{"id":19893,"date":"2025-12-30T10:17:23","date_gmt":"2025-12-30T09:17:23","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19893"},"modified":"2026-05-28T17:41:03","modified_gmt":"2026-05-28T15:41:03","slug":"rock-breakout","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/rock-breakout","title":{"rendered":"Rock breakout"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>Rock breakout<\/strong> refers to the targeted separation of rock or stone from a natural formation or from man-made structures such as concrete. In practical fields such as <em>rock excavation and tunnel construction<\/em>, <em>natural stone extraction<\/em>, and in <em>concrete demolition and special demolition<\/em>, the goal is controlled, safe, and as low-emission as possible separation processes. In addition to conventional methods such as blasting technology, hydraulic solutions play a central role &#8211; such as <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/em> for borehole-assisted splitting or <em>concrete pulverizers<\/em> for crushing reinforced concrete in urban deconstruction. The objective is always precise removal with high component control, low vibration levels, and reproducible results. In some contexts, the term also encompasses selective rock removal or controlled rock splitting in geotechnical stabilization works.<\/p>\n<h2>Definition: What is meant by rock breakout?<\/h2>\n<p>Rock breakout is understood as the <strong>controlled separation of rock<\/strong> in the form of blocks, slabs, or fragments. This can occur in massive rock (e.g., granite, limestone, sandstone) or in mineral-bound construction materials (e.g., concrete). The separation processes are based on the targeted use of material behavior: compressive strength and <em>splitting tensile strength<\/em>, stratification, joints, anisotropy, grain structure as well as moisture and temperature influence how cracks initiate and propagate. In modern practice, depending on the boundary conditions, <em>hydraulic splitting<\/em>, <em>mechanical crushing<\/em>, <em>sawing and cutting<\/em>, and (where permitted) <em>blasting technology<\/em> are combined. In urban and vibration-sensitive environments, <strong>low-vibration<\/strong> methods are often used &#8211; particularly <em>hydraulic wedge splitters<\/em> and <em>concrete pulverizers<\/em> powered by <em>hydraulic power packs<\/em>.<\/p>\n<p><strong>Objectives<\/strong> typically include dimensional accuracy along intended break lines, minimized collateral damage to adjacent structures, safe handling of breakout pieces, and high reuse or <em>recycling<\/em> potential of the mineral fraction.<\/p>\n<h2>Methods of rock breakout in comparison<\/h2>\n<p>Depending on rock type, member thickness, accessibility, and environmental requirements, the methods differ in precision, speed, noise, dust, and vibration:<\/p>\n<ul>\n<li><strong>Hydraulic splitting<\/strong> (borehole-assisted): <em>Rock wedge splitters<\/em> are inserted into predrilled holes. Through hydraulic pressure, they generate radial splitting forces. Crack propagation follows the drilling pattern and existing weaknesses (joints, bedding planes). The method is precise, low-vibration, and suitable for <em>rock excavation and tunnel construction<\/em>, <em>natural stone extraction<\/em>, and <em>concrete demolition<\/em> of large cross-sections.<\/li>\n<li><strong>Mechanical crushing<\/strong>: <em>Concrete pulverizers<\/em> grasp and crush concrete, break out edges, and reduce member cross-sections. In combination with <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a><\/em> or <em>multi cutters<\/em>, reinforcing steel is separated. The method is established in <em>special demolition<\/em> and in <em>strip-out and cutting<\/em>.<\/li>\n<li><strong>Sawing and cutting<\/strong>: Separation cuts define intended break lines or minimize secondary damage. They are often combined with splitting or crushing methods to achieve controlled separations and precisely fitting segments.<\/li>\n<li><strong>Blasting technology<\/strong>: Offers high area productivity but is subject to permits and regulatory conditions. In vibration-sensitive zones, hydraulic alternatives are preferred.<\/li>\n<li><strong>Non-explosive expansive demolition agents<\/strong>: Cementitious or chemical agents are placed into boreholes to induce expansive pressure over time. Useful where blasting is restricted; typically slower but low in vibration and noise.<\/li>\n<\/ul>\n<h2>Hydraulic splitting: planning, drilling patterns, and execution<\/h2>\n<p>In borehole-assisted splitting, the drilling pattern and equipment configuration determine the quality of the breakout. <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power packs<\/a><\/em> supply the pressure; <em>rock wedge splitters<\/em> and <em>hydraulic wedge splitters<\/em> convert it into controlled splitting forces.<\/p>\n<h3>Geology and material parameters<\/h3>\n<ul>\n<li>Rock type and fabric (e.g., isotropic vs. fissile), <em>splitting tensile strength<\/em>, compressive strength<\/li>\n<li>Joints, stratification, weathering, water-bearing conditions<\/li>\n<li>Boundary conditions in the structure: reinforcement layout, bond, cross-section<\/li>\n<\/ul>\n<h3>Drilling pattern and hole geometry<\/h3>\n<ul>\n<li>Select bore diameter to match the splitter cylinder (keep tolerance tight)<\/li>\n<li>Hole depth \u2265 planned splitting depth; sufficient edge distances for a controlled crack path<\/li>\n<li>Define hole spacing along the intended fracture line; tighter in tough rock or reinforced concrete<\/li>\n<li>Orient drilling in relation to anisotropy and joints; avoid skewed holes that divert the crack path<\/li>\n<\/ul>\n<h3>Workflow<\/h3>\n<ol>\n<li>Investigation: review joints, stratification, and structural drawings<\/li>\n<li>Mark the fracture line and define segment sizes<\/li>\n<li>Drill per plan; flush and clean the holes<\/li>\n<li>Insert the <em>rock wedge splitters<\/em>; connect to <em>hydraulic power packs<\/em><\/li>\n<li>Increase load gradually in a controlled manner; monitor crack propagation<\/li>\n<li>Segment-by-segment separation; finishing with shear or cutting methods<\/li>\n<li>Secure separated pieces, manage debris, and confirm dimensional tolerances before the next sequence<\/li>\n<\/ol>\n<h3>Equipment settings and control<\/h3>\n<ul>\n<li>Use stepwise pressure build-up with short hold phases to stabilize crack initiation<\/li>\n<li>Coordinate flow rate and number of simultaneously operated cylinders to avoid pressure drop<\/li>\n<li>Maintain wedges and contact faces; insufficient lubrication increases friction and wear<\/li>\n<\/ul>\n<h2>Concrete pulverizers in the context of rock breakout<\/h2>\n<p><strong>Concrete pulverizers<\/strong> reduce mineral components by compressive and shear action. They are used especially in <em>concrete demolition and special demolition<\/em> where blasting or large-area saw cuts are not feasible. Typical applications include slab panels, walls, foundations, and bridge components. For reinforced concrete, <em>steel shears<\/em> or <em>multi cutters<\/em> are additionally used to cut reinforcement in a targeted manner. In combination with preceding separation cuts, a controlled, limited removal with high dimensional accuracy is achieved.<\/p>\n<h3>Advantages in urban environments<\/h3>\n<ul>\n<li>Low vibration levels and precise component control<\/li>\n<li>Reduced noise emission compared with impact tools<\/li>\n<li>Selective deconstruction: concrete and steel can be handled separately<\/li>\n<li>Lower risk of secondary damage to adjacent structures and sensitive equipment<\/li>\n<\/ul>\n<h3>Selection criteria<\/h3>\n<ul>\n<li>Jaw opening and crushing force relative to member thickness<\/li>\n<li>Cycle time and energy efficiency for continuous operation<\/li>\n<li>Tooth geometry and wear-part strategy aligned with aggregate hardness<\/li>\n<\/ul>\n<h2>Applications: from rock excavation to special demolition<\/h2>\n<ul>\n<li><strong>Rock excavation and tunnel construction<\/strong>: <em>Hydraulic wedge splitters<\/em> open crowns, remove overbreaks, and create caverns without blast-typical boundary loosening.<\/li>\n<li><strong>Natural stone extraction<\/strong>: Block extraction along natural discontinuities; wedge splitters support dimensionally accurate breaks with high reusability of the material.<\/li>\n<li><strong>Concrete demolition and special demolition<\/strong>: <em>Concrete pulverizers<\/em> for cross-section reduction, member separation, and controlled removal; <em>steel shears<\/em> and <em>multi cutters<\/em> for reinforcement.<\/li>\n<li><strong>Strip-out and cutting<\/strong>: Preparation of separation cuts, segment-by-segment release of members; combination with splitting methods for low-vibration workflows.<\/li>\n<li><strong>Special applications<\/strong>: In sensitive zones (heritage structures, proximity to utilities), hydraulic methods provide a controlled alternative. Depending on the task, <em>combination shears<\/em> or <em>tank cutters<\/em> are also used where metallic components must be separated.<\/li>\n<\/ul>\n<h2>Tool and equipment selection<\/h2>\n<p>The selection depends on material, member geometry, accessibility, and environmental requirements. The following overview shows typical assignments without claim to completeness:<\/p>\n<ul>\n<li><strong>Hydraulic wedge splitters<\/strong>, <strong>rock wedge splitters<\/strong>: Borehole splitting in rock and concrete, large-format segments, deep cross-sections<\/li>\n<li><strong>Concrete pulverizers<\/strong>: Crushing concrete members, exposing reinforcement<\/li>\n<li><strong>Steel shears<\/strong>, <strong>multi cutters<\/strong>: Cutting reinforcing steel, sections, and embedded components<\/li>\n<li><strong>Combination shears<\/strong>: Changing tasks requiring alternating gripping, cutting, and crushing<\/li>\n<li><strong>Hydraulic power packs<\/strong>: Power unit supplying operating pressure and flow matched to the attachment load demand<\/li>\n<li><strong>Tank cutters<\/strong>: Specific cutting tasks on metallic structures in special applications<\/li>\n<li><strong>Quick-change couplers<\/strong>: Reduce setup times when alternating between splitting, pulverizing, and cutting<\/li>\n<\/ul>\n<h2>Planning and verification<\/h2>\n<p>Careful planning reduces risks and improves breakout quality. Key building blocks include:<\/p>\n<ul>\n<li>Investigation: geology, structural buildups, reinforcement drawings, utilities<\/li>\n<li>Method selection: vibration limits, noise and dust protection, accessibility<\/li>\n<li>Drilling and shear concept: segment sizes, load paths, crane and <em>haulage logistics<\/em><\/li>\n<li>Monitoring: <em>crack monitoring<\/em>, settlement measurements, vibration measurement (where required)<\/li>\n<li>Documentation: work logs, measurements, photo documentation<\/li>\n<li>Digital capture: 3D scans or as-built models to align drilling patterns and transport routes<\/li>\n<li>Permit and stakeholder coordination: schedule constraints, exclusion times, traffic and site access<\/li>\n<\/ul>\n<h2>Safety, health, and environment<\/h2>\n<p>Occupational safety and environmental protection are paramount in rock breakout. As a general rule, observe local regulations and recognized rules of technology.<\/p>\n<ul>\n<li><strong>Personal protective equipment<\/strong>: hard hat, safety glasses, hearing protection, gloves, dust protection<\/li>\n<li><strong>Hazard sources<\/strong>: falling pieces, uncontrolled cracks, kickback, hydraulic leaks<\/li>\n<li><strong>Emissions<\/strong>: dust suppression (water mist), noise reduction measures, exhaust management<\/li>\n<li><strong>Vibrations<\/strong>: Prefer low-vibration methods (splitting, shears) in sensitive areas<\/li>\n<li><strong>Permits<\/strong>: Observe required notifications and conditions; especially for blasting works<\/li>\n<li><strong>Exclusion zones and communication<\/strong>: define danger areas, signalers for lifting and segment removal<\/li>\n<li><strong>Hydraulics<\/strong>: hose burst protection, pressure relief, lockout-tagout during maintenance<\/li>\n<li><strong>Dust control compliance<\/strong>: manage respirable crystalline silica with wet methods and suitable filtration<\/li>\n<\/ul>\n<h2>Quality criteria and result control<\/h2>\n<p>The quality of a rock breakout is reflected in the fracture pattern, dimensional accuracy, and the condition of adjacent structures. Check and observation points:<\/p>\n<ul>\n<li>Crack path along the intended break line<\/li>\n<li>Surface quality of fracture faces (relevant for reuse in the natural stone sector)<\/li>\n<li>Breakout edges on remaining members (protect adjoining structures)<\/li>\n<li>Fractioning of stockpiles for subsequent <em>recycling<\/em><\/li>\n<li>Dimensional tolerances of cuts and segments, verified against the plan<\/li>\n<li>Back-analysis of drilling and splitting parameters to refine subsequent sequences<\/li>\n<\/ul>\n<h2>Typical errors and how to avoid them<\/h2>\n<ul>\n<li>Unsuitable bore diameter: leads to uneven load transfer of the <em>rock wedge splitters<\/em>. Solution: select diameter and tolerances according to equipment specifications.<\/li>\n<li>Incorrect hole spacing: results in uncontrolled crack paths. Solution: adapt the drilling pattern to rock type and member thickness.<\/li>\n<li>Insufficient cleaning of boreholes: reduces frictional engagement. Solution: flush and blow out thoroughly.<\/li>\n<li>Overlooked reinforcement\/embedded parts: blocks crack propagation. Solution: locate and, if necessary, use <em>steel shears<\/em> or <em>multi cutters<\/em>.<\/li>\n<li>Unaccounted boundary conditions: moisture, temperature, water ingress. Solution: check in advance and plan measures.<\/li>\n<li>Mismatched power supply: pressure or flow not aligned with splitter or attachment demand. Solution: size <em>hydraulic power packs<\/em> correctly and monitor duty cycles.<\/li>\n<\/ul>\n<h2>Key figures, material behavior, and process parameters<\/h2>\n<p>For design, practice-oriented reference values apply, which must be verified for each project:<\/p>\n<ul>\n<li><strong>Splitting tensile strength<\/strong> of natural stone: significantly lower than compressive strength &#8211; governing for splitting processes<\/li>\n<li><strong>Concrete<\/strong>: reinforcement influences crack paths; combining <em>concrete pulverizers<\/em> and splitting is often advantageous<\/li>\n<li><strong>Drilled meters per cubic meter<\/strong>: depends on rock, segment sizes, and target geometry<\/li>\n<li><strong>Load cycles<\/strong> of the splitters: stepwise pressure build-up enables controlled work<\/li>\n<li><strong>Hole spacing<\/strong>: typically a multiple of hole diameter; reduced spacing in tough, homogeneous rock<\/li>\n<li><strong>Noise and vibration targets<\/strong>: select methods to meet site-specific limits and monitoring plans<\/li>\n<\/ul>\n<h2>Practical examples: combined methods<\/h2>\n<p>Combining several methods often yields the best results &#8211; for example in the <em>foundation demolition<\/em> of massive blocks or when loosening compact rock near structures that must be protected:<\/p>\n<ul>\n<li>Pre-cut intended break lines, then split with <em>hydraulic wedge splitters<\/em><\/li>\n<li>Reduce cross-sections with <em>concrete pulverizers<\/em>, then cut reinforcement with <em>steel shears<\/em> or <em>multi cutters<\/em><\/li>\n<li>Segment-by-segment separation in confined conditions, removal by crane or conveying equipment<\/li>\n<li>Tunnel overbreak correction: targeted splitting to restore profile without additional loosening<\/li>\n<\/ul>\n<h2>Economics and project organization<\/h2>\n<p>Time, cost, and quality depend strongly on organization and equipment coordination. Key levers are:<\/p>\n<ul>\n<li>Precise drilling pattern instead of rework afterward<\/li>\n<li>Appropriate sizing of the <em>hydraulic power packs<\/em> to avoid waiting times<\/li>\n<li>Logistics of breakout pieces: plan early, keep routes short<\/li>\n<li>Sequencing: create access first, then perform the main removal<\/li>\n<li>Utilization and changeover times: minimize idle periods with coordinated teams and quick-change systems<\/li>\n<li>Early waste stream planning: define fractions and removal containers to keep the site efficient<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Rock breakout refers to the targeted separation of rock or stone from a natural formation or from man-made structures such as concrete. In practical fields such as rock excavation and tunnel construction, natural stone extraction, and in concrete demolition and special demolition, the goal is controlled, safe, and as low-emission <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rock-breakout\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19893","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rock Breakout - Excavation &amp; Concrete Demolition<\/title>\n<meta name=\"description\" content=\"Controlled rock removal \u2713 for excavation, tunneling &amp; concrete demolition. Rock breakout with low vibration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rock-breakout\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rock Breakout - Excavation &amp; Concrete Demolition\" \/>\n<meta property=\"og:description\" content=\"Controlled rock removal \u2713 for excavation, tunneling &amp; concrete demolition. Rock breakout with low vibration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/rock-breakout\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-28T15:41:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-breakout\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-breakout\",\"name\":\"Rock Breakout - Excavation & Concrete Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-30T09:17:23+00:00\",\"dateModified\":\"2026-05-28T15:41:03+00:00\",\"description\":\"Controlled rock removal \u2713 for excavation, tunneling & concrete demolition. Rock breakout with low vibration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-breakout#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-breakout\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-breakout#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Rock breakout\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rock Breakout - Excavation & Concrete Demolition","description":"Controlled rock removal \u2713 for excavation, tunneling & concrete demolition. Rock breakout with low vibration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/rock-breakout","og_locale":"en_US","og_type":"article","og_title":"Rock Breakout - Excavation & Concrete Demolition","og_description":"Controlled rock removal \u2713 for excavation, tunneling & concrete demolition. Rock breakout with low vibration.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/rock-breakout","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-28T15:41:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/rock-breakout","url":"https:\/\/www.darda.de\/en\/knowledge\/rock-breakout","name":"Rock Breakout - Excavation & Concrete Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-30T09:17:23+00:00","dateModified":"2026-05-28T15:41:03+00:00","description":"Controlled rock removal \u2713 for excavation, tunneling & concrete demolition. Rock breakout with low vibration.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/rock-breakout#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/rock-breakout"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/rock-breakout#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Rock breakout"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19893","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19893"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19893\/revisions"}],"predecessor-version":[{"id":27874,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19893\/revisions\/27874"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}