrade road infrastructure for capacity & safety with widening and low vibration methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/road-expansion","og_locale":"en_US","og_type":"article","og_title":"Road Expansion - Construction Methods & Tools","og_description":"Explore road expansion \u2713 upgrade road infrastructure for capacity & safety with widening and low vibration methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/road-expansion","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-29T09:57:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/road-expansion","url":"https:\/\/www.darda.de\/en\/knowledge\/road-expansion","name":"Road Expansion - Construction Methods & Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-31T11:13:42+00:00","dateModified":"2026-05-29T09:57:03+00:00","description":"Explore road expansion \u2713 upgrade road infrastructure for capacity & safety with widening and low vibration methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/road-expansion#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/road-expansion"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/road-expansion#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Road expansion"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19912","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19912"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19912\/revisions"}],"predecessor-version":[{"id":27885,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19912\/revisions\/27885"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}