{"id":19905,"date":"2025-12-31T13:31:49","date_gmt":"2025-12-31T12:31:49","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19905"},"modified":"2026-05-29T16:21:02","modified_gmt":"2026-05-29T14:21:02","slug":"chiseling-tool","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/chiseling-tool","title":{"rendered":"Chiseling tool"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Chiseling tools are among the fundamental working aids in demolition, deconstruction, and stone processing. They serve the controlled removal, breaking, and fine working of concrete, masonry, and natural stone. In projects by Darda GmbH, chiseling tools often functionally interact with <em>concrete pulverizers<\/em>, <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/em>, and the associated <em>hydraulic power packs<\/em>, for example when components are first loosened, opened, or exposed before a low-vibration separation or a force-driven splitting follows. In coordinated workflows, chiseling defines edges, exposes reinforcement, and prepares interfaces so that subsequent separating steps proceed with precision, reduced vibration, and predictable results.<\/p>\n<h2>Definition: What is meant by a chiseling tool?<\/h2>\n<p>A chiseling tool is a tool for material removal by chisel action. It concentrates energy at a cutting edge or point to loosen brittle or quasi-ductile materials such as concrete, masonry, or natural stone. Chiseling tools range from handheld chisels to electropneumatic or hydraulic demolition hammers up to specialized attachments for a demolition robot. Characteristic parameters are the <strong>chisel geometry<\/strong> (point, flat, spade, channel chisel), the <strong>impact energy<\/strong>, and the <strong>impact frequency<\/strong>. In deconstruction, chiseling tools are often combined with cutting, splitting, or pressing tools, for example with concrete pulverizers or rock and concrete splitters by Darda GmbH, to separate components in a controlled and material-preserving manner. In technical terms, this is percussive material removal with localized stress concentrations that initiate cracks and guide fracture planes along intended lines.<\/p>\n<h2>Design and operating principle<\/h2>\n<p>Chiseling tools concentrate mechanical energy in a short time on a small area. A drive (manual, electric, pneumatic, or hydraulic) generates impulses that are transferred via a piston to the chisel. The chisel penetrates the material matrix, creating microcracks that merge into fracture planes. Effective removal results from the balance of <em>contact force<\/em>, <em>dwell time<\/em>, and <em>rebound control<\/em> so that energy enters the workpiece with minimal loss.<\/p>\n<p>Key influencing factors are:<\/p>\n<ul>\n<li><strong>Impact energy<\/strong> per stroke (single-blow energy)<\/li>\n<li><strong>Impact frequency<\/strong> (blows per minute) and pulse shape<\/li>\n<li><strong>Chisel geometry<\/strong> and cutting angle<\/li>\n<li><strong>Contact pressure<\/strong> and tool guidance<\/li>\n<li><strong>Support systems<\/strong> such as hydraulic power packs that provide constant pressure and flow rate<\/li>\n<li><strong>Tool-material pairing<\/strong> including heat management and tip metallurgy<\/li>\n<\/ul>\n<p>Hydraulically powered chiseling tools are frequently supplied via compact hydraulic power packs in practice. In combination with rock wedge splitters or concrete pulverizers by Darda GmbH, this creates a continuous, controlled workflow: chisel to expose, then split or dismantle with shears, and finally sort materials by type. This sequencing increases process reliability, improves edge quality, and reduces collateral damage to adjacent components.<\/p>\n<h2>Types of chiseling tools and their fields of application<\/h2>\n<h3>Hand chiseling tools<\/h3>\n<p>Hand chisels, club hammers, and flat chisels are universally applicable where sensitive edge work, chiseling small recesses, or tasks in confined spaces are required. They are suitable for mortar joints, plaster, or softer natural stone materials as well as for finish work after coarse removal. Carbide-tipped variants extend service life on abrasive aggregates, while protective sleeves and striking guards support consistent striking angles and safer handling.<\/p>\n<h3>Electropneumatic demolition hammers<\/h3>\n<p>They combine mobility with solid removal performance. Typical applications include removing screed, plaster, opening chases, or working thin-walled concrete elements. By selecting the right chisel tip, edges can be defined and break directions controlled. Weight classes enable adaptation to overhead work or floor chiseling, and integrated dust extraction interfaces support low-dust operation in interior applications.<\/p>\n<h3>Hydraulic demolition hammers<\/h3>\n<p>Hydraulics deliver high power density in a compact format. Driven by a hydraulic power pack, hydraulic chiseling tools introduce consistent impact energy into massive concrete. They are used when larger cross-sections must be broken up, reinforcement exposed, or openings in load-bearing elements prepared. In these cases, <strong>rock and concrete splitters<\/strong> by Darda GmbH can subsequently be used to widen the cracks in a controlled manner and release components with minimal vibration. Constant oil flow and pressure stabilize blow energy under load, which is advantageous in reinforced sections and dense aggregates.<\/p>\n<h3>Chisel attachments and special inserts<\/h3>\n<p>The choice of attachment determines the quality of removal:<\/p>\n<ul>\n<li><em>Point chisels<\/em> for initial breaking and point loads<\/li>\n<li><em>Flat and spade chisels<\/em> for surface removal and guiding along joints<\/li>\n<li><em>Channel and grooving chisels<\/em> for defined grooves<\/li>\n<li><em>Special geometries<\/em> to minimize spalling on exposed edges<\/li>\n<\/ul>\n<p>Correct tip maintenance, sharpened edges, and the appropriate cutting angle help reduce uncontrolled crack propagation and improve surface finish for follow-up work such as shearing or splitting.<\/p>\n<h2>Distinction and interaction with other tools<\/h2>\n<p>Chiseling tools separate by impact and fracture. Other tools from Darda GmbH use complementary principles:<\/p>\n<ul>\n<li><strong>Concrete pulverizers<\/strong> reduce concrete by compressive and crushing forces, grip reinforcement with cutting segments, and reduce vibrations. They are ideal for work close to structural elements, interior demolition, or low-emission methods.<\/li>\n<li><strong>Rock and concrete splitters<\/strong> as well as <em>rock wedge splitters<\/em> use controlled tensile stresses in the borehole to initiate and guide cracks in a targeted manner. They are particularly suitable for thick cross-sections, sensitive environments, or natural stone.<\/li>\n<li><strong>Multi cutters, combination shears, steel shears<\/strong> address reinforced components and steel sections; they cut reinforcement and embedded parts after concrete has been pre-broken or exposed.<\/li>\n<li><strong>Tank cutters<\/strong> are specialized tools for safely opening tanks and pipelines; chiseling tools often prepare the connection points in the concrete surroundings.<\/li>\n<\/ul>\n<p>In practice, the methods are combined: Joints are exposed with the demolition hammer, components are released from the bond with the concrete pulverizer, and massive blocks are separated with low vibration levels using splitters. This yields a predictable process that protects materials and the surrounding environment. Tool selection follows the principle of using <em>percussive energy<\/em> only as far as necessary, then switching to <em>compressive or tensile<\/em> separation for cleaner, low-emission outcomes.<\/p>\n<h2>Use in typical scenarios<\/h2>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<p>Chiseling tools open access, create predetermined breaking lines, and remove concrete cover. Once reinforcement is visible, concrete pulverizers take over the size reduction and the separation of steel. For thick foundations or walls, switching to splitting helps reduce vibrations and noise. Predrilling along the separation line can further guide fractures and limit edge spalling in sensitive areas.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In selective interior demolition, chiseling tools are used to release coverings, screed, mortar packs, and fixtures. For openings in load-bearing elements, chiseling is often used first, then cutting or follow-up with concrete pulverizers to achieve clean cut edges. Material logistics and dust control are integral to the sequence to maintain cleanliness and shorten rework times.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>In <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">Rock demolition and tunnel construction<\/a>, chiseling tools are used to shape and loosen brittle rocks, remove loose sections, and refine contours. In massive sections, splitting with rock wedge splitters is preferred to achieve controlled fracture surfaces and low vibrations. Edge dressing and ridge removal by chiseling improve profile accuracy and reduce the need for subsequent trimming.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>For scoring and edging, chiseling tools are used selectively. The main separation is performed by rock and concrete splitters, as they produce repeatable, material-specific crack paths that ensure the quality of the raw blocks. Localized chiseling corrects seam irregularities and protects visible faces from breakout.<\/p>\n<h3>Special use<\/h3>\n<p>In sensitive environments (hospitals, laboratory areas, heritage buildings), chiseling is reduced to the <em>necessary<\/em> and complemented by lower-vibration methods. Concrete pulverizers and splitting technology by Darda GmbH minimize the transmission of vibration and noise. Time windows, shielding, and precision sequencing support compliance with strict emission constraints.<\/p>\n<h2>Selection criteria and sizing<\/h2>\n<ul>\n<li><strong>Material and strength<\/strong>: concrete compressive strength class, aggregate, moisture, degree of reinforcement<\/li>\n<li><strong>Member thickness<\/strong> and edge distances: risk of spalling, edge quality<\/li>\n<li><strong>Performance data<\/strong>: impact energy, frequency, chisel cross-section<\/li>\n<li><strong>Accessibility<\/strong>: working space, share of overhead work, equipment weight<\/li>\n<li><strong>Emissions<\/strong>: vibration, noise, dust; if necessary, alternative methods (concrete pulverizers, splitting)<\/li>\n<li><strong>Supply<\/strong>: availability of power, compressed air, or hydraulic power pack<\/li>\n<li><strong>Rework<\/strong>: required surface quality, cut straightness, reusability<\/li>\n<li><strong>Power-to-weight ratio<\/strong>: manageable tool mass for the position and duration of work<\/li>\n<li><strong>Carrier compatibility<\/strong>: interface, hose routing, and stability for robot-supported or remote work<\/li>\n<\/ul>\n<h2>Occupational safety, emissions, and environmental effects<\/h2>\n<h3>Vibrations<\/h3>\n<p>Chiseling tools generate hand-arm vibrations. Work durations and tool selection must be planned to minimize exposure. Where possible, methods with lower vibration output (concrete pulverizers, splitters) should be preferred or additionally used. Balanced stances, limited trigger time, and well-maintained shock mounts help reduce transmission.<\/p>\n<h3>Noise<\/h3>\n<p>Impacts and fracture noises produce high sound pressure levels. Hearing protection is standard; time windows and shielding should be considered. In noise-sensitive areas, switching to splitting- or shear-based methods can be sensible. Acoustic barriers and damping mats on contact surfaces further reduce reflected sound.<\/p>\n<h3>Dust<\/h3>\n<p>Chiseling generates fine and coarse dust. Effective dust reduction is achieved through dust extraction, water wetting, and organized material logistics. Legal requirements must be checked for each project; the information provided is general and non-binding. Water management must account for runoff and filtration, while suitable extraction units and filter classes support low-dust working.<\/p>\n<h2>Maintenance, chisel service life, and operation<\/h2>\n<h3>Chisel care<\/h3>\n<p>Regular regrinding at the correct cutting angle, avoiding overheating, and proper lubrication of the tool holder increase service life. Damaged chisel tips lead to increased crack formation and uncontrolled spalling. Visual checks for mushrooming, microcracks, and loss of tempering color help prevent premature failure and protect tool holders.<\/p>\n<h3>Hydraulics and power supply<\/h3>\n<p>Clean hydraulic oil, proper filtration, and adherence to pressure and flow specifications are crucial. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Compact hydraulic power units<\/a> by Darda GmbH provide the required output when chiseling tools are operated in a process chain with splitters or concrete pulverizers. Hose integrity, quick-coupler cleanliness, and temperature management safeguard stable blow energy and reduce wear.<\/p>\n<h3>Typical failure patterns<\/h3>\n<ul>\n<li>Glassy, overheated chisel tips due to continuous pressure without material removal<\/li>\n<li>Poor fracture patterns caused by unsuitable chisel geometry<\/li>\n<li>Excessive vibrations due to impact energy being too high on thin elements<\/li>\n<li>Wear on tool holders due to insufficient cleaning<\/li>\n<li>Oil aeration and blow irregularities from clogged filters or inadequate supply flow<\/li>\n<\/ul>\n<h2>Process organization: From marking to a controlled separation joint<\/h2>\n<ol>\n<li>Analyze the component (strength, reinforcement, load paths, edge distances)<\/li>\n<li>Mark the separation line and protect edges (e.g., scoring, pre-drilling)<\/li>\n<li>Select the suitable chiseling tool and chisel; check the power supply<\/li>\n<li>Break up selectively, define joints, remove concrete cover<\/li>\n<li>Switch to concrete pulverizers for targeted dismantling; cut reinforcement<\/li>\n<li>For massive cross-sections, place splitters and guide cracks<\/li>\n<li>Follow-up work, clean edges, sorting, and material logistics<\/li>\n<li>Document results and adjust parameters for subsequent work sections<\/li>\n<\/ol>\n<h2>Technical parameters and quality criteria<\/h2>\n<ul>\n<li><strong>Material removal rate<\/strong>: depends on impact energy, frequency, chisel, and material<\/li>\n<li><strong>Crack control<\/strong>: via cutting angle, contact pressure, pre-drilled holes, and cut guidance<\/li>\n<li><strong>Edge quality<\/strong>: improved by staged processing (chiseling, pulverizing\/shearing, splitting)<\/li>\n<li><strong>Construction logistics<\/strong>: short paths for power supply and material haulage<\/li>\n<li><strong>Process stability<\/strong>: consistent blow energy and repeatable break patterns across work areas<\/li>\n<\/ul>\n<h2>Practice-oriented combinations for high efficiency<\/h2>\n<p>Proven deconstruction workflows combine fast opening with demolition hammers and <strong>controlled separation<\/strong> using concrete pulverizers or rock and concrete splitters. Multi cutters, combination shears, steel shears, and tank cutters complement the process when metallic inserts, lines, or tanks are involved. This creates a methodical toolchain that brings together safety, speed, and component quality. Sequencing by emission level and required finish enables shorter downtimes, cleaner interfaces, and efficient material recovery.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Chiseling tools are among the fundamental working aids in demolition, deconstruction, and stone processing. They serve the controlled removal, breaking, and fine working of concrete, masonry, and natural stone. In projects by Darda GmbH, chiseling tools often functionally interact with concrete pulverizers, hydraulic rock and concrete splitters, and the associated <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/chiseling-tool\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19905","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Chiseling Tool for Concrete &amp; Masonry Demolition<\/title>\n<meta name=\"description\" content=\"Achieve controlled demolition of concrete &amp; stone with a chiseling tool \u27a4 impact energy, crack control, low vibration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/chiseling-tool\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Chiseling Tool for Concrete &amp; Masonry Demolition\" \/>\n<meta property=\"og:description\" content=\"Achieve controlled demolition of concrete &amp; stone with a chiseling tool \u27a4 impact energy, crack control, low vibration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/chiseling-tool\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-29T14:21:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chiseling-tool\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chiseling-tool\",\"name\":\"Chiseling Tool for Concrete & Masonry Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-31T12:31:49+00:00\",\"dateModified\":\"2026-05-29T14:21:02+00:00\",\"description\":\"Achieve controlled demolition of concrete & stone with a chiseling tool \u27a4 impact energy, crack control, low vibration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chiseling-tool#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chiseling-tool\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chiseling-tool#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Chiseling tool\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Chiseling Tool for Concrete & Masonry Demolition","description":"Achieve controlled demolition of concrete & stone with a chiseling tool \u27a4 impact energy, crack control, low vibration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/chiseling-tool","og_locale":"en_US","og_type":"article","og_title":"Chiseling Tool for Concrete & Masonry Demolition","og_description":"Achieve controlled demolition of concrete & stone with a chiseling tool \u27a4 impact energy, crack control, low vibration.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/chiseling-tool","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-29T14:21:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/chiseling-tool","url":"https:\/\/www.darda.de\/en\/knowledge\/chiseling-tool","name":"Chiseling Tool for Concrete & Masonry Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-31T12:31:49+00:00","dateModified":"2026-05-29T14:21:02+00:00","description":"Achieve controlled demolition of concrete & stone with a chiseling tool \u27a4 impact energy, crack control, low vibration.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/chiseling-tool#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/chiseling-tool"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/chiseling-tool#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Chiseling tool"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19905","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19905"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19905\/revisions"}],"predecessor-version":[{"id":27904,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19905\/revisions\/27904"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19905"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}