{"id":19896,"date":"2025-12-30T13:42:56","date_gmt":"2025-12-30T12:42:56","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19896"},"modified":"2026-05-28T16:47:02","modified_gmt":"2026-05-28T14:47:02","slug":"stonemasonry","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/stonemasonry","title":{"rendered":"Stonemasonry"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Stonemasonry combines traditional craft with modern methods of controlled material processing. It ranges from the extraction and shaping of natural stone to the restoration of historical components and precise deconstruction tasks in natural and artificial rock. Today, hydraulic tools complement classic working with chisels and mallets: <em>low-vibration<\/em> methods such as splitting with cylinders in boreholes or targeted gripping and breaking of components help protect the material, surroundings, and structure. This article explains the fundamentals, methods, and fields of application of stonemasonry in a practical way &#8211; with a professional link to applications such as concrete demolition and special demolition, rock excavation and tunnel construction, interior demolition and cutting, as well as natural stone extraction.<\/p>\n<h2>Definition: What is meant by stonemasonry?<\/h2>\n<p>Stonemasonry refers to the expert processing of natural stone (e.g., granite, basalt, gneiss, limestone, sandstone, marble) and dimension-stone-like building materials. The objectives are shaping, surface finishing, setting, securing, and &#8211; where required &#8211; gentle dismantling of stone components. Methods include manual techniques such as pointing, scabbling, bossing, splitting, and bush hammering as well as machine cutting, sawing, grinding, and hydraulic splitting. In a broader sense, stonemasonry also covers tasks on composite constructions of stone and concrete, for example on historic veneers or natural stone fa\u00e7ades on reinforced concrete frames, where controlled removal with a concrete pulverizer or splitting with borehole cylinders may be used. In heritage conservation, reversible and material-preserving procedures are prioritized to maintain fabric and authenticity.<\/p>\n<h2>Materials, structures, and their workability<\/h2>\n<p>Dimension stones differ in fabric, strength, and anisotropy. These properties determine whether a stone is efficiently cut, split, or chiseled. Sedimentary rocks such as sandstone often have pronounced bedding; metamorphic rocks such as gneiss show distinct foliation; igneous rocks such as granite are equigranular and more isotropic, but strong.<\/p>\n<ul>\n<li><strong>Key indicators for work planning:<\/strong> grain size and orientation, visible joints and veins, moisture content and weathering state, compressive and tensile strength, and susceptibility to microcracking.<\/li>\n<li><strong>Implications:<\/strong> bedded or foliated stones are preferably split parallel to their structure, while isotropic rocks often require tighter drilling patterns or higher splitting pressures.<\/li>\n<\/ul>\n<h3>Natural joints and preferred splitting directions<\/h3>\n<p>Natural joints, veins, and bedding planes are crucial for planning the work. Blocks can be separated in a controlled manner along these zones of weakness. When using <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock wedge splitters and concrete splitters<\/a><\/strong> as well as stone splitting cylinders, the borehole pattern is adapted to the splitting directions. This produces predictable fracture surfaces with low material loss and reduced crack propagation into adjacent areas. Clean, straight boreholes and effective hole cleaning enhance wedge seating and force transfer; marking joint traces on the surface supports consistent alignment.<\/p>\n<h3>Edge distances and component thicknesses<\/h3>\n<p>To achieve clean breaks, suitable edge distances, borehole diameters, and depths must be selected. Edge distances that are too small lead to spalling; excessive spacing increases energy demand and reduces splitting quality. In thin workpieces, a tighter borehole pattern is recommended; in massive blocks, a more stretched grid with staggered lines is preferable. Minimum distances and hole geometry should follow tool guidance and be verified with small-scale test bores on comparable fabric.<\/p>\n<h2>Methods and tools of stonemasonry<\/h2>\n<p>The choice of method depends on the material, component geometry, environment, and objective of the measure. Manual work provides distinctive surface textures, while hydraulic methods enable precise, <em>low-vibration<\/em> work in sensitive environments. Further selection criteria include access, permissible emissions, salvage value of components, and the feasibility of water-based cooling and dust control.<\/p>\n<h3>Manual working with chisel and mallet<\/h3>\n<p>Point chisels, scabbling chisels, tooth chisels, striking chisels, and bush hammers define classic surfaces. These tools are indispensable for restorations and for exposed surfaces with defined ornament or natural texture. Today they are often combined with prior machine removal to save time and increase dimensional accuracy. Working direction is adjusted to grain and bedding to avoid undercutting and uncontrolled flaking at edges and arrises.<\/p>\n<h3>Hydraulic splitting in boreholes<\/h3>\n<p>Hydraulically operated stone splitting cylinders and <strong>rock wedge splitters and concrete splitters<\/strong> use wedges or spreading mechanisms inserted into predrilled holes. Powered by a <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power pack<\/a>, they generate high splitting forces that initiate defined fracture lines in the stone along the drilling pattern. Advantages include low vibrations, minimal dust generation, and good noise control compared with impact or blasting methods.<\/p>\n<ul>\n<li>Typical applications: rock excavation in built-up areas, precise foundation demolition, creating wall openings in natural-stone masonry, block splitting in the quarry.<\/li>\n<li>Process steps: drilling &#8211; inserting the cylinders &#8211; controlled application of pressure &#8211; progressing along the splitting line &#8211; lifting and securing the segments.<\/li>\n<\/ul>\n<ul>\n<li><strong>Preconditions for consistent results:<\/strong> accurate marking, perpendicular drilling with low runout, thorough hole cleaning, correct wedge orientation to grain or bedding, and steady pressure ramp-up with continuous monitoring.<\/li>\n<\/ul>\n<h3>Grabbing, crushing, and controlled breaking<\/h3>\n<p>On mixed components made of stone, cast stone, and reinforced concrete, a concrete pulverizer is used. It grips components, generates local compressive and shear stresses, and reduces cross-sections in a controlled way. This is helpful for deconstruction on natural stone fa\u00e7ades on concrete, for removing an anchor, or for removing stone copings on reinforced concrete parapets. In this context, a steel shear or a hydraulic shear is often added to cut exposed reinforcement cleanly. Interchangeable jaws adapted to the aggregate and reinforcement density improve efficiency and reduce collateral damage to preserved masonry.<\/p>\n<h3>Cutting, separating, and sawing<\/h3>\n<p>Cut-off grinders, wire saws, and slab saws process stone and concrete by abrasive removal. Multi cutters are used when combined separation tasks arise in confined situations, for example when creating openings in masonry with embedded hard rock or when making precise cuts prior to a subsequent splitting operation. Pre-sawn predetermined breaking edges markedly reduce fracture surface irregularities and edge chipping. Coolant water supply, kerf management, and controlled feed rates are essential for dimensional accuracy and reduced thermal loading; slurry capture and filtration are part of work preparation.<\/p>\n<h2>Planning, marking, and dimensional accuracy<\/h2>\n<p>Careful planning determines quality, safety, and cost-effectiveness. Measurement, fabric analysis, marking of splitting lines, and defining the borehole pattern precede the intervention. Tighter tolerances apply to exposed surfaces than to concealed load-bearing elements. Temporary supports, load paths, and handling weights are considered early to avoid unplanned stress redistributions.<\/p>\n<ul>\n<li><strong>Planning checklist:<\/strong> define target geometry and tolerance class, map joints and weak zones, select sequence of operations, coordinate access and lifting points, plan dust and water management including disposal, and secure interfaces to adjacent trades.<\/li>\n<\/ul>\n<h3>Drilling and pattern planning for hydraulic splitting<\/h3>\n<p>Borehole diameter, depth, and spacing are adapted to the tool and material. For highly crystalline rocks, shorter spacing and higher pressures are advantageous; for bedded stones, the pattern follows the bedding joints. The splitting energy is provided by a suitable hydraulic power pack. A steady increase in hydraulic pressure is important to prevent uncontrolled cracking and spalling at exposed edges. Guide templates and depth stops help maintain consistent alignment and hole depth across a grid.<\/p>\n<h3>Edge and corner protection<\/h3>\n<p>Before splitting components with exposed edges, it is advisable to attach protective strips or to chamfer the edges. Where possible, cut lines are pre-made with cut-off grinders so that the fracture follows the intended joint. Additional protection with adhesive tape or sacrificial boards at arrises reduces chipping and simplifies post-finishing.<\/p>\n<h2>Application areas related to stonemasonry<\/h2>\n<p>Stonemasonry techniques are used in many fields &#8211; from extraction to processing to deconstruction. Different methods play to their strengths in specific environments. In practice, combinations of pre-sawing, hydraulic splitting, and controlled grabbing often yield the most predictable results, especially on composite constructions.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In deconstruction projects with a proportion of natural stone &#8211; such as veneers, cornices, or balusters &#8211; a concrete pulverizer is helpful to open composite sections of dimension stone and reinforced concrete in a controlled manner. Splitting massive plinths or a foundation remnant efficiently succeeds with stone splitting cylinders; this minimizes vibrations and protects adjacent components. Pre-relieving tensile zones before cutting reinforcement reduces unintended crack propagation.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Underground and in urban rock removal, <em>low-vibration<\/em> methods are in demand. <strong>Rock wedge splitters and concrete splitters<\/strong> release fractures along defined borehole lines without overloading edge zones. This is advantageous near neighboring structures, in geologically sensitive settings, or in areas with a utility line.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In <a href=\"https:\/\/www.darda.de\/en\/applications\/natural-stone-quarrying\">natural stone extraction<\/a>, the rock is split into blocks along natural splitting directions. Hydraulic splitting reduces blasting cracks and yields a higher rate of usable raw blocks. The improved predictability of fracture surfaces benefits downstream processes such as sawing and calibrating. Quarry layout, face orientation, and seasonal moisture conditions influence block size and surface quality.<\/p>\n<h3>Interior demolition and cutting<\/h3>\n<p>Interior interventions on masonry and natural stone require low-dust and low-noise procedures. A combination of pre-sawing cuts, setting stone splitting cylinders, and grabbing smaller pieces with a concrete pulverizer enables clean, controlled work when creating openings and selectively removing individual stone layers. Dust containment with enclosures and negative pressure, paired with water suppression, enhances occupational hygiene.<\/p>\n<h3>Special applications<\/h3>\n<p>In special cases &#8211; such as natural-stone components with metallic inserts &#8211; a steel shear or a hydraulic shear is added for metal separation, depending on the task. A cutting torch is considered where, in the context of stone work, tanks or metal pipelines must be cut safely. These tasks require careful coordination of the cutting and splitting sequence to avoid unintended stresses in the component. Hot-work permits and fire watch, if applicable, are planned alongside shielding to protect adjacent stone surfaces.<\/p>\n<h2>Surfaces, joints, and details<\/h2>\n<p>Surface finishes such as bossed, scabbled, bush\u2011hammered, or finely ground result from defined tool guidance. In restorations, new tool marks should harmonize with the historical character. Joint widths and profiles (e.g., cove joints and shadow joints) influence appearance and durability. During dismantling, pre-sawn separation protects exposed edges from spalling.<\/p>\n<ul>\n<li><strong>Functional aspects of finishes:<\/strong> rough textures improve slip resistance and diffuse reflections; fine grinding and polishing highlight color and grain but require edge protection; bush hammering opens pores and must be coordinated with weathering resistance and drainage.<\/li>\n<\/ul>\n<h3>Gentle removal on exposed surfaces<\/h3>\n<p>Where exposed surfaces are to be preserved, a staged approach is proven: scoring &#8211; splitting &#8211; finishing. A concrete pulverizer is suitable for releasing pieces layer by layer, while the main volume is reduced via hydraulic splitting. This keeps edges intact and reduces post-processing effort. Final dressing with appropriate chisels blends transitions and maintains a consistent surface character.<\/p>\n<h2>Occupational safety, environment, and emissions<\/h2>\n<p>Dust, noise, vibrations, and water are key factors. Hydraulic splitting methods operate quietly and produce few secondary emissions. During sawing, water cooling results in lower dust release. Residual material and slurry must be collected and disposed of properly. Safety fences, load securing, and the controlled haulage logistics of the segments are integral parts of work preparation.<\/p>\n<ul>\n<li><strong>Controls and protective measures:<\/strong> wet cutting or on-tool extraction with suitable filters, PPE appropriate to dust class, noise control with enclosures where feasible, vibration monitoring near sensitive structures, and silt traps or separators for slurry management.<\/li>\n<\/ul>\n<h3>Low-vibration alternatives to blasting<\/h3>\n<p>In sensitive areas &#8211; such as near historic structures or in densely built quarters &#8211; <em>low-vibration<\/em> splitting methods have become established. With appropriate patterns and matched pressures, cracks in adjacent components can be avoided. Monitoring (e.g., crack monitoring) supports quality assurance. Documented pressure curves and borehole layouts aid traceability and repeatability on multi-phase projects.<\/p>\n<h2>Quality assurance and practical tips<\/h2>\n<p>High execution quality starts with understanding the material and ends with clean handover. Documentation of fabric, interfaces, and removal sequence facilitates later work &#8211; whether in restoration or deconstruction. Acceptance criteria are defined in advance, including geometry, surface texture, and protection of adjacent components, and are verified on a sample area before full-scale execution.<\/p>\n<ul>\n<li>Set up a field test section to assess splitting behavior, pressure demand, and fracture appearance.<\/li>\n<li>Increase borehole pattern density at edges to avoid edge spalling.<\/li>\n<li>For composite components, combine splitting, cutting, and grabbing in a logical sequence (relieve first, then separate).<\/li>\n<li>Expose reinforcement or inserts in good time and cut with a steel shear.<\/li>\n<li>Plan transport routes; continuously secure and set down the segments.<\/li>\n<li>Record borehole layout, wedge orientation, and applied pressures for repeatable results.<\/li>\n<\/ul>\n<h3>Typical failure patterns and how to avoid them<\/h3>\n<p>Spalling often results from insufficient edge distance or uneven pressure ramp-up. Skewed fractures indicate a mismatched pattern or ignored splitting directions. With pre-sawn predetermined breaking lines, tuned hydraulic pressure, and proper centering of the splitting cylinders, these errors can be avoided. When using a concrete pulverizer, grip components so that the pressure pair and load path are balanced; localized overloading leads to uncontrolled chipping. Glazed borehole walls and residual dust reduce wedge grip and should be removed before inserting the splitting tool.<\/p>\n<h2>Integration of traditional craft and modern hydraulics<\/h2>\n<p>The combination of classical stonemasonry and hydraulic assistance enables precise results with high material protection. Workpieces are finally contoured with chisel and mallet after the volume has been reduced with <strong>rock wedge splitters and concrete splitters<\/strong>. In deconstruction situations, a concrete pulverizer ensures controlled division before exposed surfaces are finished by hand. The outcome is work that is functional, durable, and convincing in craftsmanship &#8211; in the quarry, on the construction site, and in the stonemasonry workshop. Balanced method selection aligns productivity with conservation and supports reliable project delivery.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Stonemasonry combines traditional craft with modern methods of controlled material processing. It ranges from the extraction and shaping of natural stone to the restoration of historical components and precise deconstruction tasks in natural and artificial rock. Today, hydraulic tools complement classic working with chisels and mallets: low-vibration methods such as <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stonemasonry\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19896","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stonemasonry Techniques, Tools &amp; Applications<\/title>\n<meta name=\"description\" content=\"Your guide to stonemasonry \u2713 techniques for restoration, low-vibration splitting, cutting, quarrying and demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stonemasonry\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stonemasonry Techniques, Tools &amp; Applications\" \/>\n<meta property=\"og:description\" content=\"Your guide to stonemasonry \u2713 techniques for restoration, low-vibration splitting, cutting, quarrying and demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/stonemasonry\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-28T14:47:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stonemasonry\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stonemasonry\",\"name\":\"Stonemasonry Techniques, Tools & Applications\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-30T12:42:56+00:00\",\"dateModified\":\"2026-05-28T14:47:02+00:00\",\"description\":\"Your guide to stonemasonry \u2713 techniques for restoration, low-vibration splitting, cutting, quarrying and demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stonemasonry#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stonemasonry\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stonemasonry#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Stonemasonry\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stonemasonry Techniques, Tools & Applications","description":"Your guide to stonemasonry \u2713 techniques for restoration, low-vibration splitting, cutting, quarrying and demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/stonemasonry","og_locale":"en_US","og_type":"article","og_title":"Stonemasonry Techniques, Tools & Applications","og_description":"Your guide to stonemasonry \u2713 techniques for restoration, low-vibration splitting, cutting, quarrying and demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/stonemasonry","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-28T14:47:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/stonemasonry","url":"https:\/\/www.darda.de\/en\/knowledge\/stonemasonry","name":"Stonemasonry Techniques, Tools & Applications","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-30T12:42:56+00:00","dateModified":"2026-05-28T14:47:02+00:00","description":"Your guide to stonemasonry \u2713 techniques for restoration, low-vibration splitting, cutting, quarrying and demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/stonemasonry#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/stonemasonry"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/stonemasonry#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Stonemasonry"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19896","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19896"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19896\/revisions"}],"predecessor-version":[{"id":27865,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19896\/revisions\/27865"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}