{"id":19894,"date":"2025-12-30T16:47:06","date_gmt":"2025-12-30T15:47:06","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19894"},"modified":"2026-05-28T11:28:02","modified_gmt":"2026-05-28T09:28:02","slug":"stone-quarry","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/stone-quarry","title":{"rendered":"Stone quarry"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A stone quarry is the place where rock is extracted, broken and processed at scale for further use. This is where geology, process engineering, occupational safety and environmental protection converge. In practice, tasks range from <em>rock breakout<\/em> and <strong>stone extraction<\/strong> to maintenance and the deconstruction of infrastructure. Depending on the deposit and boundary conditions, classic blasting works, sawing or drilling methods, as well as <strong>non-explosive rock removal<\/strong> techniques such as <em>hydraulic splitters (wedge)<\/em> or <em>rock wedge splitters<\/em> are used. Tools like <em>concrete pulverizers<\/em> come into play as soon as concrete or composite components around the quarry are processed &#8211; for example, at foundations, crusher buildings or bridges on the plant site.<\/p>\n<h2>Definition: What is meant by a stone quarry?<\/h2>\n<p>A stone quarry is an open pit extraction site for hard rock such as granite, basalt, limestone, dolomite or sandstone. Material is extracted over benches or berm levels, loosened, loaded, hauled and further processed in crushing and screening plants. A distinction is made between the extraction of <em>dimension stone<\/em> (block material for natural stone products) and the production of aggregates (crushed rock, chippings, premium chippings, crusher sand). Quarry operations cover the entire process chain from drilling and loosening through <strong>secondary crushing<\/strong> to quality control, including maintenance of technical equipment and the stabilization of quarry walls.<\/p>\n<p><strong>Typical outputs and uses<\/strong> include:<\/p>\n<ul>\n<li>Dimension stone blocks for cladding, paving and architectural elements.<\/li>\n<li>Aggregates for asphalt, concrete and base layers with defined grading curves.<\/li>\n<li>Crusher sand and chippings for industrial minerals or specialty applications.<\/li>\n<\/ul>\n<h2>Process chain in the stone quarry: From the deposit to the final grain size<\/h2>\n<p>It begins with geological exploration and deposit evaluation. Planning and permits follow, then site development with access roads and drainage, the release of the rock (blasting, sawing, splitting), loading and haulage to processing. Primary and secondary crushers, screens and, if applicable, washing plants produce the targeted gradation band. Non-explosive alternatives such as <strong>hydraulic splitter (wedge)<\/strong> are deployed strategically to reduce oversize, shape extraction edges precisely or work with low vibration levels in sensitive zones. Where concrete components arise (e.g., legacy structures), <em>concrete pulverizers<\/em> enable selective separation and material-conserving deconstruction.<\/p>\n<ul>\n<li><strong>Exploration and design<\/strong>: geological model, bench layout, stability assessment and method statement.<\/li>\n<li><strong>Loosening and loading<\/strong>: drilling pattern or cutting scheme, controlled fragmentation, safe mucking.<\/li>\n<li><strong>Processing<\/strong>: primary crushing, screening, secondary and tertiary stages to reach target F80 and shape.<\/li>\n<li><strong>Quality control<\/strong>: continuous gradation checks, contamination prevention and product certification.<\/li>\n<li><strong>Logistics<\/strong>: cycle time alignment between face, haul and plant to minimize idle time and fuel.<\/li>\n<\/ul>\n<h2>Geology and rock types: The impact on extraction and tool selection<\/h2>\n<p>Rock is not all the same. Tectonics, joint spacing, stratification, compressive and tensile strengths as well as abrasivity determine the extraction method. Hard rocks such as granite and gabbro require different approaches than carbonate deposits like limestone or dolomite. For block extraction, natural joints are welcome; for aggregates, uniform crushing is key. These parameters influence whether blasting, wire saws, drill-saws or hydraulic splitting technology are preferred. <strong>Rock wedge splitters<\/strong> utilize existing joint systems and create controlled separation planes &#8211; an advantage for precise edge removal or stabilization measures at the quarry face.<\/p>\n<ul>\n<li><strong>Discontinuities<\/strong>: orientation, spacing and persistence govern splitting directions and bench design.<\/li>\n<li><strong>Strength and abrasivity<\/strong>: UCS and abrasion indices influence tool wear, energy demand and crusher settings.<\/li>\n<li><strong>Weathering and water<\/strong>: alteration zones and inflows affect slope stability and method selection.<\/li>\n<\/ul>\n<h2>Extraction methods in the stone quarry<\/h2>\n<p>The choice of extraction method depends on the target product, boundary conditions and safety requirements. Typically, a combination of several methods is used to optimize quality, yield and economics.<\/p>\n<h3>Drilling and blasting technology<\/h3>\n<p>Borehole blasting loosens large volumes efficiently. Pattern, charge density and delay sequence control fragmentation, throw and vibrations. Precision work at the slope (pre-splitting, buffer holes) minimizes overbreak. In noise-sensitive areas or under strict vibration limits, blasting technology reaches its limits.<\/p>\n<p><em>Operational control<\/em> includes blast monitoring for PPV, air overpressure and flyrock exclusion zones, as well as post-blast muckpile assessment to tune fragmentation for crusher intake.<\/p>\n<h3>Low-vibration alternatives: Hydraulic splitting technology<\/h3>\n<p><strong>Hydraulic splitters (wedge)<\/strong> and <em>rock wedge splitters<\/em> develop high splitting forces in predrilled holes. They can be used to win blocks, define edges, split oversize or implement stabilization measures &#8211; with very low emissions of noise, dust and vibration. This technology is ideal for <em>rock breakout and tunnel construction<\/em> in sensitive zones, for work near buildings as well as for <em>special demolition<\/em> in infrastructure corridors.<\/p>\n<h3>Sawing, cutting and special methods<\/h3>\n<p>Wire saws cut with high dimensional accuracy, particularly in <strong>stone extraction<\/strong>. Thermal or controlled milling processes are used selectively. For steel or composite components, <em>combination shears<\/em>, <em>Multi Cutters<\/em> and <em>steel shears<\/em> extend the toolbox &#8211; especially for modification and deconstruction of installations on the quarry site.<\/p>\n<h2>Secondary crushing and block processing<\/h2>\n<p>After loosening, oversize, angular boulders or problematic geometries often occur. Secondary crushing starts right at the point of origin to optimize haulage and crusher performance.<\/p>\n<h3>Coarse size reduction at the shot pile<\/h3>\n<p>Targeted splitting with <strong>rock wedge splitters<\/strong> reduces oversize, improves crusher intake and protects the screens. This is particularly useful for hard rock and tight crusher settings. It helps manage the proportion of fines and improves particle shape.<\/p>\n<ul>\n<li>Shorter loading cycles and fewer crusher blockages.<\/li>\n<li>Improved feed homogeneity and reduced recirculation loads.<\/li>\n<li>Lower specific energy consumption and wear per ton.<\/li>\n<\/ul>\n<h3>Concrete in the stone quarry environment<\/h3>\n<p>Many quarries have foundations, piers, ramps or old concrete structures. <strong>Concrete pulverizers<\/strong> enable selective separation of concrete and reinforcing steel &#8211; important for <em>concrete demolition and special demolition<\/em> as well as clean material separation. In combination with a <em>hydraulic power pack<\/em>, mobile units can be operated flexibly in the field.<\/p>\n<h2>Occupational safety, health and the environment<\/h2>\n<p>Safety and environmental protection are integral to quarry operations. They concern personnel, residents and ecosystems and influence the choice of methods.<\/p>\n<h3>Dust, noise, vibrations<\/h3>\n<p>Dust suppression using water mist, covers and road maintenance is standard. Noise is reduced through encapsulated units, optimized delay sequences and quieter methods. <strong>Non-explosive rock removal<\/strong> methods such as hydraulic splitting minimize vibrations &#8211; a plus under strict regulations or near sensitive structures.<\/p>\n<p>Continuous monitoring with calibrated devices for respirable dust, sound levels and PPV supports compliance and early corrective action.<\/p>\n<h3>Water and soil protection<\/h3>\n<p>Drainage, sedimentation basins and controlled surface runoff protect water bodies. Operating supplies are stored properly; leakage and emergency response plans must be in place. The choice of <em>hydraulic fluid<\/em> and the integrity of systems must be continuously monitored.<\/p>\n<p>Secondary containment for fuels, spill kits at refueling points and scheduled inspections of hoses and connectors reduce environmental risk.<\/p>\n<h3>Legal framework (general, non-binding)<\/h3>\n<p>Permits, explosives regulations, workplace instruction and <em>hazard analysis<\/em> are central. Qualifications for blasting works and compliance with the relevant regulations must be verified. Specific requirements depend on the site and jurisdiction and should always be assessed individually.<\/p>\n<ul>\n<li>Typical documents: risk assessments, method statements, traffic management plan, emergency response plan.<\/li>\n<li>Evidence: training records, medical fitness where required, equipment inspection logs and calibration certificates.<\/li>\n<\/ul>\n<h3>Traffic management and training<\/h3>\n<p>Clearly separated traffic routes, speed control and visibility at intersections prevent incidents. Structured training on signaling, exclusion zones and tool operation underpins safe workflows.<\/p>\n<h2>Equipment and hydraulics in the stone quarry<\/h2>\n<p>Powerful hydraulics are crucial for forceful yet controlled processing. Component selection depends on the application profile and mobility requirements.<\/p>\n<p>Key aspects include hose protection, quick-coupling systems, temperature management and contamination control. Energy-efficient drives and preventative maintenance extend service life and uptime.<\/p>\n<h3>Hydraulic power packs<\/h3>\n<p><strong>Hydraulic power packs<\/strong> deliver flow and pressure for <em>hydraulic splitters (wedge)<\/em>, <em>concrete pulverizers<\/em>, <em>combination shears<\/em>, <em>Multi Cutters<\/em>, <em>steel shears<\/em> or <em>cutting torches<\/em>. Important factors include sufficient power reserves, robust filtration, reliable cooling and ergonomic operation. For changing sites, a compact, portable setup with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">portable hydraulic power units<\/a> is recommended; for continuous operation, a stationary solution is preferable.<\/p>\n<h3>Tools at a glance<\/h3>\n<ul>\n<li><strong>Rock wedge splitter<\/strong>: controlled loosening and splitting of rock and oversize; ideal where low-vibration requirements apply.<\/li>\n<li><strong>Hydraulic splitter (wedge)<\/strong>: universal for rock and concrete; precise separation joints, low emissions.<\/li>\n<li><strong>Concrete pulverizer<\/strong>: separating, crushing and selective deconstruction of concrete components, including exposing reinforcing steel.<\/li>\n<li><strong>Combination shears<\/strong> and <strong>Multi Cutters<\/strong>: flexible for mixed materials, reinforcement and profiles; useful for modification works.<\/li>\n<li><strong>Steel shear<\/strong>: cutting beams, scaffolds and conveyor structures made of steel.<\/li>\n<li><strong>Cutting torch<\/strong>: special tool for the safe dismantling of tanks in <em>special demolition<\/em> scenarios.<\/li>\n<\/ul>\n<h2>Maintenance, retrofit and deconstruction of stone quarry installations<\/h2>\n<p>Quarry operations include conveyor belts, crusher buildings, silos, bridges and support structures. Life cycles end, layouts change &#8211; then precise, safe deconstruction methods are required.<\/p>\n<h3>Gutting works and cutting<\/h3>\n<p><strong>Concrete pulverizer<\/strong> units allow selective opening of concrete components while protecting adjacent structures. <em>Steel shear<\/em> and <em>Multi Cutters<\/em> cut beams, chute equipment and railings. This enables deconstruction, conversion and <em>gutting works and cutting<\/em> with a high degree of control.<\/p>\n<p>Sequential planning with temporary supports, defined load paths and clear handover points reduces downtime and structural risk during retrofit phases.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>For foundations, ramps and abutments, <strong>hydraulic splitter (wedge)<\/strong> offers a low-vibration alternative to impact work. Combined with <em>concrete pulverizer<\/em>, this creates an efficient process: split &#8211; separate &#8211; sort. It reduces secondary damage and facilitates material flow.<\/p>\n<h2>Quality, efficiency and sustainability<\/h2>\n<p>High product quality arises from coordinated processes and careful tool selection. At the same time, resource efficiency and environmental aspects are gaining importance.<\/p>\n<h3>Selective extraction and oversize reduction<\/h3>\n<p>Targeted splitting and controlled loosening reduce oversize, protect crushers and improve particle shape. This increases yield of high-value fractions and lowers energy and wear costs.<\/p>\n<h3>Reclamation and land management<\/h3>\n<p>Reclamation and subsequent use should be considered during extraction. Stable slopes, controlled water management and handling of waste rock are building blocks of sustainable land development.<\/p>\n<ul>\n<li>Progressive rehabilitation with phased re-vegetation and habitat structures.<\/li>\n<li>Water reuse in washing circuits and silt management to protect downstream systems.<\/li>\n<li>Noise mapping and biodiversity action plans integrated into operations.<\/li>\n<\/ul>\n<h2>Practical guide: tool selection in the stone quarry (situation-dependent)<\/h2>\n<p>The right decision depends on the rock, target product and boundary conditions. The following guidance has proven effective:<\/p>\n<ol>\n<li><strong>Precise edge removal at the quarry face<\/strong>: <em>rock wedge splitter<\/em> for defined separation planes with minimal vibrations.<\/li>\n<li><strong>Oversize at the shot pile<\/strong>: <em>hydraulic splitter (wedge)<\/em> for coarse splitting to improve haulage and crusher performance.<\/li>\n<li><strong>Foundations and concrete components<\/strong>: a combination of <em>concrete pulverizer<\/em> (separating) and splitting technology (loosening) for clean material separation.<\/li>\n<li><strong>Modification of steel structures<\/strong>: <em>steel shear<\/em> or <em>Multi Cutters<\/em> for profiles, beams and pipelines.<\/li>\n<li><strong>Work in vibration-sensitive environments<\/strong>: preferably hydraulic splitting; blasting only after strict assessment.<\/li>\n<\/ol>\n<p>Selection should be validated on representative material and refined with feedback from operations, maintenance and quality control.<\/p>\n<h2>Application areas and typical uses in the stone quarry<\/h2>\n<p>The combination of extraction, processing and plant operation is reflected in a wide range of tasks. These include:<\/p>\n<ul>\n<li><strong>Rock breakout and tunnel construction<\/strong>: controlled removal, slope stabilization, work near infrastructure &#8211; ideal for hydraulic splitting technology; see approaches for <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>.<\/li>\n<li><strong>Stone extraction<\/strong>: dimensional block cutting, utilization of joint systems, sawing and splitting methods.<\/li>\n<li><strong>Concrete demolition and special demolition<\/strong>: selective deconstruction of legacy installations and structures on the plant site, e.g., with <em>concrete pulverizer<\/em>.<\/li>\n<li><strong>Gutting works and cutting<\/strong>: modifications to crusher houses, silos, bridges; cutting steel and concrete with shears and splitting devices.<\/li>\n<li><strong>Special demolition<\/strong>: special noise or vibration limits, protection of sensitive structures, work in confined conditions.<\/li>\n<\/ul>\n<h2>Organization, logistics and digitalization<\/h2>\n<p>Efficient processes reduce costs and increase safety. Modern surveying, regular monitoring of quarry faces and data-driven maintenance of equipment improve planning reliability. In logistics, clearly defined haul roads, synchronized cycle times between extraction, loading and processing, as well as proactive maintenance of <strong>hydraulic power packs<\/strong> and tools help significantly.<\/p>\n<ul>\n<li>Digital tools: UAV photogrammetry, GNSS machine control and fleet management with real-time KPIs.<\/li>\n<li>Condition monitoring: oil cleanliness, temperature and vibration data to prevent failures.<\/li>\n<li>Standard work: visual controls, checklists and short interval control for stable performance.<\/li>\n<\/ul>\n<h2>Notes on collaboration and tool integration<\/h2>\n<p>Tool selection and integration should be interdisciplinary &#8211; geology, operations, occupational safety and maintenance together. Tools from <strong>Darda GmbH<\/strong> such as <em>hydraulic splitter (wedge)<\/em>, <em>rock wedge splitter<\/em> or <em>concrete pulverizer<\/em> can be integrated into existing process chains, provided hydraulic power, operating limits and protective measures are carefully aligned. Tests on representative material samples and a phased introduction increase process reliability.<\/p>\n<ul>\n<li>Define interfaces: power supply, attachment points, transport paths and exclusion zones.<\/li>\n<li>Document procedures: start-up checks, routine operation, shutdown and emergency steps.<\/li>\n<li>Review outcomes: product quality, cycle times, tool wear and environmental metrics.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A stone quarry is the place where rock is extracted, broken and processed at scale for further use. This is where geology, process engineering, occupational safety and environmental protection converge. In practice, tasks range from rock breakout and stone extraction to maintenance and the deconstruction of infrastructure. Depending on the <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-quarry\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19894","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stone Quarry - Definition, Processes &amp; Safety<\/title>\n<meta name=\"description\" content=\"Guide to stone quarry operations \u2713 open pit rock extraction, blasting, hydraulic splitting, crushing &amp; safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-quarry\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stone Quarry - Definition, Processes &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Guide to stone quarry operations \u2713 open pit rock extraction, blasting, hydraulic splitting, crushing &amp; safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/stone-quarry\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-28T09:28:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-quarry\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-quarry\",\"name\":\"Stone Quarry - Definition, Processes & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-30T15:47:06+00:00\",\"dateModified\":\"2026-05-28T09:28:02+00:00\",\"description\":\"Guide to stone quarry operations \u2713 open pit rock extraction, blasting, hydraulic splitting, crushing & safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-quarry#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-quarry\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-quarry#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Stone quarry\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stone Quarry - Definition, Processes & Safety","description":"Guide to stone quarry operations \u2713 open pit rock extraction, blasting, hydraulic splitting, crushing & safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/stone-quarry","og_locale":"en_US","og_type":"article","og_title":"Stone Quarry - Definition, Processes & Safety","og_description":"Guide to stone quarry operations \u2713 open pit rock extraction, blasting, hydraulic splitting, crushing & safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/stone-quarry","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-28T09:28:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-quarry","url":"https:\/\/www.darda.de\/en\/knowledge\/stone-quarry","name":"Stone Quarry - Definition, Processes & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-30T15:47:06+00:00","dateModified":"2026-05-28T09:28:02+00:00","description":"Guide to stone quarry operations \u2713 open pit rock extraction, blasting, hydraulic splitting, crushing & safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-quarry#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/stone-quarry"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-quarry#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Stone quarry"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19894"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19894\/revisions"}],"predecessor-version":[{"id":27851,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19894\/revisions\/27851"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}