{"id":19898,"date":"2025-12-30T11:33:06","date_gmt":"2025-12-30T10:33:06","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19898"},"modified":"2026-05-28T17:45:03","modified_gmt":"2026-05-28T15:45:03","slug":"rockfall-net","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/rockfall-net","title":{"rendered":"Rockfall net"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Rockfall nets are key elements of slope stabilization and rockfall protection. They are installed on rocky slopes, along road and rail corridors, in quarries, and at tunnel portals to guide or stop falling rock blocks in a controlled manner. In construction and deconstruction projects, planning, geology, and robust engineering meet: Before installation, loose sections are often mechanically removed or relieved so that a net operates reliably. In the context of <em>rock breakout<\/em> and <em>tunnel construction<\/em> practice, hydraulic tools such as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> or <strong>concrete demolition shears<\/strong> are often used &#8211; not as part of the net, but as preparatory measures to expose components, make anchor zones accessible, or release unstable blocks in a controlled way. In practice, rockfall nets are also referred to as <em>rockfall barriers<\/em> or <em>rockfall fences<\/em> where they act as defined catch systems. Correctly dimensioned systems reduce residual risk and help maintain corridor availability over the full service life.<\/p>\n<h2>Definition: What is a rockfall net?<\/h2>\n<p>A rockfall net is a mesh made of high-strength wires or ropes that is installed on slopes and rock faces to <em>guide<\/em> (drapery) or <em>stop<\/em> (catch system) rockfall. Broadly, two operating principles are distinguished: passive systems such as drapery nets, which retain loose rock at the surface and lead it to a defined deposition area, and dynamic catch fences with posts, cables, brake elements, and anchors that absorb the kinetic energy of falling blocks. Depending on geometry, energy class, and the hazard collective, nets are anchored at the crest and toe and fixed to the ground via edge and support cables to transfer load. Rockfall nets are not decorative or dust elements, but geotechnical protection systems whose function is based on the controlled redirection and dissipation of energy. In recognized practice, systems are validated by full-scale testing for defined energy levels stated in kilojoules, and the verified <em>deformation height<\/em> and runout envelope must be compatible with the protected corridor. Drapery nets are not debris-flow or mudflow barriers and should not be used as substitutes for those hazards.<\/p>\n<h2>Design, materials, and working principle<\/h2>\n<p>A rockfall net typically consists of a high-tensile wire or rope mesh (mesh openings), edge and support cables, connecting elements, anchors, and, where applicable, posts with brake elements. The mesh can be executed as wire mesh, ring net, or rope net. Galvanization, Zn-Al coatings, or stainless steels improve corrosion resistance. Energy absorption results from the interaction of mesh deformation, cable elongation, friction in clamps, and controlled activation of brake elements. For draperies, the focus is on surface stabilization and guidance; for catch fences, on defined load transfer into the ground. Detailing such as mesh overlap orientation, consistent edge cable continuity, and adequate ground contact lines at the toe are central to performance.<\/p>\n<ul>\n<li><strong>Wire mesh:<\/strong> Dense aperture, good surface coverage for small to medium blocks; low self-weight, efficient as drapery and as primary net in lower energy classes.<\/li>\n<li><strong>Ring net:<\/strong> High deformability and multi-impact capacity; favorable for dynamic barriers with significant energy demand and variable impact angles.<\/li>\n<li><strong>Rope net:<\/strong> Robust nodes and high tensile capacity; useful where large apertures and reduced wind load are beneficial.<\/li>\n<\/ul>\n<h2>System types and deployment logic<\/h2>\n<p>In practice, different nets are combined depending on terrain, rock type, and protection needs. Drapery nets reduce the risk from small and medium blockfall and prevent undermining of the surface. Dynamic barriers are positioned within the active rockfall path to stop individual blocks at high velocity. Static barriers with massive posts are used in areas with lower energy but high event frequency. Selection follows a hazard analysis that considers block sizes, fall heights, impact angles, energy classes, and maintenance access. Hybrid layouts are common, for example source-area drapery combined with a downslope catch fence as redundancy. Path modeling supports siting, fence height, and verification of clearance to traffic envelopes and service routes.<\/p>\n<h2>Fields of application and interfaces with construction and deconstruction works<\/h2>\n<p>Rockfall nets are used on slopes along transport routes, at portal structures, in quarries, and for temporary construction states. At several points, protection systems interface with typical tasks from demolition and special foundation works:<\/p>\n<ul>\n<li><strong>Rock breakout and tunnel construction:<\/strong> Before installing the net, loose blocks are often detached in a controlled manner. <em>Rock and concrete splitters<\/em> as well as <em>rock splitting cylinders<\/em> enable low-vibration separation when blasting is not possible or undesirable. At tunnel portals, nets serve as temporary or permanent rockfall protection. This aligns with practices in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>.<\/li>\n<li><strong>Concrete demolition and specialized deconstruction:<\/strong> If anchor heads must be exposed or existing walls on slopes partially deconstructed, <em>concrete demolition shears<\/em> are used. This allows anchor plates or bearing zones for new edge cables to be created.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> In the vicinity of existing structures, steel components or reinforcement are adapted. <em>Steel shears<\/em>, <em>combination shears<\/em>, and <em>multi cutters<\/em> can assist with work on beams, brackets, or obsolete protection structures without excessively loading the slope.<\/li>\n<li><strong>Natural stone extraction:<\/strong> In quarries, draperies secure quarry faces and reduce downtime. Mechanical preparation with splitting techniques can steer detachments in a targeted manner.<\/li>\n<li><strong>Special use:<\/strong> Temporary nets in construction states, for example during the deconstruction of retaining structures, are planned project-specifically. <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">mobile hydraulic power units<\/a><\/em> supply the required tools for preparatory measures independently and mobilly.<\/li>\n<li><strong>Infrastructure corridors:<\/strong> Protection of structures near lineside equipment and at cut widenings where residual risks must be minimized for operations.<\/li>\n<li><strong>Temporary slope stabilization:<\/strong> Short-term safeguarding during excavation, portal enlargements, or fa\u00c3\u00a7ade removal, with designs tailored to reversible installation.<\/li>\n<\/ul>\n<h2>Planning and design<\/h2>\n<p>The effectiveness of a rockfall net is decided during planning. The basis is a geotechnical assessment of the slope with mapping of discontinuities, block sizes, and potential fall paths. Building on this, the selection of system type, geometry, and energy class follows. The goal is a balanced ratio of protective effect, durability, accessibility, and cost-effectiveness. Analytical and numerical tools include trajectory simulations, energy derivation from block size and height, anchor capacity checks, and deformation height verification. Where public corridors are affected, minimum clearances and residual runout areas must be demonstrated.<\/p>\n<h3>Key planning steps<\/h3>\n<ol>\n<li>Hazard analysis with determination of block volumes, fall heights, impact energies, and event probability<\/li>\n<li>Definition of protection goals (e.g., containment up to a specified energy absorption, allowance for ductility)<\/li>\n<li>System selection and preliminary design (drapery, dynamic barrier, combinations)<\/li>\n<li>Verification of load transfer via cables, posts, and anchors into the ground<\/li>\n<li>Detailing of edge connections, overlaps, crossings, and maintenance access<\/li>\n<li>Definition of inspection intervals and accessibility for upkeep<\/li>\n<li>Trajectory simulation and definition of deformation height and residual runout envelopes for clearance verification<\/li>\n<li>Interface planning with drainage, scaling, and site logistics to avoid undermining system function<\/li>\n<li>Documentation concept for as-built handover, spare parts, and baseline condition records<\/li>\n<\/ol>\n<h3>Selection criteria<\/h3>\n<ul>\n<li><strong>Geology:<\/strong> Rock quality, bedding, joints, degree of weathering<\/li>\n<li><strong>Topography:<\/strong> Inclination, steps, gullies, potential deflections<\/li>\n<li><strong>Energy demand:<\/strong> Kinetic energy, impact angle, multi-impact capacity<\/li>\n<li><strong>Durability:<\/strong> Corrosion exposure, coatings, service life<\/li>\n<li><strong>Constructability:<\/strong> Access, lifting and safety equipment, weather<\/li>\n<li><strong>Maintenance:<\/strong> Visual inspection, clearing, replaceability of components<\/li>\n<li><strong>Consequence and exposure:<\/strong> Sensitivity of protected assets and acceptable residual risk<\/li>\n<li><strong>Hydrology:<\/strong> Surface runoff, freeze-thaw, potential for fine material accumulation<\/li>\n<li><strong>Vegetation dynamics:<\/strong> Growth, root action, and biofouling at contact lines<\/li>\n<\/ul>\n<h2>Installation and construction sequence<\/h2>\n<p>Installation proceeds stepwise and is weather-dependent. A typical sequence includes:<\/p>\n<ol>\n<li>Securing the construction site and establishing protection and exclusion zones<\/li>\n<li><strong>Preparatory clearing:<\/strong> Removing loose sections; if necessary, detaching them in a low-vibration manner with <em>rock and concrete splitters<\/em> to avoid uncontrolled detachments<\/li>\n<li>Drilling and installing the anchors, including verification of setting forces<\/li>\n<li>Installing posts and routing the support cables, installing brake elements<\/li>\n<li>Placing the net, aligning, clamping, and connecting it to edge and support cables<\/li>\n<li>Forming overlaps, connections to structures, and toe-side terminations<\/li>\n<li>Functional test, documentation, and handover<\/li>\n<li>As-built survey with anchor identification, torque values, brake element status, and baseline photography<\/li>\n<\/ol>\n<h3>Occupational safety<\/h3>\n<p>Work often takes place in areas with a risk of falling. Personal <em>fall protection<\/em> equipment, rope-supported access, rockfall protection for the team, and coordinated communication channels are essential. Sensitive operations such as detaching blocks should be performed step by step with adequate retreat areas. Weather, lightning, and rock moisture must be considered in access and tool selection to avoid uncontrolled loading of the slope.<\/p>\n<ul>\n<li>Define and signpost exclusion zones sized for worst-case bounce radii and tool throw ranges<\/li>\n<li>Use lockout for hydraulic and cutting equipment during repositioning and rope maneuvers<\/li>\n<li>Coordinate radio protocols for slope clearance and staged release before impact-critical work<\/li>\n<\/ul>\n<h2>Operation, inspection, and maintenance<\/h2>\n<p>Rockfall nets are highly stressed systems and require regular inspections. Visual checks capture deformations, broken wires, corroded elements, loosened clamps, and damaged brake elements. After events with elevated loading, extraordinary inspections are advisable to assess energy absorbers and cable connections. Minor damage can be remedied by replacing net panels, clamps, and cable sections; larger deformations require partial or complete refurbishment. Inspection regimes typically combine routine intervals with event-driven checks, supported where suitable by UAV imaging in hazardous terrain.<\/p>\n<ul>\n<li><strong>Inspection focus:<\/strong> Deformation height indicators, post plumb and foundations, brake element activation, cable tensions, and ground contact lines<\/li>\n<li><strong>Post-event actions:<\/strong> Quarantine the impacted span, assess residual capacity, and replace activated brake elements before reopening<\/li>\n<\/ul>\n<h3>Maintenance notes<\/h3>\n<ul>\n<li>Regular clearing of accumulated material, especially in gullies and at the toe<\/li>\n<li>Monitoring contact points between net and ground to avoid chafing<\/li>\n<li>Checking anchors and anchor heads for visible defects; expose if necessary with <em>concrete demolition shears<\/em> when covers are damaged<\/li>\n<li>Documentation of all interventions to track condition and <em>residual load-bearing capacity<\/em><\/li>\n<li>Vegetation control to prevent lifting of the toe line and to maintain inspection visibility<\/li>\n<li>Check clamp torques and cable terminations per specification; retension if required<\/li>\n<li>Maintain a small stock of compatible mesh panels, clamps, and brake elements for rapid replacement<\/li>\n<\/ul>\n<h2>Typical failure modes and how to avoid them<\/h2>\n<ul>\n<li><strong>Insufficient edge connections:<\/strong> Load paths break off; remedy by continuous edge cables and overlapping net layout<\/li>\n<li><strong>Missing overlap:<\/strong> Openings allow passage; comply with minimum cover lengths<\/li>\n<li><strong>Corrosion:<\/strong> Damaged coatings lead to premature failure; repair or replace in time<\/li>\n<li><strong>Overloaded components:<\/strong> Replace energy absorbers after major events<\/li>\n<li><strong>Uncontrolled preparatory work:<\/strong> Spontaneous detachment during clearing; therefore use controlled splitting techniques and maintain safe working areas<\/li>\n<li><strong>Inadequate post foundations:<\/strong> Excessive tilting under impact; verify soil capacity and embedment during design and installation<\/li>\n<li><strong>Poor toe detailing:<\/strong> Undercutting beneath drapery; ensure ground contact and scour-resistant terminations<\/li>\n<li><strong>Improper splicing:<\/strong> Weak cable joints or clamp slip; use approved connectors and documented tightening procedures<\/li>\n<\/ul>\n<h2>Scope and combination with other measures<\/h2>\n<p>Rockfall nets are part of a broader catalog of measures. They can be combined with rock bolts, nailing, shotcrete, drainage, or protective berms. In tunnel areas, nets complement portal claddings and deflection devices. During deconstruction of existing protections, <em>steel shears<\/em>, <em>combination shears<\/em>, and <em>multi cutters<\/em> can be used to gently remove steel components at the perimeter before new net systems are installed. Integrated concepts align source control, path control, and catch measures within a slope risk management plan and support life-cycle cost efficiency.<\/p>\n<h2>Material selection, durability, and environmental aspects<\/h2>\n<p>The right material choice influences service life and environmental impact. High-strength wires with suitable coating, corrosion-resistant connectors, and fit-for-purpose anchors increase durability. Precise preparatory work &#8211; for example, selectively relieving critical blocks with hydraulic splitting techniques &#8211; reduces later interventions and <em>haulage logistics<\/em>. Maintenance-friendly details, easily accessible anchor heads, and modular spare parts facilitate resource-efficient upkeep.<\/p>\n<ul>\n<li><strong>Life-cycle perspective:<\/strong> Balance initial energy class against maintainability and replacement frequency<\/li>\n<li><strong>Surface protection:<\/strong> Use coatings suited to site salinity and wet-dry cycling to limit metal runoff<\/li>\n<li><strong>End-of-life:<\/strong> Prefer meshes and cables with established recycling pathways and traceable material grades<\/li>\n<\/ul>\n<h2>Documentation, responsibilities, and codes<\/h2>\n<p>Recognized engineering practice and project-specific requirements apply to planning, execution, and operation. Documentation of design assumptions, installation, and inspections supports safe operation. Legal requirements may vary by project and region; they should be considered early and professionally integrated into the safety concept. Where applicable, type testing, acceptance checks, and factory production control underpin conformity. Clear responsibility matrices for routine and event-driven inspections, response times, and spare part management strengthen operational reliability.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Rockfall nets are key elements of slope stabilization and rockfall protection. They are installed on rocky slopes, along road and rail corridors, in quarries, and at tunnel portals to guide or stop falling rock blocks in a controlled manner. In construction and deconstruction projects, planning, geology, and robust engineering meet: <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rockfall-net\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19898","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rockfall Net for Slope Stabilization &amp; Protection<\/title>\n<meta name=\"description\" content=\"Expert guide to the rockfall net for slope stabilization &amp; rockfall protection \u2713 types, design, installation, safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rockfall-net\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rockfall Net for Slope Stabilization &amp; Protection\" \/>\n<meta property=\"og:description\" content=\"Expert guide to the rockfall net for slope stabilization &amp; rockfall protection \u2713 types, design, installation, safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/rockfall-net\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-28T15:45:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rockfall-net\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rockfall-net\",\"name\":\"Rockfall Net for Slope Stabilization & Protection\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-30T10:33:06+00:00\",\"dateModified\":\"2026-05-28T15:45:03+00:00\",\"description\":\"Expert guide to the rockfall net for slope stabilization & rockfall protection \u2713 types, design, installation, safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rockfall-net#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rockfall-net\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rockfall-net#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Rockfall net\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rockfall Net for Slope Stabilization & Protection","description":"Expert guide to the rockfall net for slope stabilization & rockfall protection \u2713 types, design, installation, safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/rockfall-net","og_locale":"en_US","og_type":"article","og_title":"Rockfall Net for Slope Stabilization & Protection","og_description":"Expert guide to the rockfall net for slope stabilization & rockfall protection \u2713 types, design, installation, safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/rockfall-net","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-28T15:45:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/rockfall-net","url":"https:\/\/www.darda.de\/en\/knowledge\/rockfall-net","name":"Rockfall Net for Slope Stabilization & Protection","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-30T10:33:06+00:00","dateModified":"2026-05-28T15:45:03+00:00","description":"Expert guide to the rockfall net for slope stabilization & rockfall protection \u2713 types, design, installation, safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/rockfall-net#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/rockfall-net"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/rockfall-net#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Rockfall net"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19898","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19898"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19898\/revisions"}],"predecessor-version":[{"id":27877,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19898\/revisions\/27877"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19898"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}