{"id":19902,"date":"2025-12-31T14:52:58","date_gmt":"2025-12-31T13:52:58","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19902"},"modified":"2026-05-29T10:52:02","modified_gmt":"2026-05-29T08:52:02","slug":"stone-splitting","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/stone-splitting","title":{"rendered":"Stone splitting"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Stone splitting refers to the controlled separation of rock, natural stone, and concrete by inducing targeted crack formation. In practice it enables precise deconstruction, the extraction of natural stone, and low-vibration removal in sensitive environments. Especially in densely built areas, in tunnel construction, or during interior demolition, the method has become established because it operates with low noise emission and low vibration levels, protecting structures, infrastructure, and surroundings. In projects in the application fields of concrete demolition and special demolition as well as rock excavation and tunnel construction, <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> are frequently used; with reinforced concrete, <em>concrete demolition shears<\/em> complement the process by releasing residual bonds and reducing cross-sections. Additional benefits include minimal flying debris, good compliance with vibration and noise limits, and a predictable crack path that supports selective, low-damage removal.<\/p>\n<h2>Definition: What is meant by stone splitting?<\/h2>\n<p>Stone splitting is the introduction of tensile stresses into brittle material until a predictable crack forms and a block separates from the mass. Technically, this is usually achieved by wedge forces inserted into previously drilled holes. Stone splitting differs from blasting (impulsive energy), sawing (cutting removal) or milling (material removal) through the <em>controlled fracture<\/em> along a predefined drilling pattern. It is suitable for rock such as granite, limestone, sandstone, and also for massive and reinforced concrete. In practice, <strong>hydraulic splitters<\/strong> with matching <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/strong> or mechanical wedge systems are used; with concrete structures, <strong>concrete demolition shears<\/strong> are often used afterward to release reinforcement and downsize material. Typical drill-hole diameters range from approximately 30 to 50 mm for compact splitters, with hole depths commonly at 70 to 90 percent of the component thickness.<\/p>\n<h2>Physical principles and methods of stone splitting<\/h2>\n<p>Stone and concrete exhibit high compressive strengths but significantly lower tensile strengths. Stone splitting exploits this material contrast: a wedge transfers pressure radially into the drill hole, causing tensile stresses to build up in the surrounding material. Once these exceed the local tensile strength, a crack forms and propagates preferentially along the weakest lines (bedding planes, joints, drilling pattern). Material anisotropy, moisture, temperature, and existing free faces influence crack formation. In concrete, reinforcement must additionally be considered, as it can hinder crack propagation; combined sequences are useful here, where splitting is followed by separation with <em>concrete demolition shears<\/em>. In practice, crack guidance is enhanced by consistent hole alignment, uniform hole depth, and steady, incremental pressurization.<\/p>\n<h3>Mechanical wedge methods<\/h3>\n<p>The classical method uses wedges and spring sets that are placed and driven manually into drill holes. It is suitable for smaller cross-sections, repairs, and delicate work on sensitive components. The achievable splitting forces are limited, but the equipment is light and mobile. For fine work on natural stone with pronounced bedding, mechanical wedges allow careful orientation along fabric planes.<\/p>\n<h3>Hydraulic stone and concrete splitters<\/h3>\n<p>Hydraulic <strong>hydraulic splitters<\/strong> consist of a <strong>hydraulic splitter<\/strong> with wedge set connected via high-pressure hoses to a <strong>hydraulic power pack<\/strong>. The wedge extends in the drill hole, transmits high forces, and thereby produces reproducible cracks. Advantages include high splitting performance, low vibration levels, and the ability to work in confined conditions or inside buildings. The drill-hole geometry (diameter, depth), the drilling pattern, and the sequence of splitting operations determine the quality of the separation joint. For thicker or highly reinforced sections, multi-row drilling patterns and staged splitting improve control and reduce residual bonds.<\/p>\n<h3>Interaction with concrete demolition shears<\/h3>\n<p>For the deconstruction of reinforced concrete, the combination proves effective: first the cross-section is broken up by splitting, then <strong>concrete demolition shears<\/strong> engage the fracture edges, shear residual bonds, and expose reinforcing steel. In this way, components can be separated selectively, openings created, or massive foundations converted into transportable pieces. Depending on the task, additional hydraulic shears, multi cutters, or <strong>steel shear<\/strong> can be used to cut metal components cleanly. Where necessary, reinforcing bars can be pre-scored to prevent rebar from bridging the crack and to ensure a clean separation line.<\/p>\n<h2>Planning: drilling pattern, hole spacing, and splitting strategy<\/h2>\n<p>The quality of stone splitting stands and falls with planning. Decisive factors are knowledge of the material, a suitable drilling pattern, and the alignment of the split line. Free faces facilitate crack propagation, natural joints and bedding can be utilized, while reinforcement and embedded parts should be deliberately bypassed or subsequently separated with <em>concrete demolition shears<\/em>. For concrete structures, reinforcement detection by cover meters or scanning supports the accurate placement of holes and minimizes bit deflection and tool wear.<\/p>\n<ul>\n<li>Examination of the structure or rock mass: material, fabric, degree of reinforcement, embedded components<\/li>\n<li>Definition of the drilling pattern: hole diameter, hole depth, rows, edge distances<\/li>\n<li>Alignment to the desired fracture line: use of free edges and weak zones<\/li>\n<li>Splitting sequence: from free to fixed to promote controlled crack propagation<\/li>\n<li>Safety distances and load transfer during the process<\/li>\n<li>Typical starting points: distance between holes at around 8 to 12 times the hole diameter in hard rock, somewhat closer in heterogeneous concrete; maintain a sufficient edge distance to prevent spalling<\/li>\n<\/ul>\n<h2>Workflow in practice<\/h2>\n<ol>\n<li>Demarcate and secure the work area; locate utility lines, voids, and embedded components.<\/li>\n<li>Drill according to the drilling pattern; remove drill dust and clean the holes.<\/li>\n<li>Insert wedge systems or <strong>hydraulic splitters<\/strong>; connect to the <strong>hydraulic power pack<\/strong>.<\/li>\n<li>Build up <strong>hydraulic pressure<\/strong> in controlled stages; observe crack formation.<\/li>\n<li>Secondary breakage: release the sections and separate residual bonds, e.g., with <strong>concrete demolition shears<\/strong> or hydraulic shears.<\/li>\n<li>Sort and haul away the pieces; if necessary, finish edges and bearing surfaces.<\/li>\n<li>Document drilling pattern, pressures, and sequence; secure the area against subsequent movements during curing or temperature changes.<\/li>\n<\/ol>\n<h3>Typical influencing factors<\/h3>\n<p>Relevant factors include drill-hole quality (straightness, cleanliness), hole spacing in relation to material thickness, the presence of free faces, and the sequence of pressurization. Uniform, stepwise pressure increase promotes clean fracture surfaces and reduces uncontrolled secondary cracks. Environmental conditions matter: very low temperatures increase brittleness yet can impair hydraulic performance, while saturated materials reduce friction and may delay crack initiation.<\/p>\n<h2>Fields of application and typical uses<\/h2>\n<p>Stone splitting covers numerous tasks from inner-city deconstruction to the extraction of natural stone. The following overview shows how methods and equipment interlock.<\/p>\n<ul>\n<li>Concrete demolition and special demolition: massive foundations, walls, or slabs are pre-broken by <strong>hydraulic splitters<\/strong>. <strong>concrete demolition shears<\/strong> separate the reinforcement and downsize the chunks for haulage. For steel components, <strong>steel shear<\/strong> or hydraulic shears provide support.<\/li>\n<li>Interior demolition and cutting: in buildings with strict vibration limits, splitting enables material-friendly removal. Afterwards, concrete demolition shears and hydraulic shears create space for new installations or openings.<\/li>\n<li>Rock excavation and tunnel construction: advance and profile corrections can be carried out with low vibration levels, especially near sensitive infrastructure. The drilling pattern follows geology and the desired contour; the splitting sequence is aligned with the tunnel support concept and tunnel heading.<\/li>\n<li>Natural stone extraction: raw blocks are split along natural bedding planes. Wedge orientation follows the fabric; downstream processing (sawing, second-stage splitting) prepares transport formats.<\/li>\n<li>Special applications: in areas with explosion risk (ATEX zone), monument protection, or limited work windows, splitting enables controlled work with low emissions. Depending on the task, supplementary cutting of metal components can be performed with a cutting torch or <strong>steel shear<\/strong>.<\/li>\n<li>Water and infrastructure works: selective separation around pipelines, bridges, or quay walls is achievable with low-vibration, low-splash techniques and controlled fragment sizes.<\/li>\n<\/ul>\n<h2>Safety and environmental notes<\/h2>\n<p>The following notes are general in nature and do not replace a project-specific hazard analysis. Stone splitting generates stresses and potential movements in the component; therefore, exclusion zones, supports, and load paths must be defined in advance. Hydraulic systems are pressurized and require regular inspections. Environmental protection includes dust control, noise mitigation, and spill prevention when operating hydraulic systems.<\/p>\n<ul>\n<li>Personal protective equipment: safety glasses, hearing protection, gloves, safety footwear, and respiratory protection where necessary.<\/li>\n<li>Hydraulic safety: check hoses\/fittings, build pressure in a controlled manner, rectify leaks immediately.<\/li>\n<li>Crack monitoring: observe split joints, secure against sliding and tipping, never stand under suspended loads.<\/li>\n<li>Dust and noise: use dust extraction or binding for drill dust; ensure adequate ventilation indoors.<\/li>\n<li>Regulatory framework: observe local requirements regarding vibrations, working hours, and disposal.<\/li>\n<li>Environmental safeguards: provide spill kits for hydraulic oil, collect drilling fines, and segregate materials for recycling.<\/li>\n<li>Electrical safety: for electric power units, ensure proper protection, cable routing, and lockout where required.<\/li>\n<\/ul>\n<h2>Equipment selection and system matching<\/h2>\n<p>Which equipment is appropriate depends on material thickness, degree of reinforcement, accessibility, and permissible emissions. Hydraulic <strong>hydraulic splitters<\/strong> with matching <strong>hydraulic power packs<\/strong> deliver high splitting forces with a compact setup. For heavily reinforced cross-sections, the combination with <strong>concrete demolition shears<\/strong> is recommended to grip the resulting fracture edges effectively. Hydraulic shears, <strong>steel shear<\/strong>, or a cutting torch complement the setup when metal structures must be separated selectively. As a planning aid, align hole diameter to the wedge set, ensure adequate hose lengths and pressure ratings, and confirm that the power unit output matches the splitter cylinder requirements.<\/p>\n<h3>Hydraulic power packs and accessories<\/h3>\n<p>The choice of power pack is based on the required flow rate and the site environment. Electrically driven units are advantageous indoors; mobile solutions are suitable for remote sites. Important are robust couplings, sufficient hose lengths, and a sensible set of wedges and spreaders. Regular care &#8211; such as cleaning drill holes, checking seals, and proper storage of wedges &#8211; increases reliability. Periodic pressure gauge calibration and visual checks of wedge faces help maintain consistent performance.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>A documented drilling pattern, recorded parameters (hole spacing, sequence, pressure stages), and observation of crack formation ensure reproducibility. For demanding components, a field trial\/test area is advisable to verify material response and calibrate the method. The results form the basis for a safe, predictable process. Complementary documentation can include as-built sketches, photo records before and after splitting, and acceptance of edge quality where bearing surfaces are required.<\/p>\n<h2>Challenges and error avoidance<\/h2>\n<ul>\n<li>Excessive hole spacing leads to incomplete cracks and uncontrolled secondary fractures.<\/li>\n<li>Incorrect alignment relative to bedding or joint planes increases the required force and degrades fracture quality.<\/li>\n<li>Contaminated or wet drill holes reduce friction and can cause wedges to jam.<\/li>\n<li>Reinforcement not considered: crack is blocked; plan subsequent work with <strong>concrete demolition shears<\/strong>.<\/li>\n<li>Insufficient shoring: risk of tipping and falling of the segments.<\/li>\n<li>Inadequate free faces: crack energy is dissipated; create relief cuts or additional holes where feasible.<\/li>\n<li>Overly rapid pressurization: increases the likelihood of uncontrolled crack branching and local spalling.<\/li>\n<\/ul>\n<h3>Practical tips<\/h3>\n<p>Keep drill holes dry and clean, lightly lubricate wedge surfaces, build pressure in stages, and adhere consistently to the splitting sequence. Create free edges where possible and secure segments early against uncontrolled movement. For repeatable results, maintain uniform hole depth and angle, and verify wedge set compatibility with the selected hole diameter.<\/p>\n<h2>Sustainability aspects<\/h2>\n<p>Stone splitting operates with low vibration levels and material selectivity. This favors the preservation of adjacent components, reduces secondary damage, and facilitates the clean separation of construction materials. Combined with electrically powered <strong>hydraulic power packs<\/strong>, emissions can be reduced further; targeted downsizing also supports short transport routes and efficient recycling. Clean interfaces between materials simplify sorting, and reduced water use compared with slurry-generating methods benefits resource efficiency.<\/p>\n<h2>Terminological distinction from adjacent separation techniques<\/h2>\n<p>Compared with blasting technology, splitting offers a predictable course with low vibration levels; unlike sawing or the wire sawing method, little slurry is produced, and tool use is concentrated on drilling and wedge technique. Core drilling or milling are sensible where openings require exact contours. Often, the combination of several methods &#8211; splitting, shears, cutting &#8211; is the most efficient route to a safe, clean result. Selecting the method according to edge quality, permissible emissions, and schedule constraints increases reliability and cost-effectiveness.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Stone splitting refers to the controlled separation of rock, natural stone, and concrete by inducing targeted crack formation. In practice it enables precise deconstruction, the extraction of natural stone, and low-vibration removal in sensitive environments. Especially in densely built areas, in tunnel construction, or during interior demolition, the method has <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-splitting\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19902","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stone Splitting for Rock &amp; Concrete Demolition<\/title>\n<meta name=\"description\" content=\"Achieve controlled rock &amp; concrete separation for demolition \u2713 Stone splitting delivers low vibration &amp; precision.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-splitting\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stone Splitting for Rock &amp; Concrete Demolition\" \/>\n<meta property=\"og:description\" content=\"Achieve controlled rock &amp; concrete separation for demolition \u2713 Stone splitting delivers low vibration &amp; precision.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/stone-splitting\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-29T08:52:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-splitting\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-splitting\",\"name\":\"Stone Splitting for Rock & Concrete Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-31T13:52:58+00:00\",\"dateModified\":\"2026-05-29T08:52:02+00:00\",\"description\":\"Achieve controlled rock & concrete separation for demolition \u2713 Stone splitting delivers low vibration & precision.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-splitting#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-splitting\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-splitting#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Stone splitting\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stone Splitting for Rock & Concrete Demolition","description":"Achieve controlled rock & concrete separation for demolition \u2713 Stone splitting delivers low vibration & precision.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/stone-splitting","og_locale":"en_US","og_type":"article","og_title":"Stone Splitting for Rock & Concrete Demolition","og_description":"Achieve controlled rock & concrete separation for demolition \u2713 Stone splitting delivers low vibration & precision.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/stone-splitting","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-29T08:52:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-splitting","url":"https:\/\/www.darda.de\/en\/knowledge\/stone-splitting","name":"Stone Splitting for Rock & Concrete Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-31T13:52:58+00:00","dateModified":"2026-05-29T08:52:02+00:00","description":"Achieve controlled rock & concrete separation for demolition \u2713 Stone splitting delivers low vibration & precision.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-splitting#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/stone-splitting"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-splitting#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Stone splitting"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19902","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19902"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19902\/revisions"}],"predecessor-version":[{"id":27881,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19902\/revisions\/27881"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19902"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}