{"id":19863,"date":"2025-12-26T08:11:44","date_gmt":"2025-12-26T07:11:44","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19863"},"modified":"2026-05-26T07:30:04","modified_gmt":"2026-05-26T05:30:04","slug":"sheet-pile-shoring","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-shoring","title":{"rendered":"Sheet pile shoring"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Sheet pile shoring is a core construction method in geotechnical and hydraulic engineering when excavations, waterfront zones, or traffic areas must be enclosed safely and watertight. It enables work below groundwater level, limits ground movements, and protects adjacent structures. In addition to structural design, execution, monitoring, and subsequent deconstruction are part of the scope. In practice, sheet pile shoring involves numerous tasks that can be solved efficiently and with low emissions using tools for concrete, rock, and steel. Depending on the construction stage, among others, <strong>concrete pulverizers<\/strong>, <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/em>, steel shears, combination shears, multi cutters, hydraulic power packs, and specialized cutting tools are used &#8211; especially for exposing, separating, or adapting components in the shoring environment. Robust sequencing, environmental compliance, and life-cycle considerations increasingly guide the choice of methods and tools, supported by digital documentation and monitoring.<\/p>\n<h2>Definition: What is meant by sheet pile shoring?<\/h2>\n<p>Sheet pile shoring refers to the enclosure of excavations or waterfronts with interlocking profiles &#8211; usually steel sheet piles &#8211; that are driven, vibrated, or pressed into the ground. The piles form a wall connected in the longitudinal direction, whose interlocks ensure watertightness and whose flexural stiffness resists earth and water pressures. Depending on depth and loading, the sheet pile wall is supplemented with walers, internal struts, or tie-back anchoring systems. Besides temporary works, sheet pile walls can be designed for permanent use with provisions for <em>durability<\/em> and <em>corrosion protection<\/em>. While steel is standard, special cases may use composite or concrete elements in combination with steel. Proper toe embedment and potential base sealing are decisive where uplift and piping risks exist. Sheet pile shoring is used in excavations, cofferdams, bank protection, bridge abutments, quay structures, and flood protection. Subsequent deconstruction often involves pulling the piles, sometimes with cutting or adaptation work on steel and concrete components within the construction area.<\/p>\n<h2>Applications and objectives in geotechnical and hydraulic engineering<\/h2>\n<p>The objective of sheet pile shoring is a stable, as watertight as possible excavation enclosure with controlled deformation. It provides temporary or permanent resistance to earth and water pressures and minimizes settlements in the surroundings. In inner-city locations or near sensitive infrastructure, low-vibration procedures are advantageous. Typical tasks around the shoring &#8211; such as opening existing concrete members, cutting steel struts, or working rock lenses &#8211; can often be performed with <strong>concrete pulverizers<\/strong> and <em>rock and concrete splitters<\/em> with reduced vibration and noise. This accelerates workflows and reduces risks to existing structures. Additional goals include safeguarding against basal heave and hydraulic uplift, limiting seepage and inflow, and ensuring construction tolerances for subsequent fit-out and structural interfaces.<\/p>\n<h2>Construction methods: installing the sheet piles<\/h2>\n<p>The choice of method depends on subsoil, surrounding conditions, and permissible emissions. Where space is limited or emissions are tightly capped, method combinations and pre-treatment of the soil can expand feasibility while protecting neighboring assets.<\/p>\n<h3>Impact driving<\/h3>\n<p>Impact driving with diesel or hydraulic pile hammers is robust and efficient in cohesive and non-cohesive soils. However, it generates vibrations and airborne noise, which can impose restrictions in sensitive areas. Driveability is verified via blow counts and energy transfer; noise shrouds, hammer cushions, and working-time management help mitigate emissions.<\/p>\n<h3>Vibratory driving<\/h3>\n<p>Vibro-installation uses vibrations to reduce shaft friction. It is fast and widely used, but can generate vibrations. Monitoring is common near settlement-sensitive structures. Variable-moment vibrators and resonance-avoidance strategies reduce propagation of critical frequencies; pre-augering can further cut peak particle velocities.<\/p>\n<h3>Pressing\/Jack-in<\/h3>\n<p>Hydraulic pressing anchors the new pile to previously set piles and pushes it into the ground with virtually no vibration. The method is suitable for city centers and facilities with high protection requirements. Required reaction forces and limited penetration in dense gravel or rockbearing strata must be considered; guide frames and templates support alignment and plumbness.<\/p>\n<h3>Pre-drilling and pre-cutting of obstacles<\/h3>\n<p>In the case of obstacles such as old foundations, concrete debris, or rock lenses, pre-drilling or local separation is performed. Here, <em>rock and concrete splitters<\/em> and rock splitting cylinders help weaken obstacles in a controlled manner. Core drilling, targeted saw cuts, or water-assisted loosening may complement splitting to maintain alignment. This allows precise installation of the pile without critical vibrations.<\/p>\n<h2>Components of the sheet pile wall structure<\/h2>\n<p>A sheet pile wall acts as an overall system. In addition to the piles, the following elements govern stability and watertightness:<\/p>\n<ul>\n<li><strong>Sheet piles<\/strong>: Typically steel with Larssen or ball-and-socket interlocks. Profile selection is based on flexural stiffness and installability.<\/li>\n<li><strong>Joint sealing<\/strong>: Sealing profiles or injection materials improve the watertightness of the interlocks under water ingress.<\/li>\n<li><strong>Walers and struts<\/strong>: Horizontal walers and internal struts redistribute loads. Steel sections often require adaptation or cutting &#8211; work that is practical with steel shears, combination shears, or multi cutters.<\/li>\n<li><strong>Tie-backs<\/strong>: Soil nails or strand anchors limit deflections. Exposing anchor heads in concrete is often performed selectively with <strong>concrete pulverizers<\/strong> to make reinforcement and embedded parts accessible in a targeted manner.<\/li>\n<li><strong>Caps and supports<\/strong>: Cast-in-place cap structures distribute loads and provide connections. Adjustments or deconstruction can be carried out in a controlled manner with <strong>concrete pulverizers<\/strong>.<\/li>\n<li><strong>Corrosion protection<\/strong>: Coatings, sacrificial thickness, or cathodic protection extend service life in permanent works and aggressive environments.<\/li>\n<li><strong>Guide frames\/templates<\/strong>: Temporary guides control verticality, spacing, and alignment during installation.<\/li>\n<li><strong>Toe and base seals<\/strong>: Underseals or grout curtains limit seepage and improve hydraulic stability where required.<\/li>\n<\/ul>\n<h2>Planning, design, and boundary conditions<\/h2>\n<p>Design follows the limit state concept, considering earth and water pressures, construction stages, and deformation limits. Key influencing factors include stratigraphy, groundwater, embedment depth, anchor levels, construction sequences, and permissible emissions. In urban areas, particular attention must be paid to neighborhood compatibility. Permitting and water law issues must be clarified early; the information provided here is general and does not replace case-by-case evaluation. Checks typically cover ultimate and serviceability limit states, including basal heave, piping, global stability, interlock shear, and anchor system capacity. Numerical modeling and the observational method are useful where interactions are complex.<\/p>\n<h3>Subsoil and groundwater<\/h3>\n<p>Investigations provide parameters for friction, stiffness, and permeability. Groundwater levels and fluctuations determine watertightness requirements and, where applicable, the need for dewatering measures. Site-specific data from sounding, cone penetration testing, pressuremeter or borehole tests, and permeability or pumping tests inform design assumptions and risk management.<\/p>\n<h3>Deformation management<\/h3>\n<p>Limits for settlements and structural displacements steer the choice of execution methods. Low-vibration approaches and local preparatory work with <em>rock and concrete splitters<\/em> help meet restrictions. Defined trigger and action levels, measurement frequency, and real-time reporting facilitate timely intervention during critical stages.<\/p>\n<h3>Hydraulic safety and base stability<\/h3>\n<p>Hydraulic gradients, uplift, and heave are addressed by sufficient embedment, base strengthening, or temporary underseals. Where required, staged excavation, berms, and controlled drawdown reduce hydraulic loading. Verification includes safety against piping and factor checks for basal stability.<\/p>\n<h3>Execution tolerances and acceptance<\/h3>\n<ul>\n<li><strong>Tolerances<\/strong>: Plumbness, alignment, level, and interlock engagement within specified limits to secure capacity and watertightness.<\/li>\n<li><strong>Welding and cuts<\/strong>: Qualification, procedures, and inspection for site welds and adaptations.<\/li>\n<li><strong>Documentation<\/strong>: Traceable records of installation energy or time, penetrations, corrections, and remedial sealing.<\/li>\n<\/ul>\n<h2>Low-vibration work in existing structures<\/h2>\n<p>Near sensitive facilities, laboratories, or historic fabric, low vibration levels are crucial. Local removal of concrete caps, opening small windows in existing structures, or controlled releasing of obstacles is frequently performed with <strong>concrete pulverizers<\/strong> and <em>rock and concrete splitters<\/em>. The hydromechanical mode of action, powered by <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a>, enables controlled forces with low noise. Cold cutting and selective crushing minimize sparks and airborne dust; water mist and extraction further improve emission control.<\/p>\n<h2>Handling obstacles in the installation zone<\/h2>\n<p>Old pile heads, foundation remnants, natural stone blocks, or steel inserts can disturb pile guidance. A systematic approach reduces risks:<\/p>\n<ol>\n<li>Identification via exploratory borings or test piles.<\/li>\n<li>Selective exposure: <strong>concrete pulverizers<\/strong> expose reinforcement without large-scale damage to adjacent components.<\/li>\n<li>Splitting instead of blasting: <em>rock and concrete splitters<\/em> weaken concrete or rock in a controlled manner, dividing the obstacle into pieces that can be transported or pulled.<\/li>\n<li>Cutting steel: Interfering profiles, tie rods, or old sheet piles are cleanly cut with steel shears, combination shears, or multi cutters.<\/li>\n<li>Removal and backfilling: Extract fragments, verify face alignment, and re-establish a level guide bed before continuing installation.<\/li>\n<li>As-built control: Check pile plumbness and position to confirm tolerances after obstacle clearance.<\/li>\n<\/ol>\n<h2>Working on bracing, anchors, and cap structures<\/h2>\n<p>During installation and modification of the shoring, adaptation work is often required:<\/p>\n<ul>\n<li><strong>Anchor exposure<\/strong>: Concrete removal at the head area, protecting anchor components by controlled crushing with <strong>concrete pulverizers<\/strong>.<\/li>\n<li><strong>Struts and walers<\/strong>: Cutting and removal of temporary steel struts with steel shears or combination shears; precise adaptation cuts with multi cutters.<\/li>\n<li><strong>Caps and supports<\/strong>: Finishing, recesses, or deconstruction of concrete components is often carried out with low vibration to avoid cracks in the surroundings.<\/li>\n<li><strong>Load transfer<\/strong>: Sequencing of preloading, lock-off, and temporary support changes to maintain stability during transitions.<\/li>\n<\/ul>\n<h2>Deconstruction of sheet pile walls<\/h2>\n<p>After completion of the construction task, sheet piles are usually pulled and reused. If piles are stuck, partial cuts, head removal, or segmentation may be required. For steel separation, steel shears, combination shears, and multi cutters are common solutions. Concrete supports, caps, or grout zones can be selectively deconstructed with <strong>concrete pulverizers<\/strong>. In special cases &#8211; such as dismantling temporary steel tanks for dewatering &#8211; special cutting tools like tank cutters are used. Underwater or tidal work demands adapted procedures and additional safety measures. Safety and environmental protection measures must be strictly observed; these notes are general and do not replace project-specific planning.<\/p>\n<h2>Quality assurance, watertightness, and monitoring<\/h2>\n<p>Quality in sheet pile shoring results from planning, execution control, and measurement:<\/p>\n<ul>\n<li><strong>Geometry<\/strong>: Checking plumbness, embedment depth, and alignment in every construction stage.<\/li>\n<li><strong>Watertightness<\/strong>: Testing the interlocks and, where necessary, injections at leak points.<\/li>\n<li><strong>Deformations<\/strong>: Inclinometer measurements, vibration and settlement monitoring.<\/li>\n<li><strong>Hydraulic safety<\/strong>: Pore pressure and inflow checks, trigger levels for drawdown and sealing responses.<\/li>\n<li><strong>Documentation<\/strong>: Complete recording of installation parameters, cutting operations, and adaptation processes, ideally with digital logs for traceability.<\/li>\n<\/ul>\n<h2>Occupational safety and environmental protection<\/h2>\n<p>Safe work takes priority. Relevant aspects include load handling during pile manipulation, pinch and shear points at bracing, cutting sparks, noise, dust, and water law requirements. Hydraulically operated tools &#8211; such as <strong>concrete pulverizers<\/strong> and <em>rock and concrete splitters<\/em> &#8211; often enable low spark generation and reduced noise. Hydraulic power packs must be operated and maintained by qualified personnel. Biodegradable hydraulic fluids, spill containment, and dust suppression reduce environmental risks. Working-time windows, vibration limits, and interface management with neighboring uses are defined in advance; the notes are to be understood as general.<\/p>\n<h2>Sustainability and circular economy<\/h2>\n<p>Sheet piles are highly reusable. Selective deconstruction conserves resources and facilitates recycling. <strong>Concrete pulverizers<\/strong> enable separation of concrete and reinforcement, while steel shears and multi cutters divide steel sections by material type. Where obstacles lie in the subsoil, the splitting approach with <em>rock and concrete splitters<\/em> can avoid blasting and reduce emissions. Material passports, component tracking, and documented reuse strategies strengthen circular outcomes and improve verifiable environmental performance.<\/p>\n<h2>Typical application areas and interfaces<\/h2>\n<p>The range spans from excavations in dense urban fabric to bank protection and cofferdams. Interfaces to application areas such as <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and specialized deconstruction<\/a>, strip-out and cutting, rock excavation and tunneling, natural stone extraction, and special operations are common: wherever concrete components must be opened, rock lenses loosened, or steel profiles cut, <strong>concrete pulverizers<\/strong>, <em>rock and concrete splitters<\/em>, steel shears, combination shears, multi cutters, and the associated hydraulic power packs support a controlled, low-emission way of working. Works at ports, bridges, and flood control facilities particularly benefit from precise installation and low-vibration adaptation.<\/p>\n<h2>Practice-oriented notes for planning and execution<\/h2>\n<ul>\n<li>Clarify subsoil risks, obstacles, and emission limits early; align methods accordingly.<\/li>\n<li>Sequence installation paths logically; ensure sufficient starter fields for pressing.<\/li>\n<li>Adapt joint sealing and watertightness concepts to groundwater and intended use.<\/li>\n<li>Plan adaptation work in existing structures with low-vibration methods, such as with <strong>concrete pulverizers<\/strong> and <em>rock and concrete splitters<\/em>.<\/li>\n<li>Plan steel cutting operations with appropriate shears; define relief cuts and load transfer in advance.<\/li>\n<li>Consistently implement monitoring of vibrations, settlements, and groundwater levels.<\/li>\n<li>Plan deconstruction with reuse and recycling in mind; promote separation by material type.<\/li>\n<li>Define trigger and action levels for deformations, vibrations, and inflows; specify responsibilities and response times.<\/li>\n<li>Prepare an obstruction response plan, including decision criteria for splitting, cutting, or rerouting.<\/li>\n<li>Coordinate dewatering, discharge permits, and contingency storage for peak inflows.<\/li>\n<li>Establish a noise and vibration management plan with communication to neighbors and stakeholders.<\/li>\n<li>Maintain a digital construction log linking installation metrics, monitoring results, and quality records.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Sheet pile shoring is a core construction method in geotechnical and hydraulic engineering when excavations, waterfront zones, or traffic areas must be enclosed safely and watertight. It enables work below groundwater level, limits ground movements, and protects adjacent structures. In addition to structural design, execution, monitoring, and subsequent deconstruction are <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-shoring\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19863","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sheet Pile Shoring for Excavations &amp; Waterfronts<\/title>\n<meta name=\"description\" content=\"Guide to sheet pile shoring in geotechnical &amp; hydraulic engineering \u2713 methods, watertight design, low-vibration work.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-shoring\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sheet Pile Shoring for Excavations &amp; Waterfronts\" \/>\n<meta property=\"og:description\" content=\"Guide to sheet pile shoring in geotechnical &amp; hydraulic engineering \u2713 methods, watertight design, low-vibration work.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-shoring\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-26T05:30:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sheet-pile-shoring\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sheet-pile-shoring\",\"name\":\"Sheet Pile Shoring for Excavations & Waterfronts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-26T07:11:44+00:00\",\"dateModified\":\"2026-05-26T05:30:04+00:00\",\"description\":\"Guide to sheet pile shoring in geotechnical & hydraulic engineering \u2713 methods, watertight design, low-vibration work.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sheet-pile-shoring#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sheet-pile-shoring\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sheet-pile-shoring#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Sheet pile shoring\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sheet Pile Shoring for Excavations & Waterfronts","description":"Guide to sheet pile shoring in geotechnical & hydraulic engineering \u2713 methods, watertight design, low-vibration work.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-shoring","og_locale":"en_US","og_type":"article","og_title":"Sheet Pile Shoring for Excavations & Waterfronts","og_description":"Guide to sheet pile shoring in geotechnical & hydraulic engineering \u2713 methods, watertight design, low-vibration work.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-shoring","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-26T05:30:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-shoring","url":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-shoring","name":"Sheet Pile Shoring for Excavations & Waterfronts","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-26T07:11:44+00:00","dateModified":"2026-05-26T05:30:04+00:00","description":"Guide to sheet pile shoring in geotechnical & hydraulic engineering \u2713 methods, watertight design, low-vibration work.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-shoring#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-shoring"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-shoring#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Sheet pile shoring"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19863","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19863"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19863\/revisions"}],"predecessor-version":[{"id":27780,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19863\/revisions\/27780"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19863"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}