{"id":19903,"date":"2025-12-31T12:09:36","date_gmt":"2025-12-31T11:09:36","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19903"},"modified":"2026-05-29T14:21:03","modified_gmt":"2026-05-29T12:21:03","slug":"stone-saw","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/stone-saw","title":{"rendered":"Stone saw"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A stone saw is a central tool for the separating processing of rock and concrete &#8211; from precise joints in natural stone to wall and ceiling cuts in reinforced concrete to openings in special demolition. In practice, it often forms a process chain with other hydraulic tools: Saw cuts define components, which are then released or reduced in a controlled manner &#8211; using, for example, <strong>concrete shears<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a><\/strong> from Darda GmbH. This enables low-vibration, predictable, and material-specific, safe results even in sensitive areas. Typical power concepts include electric and hydraulic drives; compliance with site-specific emission limits and water management concepts is integral to planning.<\/p>\n<h2>Definition: What is a stone saw?<\/h2>\n<p>A stone saw is a machine that separates mineral building materials such as natural stone, masonry, and concrete using <em>diamond tools<\/em>. Depending on the design, the cut is made with rotating diamond cutting blades (e.g., table, hand-held, or joint cutters), with diamond-embedded wires (diamond wire saws), or as a linearly guided cut (e.g., wall saws). The kerf is created by abrasive micro-chipping of the diamond grains; the segment bond controls exposure and wear. In deconstruction, saw cuts are often combined with hydraulic splitting or gripping to extract components in a controlled manner. Cutting depth, kerf width, and achievable tolerances depend on tool diameter or wire configuration, guide rigidity, and cooling strategy.<\/p>\n<h2>Types and operating principles of stone saws<\/h2>\n<p>Stone saws can be distinguished by drive, guidance, and cutting technique. Hand-held cut-off saws and joint cutters are mobile and flexible for joints, openings, and ceiling cuts. <strong>Wall saws<\/strong> enable precise, plumb, and aligned cuts in reinforced concrete with defined depth. <strong>Diamond wire saws<\/strong> operate with virtually no limitation on cutting length and are suitable for massive cross-sections or irregular geometries. The diamond tool runs at a defined peripheral speed; cooling (wet cutting) dissipates heat, binds dust, and removes swarf from the kerf. Cut quality depends significantly on material, segment bond, rotational speed, feed rate, and guidance. For productivity, the interaction of drive torque, blade stiffness, and guide rails is decisive, as is the choice between electric, hydraulic, or pneumatic power on constrained sites.<\/p>\n<ul>\n<li><strong>Drives<\/strong>: electric for low local emissions, hydraulic for high torque and robust duty cycles.<\/li>\n<li><strong>Guidance<\/strong>: rail-bound wall saws for accuracy, table or bridge saws for dimension stone, freehand for small openings.<\/li>\n<li><strong>Cutting technique<\/strong>: continuous blades for straight kerfs, wire loops for large or irregular geometries, stitch cuts for thick sections.<\/li>\n<\/ul>\n<h2>Use in concrete demolition and special demolition<\/h2>\n<p>In <strong>concrete demolition<\/strong> and <strong>special demolition<\/strong>, saw cuts create clear separation joints, limit crack formation, and avoid uncontrolled load redistribution. After sawing, components can be selectively separated using <strong>concrete shears<\/strong> or broken with <strong>stone and concrete splitters<\/strong>. This combination reduces vibrations, is highly predictable, and enables selective work near sensitive infrastructure. Where prestressing or high reinforcement ratios are expected, preliminary investigations and a sequenced cutting and releasing concept reduce risks and ensure stability during every phase.<\/p>\n<h3>Typical work steps in deconstruction<\/h3>\n<ul>\n<li>Component analysis: Determine material, reinforcement, load path, cut line, and shoring.<\/li>\n<li>Marking and setup: Guide rails, anchor points, water or dust management.<\/li>\n<li>Cutting: Selection of blade diameter, segment bond, and cooling; controlled feed.<\/li>\n<li>Relieving and releasing: Use <strong>stone splitting cylinders<\/strong> or <strong>concrete shears<\/strong> from Darda GmbH along the joint.<\/li>\n<li>Removal: Safe lowering, downsizing with <strong>combination shears<\/strong> or <strong>Multi Cutters<\/strong>, and material sorting.<\/li>\n<li>Monitoring and documentation: Vibration and noise logs, photo records, tolerance checks.<\/li>\n<li>Waste handling and disposal: Slurry separation, recycling routes, and compliant transport.<\/li>\n<\/ul>\n<h2>Rock excavation and tunnel construction: sawing in a controlled system<\/h2>\n<p>In <strong>rock excavation and tunnel construction<\/strong>, wire-saw cuts or targeted separation joints serve as preparation for controlled splitting. Especially where vibration limits apply or in urban areas, blasting technology is replaced by a combined method of sawing and hydraulic splitting. <strong>Stone and concrete splitters<\/strong> powered by <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/strong> from Darda GmbH extend saw cuts into fracture lines with defined propagation &#8211; crucial for safety and stability control in rock masses. Geotechnical mapping of discontinuities and groundwater conditions informs the alignment of saw joints and the placement of splitting cylinders for reproducible breakage planes.<\/p>\n<h2>Natural stone extraction and dimension stone processing<\/h2>\n<p>In <strong>natural stone extraction<\/strong>, bedding and joints are used to pre-cut large-format blocks with wire saws. Rows of boreholes then allow the placement of <strong>stone splitting cylinders<\/strong> that cleanly release the block along the saw cuts. In dimension stone processing, table and bridge saws ensure square cuts; subsequent processing is controlled to minimize edge chipping. Orientation to bedding and vein patterns improves yield and reduces waste, while consistent feed and cooling enhance surface finish for further processing steps.<\/p>\n<h2>Tool selection: diamond, bond, and segment geometry<\/h2>\n<p>The choice of <em>diamond cutting blade<\/em> or wire determines cutting speed, cleanliness, and tool life. Hard, low-abrasion rocks (granite) require softer bonds to continuously expose diamonds; abrasive materials (calcium silicate brick) need harder bonds to resist rapid wear. Segment height, kerf width, and undercut protection influence guidance, cooling, and the kerf itself. A smooth-running blade body increases dimensional accuracy and reduces vibration, which benefits subsequent work with <strong>concrete shears<\/strong>. Matching diamond size and concentration to the matrix supports consistent chip formation, while ventilated cores and expansion slots help manage thermal load.<\/p>\n<h3>Key selection criteria<\/h3>\n<ul>\n<li>Diamond size and concentration: coarse for aggressive stock removal, fine for smoother finishes.<\/li>\n<li>Bond hardness: softer for dense, hard stone; harder for abrasive aggregates or masonry.<\/li>\n<li>Core design: tensioning and slot configuration for stable runout and improved cooling.<\/li>\n<\/ul>\n<h3>Parameters for precise cuts<\/h3>\n<ul>\n<li>Peripheral speed: matched to tool and material to avoid friction heat and glazing.<\/li>\n<li>Feed rate: even, without jerks; reduce in time when hitting reinforcement.<\/li>\n<li>Cooling: sufficient water flow for heat dissipation and slurry transport.<\/li>\n<li>Guidance: stable rail or table support; plane-parallel infeed for rectangular elements.<\/li>\n<li>Entry and exit strategy: ramped entry and backed exit edges to prevent breakout.<\/li>\n<li>Stitch cutting sequence: overlapping passes to reach depth in thick sections while controlling heat.<\/li>\n<\/ul>\n<h2>Wet and dry cutting: dust and slurry management<\/h2>\n<p>Wet cutting binds fine dust, improves tool life, and enhances surface finish. The resulting saw slurry must be collected in a controlled manner and properly disposed of. Where dry cutting is planned, high-performance extraction and suitable filtration are important. Good emission control improves visibility, dimensional accuracy, and occupational health &#8211; especially indoors during <strong>strip-out and cutting<\/strong>. Clarification of process water, pH adjustment where required, and re-use loops reduce consumption and environmental impact.<\/p>\n<h2>Sawing and splitting in combination<\/h2>\n<p>Instead of deep full-depth cuts, <em>relief or starter cuts<\/em> are often produced and then extended to full separations with <strong>stone and concrete splitters<\/strong>. Advantages include lower noise and dust, smaller kerfs, and reduced tool wear. With <strong>hydraulic power packs<\/strong>, multiple <strong>stone splitting cylinders<\/strong> can be deployed strategically along the saw path to open components in a controlled manner. Afterwards, <strong>concrete shears<\/strong> engage precisely in the weakened structure to release sections in a material-appropriate way. Structural checks between stages confirm that temporary conditions remain within allowable limits before the next separation step starts.<\/p>\n<h2>Reinforced concrete: detecting and controlling reinforcement<\/h2>\n<p>In reinforced concrete, detecting reinforcement before cutting is essential. Locating helps prevent diamond damage and optimize the cut path. When the stone saw encounters reinforcement, a reduced feed is advisable. After sawing, protruding bars can be separated with <strong>steel shears<\/strong> or <strong>combination shears<\/strong> from Darda GmbH; for complex nodes, <strong>Multi Cutters<\/strong> excel. The interplay of a precise separation joint and suitable shear geometry increases efficiency and control over the component. Non-destructive testing methods such as cover meters and ground-penetrating radar assist in mapping bar positions, cover, and potential embedded services to refine sequencing.<\/p>\n<h2>Special applications: confined spaces and sensitive environments<\/h2>\n<p>In plants, hospitals, or heritage buildings, vibrations, noise, and emissions are severely limited. Short saw cuts, segmented components, and follow-up with <strong>stone and concrete splitters<\/strong> or <strong>concrete shears<\/strong> allow a step-by-step, low-risk approach. Compact hydraulic solutions support operation in areas with restricted power supply or limited access. Remote operation, low-emission drives, and targeted water capture enable precise work with minimal disruption to ongoing operations.<\/p>\n<h2>Cost-effectiveness and project planning<\/h2>\n<p>Cost-effectiveness depends on accessibility, material, cutting length, required accuracy, and post-processing. Well-thought-out cutting plans reduce blind and duplicate cuts. The combination of sawing and splitting lowers tool wear, shortens cycle times, and minimizes lifting equipment needs, as smaller segments can be purposefully released and moved. The bid should account for setup times, water and slurry management, disposal, and component tolerances. Transparent productivity assumptions (e.g., cutting meters per hour by thickness class) and contingency for unknowns improve forecasting and risk control.<\/p>\n<h2>Safety and health protection<\/h2>\n<p>Safe operation requires personal protective equipment, firmly anchored guidance systems, and securing released components against tipping or falling. Keep water and electricity separate, and secure hose and cable routes. During the transition from sawing to gripping or splitting, the danger zone must be kept clear. Safety notes are always general; specific measures depend on the site, method, and applicable regulations.<\/p>\n<ul>\n<li>PPE and hygiene: eye, hearing, respiratory, and cut protection matched to the method.<\/li>\n<li>Lockout and isolation: verify zero-energy state and safe routing of cables and hoses.<\/li>\n<li>Exclusion zones: define, mark, and supervise drop and swing areas during release.<\/li>\n<\/ul>\n<h2>Maintenance, care, and tool life<\/h2>\n<p>Diamond tools benefit from correctly selected bond and regular <em>self-sharpening<\/em> on suitable, abrasive materials if segments are glazed. Clean flanges, proper runout, and intact bearings increase cut quality and reduce heat. After use, the machine and cooling circuit must be cleaned to prevent deposits and corrosion. Documented maintenance extends service life and minimizes downtime &#8211; especially when stone saws operate in combination with <strong>concrete shears<\/strong> and <strong>stone and concrete splitters<\/strong> from Darda GmbH in tightly scheduled projects. Water quality management, correct storage of blades and wires, and hour-based inspections help maintain consistent performance.<\/p>\n<h2>Typical fault patterns and remedies<\/h2>\n<ul>\n<li>Glazed segments: bond too hard or feed too low &#8211; dress on abrasive material, adjust bond.<\/li>\n<li>Side breakout\/edge chipping: unstable guidance or feed too high &#8211; stabilize guidance, reduce feed, improve cooling.<\/li>\n<li>Drifting cuts: insufficient fixing &#8211; align rails precisely, multi-point fixing, check blade condition.<\/li>\n<li>Overheating\/discoloration: insufficient cooling &#8211; increase water flow, adjust cutting intervals.<\/li>\n<li>Snagging on reinforcement: incorrect approach &#8211; throttle feed, restart the cut, pre-cut with <strong>steel shears<\/strong> if necessary.<\/li>\n<li>Uneven segment wear: misalignment or warped core &#8211; correct guidance, verify flange flatness, replace damaged blades.<\/li>\n<li>Blade wobble\/runout: contaminated or damaged flanges &#8211; clean interfaces, check tightening torque, replace bearings if needed.<\/li>\n<li>Low penetration rate: speed-feed mismatch &#8211; raise feed within limits, optimize peripheral speed, verify bond suitability.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A stone saw is a central tool for the separating processing of rock and concrete &#8211; from precise joints in natural stone to wall and ceiling cuts in reinforced concrete to openings in special demolition. In practice, it often forms a process chain with other hydraulic tools: Saw cuts define <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-saw\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19903","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stone Saw - Diamond Cutting for Rock &amp; Concrete<\/title>\n<meta name=\"description\" content=\"Discover the stone saw \u2713 cutting tool for rock &amp; concrete with precise cuts, low vibration &amp; wet cutting guidance.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-saw\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stone Saw - Diamond Cutting for Rock &amp; Concrete\" \/>\n<meta property=\"og:description\" content=\"Discover the stone saw \u2713 cutting tool for rock &amp; concrete with precise cuts, low vibration &amp; wet cutting guidance.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/stone-saw\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-29T12:21:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-saw\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-saw\",\"name\":\"Stone Saw - Diamond Cutting for Rock & Concrete\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-31T11:09:36+00:00\",\"dateModified\":\"2026-05-29T12:21:03+00:00\",\"description\":\"Discover the stone saw \u2713 cutting tool for rock & concrete with precise cuts, low vibration & wet cutting guidance.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-saw#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-saw\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-saw#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Stone saw\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stone Saw - Diamond Cutting for Rock & Concrete","description":"Discover the stone saw \u2713 cutting tool for rock & concrete with precise cuts, low vibration & wet cutting guidance.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/stone-saw","og_locale":"en_US","og_type":"article","og_title":"Stone Saw - Diamond Cutting for Rock & Concrete","og_description":"Discover the stone saw \u2713 cutting tool for rock & concrete with precise cuts, low vibration & wet cutting guidance.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/stone-saw","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-29T12:21:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-saw","url":"https:\/\/www.darda.de\/en\/knowledge\/stone-saw","name":"Stone Saw - Diamond Cutting for Rock & Concrete","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-31T11:09:36+00:00","dateModified":"2026-05-29T12:21:03+00:00","description":"Discover the stone saw \u2713 cutting tool for rock & concrete with precise cuts, low vibration & wet cutting guidance.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-saw#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/stone-saw"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-saw#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Stone saw"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19903","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19903"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19903\/revisions"}],"predecessor-version":[{"id":27895,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19903\/revisions\/27895"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19903"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}