{"id":19880,"date":"2025-12-29T13:56:49","date_gmt":"2025-12-29T12:56:49","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19880"},"modified":"2026-05-27T15:52:02","modified_gmt":"2026-05-27T13:52:02","slug":"tool-service-life","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tool-service-life","title":{"rendered":"Tool service life"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The tool service life determines cycle times, costs, safety, and planning reliability in demolition, deconstruction, and raw material extraction. The more stable the service life, the more predictable the construction workflows &#8211; whether using concrete pulverizer, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete hydraulic splitter<\/a>, combi shears, or steel shear. Across all application areas of Darda GmbH &#8211; from concrete demolition and special deconstruction through building gutting and cutting to rock excavation, tunnel construction, natural stone extraction, and special demolition &#8211; material, tool geometry, hydraulics, operating practice, and maintenance influence tool service life. This knowledge consolidates practical fundamentals and provides guidance for the targeted extension of service life. Clear definitions, consistent metrics, and reproducible methods enable comparable reporting across sites and fleets.<\/p>\n<h2>Definition: What is meant by tool service life?<\/h2>\n<p><strong>Service life<\/strong> refers to the usable operating duration of a tool until a defined wear or functional limit is reached. In practice, the service life of hydraulic demolition and splitting tools is recorded as the sum of <em>operating hours<\/em>, the number of <em>work cycles<\/em> (e.g., spreading or cutting cycles), or as <em>throughput<\/em> (e.g., m\u00b3 of concrete, tons of rock, meters of steel cut). Service life ends when cutting edges lose cutting quality, splitting wedges can no longer achieve the required crack initiation, jaws develop excessive play, or safety and performance limits would be exceeded. Service life is therefore a key indicator for cost-effectiveness, availability, and technical reliability of a concrete pulverizer and a stone and concrete hydraulic splitter as well as Multi Cutters, combi shears, steel shears, and tank cutters. Where appropriate, <em>condition-based<\/em> replacement thresholds complement time-based limits to maintain consistent performance.<\/p>\n<h2>Influencing factors on service life in demolition and extraction<\/h2>\n<p>Service life is determined by an interplay of material, geometry, force transmission, load spectrum, and operation. Decisive are the resistances of the material to be processed (e.g., compressive strength, degree of reinforcement, aggregate composition), the actual hydraulic drive power at the tool, thermal management, and the condition of joints, pins, bushings, and blade or jaw surfaces. In practice it shows: a stable hydraulic power supply, correctly set working pressure, appropriate tool selection, and consistent inspections noticeably extend the operating duration. Misalignment, eccentric loading, and worn bearing points amplify surface pressures and accelerate wear.<\/p>\n<h2>Service life with concrete pulverizer and stone and concrete hydraulic splitter: specifics<\/h2>\n<p>Concrete pulverizer and stone and concrete hydraulic splitter operate with high point loads, changing contact angles, and material-specific crack processes. This results in typical service-life topics:<\/p>\n<h3>Concrete pulverizer<\/h3>\n<ul>\n<li><strong>Jaw and blade geometry:<\/strong> Aggressive toothings accelerate initial biting but increase surface pressure and thus wear. Rounded transitions reduce notch effects and edge breakage.<\/li>\n<li><strong>Influence of reinforcement:<\/strong> Frequent contacts with reinforcing steel lead to micro-chipping and cold deformation. Resharpening at short intervals preserves cutting quality and prevents spalling.<\/li>\n<li><strong>Hydraulic dynamics:<\/strong> Excessive pressure spikes cause impact fatigue at cutting edges and pins. A cleanly set maximum pressure with sufficient flow stabilizes service life.<\/li>\n<li><strong>Structural guidance:<\/strong> Precise jaw guidance and avoidance of twisting loads reduce edge chipping and pin wear.<\/li>\n<\/ul>\n<h3>Stone and concrete hydraulic splitter<\/h3>\n<ul>\n<li><strong>Crack initiation and wedge friction:<\/strong> The friction pairing between splitting wedge and borehole wall determines force losses and surface damage on the wedge. A tailored surface hardness and sufficient lubrication within the permitted range reduce abrasion.<\/li>\n<li><strong>Borehole execution:<\/strong> Clean, dimensionally accurate boreholes with matching diameter prevent transverse forces and edge crushing on the splitting cylinder and the wedge.<\/li>\n<li><strong>Rock variability:<\/strong> Hard, granular rock (e.g., granite) causes higher material removal than softer, homogeneously bound concrete; service life differs accordingly.<\/li>\n<li><strong>Spacing and edge distances:<\/strong> Proper borehole spacing and sufficient edge distances minimize parasitic bending moments on cylinders and wedges.<\/li>\n<\/ul>\n<h2>Key figures, measurement methods, and failure criteria<\/h2>\n<p>A robust service-life assessment requires traceable, reproducible metrics and clear criteria for reaching the wear limit.<\/p>\n<ul>\n<li><strong>Metrics:<\/strong> Operating hours; work cycles (e.g., jaw opening\/closing, splitting operations); throughput (m\u00b3 of concrete, tons of rock, meters cut); energy input (hydraulic work over time); utilization factor (% time under load within a shift).<\/li>\n<li><strong>Failure criteria:<\/strong> Falling below a defined cutting or splitting performance; excessive play in joints; crack formation in highly loaded zones; limit dimensions reached on blades\/jaws\/wedges.<\/li>\n<li><strong>Documentation:<\/strong> Regular visual inspection with gauge, photo documentation, counter readings, and maintenance log support comparable service-life data. Recording material class, reinforcement ratio, and ambient temperature improves cross-project comparability.<\/li>\n<\/ul>\n<h2>Wear mechanisms and material selection<\/h2>\n<p>Wear rarely occurs monocasually. Multiple mechanisms often act simultaneously:<\/p>\n<ul>\n<li><strong>Abrasion:<\/strong> Hard aggregate, reinforcing wires, and concrete residue abrade surfaces. <em>Two-body<\/em> and <em>three-body abrasion<\/em> both occur. Harder, heat-treated tool steels and tough-hard cutting edges reduce volume loss.<\/li>\n<li><strong>Adhesion and cold welding:<\/strong> Local micro-welds under pressure and relative movement lead to material transfer and scoring.<\/li>\n<li><strong>Impact fatigue:<\/strong> Alternating peak loads create microcracks; rounded edges and adapted force profiles reduce notch stresses.<\/li>\n<li><strong>Edge breakage:<\/strong> Too sharp bevels or pre-damage promote spalling; timely resharpening preserves support width.<\/li>\n<li><strong>Temperature and corrosion:<\/strong> High operating temperatures weaken strength; moisture and salt promote corrosion &#8211; both reduce service life.<\/li>\n<\/ul>\n<p>The appropriate material strategy combines hardness and toughness. For cutting and gripping edges, a hard, wear-resistant surface with a tough core has proven effective; for pins and bushings, matched pairings with defined lubrication are effective for service life. Surface treatments with controlled case depths and suitable hardness gradients help stabilize wear behavior.<\/p>\n<h2>Set operating parameters deliberately<\/h2>\n<p>The performance of hydraulic power packs has a direct effect on the service life of connected tools. A coherent interaction of pressure, flow rate, and temperature is crucial.<\/p>\n<ul>\n<li><strong>Working pressure:<\/strong> As high as necessary, as low as possible. Excessive pressure creates unnecessary peak loads; too low pressure extends cycles and increases friction time.<\/li>\n<li><strong>Flow rate:<\/strong> Sufficient to achieve the planned cycle times without risking cavitation. Too low a delivery rate leads to heat input and sluggish operation.<\/li>\n<li><strong>Thermal management:<\/strong> Operate hydraulic fluid within the permissible temperature window; heat stresses seals, reduces lubricant films, and accelerates wear.<\/li>\n<li><strong>Fluid cleanliness:<\/strong> Fine filtration protects valves, cylinders, and seals; particles in the fluid shorten the service life of moving fits and seals.<\/li>\n<li><strong>Cold-start behavior:<\/strong> Allow warm-up to reach viscosity ranges that ensure reliable lubrication and responsive valve function.<\/li>\n<\/ul>\n<h2>Maintenance, care, and repair as levers for service life<\/h2>\n<p>Regular and professional care significantly extends the operating duration of concrete pulverizer, stone and concrete hydraulic splitter, and other tools of Darda GmbH.<\/p>\n<ol>\n<li><strong>Inspection:<\/strong> Daily visual check of cutting edges, jaws, wedges, pins, and bushings; check for cracks, spalling, play, and leaks.<\/li>\n<li><strong>Lubrication:<\/strong> Supply lubrication points according to specifications; remove dirt beforehand to avoid abrasive ingress.<\/li>\n<li><strong>Resharpening and resetting:<\/strong> Early, dimensionally accurate resharpening preserves geometry and reduces material removal; reposition or replace wedges in time.<\/li>\n<li><strong>Replace wear parts in time:<\/strong> Replace blades, jaw plates, pins\/bushings before consequential wear occurs on carrier parts.<\/li>\n<li><strong>Hydraulic care:<\/strong> Check fluid level, fluid quality, and filter condition; rectify leaks promptly.<\/li>\n<li><strong>Fastener control:<\/strong> Check torque on critical bolted joints at specified intervals to prevent misalignment and secondary damage.<\/li>\n<\/ol>\n<h2>Application areas and typical load profiles<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>Heterogeneous components, high reinforcement ratios, and varying wall thicknesses create varying load peaks. Concrete pulverizer benefit from controlled starter cuts, targeted bite points, and sufficient opening paths; gains in service life arise from orderly work steps and consistent resharpening. Avoiding prying against rebar bundles and maintaining straight attack angles limits peak stresses.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>With combi shears (<a href=\"https:\/\/www.darda.de\/en\/product-overview\/combi-shears-hcs8\">HCS8<\/a>), Multi Cutters, and steel shear, shear stresses dominate. Clean material separation (e.g., reinforcing steel, sections, cables) with suitable blade geometry minimizes edge breakage and preserves cutting quality longer. Short, decisive cuts with adequate opening clearance reduce heat and wear.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Rocks with high abrasiveness stress splitting wedges and cylinder surfaces. Dimensionally accurate boreholes, correct wedge guidance, and careful cleaning of contact surfaces extend the service life of the splitting tools. Sequenced splitting with controlled pressure ramps stabilizes crack propagation and reduces wedge scuffing.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Reproducible crack patterns are crucial. Constant wedge forces, uniform stress distribution, and a smooth pressure ramp protect tool edges and cylinder components. Monitoring wedge temperature and lubrication status further mitigates friction wear.<\/p>\n<h3>Special demolition<\/h3>\n<p>Unconventional materials or confined conditions increase misloading. Careful probing, additional interlayers to protect cutting edges, and a conservative pressure setting promote service life. Temporary supports that reduce unintended bending help limit joint and pin wear.<\/p>\n<h2>Identify failure patterns and correct them<\/h2>\n<ul>\n<li><strong>Micro-chipping on cutting edges:<\/strong> Often caused by steel contact or impact load; remedy: timely fine grinding, reduce pressure spikes.<\/li>\n<li><strong>Irregular wear on jaws:<\/strong> Indicates skew pull or incorrect attack angle; remedy: check tool alignment, inspect bearing points.<\/li>\n<li><strong>Polished wedge surfaces with scoring:<\/strong> Abrasion due to particles; remedy: clean, check surface hardness, ensure borehole quality.<\/li>\n<li><strong>Excessive joint play:<\/strong> Wear on pins\/bushings; remedy: renew pairing, adjust lubrication intervals.<\/li>\n<li><strong>Thermal discoloration:<\/strong> Indicates overheating; remedy: check hydraulic temperature and flow rate, stagger duty cycles.<\/li>\n<li><strong>Extruded or nicked seal lips:<\/strong> Points to overtemperature or pressure spikes; remedy: review pressure setting, cooling capacity, and filtration.<\/li>\n<\/ul>\n<h2>Tool selection and geometry optimization<\/h2>\n<p>The right tool geometry for the task is a major lever for service life. For heavily reinforced concrete, robust, tough cutting edges are sensible; with brittle, lightly reinforced material, sharper geometries can increase efficiency but must be consistently maintained. With stone and concrete hydraulic splitter, a wedge angle that reliably splits the material without pre-cracking improves both process stability and service life. Matching jaw profiles and blade hardness classes to the dominant material spectrum improves predictability and reduces resharpening frequency.<\/p>\n<h2>Hydraulic power packs: impact on service life and availability<\/h2>\n<p>Hydraulic power packs (<a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>) from Darda GmbH supply the energy for concrete pulverizer, splitting tools, and shears. Cleanliness, temperature, and stability of the hydraulic system determine the service life of seals, cylinders, and valves &#8211; and thus indirectly the service life of the tools.<\/p>\n<ul>\n<li><strong>Filtration and fluid care:<\/strong> Particle-free fluid reduces wear on precision fits; replace filters in time.<\/li>\n<li><strong>Stable pressure regulation:<\/strong> Avoids pressure spikes and cavitation; uniform force transmission protects edges and joints.<\/li>\n<li><strong>Hose lengths and cross-sections:<\/strong> Adapted hydraulic hose lines maintain flow and reduce pressure losses, keeping cycle times and temperature in balance.<\/li>\n<li><strong>Cooling capacity and ambient conditions:<\/strong> Sufficient cooling reserves and clean heat exchangers keep oil within target temperature windows under varying site conditions.<\/li>\n<\/ul>\n<h2>Operating practice: work gently, gain service life<\/h2>\n<p>Operation has a direct influence on tool service life. Training, routine, and a forward-looking working style contribute to service life.<\/p>\n<ul>\n<li><strong>Targeted starter cuts:<\/strong> With concrete pulverizer, first bite at edges and weak points; use lever effects instead of working bluntly against massive cross-sections.<\/li>\n<li><strong>No \u201cempty clamping\u201d:<\/strong> Holding at the pressure end stop without material contact for long periods increases heat and wear; prefer cycle work with short pauses.<\/li>\n<li><strong>Clean contact surfaces:<\/strong> Sand, debris, and foreign particles between cutting edges or wedges increase abrasion; regular cleaning pays off.<\/li>\n<li><strong>Material knowledge:<\/strong> Degree of reinforcement, concrete age, and aggregate determine the approach; adjusting tactics protects cutting edges and splitting wedges.<\/li>\n<li><strong>Avoid side loading:<\/strong> Keep attacks straight and avoid prying to reduce torsional peaks in joints and pins.<\/li>\n<\/ul>\n<h2>Economics and sustainability of higher service life<\/h2>\n<p>Increased service life lowers unit costs, reduces downtime, and decreases resource consumption. Fewer spare parts, shorter setup times, and a stable energy input per ton of material have positive ecological and economic effects. Overall scheduling, safety, and equipment service life benefit equally. Documented improvements in service life also support sustainability reporting and lifecycle assessments.<\/p>\n<h2>Planning, documentation, and spare parts management<\/h2>\n<p>Structured planning keeps tools available and protects the carrier structure.<\/p>\n<ul>\n<li><strong>Spare parts buffer:<\/strong> Procure wear parts for concrete pulverizer and splitting tools in time to meet planned maintenance windows.<\/li>\n<li><strong>Maintenance cycles:<\/strong> Adapt to real load spectra; harsh applications require tighter intervals.<\/li>\n<li><strong>Service-life tracking:<\/strong> Document cycles, throughput, and resharpening points; feed the resulting insights back into tool selection and hydraulic settings.<\/li>\n<li><strong>Kits and interchangeability:<\/strong> Use standardized wear-part kits and compatible components to minimize downtime and simplify logistics.<\/li>\n<\/ul>\n<h2>Safety and general notes<\/h2>\n<p>Work with hydraulic demolition and splitting tools requires careful preparation and compliance with applicable regulations. Personal safety equipment, secured work areas, and adherence to the technical instructions of Darda GmbH help prevent damage and preserve service life. Legal requirements can vary by project and location; careful compliance with the generally accepted rules of good engineering practice is recommended. Energy isolation procedures and defined communication routines further reduce risk and secondary damage.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The tool service life determines cycle times, costs, safety, and planning reliability in demolition, deconstruction, and raw material extraction. The more stable the service life, the more predictable the construction workflows &#8211; whether using concrete pulverizer, stone and concrete hydraulic splitter, combi shears, or steel shear. Across all application areas <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tool-service-life\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19880","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tool Service Life for Demolition &amp; Rock Splitting<\/title>\n<meta name=\"description\" content=\"Boost tool service life in demolition and extraction \u2713 with tips on wear, hydraulics, maintenance and smart operation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tool-service-life\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tool Service Life for Demolition &amp; Rock Splitting\" \/>\n<meta property=\"og:description\" content=\"Boost tool service life in demolition and extraction \u2713 with tips on wear, hydraulics, maintenance and smart operation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tool-service-life\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-27T13:52:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tool-service-life\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tool-service-life\",\"name\":\"Tool Service Life for Demolition & Rock Splitting\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-29T12:56:49+00:00\",\"dateModified\":\"2026-05-27T13:52:02+00:00\",\"description\":\"Boost tool service life in demolition and extraction \u2713 with tips on wear, hydraulics, maintenance and smart operation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tool-service-life#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tool-service-life\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tool-service-life#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tool service life\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tool Service Life for Demolition & Rock Splitting","description":"Boost tool service life in demolition and extraction \u2713 with tips on wear, hydraulics, maintenance and smart operation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tool-service-life","og_locale":"en_US","og_type":"article","og_title":"Tool Service Life for Demolition & Rock Splitting","og_description":"Boost tool service life in demolition and extraction \u2713 with tips on wear, hydraulics, maintenance and smart operation.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tool-service-life","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-27T13:52:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tool-service-life","url":"https:\/\/www.darda.de\/en\/knowledge\/tool-service-life","name":"Tool Service Life for Demolition & Rock Splitting","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-29T12:56:49+00:00","dateModified":"2026-05-27T13:52:02+00:00","description":"Boost tool service life in demolition and extraction \u2713 with tips on wear, hydraulics, maintenance and smart operation.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tool-service-life#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tool-service-life"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tool-service-life#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tool service life"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19880","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19880"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19880\/revisions"}],"predecessor-version":[{"id":27841,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19880\/revisions\/27841"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19880"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}