{"id":19877,"date":"2025-12-27T15:52:13","date_gmt":"2025-12-27T14:52:13","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19877"},"modified":"2026-05-27T11:18:02","modified_gmt":"2026-05-27T09:18:02","slug":"steel-wall","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/steel-wall","title":{"rendered":"Steel wall"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Steel walls are key structural elements in industrial plants, infrastructure, tank and vessel construction, in tunnel and special foundation engineering, as well as in deconstruction. In Darda GmbH\u2019s fields of application, professionals encounter steel walls as vessel shells, sheet pile walls, protective and partition walls, or as linings. Especially in concrete demolition and special demolition, gutting works and cutting, as well as in rock breakout and tunnel construction, methods for low-spark separation, controlled segmenting, and safe handling of steel plates play a crucial role. When steel is bonded to concrete or rock, <strong>concrete pulverizers<\/strong> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> are often additionally used to release composite zones cleanly. This combination allows stepwise dismantling with minimal heat input, limited vibration, and high process reliability.<\/p>\n<h2>Definition: What is meant by a steel wall?<\/h2>\n<p>A steel wall is understood to be a planar wall component made of steel, usually fabricated from sheets or plates, acting as a shell, partition, protective, or supporting element. Typical forms are straight or curved sheet walls with stiffeners, welded vessel walls, sheet pile walls in hydraulic and geotechnical works, or temporary enclosures. Depending on the task, steel walls carry bending, membrane, and shear forces, resist pressure and vacuum loads, secure voids, or separate media. Connections are created by welding, bolting, riveting, or clamping; supports occur on frames, ribs, sections, or directly via wall thicknesses and beads. In practice, corrosion allowance, inspection openings, and fabrication tolerances influence both the load path and separability.<\/p>\n<h2>Steel walls in construction and deconstruction: fields of application<\/h2>\n<p>Steel walls are found as tank and silo walls, as cladding of machine halls, as fire protection and splash protection walls, as sheet pile walls in excavation pits, and as steel liners in tunnel construction. In deconstruction, they are cut, segmented, and removed, often under confined, sensitive, or emission-critical conditions. For separating steel walls, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">hydraulic steel shears for plates<\/a>, <em>multi cutters<\/em>, or <em>combination shears<\/em> are used; for tank- or vessel-specific tasks, a <a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">tank cutter TC120<\/a> is suitable for low-spark opening of shell surfaces. If steel walls are grouted with concrete (e.g., steel-concrete composite, base plates, anchor heads), <strong>concrete pulverizers<\/strong> can locally remove concrete, while <strong>rock wedge splitters and concrete splitters<\/strong> create controlled crack paths to release connections without heavy vibrations.<\/p>\n<ul>\n<li>Typical application goals: create access openings, reduce component size, detach composite interfaces, and prepare safe lifting points.<\/li>\n<li>Preferred methods: cold cutting with hydraulic shears and cutters to avoid hot work, combined with selective concrete removal where required.<\/li>\n<\/ul>\n<h2>Structure, materials, and typical thicknesses<\/h2>\n<p>Steel walls often consist of carbon steel sheets (e.g., structural steels of normal or higher strength), less commonly of stainless steels for corrosive media. Wall thicknesses range from thin cassette elements to massive plates for pressure vessels or sheet pile profiles. Stiffeners using beads, angle or T-sections reduce the risk of buckling and increase plate load-carrying capacity. Coatings, duplex systems, or metallic overlays protect against corrosion; internal linings reduce abrasion or chemical attack. Weld seams, nozzles, and manholes represent structural specifics that require particular attention during separation and segmenting.<\/p>\n<ul>\n<li>Indicative thickness bands: light cladding approx. 1.5-4 mm, structural plates approx. 5-20 mm, heavy vessel and liner plates above approx. 20 mm (project dependent).<\/li>\n<li>Typical details affecting cutting: backing strips at welds, lap joints, corner seams, local reinforcements around penetrations.<\/li>\n<li>Access factors: clearance for jaw entry, reach to cut lines, and space for intermediate supports or slings.<\/li>\n<\/ul>\n<h2>Separation and deconstruction techniques on steel walls<\/h2>\n<p>Controlled separation of steel walls aims for low-spark, low-vibration, and precise cuts. In deconstruction, openings are created, panel fields are cut out, and assemblies are divided into manageable segments. Cold-cutting hydraulic shears and cutting tools are particularly suitable; they minimize heat, reduce sparks, and protect adjacent components.<\/p>\n<ul>\n<li>Quality targets during cutting: dimensional accuracy, stable guidance of cutting edges, minimal burring, and avoidance of secondary damage to stiffeners or adjacent systems.<\/li>\n<li>Process control: defined cutting sequences, continuous monitoring of panel behavior, and immediate edge dressing at hazard points.<\/li>\n<\/ul>\n<h3>Cold cutting with hydraulic cutting tools<\/h3>\n<p>Hydraulically operated <em>steel shears<\/em>, <em>combination shears<\/em>, and <em>multi cutters<\/em> enable low-noise and low-vibration cuts through plates, beams, and sections. On tanks and silos, <em>tank cutters<\/em> are often used section by section along marked cutting lines to create openings for emptying, ventilation, and safe segmenting. Proper blade selection and maintenance reduce notch effects and help to maintain consistent cutting forces.<\/p>\n<h3>Cleanly releasing composite constructions<\/h3>\n<p>Where a steel wall meets concrete (e.g., at fixings, foundation connections, or steel-concrete composite shells), the combination of steel cutting and concrete breaking proves effective: <strong>concrete pulverizers<\/strong> create space at nodes, expose anchors, and allow separation of steel-concrete connections. <strong>rock wedge splitters and concrete splitters<\/strong> can apply pressure cracks in a targeted manner to release composite joints without overloading the steel wall. A proven sequence is to remove confinement in concrete first, then cut the steel while keeping temporary supports active.<\/p>\n<h3>Segmenting and load control<\/h3>\n<p>Steel panels are cut so that self-weight and residual load-bearing capacity remain controllable. During cut-outs, auxiliary suspensions or intermediate shoring relieve the cutting zone. Cutting sequences prevent unwanted buckling or twisting.<\/p>\n<ul>\n<li>Segment geometry: favor compact shapes with low slenderness to limit elastic rebound and distortion.<\/li>\n<li>Lifting strategy: tag-line control and pre-tensioned slings to counter unexpected rotation when the final cut passes.<\/li>\n<li>Redundancy: secondary securing of segments in case of adhesive bonding or residual attachments.<\/li>\n<\/ul>\n<h2>Safety, stability, and work preparation<\/h2>\n<p>Before separating, load paths, stress states, and potential residual pressures must be checked. Steel walls in vessels must be emptied, degassed, and ventilated; for sheet pile walls, earth pressure must be considered. Temporary shoring, catch devices, and reliable anchorage points must be planned. Safety equipment, shielding against flying fragments, and orderly hose routing from <em>hydraulic power packs<\/em> increase safety.<\/p>\n<ul>\n<li>Permits and coordination: clarify hot work avoidance by cold cutting, lockout-tagout, and interface management with operations or site logistics.<\/li>\n<li>Atmosphere control: continuous gas measurement where explosive or toxic atmospheres are possible; ensure defined air exchange routes.<\/li>\n<li>Monitoring: observe deflections and settlement, especially near foundations and excavations; set intervention thresholds.<\/li>\n<\/ul>\n<h3>Workflow in practice<\/h3>\n<ol>\n<li>Survey: Record material, thickness, coatings, stiffeners, and connections.<\/li>\n<li>Check stability: Assess loads, supports, and possible deformations; plan shoring.<\/li>\n<li>Define separation strategy: Cutting sequence, segment sizes, suspensions, and haulage logistics.<\/li>\n<li>Release composite joints: Remove concrete portions with <strong>concrete pulverizers<\/strong>, apply splitting forces in a measured way.<\/li>\n<li>Perform cold cutting: Use hydraulic shears and <em>tank cutters<\/em> with low spark generation.<\/li>\n<li>Secure and remove segments: Dress edges, mitigate sharp-edged areas.<\/li>\n<li>Document results and waste streams: record cut lines, segment weights, and material classification for recycling or disposal.<\/li>\n<li>Final safety check: verify that remaining edges are secured, temporary systems are removed in a controlled manner, and the area is released.<\/li>\n<\/ol>\n<h2>Corrosion and fire protection: influences on work on steel walls<\/h2>\n<p>Coatings, galvanization, or fire and chemical protection systems can lead to smoke or particulates during separation. Mechanical methods with low heat generation reduce emissions. Potential hazardous substances must be identified in advance, and suitable extraction and filtration provided. For fire-relevant components, temporary substitute measures must be planned when load-bearing or fire stop functions are removed.<\/p>\n<ul>\n<li>Material screening: test for heavy metals in old coatings and for isocyanate-containing layers in fire protection systems.<\/li>\n<li>Protective measures: localized wetting, spark catchers, and mobile extraction near the cutting zone.<\/li>\n<li>Restoration: coordinate re-application of corrosion protection after cutting and transport interfaces.<\/li>\n<\/ul>\n<h2>Steel walls in tunnel and special foundation engineering<\/h2>\n<p>In tunnel construction, steel walls appear as linings, liners, or portal reinforcements. During refurbishments, openings are created, service penetrations added, or damaged sections replaced. In excavation pits and trenches, sheet pile walls made of steel take up lateral earth and water pressure. In deconstruction work on such steel walls, the interaction with surrounding soil and groundwater must be considered. For accompanying measures in rock, such as exposing anchors or removing concrete edges, <strong>rock wedge splitters and concrete splitters<\/strong> as well as <strong>concrete pulverizers<\/strong> help to keep vibrations low.<\/p>\n<ul>\n<li>Constraints: settlement sensitivity of adjacent structures, groundwater management, and vibration thresholds for monitoring.<\/li>\n<li>Interface control: sequence measures so that soil support or lining continuity is never compromised during cutting.<\/li>\n<\/ul>\n<h2>Measurement methods and condition assessment<\/h2>\n<p>Typical damage patterns on steel walls are corrosion loss, pitting, cracks at weld seams, dents due to instability, or plastic deformations after overload. Wall thickness measurements, visual inspections, magnetic particle or dye penetrant testing, and geometric checks support the assessment. The condition assessment determines where cutting is permitted and which shoring is required.<\/p>\n<ul>\n<li>Additional checks: ultrasonic thickness gauging on corroded areas, hardness spot checks near heat-affected regions, and verification of hidden reinforcements or inserts.<\/li>\n<li>Documentation: mapping of defects and thickness readings to align cut lines with structurally favorable zones.<\/li>\n<\/ul>\n<h2>Hydraulic power packs and tool selection<\/h2>\n<p><em>Hydraulic power packs<\/em> provide the flow rate and pressure for shears, pulverizers, and splitters. The choice of tools depends on wall thickness, steel grade, and section geometry. Blade and jaw designs must be selected so that cutting edges are guided stably and the cut line is accessible. Hose lengths, couplings, and pressure stages are coordinated to ensure safe and ergonomic operation on site.<\/p>\n<ul>\n<li>Selection criteria: required cutting force, jaw opening, reach to the workpiece, and duty cycle with matching flow and pressure.<\/li>\n<li>Operational safety: remote placement of power packs in low-exposure zones; pressure monitoring and quick-coupling compatibility.<\/li>\n<li>Efficiency: tool changes planned by segment type to minimize repositioning and idle times.<\/li>\n<\/ul>\n<h2>Special steel walls: tanks, silos, and pressure vessels<\/h2>\n<p>For tanks and silos, residual media, coatings, and internals (agitators, baffle plates, risers) must be considered. Before separation, inerted or ventilated conditions must be established, ignition sources minimized, and grounding measures provided. <em>Tank cutters<\/em> enable <strong>cold<\/strong> guided opening cuts; large-format panels are divided into transportable pieces. At foundations, the steel wall is often connected to concrete: <strong>concrete pulverizers<\/strong> create the necessary free cuts so that the steel sheet can be released without tensile tears.<\/p>\n<ul>\n<li>Preparatory steps: verify fill history, clean residues, purge or inert as required, and confirm gas-free status with continuous measurement.<\/li>\n<li>Cut planning: arrange vent and drain openings ahead of shell cuts to avoid trapped energy and pressure pockets.<\/li>\n<li>Handling: define internal and external lift points to control shell curvature during segmenting.<\/li>\n<\/ul>\n<h2>Measures to reduce emissions during deconstruction<\/h2>\n<p>Cutting steel with hydraulic equipment reduces sparks, heat, and noise. Additional measures such as localized wetting, mobile shielding, and low-dust concrete processing improve the working environment. Indoors, air changes, filters, and clear material routes must be planned to safely run gutting works and cutting in parallel.<\/p>\n<ul>\n<li>Noise control: temporary acoustic screens and low-rebound contact surfaces under segments.<\/li>\n<li>Dust and fume management: near-source extraction with suitable filtration; water use balanced against runoff management.<\/li>\n<li>Logistics: segregated routes for cut scrap, temporary storage with drip trays if contaminated, and timed removal to avoid congestion.<\/li>\n<\/ul>\n<h2>Design and load-bearing aspects at a glance<\/h2>\n<p>Depending on their support, steel walls act as plates, membranes, or shells. Critical are local buckling, stress concentrations at openings and weld seams, as well as notch effects during cutting. For work on load-bearing steel walls, it must always be checked whether temporary substitute systems are required. The applicable rules of steel and metal construction, as well as explosion protection, occupational safety, and fire protection, must be considered; binding case-by-case evaluations are the responsibility of the planners and contractors.<\/p>\n<ul>\n<li>Do not remove stiffeners or edge restraints prematurely; preserve load paths until substitutes are active.<\/li>\n<li>Position cut lines away from peak stress zones and weld toe transitions where feasible.<\/li>\n<li>Leave defined bridges for control, then remove them under lifting load with adequate securing.<\/li>\n<\/ul>\n<h2>Classification compared to related types<\/h2>\n<p>Steel walls differ from reinforced concrete walls in material and fracture behavior as well as separation techniques. Compared to sheet pile walls as profile shoring, vessel or cassette walls exhibit different stiffening patterns and connection details. In deconstruction, these differences imply an adapted sequence of steel cutting and concrete release, often using a combination of shears, <strong>concrete pulverizers<\/strong> and <strong>rock wedge splitters and concrete splitters<\/strong> to separate structures in a controlled and material-appropriate manner. Coordinated tool pairing and a staged approach reduce risks, limit emissions, and improve schedule reliability across varying wall types.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Steel walls are key structural elements in industrial plants, infrastructure, tank and vessel construction, in tunnel and special foundation engineering, as well as in deconstruction. In Darda GmbH\u2019s fields of application, professionals encounter steel walls as vessel shells, sheet pile walls, protective and partition walls, or as linings. Especially in <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/steel-wall\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19877","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Steel Wall Construction &amp; Demolition Techniques<\/title>\n<meta name=\"description\" content=\"Expert guide to steel wall construction &amp; deconstruction in tanks, tunnels &amp; sheet piles \u2713 safe low-spark separation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/steel-wall\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Steel Wall Construction &amp; Demolition Techniques\" \/>\n<meta property=\"og:description\" content=\"Expert guide to steel wall construction &amp; deconstruction in tanks, tunnels &amp; sheet piles \u2713 safe low-spark separation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/steel-wall\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-27T09:18:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/steel-wall\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/steel-wall\",\"name\":\"Steel Wall Construction & Demolition Techniques\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-27T14:52:13+00:00\",\"dateModified\":\"2026-05-27T09:18:02+00:00\",\"description\":\"Expert guide to steel wall construction & deconstruction in tanks, tunnels & sheet piles \u2713 safe low-spark separation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/steel-wall#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/steel-wall\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/steel-wall#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Steel wall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Steel Wall Construction & Demolition Techniques","description":"Expert guide to steel wall construction & deconstruction in tanks, tunnels & sheet piles \u2713 safe low-spark separation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/steel-wall","og_locale":"en_US","og_type":"article","og_title":"Steel Wall Construction & Demolition Techniques","og_description":"Expert guide to steel wall construction & deconstruction in tanks, tunnels & sheet piles \u2713 safe low-spark separation.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/steel-wall","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-27T09:18:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/steel-wall","url":"https:\/\/www.darda.de\/en\/knowledge\/steel-wall","name":"Steel Wall Construction & Demolition Techniques","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-27T14:52:13+00:00","dateModified":"2026-05-27T09:18:02+00:00","description":"Expert guide to steel wall construction & deconstruction in tanks, tunnels & sheet piles \u2713 safe low-spark separation.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/steel-wall#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/steel-wall"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/steel-wall#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Steel wall"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19877"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19877\/revisions"}],"predecessor-version":[{"id":27817,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19877\/revisions\/27817"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}