{"id":19897,"date":"2025-12-30T12:33:56","date_gmt":"2025-12-30T11:33:56","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19897"},"modified":"2026-05-28T17:42:07","modified_gmt":"2026-05-28T15:42:07","slug":"rockfall","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/rockfall","title":{"rendered":"Rockfall"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Rockfall refers to the sudden detachment and descent of rock fragments from natural rock faces, on slopes, and on slopes cut by construction activities. Consequences range from localized material loss to significant hazards for people, infrastructure, and structures. In practice, the topic touches numerous fields of application: from <em>rock breakout and tunnel construction<\/em> to <em>natural stone extraction<\/em> and measures in <em>concrete demolition and special demolition<\/em>. A central role is played by controlled interventions in unstable zones &#8211; for example, the targeted release of blocks using <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> or the safe deconstruction of damaged components with <strong>concrete demolition shears<\/strong>. Where topography allows, combining source removal with delineated deposition zones reduces residual risk and improves operational safety.<\/p>\n<h2>Definition: What is meant by rockfall?<\/h2>\n<p>Rockfall is the release of individual stones or small blocks from a rock or slope surface that detach under the influence of gravity and, with increasing speed, roll, bounce, or slide downslope. In a narrower sense, the term covers the size range from gravel to blocks, whereas large-volume events are referred to as rock slides or rock avalanches. The path of movement (trajectory) and impact energy depend on slope angle, roughness, vegetation, block shape and size, and the characteristics of the ground. Depending on restitution characteristics and surface roughness, <strong>bounce heights<\/strong> of several meters and <strong>runout distances<\/strong> of hundreds of meters are possible even for comparatively small blocks. Rockfall affects natural rock flanks as well as man-made cuts, tunnel portals, quarries, retaining walls, and traffic routes near rock.<\/p>\n<h2>Causes and triggering mechanisms<\/h2>\n<p>Rockfall results from interactions between rock properties, discontinuities (joints, bedding planes, faults), weathering influences, and dynamic actions. Typical mechanisms include reduction of shear strength along joints, widening of cracks due to freeze-thaw cycles, elevated pore water pressures, and slope oversteepening caused by construction. Triggers are often multi-causal and seasonally variable, with increased activity after thaw periods and intense rainfall.<\/p>\n<ul>\n<li>Weather: Frost wedging, temperature fluctuations, desiccation, and chemical weathering weaken crack tips and contact surfaces.<\/li>\n<li>Water: Infiltration, ponded water, and fluctuating saturation reduce friction, increase uplift, and promote sliding or toppling failure.<\/li>\n<li>Geology: Irregular joint spacing, unfavorable bedding, and anisotropic strengths favor planar, wedge-shaped, or toppling failure modes.<\/li>\n<li>Dynamics: Vibrations from traffic, construction equipment, blasting, or earthquakes can trigger already pre-damaged blocks.<\/li>\n<li>Anthropogenic interventions: Oversteepening, undercutting, missing berms, and inadequate drainage increase the likelihood of falls.<\/li>\n<\/ul>\n<h2>Hazard assessment and stability evaluation<\/h2>\n<p>A robust evaluation combines rock mass investigation, joint and structural mapping, geomechanical classifications, and kinematic analyses of possible failure modes (sliding, toppling, wedge failure). In addition, trajectories and impact energies are modeled to size the effectiveness of planned retention or protection systems. Calibration by back-analysis of past events and test drops increases the reliability of <em>restitution coefficients<\/em>, <em>rolling friction<\/em>, and other model inputs, while risk matrices support prioritization of measures in line with tolerable risk criteria.<\/p>\n<h3>Visual and instrument-based monitoring<\/h3>\n<p>Loose blocks, fresh spalls, hollow sound, active crack traces, root pressure, or washouts are warning signs. Instrument-based methods such as strain measurements, crack width gauges, geodetic monitoring, remote sensing, and repeat image analysis (e.g., photogrammetry) capture changes. In portal areas and on steep cuts, close-interval inspections after frost or heavy rainfall events are advisable. For sensitive sites, continuous or campaign-based monitoring enables early warning and optimized timing of interventions.<\/p>\n<ul>\n<li><strong>Survey and imaging:<\/strong> Terrestrial laser scanning, structure-from-motion photogrammetry, and radar-based displacement tracking.<\/li>\n<li><strong>Contact sensors:<\/strong> Crack gauges, strain sensors, and tilt meters on blocks or anchors.<\/li>\n<li><strong>Environmental context:<\/strong> Rain gauges, temperature and moisture sensors to correlate triggering conditions.<\/li>\n<\/ul>\n<h2>Prevention and protection measures<\/h2>\n<p>Rockfall prevention combines source-related measures (removal of loose sections, stabilization) with linear or areal protection systems. Selection is based on geometry, energy classes, uses in the detachment and deposition areas, and construction-operational constraints. Design should consider both ultimate capacity for rare events and serviceability for frequent low-energy impacts, alongside safe maintenance access and inspectability.<\/p>\n<ul>\n<li>Source-based measures: Scaling, controlled splitting, rock bolting, netting, shotcrete, drainage.<\/li>\n<li>Spatial separation: Berms, catch trenches, protective embankments, targeted guidance of trajectories.<\/li>\n<li>Protection elements: Rockfall protection nets and fences, impact walls, galleries, lattice girder beams, precast concrete elements with energy-absorbing layers.<\/li>\n<li>Operational measures: Closures, temporary protective canopies, work windows subject to weather constraints.<\/li>\n<\/ul>\n<h3>Controlled deconstruction of unstable areas<\/h3>\n<p>Before passive protection systems are installed or upgraded, removing loosely stored blocks is crucial. Here, <strong>rock and concrete splitters<\/strong> with <em>stone splitting cylinders<\/em> are suitable to work precisely along natural weakness zones, with low vibration and without explosives. In portal and retaining wall areas, mechanical separation with <strong>concrete demolition shears<\/strong> is an option for damaged concrete components; reinforcement can be cut using <em>Multi Cutters<\/em> or <em>Steel Shears<\/em>. Power supply is provided by suitable <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">reliable hydraulic power units<\/a><\/em> that ensure a safe, reproducible contact pressure. Sequenced removal from top to bottom, dust suppression, and clearly defined exclusion zones reduce secondary hazards and preserve the residual load-bearing capacity of adjacent structures.<\/p>\n<h2>Rockfall in construction and deconstruction contexts<\/h2>\n<p>In <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, new joint exposures are created by excavation or cutting. Immediately after advance, scaling is common to remove loose stones. In <em>natural stone extraction<\/em>, bench heights, berms, and working distances influence residual stability; controlled splitting reduces unwanted releases. In <em>concrete demolition and special demolition<\/em>, analogous risks arise from falling fragments, for example on retaining walls, galleries, or noise barrier walls near rock faces. Temporary rockfall protection and traffic management are often decisive to maintain operations during construction phases.<\/p>\n<h3>Fields of application and typical workflows<\/h3>\n<ol>\n<li>Inspection and hazard assessment: Identification of loose sections, definition of exclusion zones and escape routes, documentation with photographs and coordinates.<\/li>\n<li>Source removal: Scaling with hand tools; where needed, precise widening of existing cracks using <strong>rock and concrete splitters<\/strong> for controlled detachment.<\/li>\n<li>Deconstruction of damaged concrete components: Selective biting with <strong>concrete demolition shears<\/strong>, separation of inserts using <em>Multi Cutters<\/em>\/<em>Steel Shears<\/em>.<\/li>\n<li>Installation of protections: Rock bolting, nets, shotcrete, and catch systems according to design, including test pulls and acceptance checks.<\/li>\n<li>Final inspection and documentation: Visual checks, measurements, and definition of inspection intervals, plus a clear maintenance plan.<\/li>\n<\/ol>\n<h2>Planning, verifications, and design considerations<\/h2>\n<p>Planning is based on recognized rules of engineering and relevant guidelines. For sizing, representative block sizes, impact energies, slope geometries, and ground parameters must be used. For interventions on rocky slopes, a plausible water and drainage concept is essential, as seepage lines and ponded water can significantly contribute to instability. Verifications for catch systems consider energy absorption, deflection, and ground anchorage. Durability, corrosion protection, redundancy, and load redistribution after impact are to be addressed, alongside constructability, access, and life-cycle inspection requirements.<\/p>\n<h2>Occupational safety and site organization<\/h2>\n<p>Safety requires consistent organization and appropriate equipment. Measures must be tailored to the local situation and may vary depending on the hazard level.<\/p>\n<ul>\n<li>Isolation and zoning: No presence in potential fall zones; clearly marked exclusion areas.<\/li>\n<li>Personal protective equipment: Hard hat with chin strap, eye protection, hand protection, stable footwear, fall protection if required.<\/li>\n<li>Work sequence: Top to bottom, inside to outside; clear signals, radio discipline, defined retreat areas.<\/li>\n<li>Weather windows: Work during ice, heavy rain, or gusty winds only after a specific assessment.<\/li>\n<li>Equipment use: Prefer low-vibration methods (e.g., <strong>rock and concrete splitters<\/strong>) in sensitive environments to avoid secondary damage.<\/li>\n<li>Supervision and communication: Appoint a lookout with stop-work authority and maintain line-of-sight or reliable radio contact.<\/li>\n<li>Emergency preparedness: Establish rescue routes, first-aid readiness, and procedures for rapid evacuation.<\/li>\n<\/ul>\n<p>Legal requirements and regulatory provisions must be checked for the specific location. The notes provided are of a general nature.<\/p>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Underestimating small blocks: Even small masses can reach high impact energies &#8211; design protection systems to real trajectories.<\/li>\n<li>Lack of water management: Clogged drains or missing drainage increase the likelihood of falls &#8211; keep drainage paths clear and add as needed.<\/li>\n<li>Insufficient scaling: Loose sections remain on the slope &#8211; work systematically from top to bottom.<\/li>\n<li>Wrong methods: Impact-intensive methods in heavily jointed rock can propagate damage &#8211; consider controlled splitting with <strong>rock and concrete splitters<\/strong> as an alternative.<\/li>\n<li>Ignoring the sequence: Secure\/remove the source first, then install passive protection systems.<\/li>\n<li>Missing calibration: Using default restitution values without back-analysis leads to mis-sized barriers.<\/li>\n<\/ul>\n<h2>Relevant terms, quantities, and parameters<\/h2>\n<p><strong>Trajectory:<\/strong> The path of a block\u2019s movement, shaped by slope form and roughness. <strong>Impact energy:<\/strong> The product of mass, velocity, and fall height &#8211; decisive for sizing catch systems. <strong>Joint system:<\/strong> Orientation, spacing, and roughness of discontinuities determine possible failure modes (planar, wedge, toppling). <strong>Berms\/catch trenches:<\/strong> Terraces or trenches for speed reduction and retention. <strong>Residual load-bearing capacity:<\/strong> Stability of the remaining material or structure after interventions; to be verified for deconstruction works with <em>concrete demolition shears<\/em>. <strong>Restitution coefficients:<\/strong> Normal and tangential parameters governing rebound behavior in trajectory models. <strong>Energy class:<\/strong> Characteristic capacity of protection elements (e.g., in kJ) for design and verification.<\/p>\n<h2>Documentation, maintenance, and monitoring after stabilization<\/h2>\n<p>After implementing protection measures, regular inspection is essential. Nets and fences must be cleared of block deposits, anchors retightened, and drainage kept open. On slopes with a pronounced freeze-thaw regime, tighter inspection intervals are recommended. Digital condition documentation and repeat imaging support tracking. If changes are detected, targeted follow-up actions &#8211; such as renewed controlled splitting with <strong>rock and concrete splitters<\/strong> or selective deconstruction with <strong>concrete demolition shears<\/strong> &#8211; can sustainably increase safety. Defining measurable trigger thresholds for maintenance and repairs improves response quality and minimizes downtime.<\/p>\n<h2>Selection of materials and tools for interventions on rock and concrete components<\/h2>\n<p>The choice of method has a direct impact on safety, quality, and environmental effects. The following criteria support an appropriate decision:<\/p>\n<ul>\n<li>Vibrations and shocks: Prefer low-vibration methods (splitting) in sensitive areas.<\/li>\n<li>Precision and crack control: Work along predefined separation joints with <em>stone splitting cylinders<\/em> to avoid uncontrolled spalling.<\/li>\n<li>Component continuity: For reinforced concrete, selective separation with <strong>concrete demolition shears<\/strong>, complemented by <em>Multi Cutters<\/em>\/<em>Steel Shears<\/em> for reinforcement elements.<\/li>\n<li>Power supply and handling: Choose suitable <em>hydraulic power packs<\/em> to ensure constant pressure and reproducible results.<\/li>\n<li>Environment and access: In confined or hard-to-access locations, use compact, easily positionable equipment and keep load paths short.<\/li>\n<li>Emissions and by-products: Plan for dust suppression, noise reduction, and controlled handling of debris and water.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Rockfall refers to the sudden detachment and descent of rock fragments from natural rock faces, on slopes, and on slopes cut by construction activities. Consequences range from localized material loss to significant hazards for people, infrastructure, and structures. In practice, the topic touches numerous fields of application: from rock breakout <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rockfall\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19897","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rockfall Hazard, Causes &amp; Protection Measures<\/title>\n<meta name=\"description\" content=\"Understand rockfall as a geohazard \u2713 Causes, risk assessment, and protection measures for slopes and infrastructure.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rockfall\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rockfall Hazard, Causes &amp; Protection Measures\" \/>\n<meta property=\"og:description\" content=\"Understand rockfall as a geohazard \u2713 Causes, risk assessment, and protection measures for slopes and infrastructure.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/rockfall\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-28T15:42:07+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rockfall\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rockfall\",\"name\":\"Rockfall Hazard, Causes & Protection Measures\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-30T11:33:56+00:00\",\"dateModified\":\"2026-05-28T15:42:07+00:00\",\"description\":\"Understand rockfall as a geohazard \u2713 Causes, risk assessment, and protection measures for slopes and infrastructure.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rockfall#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rockfall\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rockfall#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Rockfall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rockfall Hazard, Causes & Protection Measures","description":"Understand rockfall as a geohazard \u2713 Causes, risk assessment, and protection measures for slopes and infrastructure.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/rockfall","og_locale":"en_US","og_type":"article","og_title":"Rockfall Hazard, Causes & Protection Measures","og_description":"Understand rockfall as a geohazard \u2713 Causes, risk assessment, and protection measures for slopes and infrastructure.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/rockfall","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-28T15:42:07+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/rockfall","url":"https:\/\/www.darda.de\/en\/knowledge\/rockfall","name":"Rockfall Hazard, Causes & Protection Measures","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-30T11:33:56+00:00","dateModified":"2026-05-28T15:42:07+00:00","description":"Understand rockfall as a geohazard \u2713 Causes, risk assessment, and protection measures for slopes and infrastructure.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/rockfall#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/rockfall"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/rockfall#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Rockfall"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19897","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19897"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19897\/revisions"}],"predecessor-version":[{"id":27875,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19897\/revisions\/27875"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19897"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}