{"id":19864,"date":"2025-12-26T15:39:11","date_gmt":"2025-12-26T14:39:11","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19864"},"modified":"2026-05-26T11:47:02","modified_gmt":"2026-05-26T09:47:02","slug":"steel-anchor","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/steel-anchor","title":{"rendered":"Steel anchor"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Steel anchors are central connecting elements in structural engineering, geotechnical engineering, and plant construction. They transfer tensile and transverse (shear) forces into concrete, masonry, or rock and secure components, machine foundations, fa\u00e7ades, column bases, or temporary shoring. In deconstruction and during repair works, the construction type, embedment depth, and pre-tension of steel anchors influence the choice of method and tool. Especially when working with <strong>concrete pulverizers<\/strong> as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH, understanding the anchor geometry, the load transfer, and the boundary conditions is crucial to work in a controlled, material-friendly, and safe manner with low vibration and reduced emissions.<\/p>\n<h2>Definition: What is meant by a steel anchor?<\/h2>\n<p>Steel anchors are steel anchorages that introduce loads into a load-bearing substrate. They often consist of threaded rods or strands with an anchor head and an anchor plate, are fixed mechanically (for example by expansion or undercut) or adhesively (for example with injection mortar) in the borehole, and transfer forces via friction, positive fit, and bond. In rock and tunnel construction, pre-tensioned rock bolts and permanent anchors are also used to secure excavations, adits, or cavities. In existing structures, steel anchors appear as bonded anchors, dowels, through-anchors, headed studs, or as part of anchor plate assemblies and must be treated in deconstruction as local reinforcements and potential restraint points. <em>Documentation of the original installation method significantly improves predictability during dismantling.<\/em><\/p>\n<ul>\n<li><strong>Typical components<\/strong>: tension member (rod, bar, or strand), anchorage head, plate or washer, and the bonding or expansion mechanism in the borehole.<\/li>\n<li><strong>Substrates<\/strong>: normal and high-strength concrete, masonry, and rock with differing behavior under splitting and cutting.<\/li>\n<li><strong>Load directions<\/strong>: tension and shear, often combined with bending due to eccentricity.<\/li>\n<\/ul>\n<h2>Design and types of steel anchors<\/h2>\n<p>Steel anchors can be differentiated by their working principle and installation. Mechanical anchors generate an <em>expansion effect<\/em> in the borehole or engage positively in an undercut geometry. Chemical anchors utilize the <em>bond<\/em> between mortar and substrate; they are often suitable for cracked and older concrete. Through-anchors and installation anchors are set through the attached parts and can be identified in existing structures by visible nuts and washers. Rock bolts and strand anchors are usually pre-tensioned; their end anchorage with an anchor plate is accessible, while the free anchor length is grouted in the borehole. In refurbishment works, grouted dowels, headed studs, and bonded anchors are also encountered; when cutting, these can produce different failure behaviors.<\/p>\n<ul>\n<li><strong>Mechanical systems<\/strong>: fast load transfer and immediate capacity, but sensitive to edge distances and substrate brittleness.<\/li>\n<li><strong>Chemical systems<\/strong>: high adaptability to irregular boreholes and cracked concrete, with curing times and temperature effects to consider.<\/li>\n<li><strong>Pretensioned systems<\/strong>: energy storage due to elongation, requiring controlled release prior to severing.<\/li>\n<\/ul>\n<h2>Planning and investigation: identifying steel anchors in existing structures<\/h2>\n<p>Careful investigation reduces surprises in deconstruction. Clues are provided by existing drawings, anchor logs, reinforcement and formwork drawings, as well as a visual inspection of anchor heads, plates, or supports. For concealed anchors, trial openings, magnetic location, and endoscopic drillings help. Decisive parameters are embedment depth, diameter, edge distances, and any pre-tension. These determine whether controlled <em>exposing<\/em> with concrete pulverizers, <em>splitting<\/em> with stone and concrete splitters, or <em>cutting<\/em> with steel shear and Multi Cutters from Darda GmbH is appropriate. For pre-tensioned systems, safe releasing before severing must be planned; the procedure follows project-specific requirements and should always be chosen to minimize risk.<\/p>\n<ul>\n<li><strong>Investigation methods<\/strong>: selective exposing, cover meter and magnetic scanning, small-diameter probe drilling with endoscopy, and hardness checks of grout and mortar.<\/li>\n<li><strong>Key decision parameters<\/strong>: <em>embedment depth<\/em>, <em>bar or strand diameter<\/em>, <em>edge and spacing distances<\/em>, <em>substrate condition<\/em> (cracked, carbonated, wet), and <em>pre-tension level<\/em>.<\/li>\n<li><strong>Access management<\/strong>: define working clearances, protect adjacent finishes, and plan debris containment from the outset.<\/li>\n<\/ul>\n<h2>Deconstruction concept: expose, split, cut, extract<\/h2>\n<h3>Exposing with concrete pulverizers<\/h3>\n<p>Concrete pulverizers locally crush the concrete cover to make anchor heads, nuts, washers, and anchor plates accessible. Targeted nibbling reduces vibrations and enables successive exposing even in sensitive areas. Controlled force application via <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units from Darda<\/a> allows finely metered work that minimizes spalling at edges and corners.<\/p>\n<ul>\n<li>Proceed in small bites from the free edge toward the anchor zone to preserve load paths.<\/li>\n<li>Shield reinforcement to avoid unintended cutting where later splitting is planned.<\/li>\n<li>Maintain clear sight of the anchor head to assess residual pre-tension and damage.<\/li>\n<\/ul>\n<h3>Splitting with stone and concrete splitters<\/h3>\n<p>Stone and concrete splitters as well as stone splitting cylinders create defined fracture planes along the desired separation line. Around anchor zones, this allows the concrete to be broken into manageable pieces without introducing extensive impacts or vibrations. This is particularly advantageous in <strong>concrete demolition and special demolition<\/strong> when neighboring components or installations must be protected.<\/p>\n<ul>\n<li>Align splitting direction with anticipated tension cone and reinforcement layout.<\/li>\n<li>Apply staggered placements where edge distances are tight to steer crack propagation.<\/li>\n<li>Adapt splitting pressure to moisture and strength class to keep fractures controlled.<\/li>\n<\/ul>\n<h3>Cutting with steel shears, Multi Cutters, and combination shears<\/h3>\n<p>After exposing, anchor rods, anchor plates, or tension members are separated with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a> or Multi Cutters. For mixed-material cross-sections &#8211; such as residual concrete with embedded steel parts &#8211; combination shears help cut through both materials in a single pass. The choice of cutting jaws depends on diameter, material strength, and accessibility. For thick anchor plates, step-by-step removal combined with splitting of the surrounding concrete can be more process-safe.<\/p>\n<ul>\n<li><strong>Selection criteria<\/strong>: section thickness, steel grade, accessibility, and risk of rebound movements.<\/li>\n<li><strong>Technique<\/strong>: position blades perpendicular to the member axis where possible to reduce burrs and notch effects.<\/li>\n<li><strong>Sequencing<\/strong>: cut secondary elements first, then the primary tension member under controlled support.<\/li>\n<\/ul>\n<h3>Releasing pre-tensioned anchors<\/h3>\n<p>Pre-tensioned rock bolts or strand anchors may contain stored energy. Before any cut, a safe release must be ensured, for example by controlled loosening of the anchor plate, incremental backing off of the nut, or by pre-removing surrounding concrete to reduce clamping and bond forces. The specific procedure should follow recognized rules and be performed only by trained personnel.<\/p>\n<ol>\n<li>Establish exclusion zones and shielding against snap-back.<\/li>\n<li>Expose the anchorage head sufficiently to access nut and plate without binding.<\/li>\n<li>Reduce confinement around the free length to minimize bond and wedge effects.<\/li>\n<li>Back off pre-tension in small increments while monitoring movement and elongation.<\/li>\n<\/ol>\n<h2>Load transfer, edge distances, and failure modes<\/h2>\n<p>Steel anchors transfer tensile forces into the substrate through bond and positive-fit mechanisms. Typical failure modes are steel failure, pull-out of the concrete tension cone, bond failure in the mortar, or a combination thereof. Edge distances and spacing influence the size of the tension cone and thus both the load-bearing capacity and the controlled removal in deconstruction. Sufficient exposing with concrete pulverizers facilitates the targeted placement of splitting wedges and reduces uncontrolled spalling. With tight edge distances, splitting in multiple, staggered placements is recommended to steer crack propagation.<\/p>\n<ul>\n<li><strong>Group effects<\/strong>: overlapping cones reduce capacity and affect crack steering during removal.<\/li>\n<li><strong>Cracked vs. uncracked substrates<\/strong>: existing cracks can re-route fracture lines and require adapted splitting pressure.<\/li>\n<li><strong>Shear transfer<\/strong>: combined tension and shear demands may necessitate additional supports during cutting.<\/li>\n<\/ul>\n<h2>Application areas: practical use<\/h2>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In heavily anchored foundations or machine substructures, steel anchors are often large in size. The coordinated interaction of exposing, splitting, and cutting &#8211; concrete pulverizers, stone and concrete splitters, and steel shears &#8211; enables sequential removal that accounts for residual load-bearing capacity and increases occupational safety.<\/p>\n<ul>\n<li>Segment works into manageable stages to maintain stability at all times.<\/li>\n<li>Verify temporary supports before each cut and re-check after each splitting cycle.<\/li>\n<\/ul>\n<h3>Strip-out and cutting<\/h3>\n<p>When dismantling fa\u00e7ade anchors, brackets, and attachments, accessibility is crucial. After opening the connection zone with concrete pulverizers, anchor rods are separated with Multi Cutters. The low vibration levels preserve adjacent fit-out and installations.<\/p>\n<ul>\n<li>Use dust-minimized exposing in occupied or sensitive environments.<\/li>\n<li>Protect cladding and glazing with impact and debris screens.<\/li>\n<\/ul>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>Temporary rock bolts and securing elements are removed or destressed depending on the project. Splitting techniques help remove anchor heads and anchor plates without destabilizing the surroundings. Where full extraction is not required, flush cutting and the safe sealing of core drill holes is often sufficient.<\/p>\n<ul>\n<li>Coordinate with ground monitoring to ensure no adverse movements during destressing.<\/li>\n<li>Seal boreholes compatibly with groundwater protection and durability requirements.<\/li>\n<\/ul>\n<h3>Natural stone extraction<\/h3>\n<p>In quarries, anchored safety and temporary fixings are used. Stone and concrete splitters enable precise opening along split cracks, while steel shears separate steel anchorings. Blocks can thus be released in a controlled manner and sized for transport.<\/p>\n<ul>\n<li>Plan split lines along natural discontinuities to minimize waste and tool wear.<\/li>\n<\/ul>\n<h3>Special operation<\/h3>\n<p>In special situations &#8211; such as severely corroded or oversized anchor heads &#8211; a combined approach may be necessary: segmental nibbling of the plate, splitting the anchor surroundings, and final separation of the remaining tension members. Hydraulic power packs from Darda GmbH provide the finely metered power needed for a controlled approach.<\/p>\n<ul>\n<li>For unknown steel grades or corrosion states, test cuts at low force and inspect cut faces.<\/li>\n<\/ul>\n<h2>Material, corrosion, and durability<\/h2>\n<p>Material properties influence cutting behavior. High-strength steels are more notch-sensitive; cutting surfaces should therefore be produced with minimal burrs. Corrosion can reduce bond or create nonuniform load paths, changing the failure pattern. Injection mortars and fillers encountered during exposing can vary &#8211; from mineral to polymeric. The appropriate tool and cutting sequence are therefore matched to material, moisture, and substrate strength.<\/p>\n<ul>\n<li><strong>Steel grades<\/strong>: tougher grades demand higher cutting forces and careful blade positioning.<\/li>\n<li><strong>Corrosion<\/strong>: section loss and pitting introduce stress risers that can trigger sudden release.<\/li>\n<li><strong>Mortars and grouts<\/strong>: polymeric systems may smear when warm, mineral systems chip more brittlely.<\/li>\n<\/ul>\n<h2>Procedural principles for controlled deconstruction<\/h2>\n<h3>Sequence and pacing<\/h3>\n<p>First expose, then split, and finally cut &#8211; this sequence provides clarity, reduces restraint, and facilitates safe extraction. For plate anchors, a star-shaped approach with alternating contact points has proven effective.<\/p>\n<ol>\n<li>Define the working zone and supports.<\/li>\n<li>Expose anchorage points with minimal collateral damage.<\/li>\n<li>Split to relieve confinement before any cut.<\/li>\n<li>Cut under controlled support and remove elements in planned order.<\/li>\n<\/ol>\n<h3>Achieving load-free states<\/h3>\n<p>Before tension members are cut, the component should be brought as close as possible to a load-free state, for example by temporary shoring or relief via additional cuts. This avoids uncontrolled movements.<\/p>\n<ul>\n<li>Install shoring or back-propping prior to weakening measures.<\/li>\n<li>Monitor deflections or crack widths to verify effective unloading.<\/li>\n<\/ul>\n<h3>Cleanliness in the borehole and at the contact zone<\/h3>\n<p>Dust and loose particles affect bond and crack propagation. Careful cleaning of the contact zones improves the predictability of splitting and failure behavior.<\/p>\n<ul>\n<li>Use blow-out and vacuum extraction in sequence to keep boreholes clean.<\/li>\n<li>Remove slurry and debris from cutting zones to maintain visibility and blade efficiency.<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>Ongoing documentation of the work steps &#8211; such as photos of exposing, cut interfaces, and removed anchor parts &#8211; increases traceability. Cut edges, remaining lengths, and the treatment of boreholes are recorded. Removed steel must be separated according to applicable rules and directed to recycling. Where project-specific requirements for noise emission, dust exposure, or vibrations apply, working with hydraulic concrete pulverizers and splitters offers advantages, as these methods can be precisely and low-emission metered.<\/p>\n<ul>\n<li><strong>Records<\/strong>: anchor type, dimensions, embedment depth, release method, and sequence of operations.<\/li>\n<li><strong>Evidence<\/strong>: photo log of each stage including protective measures and final condition.<\/li>\n<li><strong>Environmental tracking<\/strong>: dust, noise, and vibration readings where required.<\/li>\n<\/ul>\n<h2>Occupational safety and environmental protection<\/h2>\n<p>When dealing with steel anchors, personnel safety and protection of the surroundings come first. Potential risks include stored pre-tension forces, uncontrolled component movements, cutting and crushing hazards, as well as dust and noise emissions. Protective measures include exclusion zones, load release, spark and debris protection, appropriate personal protective equipment, and a clear communication structure within the team. Procedures must always be planned project-specifically and executed with due care.<\/p>\n<ul>\n<li><strong>Risk controls<\/strong>: pre-task briefings, barrier systems, and clear hand signals in noisy environments.<\/li>\n<li><strong>PPE<\/strong>: cut-resistant gloves, eye and face protection, hearing protection, and safety footwear appropriate to site conditions.<\/li>\n<li><strong>Environmental care<\/strong>: dust suppression, proper debris segregation, and avoidance of contaminant entry into drainage systems.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Steel anchors are central connecting elements in structural engineering, geotechnical engineering, and plant construction. They transfer tensile and transverse (shear) forces into concrete, masonry, or rock and secure components, machine foundations, fa\u00e7ades, column bases, or temporary shoring. In deconstruction and during repair works, the construction type, embedment depth, and pre-tension <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/steel-anchor\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19864","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Steel Anchor in Concrete &amp; Rock | Removal Methods<\/title>\n<meta name=\"description\" content=\"Master controlled handling of steel anchor in construction with types, load transfer &amp; safe removal \u27a4 learn more.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/steel-anchor\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Steel Anchor in Concrete &amp; Rock | Removal Methods\" \/>\n<meta property=\"og:description\" content=\"Master controlled handling of steel anchor in construction with types, load transfer &amp; safe removal \u27a4 learn more.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/steel-anchor\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-26T09:47:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/steel-anchor\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/steel-anchor\",\"name\":\"Steel Anchor in Concrete & Rock | Removal Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-26T14:39:11+00:00\",\"dateModified\":\"2026-05-26T09:47:02+00:00\",\"description\":\"Master controlled handling of steel anchor in construction with types, load transfer & safe removal \u27a4 learn more.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/steel-anchor#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/steel-anchor\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/steel-anchor#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Steel anchor\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Steel Anchor in Concrete & Rock | Removal Methods","description":"Master controlled handling of steel anchor in construction with types, load transfer & safe removal \u27a4 learn more.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/steel-anchor","og_locale":"en_US","og_type":"article","og_title":"Steel Anchor in Concrete & Rock | Removal Methods","og_description":"Master controlled handling of steel anchor in construction with types, load transfer & safe removal \u27a4 learn more.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/steel-anchor","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-26T09:47:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/steel-anchor","url":"https:\/\/www.darda.de\/en\/knowledge\/steel-anchor","name":"Steel Anchor in Concrete & Rock | Removal Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-26T14:39:11+00:00","dateModified":"2026-05-26T09:47:02+00:00","description":"Master controlled handling of steel anchor in construction with types, load transfer & safe removal \u27a4 learn more.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/steel-anchor#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/steel-anchor"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/steel-anchor#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Steel anchor"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19864"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19864\/revisions"}],"predecessor-version":[{"id":27797,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19864\/revisions\/27797"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}