{"id":19886,"date":"2025-12-29T16:41:39","date_gmt":"2025-12-29T15:41:39","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19886"},"modified":"2026-05-28T09:53:02","modified_gmt":"2026-05-28T07:53:02","slug":"dust-protection-mask","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/dust-protection-mask","title":{"rendered":"Dust protection mask"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Dust is generated wherever concrete, rock, or metal is separated, split, or crushed. In fields such as concrete demolition and special demolition, strip-out and cutting, rock excavation and tunnel construction, as well as natural stone extraction, an appropriate dust protection mask is a fixed component of personal protective equipment. This applies in particular when working with powerful, hydraulically operated tools from Darda GmbH &#8211; such as concrete pulverizers, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, combination shears, multi cutters, steel shears, tank cutters, or stone splitting cylinders. A professionally selected and correctly worn dust protection mask reduces inhalation exposure to mineral fine dust, abrasion particles, and quartz-containing dusts and complements technical and organizational dust-reduction measures. In many operations, respirable crystalline silica (RCS) is relevant, which underscores the need for coordinated respiratory protection.<\/p>\n<h2>Definition: What is a dust protection mask?<\/h2>\n<p>A dust protection mask is a particulate-filtering half mask for protecting the respiratory tract against solid particles and aerosols. It is worn tightly over the mouth and nose and filters inhaled air through a fleece or multilayer filter system. In industrial environments, filter classes according to EN 149 (FFP1, FFP2, FFP3) have become established. Dust protection masks are <em>not<\/em> suitable for gases or vapors and require a sufficient oxygen concentration in the ambient air. They are used in dust-intensive tasks, such as those that typically occur when using concrete pulverizers, stone and concrete splitters, or when separating and downsizing components. The term FFP also denotes the filtering facepiece category per EN 149 and is commonly used in risk assessments.<\/p>\n<h2>Protection types, markings, and standards<\/h2>\n<p>The selection of a suitable dust protection mask is based on the particle load, the duration of the task, and the legal and technical frameworks. In European work environments, particulate-filtering half masks according to EN 149 are common. The key characteristics:<\/p>\n<ul>\n<li><strong>FFP1<\/strong>: Basic protection against coarser, non-toxic dusts at low concentration. Too weak for most mineral dusts in the demolition context.<\/li>\n<li><strong>FFP2<\/strong>: Protection against harmful dusts and solid aerosols at moderate concentration, a typical standard in concrete and rock processing, e.g., when working with concrete pulverizers or combination shears during strip-out.<\/li>\n<li><strong>FFP3<\/strong>: High filtration performance for fine, alveolar-penetrating dusts, including quartz-containing fine dusts, as can occur when downsizing concrete, during rock excavation, or in tunnel construction.<\/li>\n<\/ul>\n<p>Additional markings support practical selection:<\/p>\n<ul>\n<li><strong>NR<\/strong> (non-reusable): Designed for one work shift.<\/li>\n<li><strong>R<\/strong> (reusable): Usable for several work shifts when properly stored.<\/li>\n<li><strong>D<\/strong>: Passed the dolomite dust test; an indication of good breathing resistance even under dust loading.<\/li>\n<li><strong>Exhalation valve<\/strong>: Facilitates exhalation, reduces moisture and heat build-up under the mask &#8211; useful for physically demanding tasks, e.g., when handling heavy concrete pulverizers or stone splitting cylinders.<\/li>\n<\/ul>\n<p>For tasks with high dust release, as typically seen when crushing, shearing, splitting, and cutting concrete and natural stone, at least FFP2 is frequently used; in heavily dusting situations FFP3 is often chosen. Decisive factors are the risk assessment, the dust type (e.g., quartz-containing fine dust), and the concentration at the workplace. A dust protection mask is part of a coordinated protection concept that includes technical dust reduction (e.g., via wet cutting or point extraction) and organizational measures.<\/p>\n<p><em>Note:<\/em> CE marking, the applicable standard, and the manufacturer identification must be present and legible. Shelf life information on the packaging supports safe stock management.<\/p>\n<h2>Dust sources in concrete demolition, rock excavation, and strip-out<\/h2>\n<p>The type of dust determines the requirements for the dust protection mask. In the context of Darda GmbH, typical dust sources are:<\/p>\n<ul>\n<li><strong>Downsizing concrete<\/strong> with concrete pulverizers: Release of cement dust, fine rock flour, and possibly quartz-containing fine dust; reinforcement content can generate additional abrasion particles.<\/li>\n<li><strong>Splitting rock<\/strong> with stone and concrete splitters or stone splitting cylinders: Localized material separations that can release micro-fractures and fine dust depending on the substrate.<\/li>\n<li><strong>Strip-out and cutting<\/strong> with combination shears, multi cutters, steel shears, and tank cutters: Metal abrasion, paint and coating residues, mineral dust from adjacent masonry.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: High fractions of fine dust from rock abrasion; in enclosed spaces (tunnels, shafts) the dust concentration is often elevated.<\/li>\n<li><strong>Secondary dust formation<\/strong> during handling, transport, sweeping, and disposal of rubble and fines can significantly increase exposure if not controlled.<\/li>\n<\/ul>\n<h2>Selecting the dust protection mask by application area<\/h2>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>When separating, shearing, and pressing concrete structures, the share of fine particles is often high. <strong>FFP2<\/strong> is frequently the starting level; with intensive fine-dust formation or elevated quartz exposure, <strong>FFP3<\/strong> is often preferred in practice. Exhalation valves improve wearing comfort during physical exertion and high ambient temperatures. Adjustable nose clips and sealing foams can reduce leakage at the bridge of the nose.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Indoors with low air exchange, dust concentration can rise quickly. When working with combination shears and multi cutters, fine metal and coating abrasion are relevant in addition to mineral dust. Tight-fitting masks with reliable face sealing and, where applicable, <em>D<\/em> marking are advantageous. Odors from coatings may be noticeable but are not filtered by particulate masks, making effective ventilation important.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Alveolar-penetrating dusts from rock abrasion can be particularly critical. <strong>FFP3<\/strong> masks are frequently used. In underground areas, also ensure a sufficient oxygen content of the air; dust protection masks do not filter gases. For longer shifts, comfort-oriented models with low breathing resistance offer advantages. Communication-friendly designs and anti-fog features support consistent wear in confined spaces.<\/p>\n<h3>Natural stone extraction and special assignments<\/h3>\n<p>Depending on the rock type and processing method, the dust load varies. A careful risk assessment that considers material, method (dry\/wet), and duration is the basis for selection. With changing tasks, clear mask labeling and a structured issuing practice have proven effective. Recording mask selection decisions for recurring activities improves consistency.<\/p>\n<h2>Fit, seal, and wearing practice<\/h2>\n<p>The protective effect stands and falls with tightness. Hair growth in the sealing area, incorrectly adjusted straps, or a shifted mask body significantly reduce performance. Before starting work, a simple seal check is recommended by covering the mask body while inhaling. Eyeglass wearers should pay attention to compatible nose clips to reduce leakage. For sweat-inducing tasks (e.g., when handling concrete pulverizers or stone and concrete splitters), masks with a valve help reduce fogging of safety glasses.<\/p>\n<ul>\n<li><strong>User seal check<\/strong>: Perform a negative and, where possible, positive pressure check after donning.<\/li>\n<li><strong>Strap adjustment<\/strong>: Position the upper strap high on the crown and the lower strap below the ears without twisting.<\/li>\n<li><strong>Nose clip<\/strong>: Pre-form gently and press from the bridge outward to ensure a uniform seal.<\/li>\n<li><strong>Facial hair<\/strong>: Beards in the sealing area compromise protection; maintain a clean-shaven seal zone.<\/li>\n<\/ul>\n<h2>Use in combination with other PPE<\/h2>\n<p>In demolition and tunnel environments, dust protection masks are worn together with safety helmet, hearing protection, safety glasses, and hand protection. The components should be coordinated so that no pressure points arise and the seal is not impaired. Slim mask bodies often harmonize better with close-fitting safety glasses and earmuffs. When face shields or visors are required, verify that the mask maintains contact pressure on the face.<\/p>\n<h2>Limits of the dust protection mask<\/h2>\n<p>Particulate-filtering half masks protect <em>exclusively<\/em> against particles. They offer no protection against gases or vapors and are not suitable for oxygen-deficient environments. At very high dust concentrations, long wear times, or specific hazardous substances, other respiratory protection systems may be required. Decisions should be based on recognized rules of technology and the results of the risk assessment. Where limits of use for FFP masks are exceeded, powered or elastomeric respirators with suitable filters may be indicated within a graded protection concept.<\/p>\n<h2>Dust reduction at the source and work organization<\/h2>\n<p>The dust protection mask is part of a package of measures. Technical and organizational steps significantly reduce exposure:<\/p>\n<ul>\n<li>Prefer low-dust methods, e.g., separating and splitting instead of grinding where possible.<\/li>\n<li>Consider wet cutting, local extraction, or shielding.<\/li>\n<li>Spatially separate work areas, enclose dust sources, take air currents into account.<\/li>\n<li>Clean with appropriate methods; avoid dry dust agitation.<\/li>\n<li>Plan tasks and breaks to allow recovery phases.<\/li>\n<li>Use on-tool extraction with suitably classified vacuums and maintain filters to sustain flow rates.<\/li>\n<li>Define one-way material and personnel routes to minimize dust carryover between zones.<\/li>\n<\/ul>\n<h2>Care, storage, and replacement<\/h2>\n<p>For the intended period of use: Replace any mask that is wet, damaged, or indicates significantly increased breathing resistance. Reusable variants are stored clean and dry in the original packaging or a clean box. Do not store masks in tool bags with grinding dust. Observe markings such as <strong>NR<\/strong>\/<strong>R<\/strong>.<\/p>\n<ul>\n<li>Observe expiry dates and packaging integrity before issue.<\/li>\n<li>Avoid deformation during storage; protect from extreme temperatures and humidity.<\/li>\n<li>Dispose of single-use masks after contamination with slurry, oil, or after the designated shift.<\/li>\n<\/ul>\n<h2>Occupational health and legal aspects<\/h2>\n<p>In professional environments, general occupational safety requirements as well as relevant standards and rules of technology apply. The selection and use of the dust protection mask are based on the risk assessment, substance data, and workplace conditions. Training and careful documentation of protective measures support reliable application in Darda GmbH\u2019s fields of use. Regular instruction and, where applicable, fit verification complement the risk-based selection of FFP classes.<\/p>\n<h2>Avoid common mistakes<\/h2>\n<ul>\n<li>Donning the mask with dirty hands: risk of leaks and skin irritation.<\/li>\n<li>Loosely worn straps: leakage especially at the nose and cheeks.<\/li>\n<li>Reusing <strong>NR<\/strong> masks beyond a single shift.<\/li>\n<li>Use in an unclear atmosphere (gases, oxygen deficiency) despite particle protection.<\/li>\n<li>Combining with mismatched safety glasses or hearing protection that disturb the seal.<\/li>\n<li>Parking the mask under the chin between tasks, contaminating the inner surface.<\/li>\n<li>Over-bending the nose clip repeatedly, leading to poor fit or breakage.<\/li>\n<\/ul>\n<h2>Practice-oriented examples from Darda GmbH\u2019s application areas<\/h2>\n<p>When crushing reinforced concrete with concrete pulverizers, sharp-edged cement dust is generated at the fracture edge. A tight-fitting FFP2 or FFP3 mask reduces the intake of this fine dust. When splitting massive natural stone blocks with stone and concrete splitters, visible dust development is often low, yet fine particles can still be released &#8211; so a situationally adapted dust protection mask remains sensible. In tunnel headings with limited air exchange, choosing a comfortable mask with low breathing resistance helps ensure it is worn consistently over longer intervals. During strip-out with coated metals, models with <em>D<\/em> marking can maintain breathing comfort longer under higher dust load.<\/p>\n<h2>Checkpoints for selection in day-to-day work<\/h2>\n<ol>\n<li>What dust type and quantity are expected (e.g., quartz-containing concrete dust, rock abrasion, fine metal dust)?<\/li>\n<li>How long does the task last and what is the air circulation (indoors\/outdoors, tunnel\/shaft)?<\/li>\n<li>Which filter class is appropriate (<strong>FFP2<\/strong> as standard, <strong>FFP3<\/strong> for high fine-dust loads)?<\/li>\n<li>Do I need an exhalation valve for reduced heat build-up?<\/li>\n<li>Are glasses, helmet, and hearing protection compatible with the mask shape?<\/li>\n<li>NR or R &#8211; how are planned use and storage organized?<\/li>\n<li>Is sufficient oxygen present and are gases or vapors ruled out in the work area?<\/li>\n<li>Are size, CE marking, and clear labeling available for rapid identification and documentation?<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dust is generated wherever concrete, rock, or metal is separated, split, or crushed. In fields such as concrete demolition and special demolition, strip-out and cutting, rock excavation and tunnel construction, as well as natural stone extraction, an appropriate dust protection mask is a fixed component of personal protective equipment. This <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/dust-protection-mask\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19886","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Dust Protection Mask for Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Choose the right dust protection mask \u2713 Respiratory PPE for demolition, concrete and rock tasks with FFP2 &amp; FFP3 tips.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/dust-protection-mask\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dust Protection Mask for Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Choose the right dust protection mask \u2713 Respiratory PPE for demolition, concrete and rock tasks with FFP2 &amp; FFP3 tips.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/dust-protection-mask\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-28T07:53:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dust-protection-mask\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dust-protection-mask\",\"name\":\"Dust Protection Mask for Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-29T15:41:39+00:00\",\"dateModified\":\"2026-05-28T07:53:02+00:00\",\"description\":\"Choose the right dust protection mask \u2713 Respiratory PPE for demolition, concrete and rock tasks with FFP2 & FFP3 tips.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dust-protection-mask#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dust-protection-mask\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dust-protection-mask#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Dust protection mask\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Dust Protection Mask for Construction & Demolition","description":"Choose the right dust protection mask \u2713 Respiratory PPE for demolition, concrete and rock tasks with FFP2 & FFP3 tips.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/dust-protection-mask","og_locale":"en_US","og_type":"article","og_title":"Dust Protection Mask for Construction & Demolition","og_description":"Choose the right dust protection mask \u2713 Respiratory PPE for demolition, concrete and rock tasks with FFP2 & FFP3 tips.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/dust-protection-mask","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-28T07:53:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/dust-protection-mask","url":"https:\/\/www.darda.de\/en\/knowledge\/dust-protection-mask","name":"Dust Protection Mask for Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-29T15:41:39+00:00","dateModified":"2026-05-28T07:53:02+00:00","description":"Choose the right dust protection mask \u2713 Respiratory PPE for demolition, concrete and rock tasks with FFP2 & FFP3 tips.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/dust-protection-mask#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/dust-protection-mask"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/dust-protection-mask#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Dust protection mask"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19886"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19886\/revisions"}],"predecessor-version":[{"id":27849,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19886\/revisions\/27849"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}