{"id":19895,"date":"2025-12-30T14:42:29","date_gmt":"2025-12-30T13:42:29","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19895"},"modified":"2026-05-28T16:58:02","modified_gmt":"2026-05-28T14:58:02","slug":"stone-masonry","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/stone-masonry","title":{"rendered":"Stone masonry"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Stone masonry shapes historic townscapes as well as modern civil and infrastructure structures. It serves as a load-bearing wall, as a retaining wall in earthworks and road construction, as a facing, as a bank protection and noise barrier wall structure, or as a dry stone wall in landscape construction. The diversity of materials such as granite, basalt, sandstone, and limestone, as well as the construction types from dry stone masonry to mortared ashlar masonry, result in very different properties in load-bearing behavior, durability, and construction processes. In planning, execution, maintenance, and deconstruction, procedures are selected that protect the fabric, minimize emissions, and enable clean, single-grade reuse. Where needed, <em>low-vibration<\/em> separation and splitting methods are also considered, for example with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> or concrete pulverizer tools from Darda GmbH &#8211; such as in concrete demolition and special demolition, during gutting works, or for special assignments.<\/p>\n<h2>Definition: What is meant by stone masonry?<\/h2>\n<p>Stone masonry is understood as a masonry construction made of natural stones or artificially manufactured stones (e.g., ashlar stone block), which is erected either without mortar as a dry stone wall or with mortar. The load-bearing effect results from the geometric arrangement of the stones in bond, the transfer of loads through bed and head joints, and the load path into the foundation. A distinction is made, among others, between rubble masonry, cyclopean masonry, and ashlar masonry. The joints can be dry, mortared, or backed with drainage layers. Depending on the requirements, air lime, hydraulic lime, or cement mortars (often with trass components) are used as binders. Areas of application range from retaining walls in transportation and hydraulic engineering to fa\u00e7ade claddings and garden terracing. Recognized rules of technology for structural stability, frost protection, drainage, material selection, and building physics apply to planning and execution. Material behavior is influenced by bedding planes, anisotropy, water absorption, compressive and shear strength, and by the interaction of face and core layers in multi-leaf walls.<\/p>\n<ul>\n<li><strong>Key drivers of performance<\/strong>: stone geometry and dressing quality, continuous bed joints with sufficient width, well-distributed header stones, and compatible mortar or dry interlock.<\/li>\n<li><strong>Durability factors<\/strong>: water management, frost and de-icing exposure, salt ingress, and protection of copings and wall crowns.<\/li>\n<\/ul>\n<h2>Construction types, bonds, and joint patterns at a glance<\/h2>\n<p>Stone masonry is executed as <strong>dry stone masonry<\/strong> without mortar or as <strong>mortared masonry<\/strong>. Dry stone walls transmit loads via interlocking stones and open joints, allow water to pass through, and promote biodiversity. Mortared versions offer higher compressive strength and a closed joint network; the joint pattern (bed\/head joints, struck joints) and stone finishing (rustic split, drafted, pointed, ground) shape the appearance and durability. In <em>rubble masonry<\/em>, irregular stones are laid in courses; <em>cyclopean masonry<\/em> uses large, polygonal stones with carefully wedged infill; <em>ashlar masonry<\/em> consists of dressed, rectangular stones with defined joint widths. The bonds (alternation of stretchers and headers, through stones) ensure interlock and minimize continuous head joints. In multi-leaf constructions, double-faced skins with a suitable core (drainable or grouted depending on purpose) enhance stability and water management when detailed correctly.<\/p>\n<h2>Planning and design: load-bearing behavior, drainage, and frost protection<\/h2>\n<p>Self-weight, earth pressure, water loads, traffic loads, and temperature fluctuations are decisive for structural safety. Backfilled retaining walls require functioning drainage and a capillary-breaking, frost-resistant backfill. Joint pattern, course heights, and the length of header stones ensure force transmission and the avoidance of continuous load paths. Technical codes provide orientation values and design approaches; for existing walls, reserve capacity, deformations, and material parameters are often derived through structural investigations. Damage from freeze-thaw and de-icing cycles is limited by suitable material selection, water control, and copings. Safety verification typically addresses sliding, overturning, bearing pressure, and global stability, coordinated with the geotechnical design of the subsoil and backfill.<\/p>\n<ul>\n<li><strong>Drainage concept<\/strong>: filter-stable layers, geotextiles, weep holes where required, and protected outlets to prevent clogging.<\/li>\n<li><strong>Detailing<\/strong>: drip edges and copings, splash protection, transitions with movement joints to avoid restraint and crack initiation.<\/li>\n<li><strong>Material compatibility<\/strong>: binders matched to stone type, avoiding overly rigid mortars with soft natural stone.<\/li>\n<li><strong>Serviceability<\/strong>: limitation of deformations and bulging by bond integrity and adequate tie stones.<\/li>\n<\/ul>\n<h3>Subgrades and foundations<\/h3>\n<p>The foundation is constructed frost-free with a load-bearing, compacted foundation level. Capillary-breaking layers and a drain pipe (perforated pipe) at the base are common, reducing the risk of backwater. For retaining walls, slight batter and terracing are considered to improve stability geometry. Transitions to adjacent components receive expansion joint and constructive details to avoid restraint. Settlement sensitivity, groundwater level, and potential soft layers are clarified by geotechnical exploration; bearing pressures remain within admissible limits with appropriate base width and stiffness.<\/p>\n<h3>Water management and drainage<\/h3>\n<p>Water is the main cause of frost damage, efflorescence, and mortar loss. Therefore, filter fleece, drainage layers, and water removal behind and beneath the wall must be considered. In dry stone walls, open joints provide the drainage function; in mortared walls, weep holes and defined drainage help. Typical practice includes a slight back slope of the sub-base, protected outfalls, and, if specified, weep hole spacing in regular intervals with splash protection to the front face.<\/p>\n<h2>Construction execution step by step<\/h2>\n<p>Professional execution combines dimensional accuracy, careful selection of bearing surfaces, and good interlock. Large-format stones are pre-shaped, cleaned, and sorted by course thickness. Joint widths remain uniform; head joints are staggered, and through cross-joints are avoided. In mortared walls, mortar is applied fully to bed and head joints; the surface receives a struck joint finish as required or remains open-pored. Weather-sensitive works are planned with curing protection, and tolerances for line, plumb, and face evenness are observed and documented.<\/p>\n<h3>Dry stone wall &#8211; proven practice<\/h3>\n<ul>\n<li>Construct sub-base, install capillary-breaking layer, provide base slope.<\/li>\n<li>Set the first course with the largest stones as the foundation layer, carefully align.<\/li>\n<li>Select stones with broad bearing faces, fill interstices with chock stones.<\/li>\n<li>Interlock each course to the rear, plan header stones for load-bearing action.<\/li>\n<li>Compact the backfill in layers, install and protect drainage.<\/li>\n<li>Form the wall crown with larger stones or a cover to protect against driving rain.<\/li>\n<li>Place hearting stones firmly without creating continuous voids; avoid fine particles that could wash out.<\/li>\n<li>Provide occasional through stones to tie front and rear zones where geometry permits.<\/li>\n<\/ul>\n<h3>Mortared masonry &#8211; essential steps<\/h3>\n<ol>\n<li>Prepare stones, remove loose parts, adjust bearing faces.<\/li>\n<li>Mix mortar as specified (e.g., lime\/trass\/cement mortar depending on the stone).<\/li>\n<li>Create a full bed joint, set the stone, align plumb and true to line.<\/li>\n<li>Compact head joints, avoid voids, cleanly remove excess mortar.<\/li>\n<li>Strike or profile joints, repoint later if required.<\/li>\n<li>Protect curing (temperature, moisture), seal or cover the wall crown.<\/li>\n<li>Pre-wet highly absorbent stones as required to prevent premature water withdrawal from the mortar.<\/li>\n<\/ol>\n<h2>Maintenance, damage, and refurbishment<\/h2>\n<p>Typical causes of damage are settlements, moisture ingress, inadequate drainage, unsuitable mortars, freeze-thaw and de-icing exposure, and restraints. Visible are <em>cracks<\/em>, edge spalling, efflorescence, voids, washed-out joints, bulging, and deformations. Refurbishment aims at minimally invasive measures: keep water away, supplement drainage, renew joints, replace damaged stones, and re-create bonds. For existing masonry of cultural and historical value, preserving the substance is the priority; interventions are cautious and reversible, and material compatibility (e.g., soft lime mortars with soft natural stones) is crucial. Monitoring with simple gauges or deformation measurements supports the assessment of urgency and sequencing.<\/p>\n<h3>Identifying damage patterns<\/h3>\n<p>Vertical cracks indicate settlements or missing expansion joint; shell-like delamination points to frost or salt exposure. Efflorescence indicates dissolved salts and moisture ingress. Weathered joints impair load transfer and promote water entry; loose stones reduce bond action. Bulging and out-of-plumb faces suggest sliding at the base or missing tie stones; biological growth often correlates with persistent moisture.<\/p>\n<h3>Refurbishment principles<\/h3>\n<p>Address causes, not just symptoms: optimize drainage, renew joints with compatible mortars, replace stones with suitable substitutes. Where necessary, provide temporary stabilization (shoring, tie bands) before restoring bonds. Work in critical existing areas is performed step by step and documented. Trial areas and mock-ups validate joint profiles, mortar color, and surface finishes before area-wide application.<\/p>\n<ul>\n<li>Selective stone replacement with matching petrology and texture, avoiding hard-spot effects.<\/li>\n<li>Repointing in stages with careful removal of weak joints and cleaning of flanks.<\/li>\n<li>Retrofit of weep holes or relief joints where feasible, without impairing structural function.<\/li>\n<\/ul>\n<h2>Deconstruction of stone masonry: selective separation instead of destruction<\/h2>\n<p>In concrete demolition and special demolition as well as in gutting works and cutting, the deconstruction of stone masonry often requires a <strong>selective, low-vibration<\/strong> approach &#8211; such as in inner-city locations, near sensitive facilities, or on heritage structures. Mechanical methods with controlled force application make it possible to remove courses and partial areas without unnecessarily stressing adjacent structures. Stone and concrete splitting devices by Darda GmbH split masonry and rock along existing planes of weakness and facilitate the removal of individual stones. A concrete pulverizer grips and crushes bonded areas, particularly where mortar or concrete inclusions need to be separated. A hydraulic power pack provides the required power supply in confined spaces. Where metal inserts are present (e.g., tension anchor, scarf joints), a steel shear or a hydraulic demolition shear can help cut reinforcing parts; multi cutters support mixed-material bonds. For special assignments, for example in hard-to-access terrain, lightweight, mobile systems are advantageous to improve accessibility and occupational safety. Method statements, risk assessments, and vibration or dust monitoring enhance planning reliability and compliance.<\/p>\n<h3>Low vibration levels and emissions-aware<\/h3>\n<p>Low vibrations and reduced noise emission are particularly relevant in densely built-up areas and existing structures. Splitting and shear methods generally produce fewer vibrations than percussive or blasting methods and allow better control of fracture lines. Dust is reduced through an adapted sequence of operations, dust extraction, and &#8211; where permitted &#8211; moistened work areas. Enclosures and negative-pressure extraction can further limit dust migration; tool selection and sharpness influence both noise and particulate emissions.<\/p>\n<h3>Selective deconstruction and reuse<\/h3>\n<p>Clean, single-grade separation facilitates the reuse of natural stone and the recycling of mineral residuals into recycled construction material. By carefully releasing entire ashlar units, qualities can be preserved and re-employed in landscape or civil engineering. This conserves resources and reduces transport and disposal loads. Documentation of origin, format, and condition enables targeted reuse, supports circular construction, and may feed into building component registers or material passports.<\/p>\n<h2>Natural stone extraction and production of stones for masonry<\/h2>\n<p>For ashlar masonry and dimension stone work, raw rock blocks are obtained in the quarry, rough-broken, and dressed. In natural stone extraction, a <strong>rock wedge splitter<\/strong> and stone and concrete splitting devices from Darda GmbH enable controlled opening along natural joints. This reduces offcut and preserves usable formats for masonry. In rock excavation and tunnel excavation, similar principles are used to release rock in sections without excessively stressing adjacent structures. The choice of separation direction (parallel or transverse to bedding), the placement of borehole drilling, and the sequence of splitting operations influence the quality, dimensional accuracy, and economy of the stones obtained. Where appropriate, sawing and drilling processes are combined with splitting to optimize yield and surface quality.<\/p>\n<h2>Typical application fields in construction<\/h2>\n<p>Stone masonry is found in retaining structures along transportation routes, on bank protections, in dams with natural stone facing, as a noise barrier wall, as freestanding garden and boundary walls, and as facing for load-bearing shell construction. In tunnel construction, natural stone walls are used locally as support or facing shells; in landscape construction, dry stone walls structure slopes and terraces. The specific execution is tailored to the use: open-pored and drainable on terrain, closed and weather-resistant on freely weathered fa\u00e7ades. Structural, hydraulic, and aesthetic requirements are balanced to achieve robust performance and low maintenance.<\/p>\n<h2>Equipment, tools, and construction logistics<\/h2>\n<p>Hand tools such as setting hammer, point chisel, mason&#8217;s hammer, and club hammer remain central for adjusting bearing surfaces. For large ashlars and existing works with limited space, additional equipment is used: stone and concrete splitting devices for targeted release of blocks, a concrete pulverizer for bonded areas of stone and mortar, and a steel shear for metallic inserts. A hydraulic power pack ensures the energy supply for compact hydraulic tools. Thought-out construction logistics &#8211; short load paths, safe lifting points, tiered storage areas &#8211; reduce risks and increase execution quality. Suitable lifting gear (slings, clamps, vacuum lifters as specified), protected storage on spacers, and clear sequencing prevent damage to edges and faces.<\/p>\n<h2>Safety, environment, and building culture<\/h2>\n<p>Safe work on stone masonry requires stable construction stages, suitable shoring, and controlled load redistribution. Personal safety equipment, dust protection and noise control, as well as emission avoidance, are standard. Environmental aspects such as protection of vegetation and soil, water return, and the reuse of natural stones contribute to sustainability. Where the substance is worth preserving, work proceeds gently; methods that enable <em>selective<\/em> release and placement support the historical building intent. Coordination with heritage protection and nature conservation requirements, including potential species protection, is integrated early into planning.<\/p>\n<h2>Quality control and documentation<\/h2>\n<p>Quality criteria include, among others, evenness of courses, uniform joint widths, clean bond alternation, sufficient header lengths, load-bearing bearing surfaces, and functioning drainage. Inspections include visual checks, sounding for voids, moisture measurements, and documentation of backfill and drainage. During deconstruction and refurbishment, sorting is documented to facilitate the reuse of natural stones. Checklists, photo documentation, and as-built sketches with dimensions and material notes ensure traceability; sampling protocols for mortars and stones support future maintenance and compatible repairs.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Stone masonry shapes historic townscapes as well as modern civil and infrastructure structures. It serves as a load-bearing wall, as a retaining wall in earthworks and road construction, as a facing, as a bank protection and noise barrier wall structure, or as a dry stone wall in landscape construction. The <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-masonry\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19895","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stone Masonry - Definition, Types &amp; Construction<\/title>\n<meta name=\"description\" content=\"Learn stone masonry in construction \u2713 load-bearing, drainage, dry &amp; mortared walls, and selective deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-masonry\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stone Masonry - Definition, Types &amp; Construction\" \/>\n<meta property=\"og:description\" content=\"Learn stone masonry in construction \u2713 load-bearing, drainage, dry &amp; mortared walls, and selective deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/stone-masonry\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-28T14:58:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-masonry\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-masonry\",\"name\":\"Stone Masonry - Definition, Types & Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-30T13:42:29+00:00\",\"dateModified\":\"2026-05-28T14:58:02+00:00\",\"description\":\"Learn stone masonry in construction \u2713 load-bearing, drainage, dry & mortared walls, and selective deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-masonry#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-masonry\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-masonry#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Stone masonry\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stone Masonry - Definition, Types & Construction","description":"Learn stone masonry in construction \u2713 load-bearing, drainage, dry & mortared walls, and selective deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/stone-masonry","og_locale":"en_US","og_type":"article","og_title":"Stone Masonry - Definition, Types & Construction","og_description":"Learn stone masonry in construction \u2713 load-bearing, drainage, dry & mortared walls, and selective deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/stone-masonry","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-28T14:58:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-masonry","url":"https:\/\/www.darda.de\/en\/knowledge\/stone-masonry","name":"Stone Masonry - Definition, Types & Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-30T13:42:29+00:00","dateModified":"2026-05-28T14:58:02+00:00","description":"Learn stone masonry in construction \u2713 load-bearing, drainage, dry & mortared walls, and selective deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-masonry#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/stone-masonry"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-masonry#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Stone masonry"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19895","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19895"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19895\/revisions"}],"predecessor-version":[{"id":27867,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19895\/revisions\/27867"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19895"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}