{"id":19911,"date":"2025-12-31T14:12:59","date_gmt":"2025-12-31T13:12:59","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19911"},"modified":"2026-05-29T15:45:03","modified_gmt":"2026-05-29T13:45:03","slug":"butt-joint","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/butt-joint","title":{"rendered":"Butt joint"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The butt joint denotes a load-transferring and interlocking connection of two components that abut end-to-end. In construction, this mainly concerns the connection of reinforcing steel in reinforced concrete members, but also butt joints in steel and timber construction. For the deconstruction of structures, understanding butt joints is central: the type of connection influences structural behavior, separation strategy, and tool selection, for example when using concrete pulverizers, steel shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a>, or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> from Darda GmbH. Beyond tool choice, knowledge of joint detailing supports safer sequencing, reduced vibration, and lower dust and noise emissions in sensitive environments.<\/p>\n<h2>Definition: What is meant by a butt joint?<\/h2>\n<p>A <em>butt joint<\/em> is an end-to-end connection of two elements that transfers forces (tension, compression, shear) through suitable design measures. In reinforced concrete construction, this primarily involves connecting reinforcing bars; in steel construction, plates and sections; in timber construction, beams or panels. What matters is that the joint provides the required <strong>load-bearing capacity<\/strong> and <strong>ductility<\/strong> and that the structure functions without inadmissible deformations or stress concentrations. In deconstruction, the butt joint is often a key intervention point to selectively separate components, cut reinforcement in a controlled manner, or release members with low vibration. Unlike mere contact joints without force transfer, structural butt joints are detailed to meet recognized design rules, robustness requirements, and, where relevant, seismic detailing provisions.<\/p>\n<h2>Types and functional principles of butt joints<\/h2>\n<p>Butt joints can be classified by material, force transfer, and execution. In reinforced concrete, lap splices (overlapping reinforcement in concrete), mechanical coupler splices (threaded or swaged couplers), and welded splices are primarily used. In steel construction, butt welds and butt bolted joints are common; in timber construction, butt glue joints or steel-reinforced connectors are used. The functional principle is always to shape the cross-section and bond so that forces are reliably transmitted and local stress peaks remain limited.<\/p>\n<ul>\n<li><strong>Reinforced concrete<\/strong>: lap splices with sufficient lap length and confinement; mechanical couplers enabling near-bar-strength transfer; welded splices for special cases with qualified procedures<\/li>\n<li><strong>Steel<\/strong>: full-penetration butt welds; bolted butt splices with plates or end plates designed for slip-resistance or bearing<\/li>\n<li><strong>Timber<\/strong>: bonded butt joints with verified adhesive systems; dowelled or steel-reinforced butt connectors with adequate edge distances<\/li>\n<\/ul>\n<h2>Constructive executions and use in reinforced concrete<\/h2>\n<p>In reinforced concrete members, the butt joint of reinforcing bars is a key detail. Lap splices utilize the bond between steel and concrete over a defined lap length; mechanical couplers transfer forces via mechanical interlock in steel; welded splices require special qualifications and are less common in practice. The choice of execution influences load-bearing capacity, deformation behavior, fatigue resistance, and deconstruction-friendliness. For selective concrete demolition with Darda GmbH concrete pulverizers, knowing the location and type of butt joint is relevant to expose reinforcement and cut it in a targeted manner.<\/p>\n<p>Couplers are often favored in congested reinforcement zones, large bar diameters, or where construction stages demand short development lengths. Lap splices are robust and economical but require adequate cover, confinement, and staggering. Welded splices can be efficient in precast fabrication but increase quality control demands and sensitivity to heat input.<\/p>\n<ul>\n<li><strong>Selection criteria<\/strong>: bar diameter and grade, available lap length, expected cyclic action, fire and corrosion exposure, accessibility for future interventions<\/li>\n<li><strong>Detailing<\/strong>: stagger splices to prevent planes of weakness, ensure transverse reinforcement for confinement, avoid placing multiple splices at peak moment regions where possible<\/li>\n<\/ul>\n<h2>Structural behavior and design aspects<\/h2>\n<p>The structural behavior of a butt joint is determined by geometry, material properties, and bond. Lap splices require sufficient concrete cover and lap length to develop tensile forces. Mechanical couplers provide near-full bar cross-sectional capacity and are less sensitive to reduced concrete cover. Important influences include stress concentration, ductility, fatigue under cyclic loading, and behavior under fire or corrosion. In deconstruction, corroded or heavily concreted connections increase separation effort; visible couplers or welded splices can, by contrast, facilitate the targeted use of steel shears or Multi Cutters.<\/p>\n<ul>\n<li><strong>Checks<\/strong>: anchorage and development, confinement by transverse reinforcement, bar spacing and cover, compatibility of stiffness, and robustness against progressive failure<\/li>\n<li><strong>Failure modes<\/strong>: bond slip and splitting in lap zones, fracture at heat-affected zones for welded splices, localized bearing and prying in bolted steel butt joints<\/li>\n<li><strong>Performance<\/strong>: serviceability crack control, low-cycle fatigue in seismic regions, resistance retention under elevated temperature and after corrosion<\/li>\n<\/ul>\n<h2>Planning, documentation, and findability in existing structures<\/h2>\n<p>The location of butt joints is often documented in execution drawings; in existing structures, they are not always unequivocally traceable. Exploratory methods such as probing, exposing with concrete pulverizers, and low-destructive testing support localization. Mechanical couplers are often identifiable as slightly enlarged steel cross-sections. For controlled deconstruction, a <strong>careful survey of the existing structure<\/strong> is advisable to avoid unexpected load redistributions or uncontrolled cross-section weakening.<\/p>\n<p>Complementary techniques such as cover meters, rebar scanners, and ground-penetrating radar can improve the probability of detection before selective exposure. Marking identified splice zones and updating the as-built documentation or model streamlines sequencing, tool mobilization, and permitting.<\/p>\n<h2>Influence on deconstruction: method selection and tool choice<\/h2>\n<p>Butt joints determine the sequence of separation and demolition steps. For lap splices, <em>exposing and crushing<\/em> the concrete with concrete pulverizers is expedient to reveal the overlapping bars and then cut them with steel shears or Multi Cutters. For coupler splices, the concrete can be cracked open in a targeted manner; the coupler is then released with cutting or separation tools. Darda GmbH rock and concrete splitters enable a particularly low-vibration approach in sensitive areas to weaken the bond, control crack formation, and progressively release components.<\/p>\n<p>Boundary conditions such as vibration limits, airborne noise, dust control, and proximity to live services influence whether predominantly crushing, splitting, or cutting is prioritized and how sections are dimensioned for removal.<\/p>\n<h2>Procedure for separating butt joints in concrete demolition<\/h2>\n<p>For a safe and efficient process, a structured sequence has proven itself that accounts for structural behavior and avoids uncontrolled fractures.<\/p>\n<h3>1. Expose and assess<\/h3>\n<p>Remove concrete selectively with concrete pulverizers until reinforcement and joint are fully visible. Assess condition (corrosion, cross-section, coupler type) and consider possible residual stresses. Document findings and confirm that the identified joint corresponds to the planning basis.<\/p>\n<h3>2. Ensure load relief<\/h3>\n<p>Before cutting, check for temporary shoring or load relief. Especially for column joints or components with high restraint forces, controlled load paths must be ensured. Define hold points for verification and establish stop criteria for unforeseen movements or cracking.<\/p>\n<h3>3. Mechanical separation<\/h3>\n<p>Cut reinforcing bars at an accessible location with steel shears or Multi Cutters. For couplers, choose the cut position to avoid binding and keep cutting forces low. Maintain adequate stand-off distance and use shields where falling fragments are possible.<\/p>\n<h3>4. Low-vibration release<\/h3>\n<p>Where vibration or noise must be minimized (special demolition, hospitals, laboratories), use wedges from rock and concrete splitters to weaken the concrete bond and release the component in a controlled manner. Pre-drilling patterns and staged pressurization improve crack guidance along the intended line.<\/p>\n<h3>5. Section-by-section approach<\/h3>\n<p>Work large cross-sections in sequences to control load redistributions. For tunnel linings or massive foundation elements, stagger cuts so that butt joints are exposed one after another. Coordinate lifting and removal with rigging capacity and transport paths.<\/p>\n<h3>6. Make safe, remove, and document<\/h3>\n<p>Secure released elements against unplanned movement, remove sections in the agreed lift plan, and record locations and types of butt joints encountered to refine the method statement for subsequent areas.<\/p>\n<h2>Typical damage patterns and their significance<\/h2>\n<p>Insufficient lap lengths, improper coupler installation, inadmissible welding heat input, or corrosion can reduce load-bearing capacity. Visible are:<\/p>\n<ul>\n<li>Crack formation along reinforcement (debonding, splitting cracks)<\/li>\n<li>Bulging or spalling in the area of mechanical couplers<\/li>\n<li>Notch cracks at welded splices<\/li>\n<li>Local cross-section weakening after uncontrolled deconstruction<\/li>\n<li>Slip or bar pull-out at lap splices under cyclic loading<\/li>\n<li>Heat-affected brittleness adjacent to welded joints<\/li>\n<\/ul>\n<p>For deconstruction, this means increased caution when applying cutting and crushing tools and, where appropriate, an adjusted sequence and shoring. Monitoring measures (deflection checks, crack gauges) can add assurance where damage is suspected.<\/p>\n<h2>Butt joints in tunnel construction and segmental linings<\/h2>\n<p>In tunnel linings and segmental lining segments, reinforcement splices and segment joints are executed as butt joints. For selective deconstruction in <em>rock excavation and tunnel construction<\/em>, targeted exposure of the joint areas is crucial to avoid unintentionally channeling forces into neighboring segments. Concrete pulverizers and rock and concrete splitters from Darda GmbH enable section-by-section release, while steel shears cut the reinforcement in a controlled manner.<\/p>\n<p>Particular attention is required at segment interfaces with gaskets, dowels, and bolts so that sealing systems are not damaged and preloads are relieved in a controlled way. Sequencing should prevent eccentric load transfer into adjacent rings or segments during removal.<\/p>\n<h2>Strip-out and cutting in existing structures<\/h2>\n<p>During strip-out, butt joints of beams, columns, and walls influence the sequence of cuts. Mechanical couplers can be clearly identified after concrete removal and cut in a targeted manner; lap splices require longer exposure. A <strong>clean cutting line<\/strong> with Multi Cutters or concrete pulverizers reduces secondary damage and facilitates detachment of individual segments for removal.<\/p>\n<p>Where applicable, pre-sawing can reduce vibration before crushing, and dust suppression with water minimizes secondary contamination. Early sorting of released steel and concrete improves logistics and downstream recycling quality.<\/p>\n<h2>Quality assurance, safety, and general notes<\/h2>\n<p>For planning, execution, and deconstruction of butt joints, the applicable recognized rules of practice are decisive. These include accepted design principles, qualification requirements for welding and assembly work, and suitable testing procedures. In deconstruction, hazards due to falling parts, uncontrolled crack propagation, and energy stored in the composite must be considered. Careful work preparation, appropriate personal protective equipment, and a step-by-step approach with suitably sized concrete pulverizers, steel shears, and rock and concrete splitters are fundamental building blocks of a safe process.<\/p>\n<ul>\n<li><strong>Method statements and permits<\/strong>: define joint types, cut locations, hold points, and stop-work criteria<\/li>\n<li><strong>Competence<\/strong>: qualified personnel for welding, threading, and cutting; calibrated equipment with maintained blades and jaws<\/li>\n<li><strong>Controls<\/strong>: pre-task briefings, exclusion zones, tag-out of live services, and verification of temporary supports<\/li>\n<li><strong>Inspection<\/strong>: visual checks of exposed joints, measurement of lap lengths, and documentation with photos and sketches<\/li>\n<\/ul>\n<h2>Role of the butt joint in natural stone extraction<\/h2>\n<p>In quarries, abutment contacts of natural stone elements are more commonly referred to as butt joints. In extraction, geological joint patterns influence the natural \u201cjoint line.\u201d Darda GmbH rock and concrete splitters exploit these zones of weakness: with controlled splitting pressure, the rock mass can be released along existing joints without damaging the surroundings. Although this is not a technically manufactured butt joint, the principles of force transmission and crack guidance are comparable. Pre-splitting along discontinuities reduces microcracking in the remaining rock and improves block quality.<\/p>\n<h2>Sustainability and circular deconstruction<\/h2>\n<p>Butt joints shape the dismantlability of structures. Mechanical couplers can promote clean separation of steel and concrete if the joint is readily accessible. Lap splices do make release more difficult but allow robust force transfer during the service life. A <em>deconstruction-friendly detail<\/em> supports the reuse of reinforcing steel and the clean separation of construction materials. Low-vibration methods with concrete pulverizers and rock and concrete splitters reduce emissions and improve the recycling quality of demolition debris.<\/p>\n<p>Integrating deconstruction objectives into design and documentation (material passports, mapping of splice locations) facilitates future interventions. Selective removal with minimized contamination yields higher-grade recyclates and reduces processing energy.<\/p>\n<h2>Practical tips for tool selection<\/h2>\n<p>Tool selection depends on cross-section, accessibility, and joint type:<\/p>\n<ul>\n<li>Concrete pulverizers: exposing lap splices, removing concrete cover, controlled crushing<\/li>\n<li>Steel shears\/Multi Cutters: cutting reinforcing bars, couplers, and section parts<\/li>\n<li>Rock and concrete splitters: low-vibration crack initiation, releasing massive components in sensitive environments<\/li>\n<\/ul>\n<p>A combination of these tools enables a structured approach in <em><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a><\/em> as well as in <em>special operations<\/em> with particular boundary conditions. Additional criteria include jaw opening relative to bar and coupler sizes, reach in confined spaces, blade geometry for rebar versus plates, and maintenance to keep cutting forces within safe limits.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The butt joint denotes a load-transferring and interlocking connection of two components that abut end-to-end. In construction, this mainly concerns the connection of reinforcing steel in reinforced concrete members, but also butt joints in steel and timber construction. For the deconstruction of structures, understanding butt joints is central: the type <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/butt-joint\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19911","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Butt Joint in Construction &amp; Demolition Explained<\/title>\n<meta name=\"description\" content=\"Guide to the butt joint as a structural connection in reinforced concrete, steel &amp; timber \u2713 design and deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/butt-joint\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Butt Joint in Construction &amp; Demolition Explained\" \/>\n<meta property=\"og:description\" content=\"Guide to the butt joint as a structural connection in reinforced concrete, steel &amp; timber \u2713 design and deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/butt-joint\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-29T13:45:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/butt-joint\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/butt-joint\",\"name\":\"Butt Joint in Construction & Demolition Explained\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-31T13:12:59+00:00\",\"dateModified\":\"2026-05-29T13:45:03+00:00\",\"description\":\"Guide to the butt joint as a structural connection in reinforced concrete, steel & timber \u2713 design and deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/butt-joint#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/butt-joint\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/butt-joint#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Butt joint\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Butt Joint in Construction & Demolition Explained","description":"Guide to the butt joint as a structural connection in reinforced concrete, steel & timber \u2713 design and deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/butt-joint","og_locale":"en_US","og_type":"article","og_title":"Butt Joint in Construction & Demolition Explained","og_description":"Guide to the butt joint as a structural connection in reinforced concrete, steel & timber \u2713 design and deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/butt-joint","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-29T13:45:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/butt-joint","url":"https:\/\/www.darda.de\/en\/knowledge\/butt-joint","name":"Butt Joint in Construction & Demolition Explained","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-31T13:12:59+00:00","dateModified":"2026-05-29T13:45:03+00:00","description":"Guide to the butt joint as a structural connection in reinforced concrete, steel & timber \u2713 design and deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/butt-joint#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/butt-joint"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/butt-joint#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Butt joint"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19911"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19911\/revisions"}],"predecessor-version":[{"id":27899,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19911\/revisions\/27899"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}