{"id":19862,"date":"2025-12-26T12:02:42","date_gmt":"2025-12-26T11:02:42","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19862"},"modified":"2026-05-26T16:26:02","modified_gmt":"2026-05-26T14:26:02","slug":"sheet-pile-profile","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-profile","title":{"rendered":"Sheet pile profile"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Sheet pile walls are among the core construction methods of hydraulic and civil engineering, special foundation engineering, and temporary pit shoring. The <em>sheet pile profile<\/em> describes the cross-sectional shape and the interlock geometry of a sheet pile which, in combination with other piles, forms a tight, bending-stiff wall. Whether in harbor construction, quay structures, excavation pits along urban traffic routes, or as dike and bank protection: the profile choice affects load-bearing capacity, watertightness, installability, deconstruction and reuse. In construction and deconstruction phases, sheet pile walls frequently interface with concrete components such as capping beams, anchor blocks, and bracing. For careful, low-vibration removal of such concrete parts, depending on the situation, <strong>concrete pulverizers<\/strong> and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH are particularly suitable. For work on exposed steel piles, steel shears, multi cutters, or tank cutters can also be used for defined separation cuts, provided this is structurally permissible. As retaining and cutoff structures, sheet pile systems require coordinated planning across structural design, installation logistics, and controlled deconstruction to protect adjacent assets.<\/p>\n<h2>Definition: What Is Meant by a Sheet Pile Profile?<\/h2>\n<p>The term <strong>sheet pile profile<\/strong> refers to the specific cross-section geometry of a sheet pile together with its interlock connections. These profiles (e.g., U, Z, or combined profiles) are rolled or cold-formed from steel and assembled into a mutually interlocking, watertight wall. The profile selection determines, among other things, the <em>section modulus<\/em>, <em>stiffness<\/em>, <em>driving\/installation behavior<\/em>, <em>interlock tightness<\/em>, and suitability for temporary or permanent structures. In practice, profiles are selected according to load capacity, installation method, and ground conditions and, in combination with struts, anchors, capping beams, and infill panels, form complete shoring systems. In addition, the manufacturing route influences tolerances and interlock robustness, and design verifications typically follow recognized standards for steel sheet piling and execution.<\/p>\n<h2>Structure and Geometry of Sheet Pile Profiles<\/h2>\n<p>Sheet pile profiles are designed to provide a high moment of inertia with comparatively low material usage and to be positively connected via interlocks. Key elements:<\/p>\n<ul>\n<li><strong>Flange and web regions:<\/strong> They transfer bending moments and normal forces. Plate thicknesses vary according to structural requirements.<\/li>\n<li><strong>Interlock connections:<\/strong> Profiled edges (e.g., Larssen interlock) that allow a releasable connection between the piles. Sealants can increase watertightness.<\/li>\n<li><strong>Embedment length:<\/strong> The portion anchored in the ground ensures overturning safety, buoyancy safety, and earth pressure equilibrium.<\/li>\n<li><strong>Material:<\/strong> Mostly unalloyed structural steel with defined strength classes; corrosion allowances and protection systems extend service life.<\/li>\n<li><strong>Head and toe detailing:<\/strong> Head stiffeners, gripping plates, and welded attachments at the pile head enable safe lifting and connection to caps; toe shoes or chisel tips can improve penetration through dense layers or obstructions.<\/li>\n<li><strong>Tolerances and straightness:<\/strong> Out-of-straightness, camber, and twist affect drivability and wall alignment; tight tolerances reduce lock stress and leakage risk.<\/li>\n<\/ul>\n<h3>Interlocks and Tightness<\/h3>\n<p>The shape of the interlocks determines how securely and tightly the piles can be joined. For increased requirements (e.g., groundwater lowering, port facilities), the interlocks are supplemented with sealing profiles or injection materials. Typical sealing systems include bituminous sealants, elastic sealants, and hydrophilic swelling strips; lock lubricants can reduce driving resistance. For deconstruction, interlock quality also matters: smooth-running, minimally deformed interlocks facilitate pulling the piles, whereas distorted or fused interlocks may necessitate cutting and relief cuts. Quality checks can comprise lock opening measurements, leak tests, or targeted probing.<\/p>\n<h2>Profile Types and Designations<\/h2>\n<p>In practice, several profile families are established, differing in load behavior, slenderness, and suitability for different construction tasks:<\/p>\n<ul>\n<li><strong>U-profiles:<\/strong> Symmetrical cross sections with high stiffness per individual element. Often used in temporary excavation pits; easy to handle.<\/li>\n<li><strong>Z-profiles:<\/strong> Asymmetrical cross sections with efficient material utilization and high section modulus in the plane of the wall; common in hydraulic and harbor construction.<\/li>\n<li><strong>Combined walls (e.g., H\/HZ-profiles with intermediate sheets):<\/strong> Bearing piles (H or tubular profiles) carry the main loads, with sheet piles in between as infill. Suitable for large embedment depths and high bending demands.<\/li>\n<li><strong>Special profiles:<\/strong> Flat, omega, or custom profiles for niche solutions, e.g., where installation space is limited or special tightness is required.<\/li>\n<\/ul>\n<p>Beyond the basic shapes, hot-rolled profiles offer robust interlocks and tight dimensional control, while cold-formed profiles can be advantageous for lighter temporary works where economy and availability are key.<\/p>\n<h2>Design and Selection Criteria<\/h2>\n<p>Selecting a sheet pile profile follows structural, design, and construction logistics criteria. The key parameters include:<\/p>\n<ul>\n<li><strong>Load-bearing capacity:<\/strong> section modulus, moment of inertia, cross-section classes, allowable stresses and deflections.<\/li>\n<li><strong>Soil and groundwater conditions:<\/strong> grain structure, angle of friction, cohesion, stratification changes, abrasiveness, hydrostatic pressures.<\/li>\n<li><strong>Installability:<\/strong> suitability for vibratory hammers, impact hammers, or presses; sensitivity of the surroundings to vibrations and noise.<\/li>\n<li><strong>Tightness:<\/strong> requirements for groundwater control, leakage rates, injections, and interlock sealing.<\/li>\n<li><strong>Durability:<\/strong> corrosion allowances, coating systems, inspection and maintenance concepts.<\/li>\n<li><strong>Deconstructability:<\/strong> reuse, pull-out forces, risk of jammed interlocks, options for defined separation cuts.<\/li>\n<li><strong>Geometric constraints:<\/strong> headroom, access corridors, crane reach, and interface tolerances to caps and slabs.<\/li>\n<li><strong>Regulatory and standards context:<\/strong> design life definition for temporary vs. permanent works, verification formats, and execution class requirements.<\/li>\n<li><strong>Sustainability aspects:<\/strong> reuse potential, recycled content, and deconstruction planning that minimizes waste and emissions.<\/li>\n<\/ul>\n<h2>Installation and Deconstruction: Methods and Interfaces to Equipment Technology<\/h2>\n<p>Sheet piles are installed with vibratory hammers, impact hammers, or presses. In sensitive environments (existing structures, vibration limits), pressing or low-frequency methods are used. Where dense layers or obstructions exist, predrilling, water jetting, or the removal of boulders and rubble can be required. Deconstruction is performed by pulling, often supported by vibrations. Additional steps may be required:<\/p>\n<ul>\n<li><strong>Expose the pile head:<\/strong> remove capping beams, overlay concrete, or grout bodies, often made of reinforced concrete.<\/li>\n<li><strong>Separating bracing and anchors:<\/strong> release steel beams, wind bracing, or anchor heads; defined cutting required.<\/li>\n<li><strong>Relief cutting of jammed interlocks:<\/strong> local separation to relieve or segment.<\/li>\n<li><strong>Pre-loosening:<\/strong> apply low-amplitude vibrations or incremental jacking to overcome skin friction before full pulling.<\/li>\n<li><strong>Cold cutting in sensitive zones:<\/strong> where sparks are not permissible, use mechanical shearing or water-abrasive techniques in accordance with permits.<\/li>\n<\/ul>\n<p>For removing concrete overlays, anchor blocks, and massive concrete elements, <strong>concrete pulverizers<\/strong> are proven for selective crushing, and <strong>hydraulic splitters<\/strong> for vibration- and noise-reduced splitting, for example when adjacent structures must be protected. Steel parts such as bracing, edge angles, and sheet pile ends protruding from the wall can &#8211; depending on material thickness and accessibility &#8211; be separated with steel shears, multi cutters, or tank cutters. For all methods, flying sparks, splatter, and proximity to water-bearing areas must be taken into account. Tool selection and cutting parameters should be verified by trial sections before serial work.<\/p>\n<h3>Work on Existing Structures<\/h3>\n<p>In inner-city special deconstruction, vibration limitation and dust and noise reduction are paramount. Splitters develop high splitting forces at very low noise emission and enable controlled piece sizes. Concrete pulverizers allow targeted removal of reinforced concrete while preserving adjacent components, for example during partial head repairs. Complementary measures include localized shielding, misting for dust suppression, and vibration monitoring near sensitive installations.<\/p>\n<h2>Processing and Cutting of Sheet Piles During Deconstruction<\/h2>\n<p>Depending on the plan, sheet piles can be fully pulled, shortened in sections, or left in place in areas with permanent installations. A typical, non-binding procedure:<\/p>\n<ol>\n<li><strong>Survey:<\/strong> determine wall build-up, profile type, interlock condition, concrete overlays, anchors, and utility lines. Record constraints such as headroom and environmental limits.<\/li>\n<li><strong>Expose and remove:<\/strong> selectively remove overlay concrete, grout, and capping beams with concrete pulverizers; for massive blocks, pre-split with hydraulic splitters in a low-vibration manner.<\/li>\n<li><strong>Cut the steel parts:<\/strong> segment bracing, cap plates, or pile protrusions with suitable shears or cutters; deburr edges. Provide temporary supports where stability requires it.<\/li>\n<li><strong>Pull the piles:<\/strong> with appropriate lifting equipment and, if necessary, vibration assistance. If resistance occurs: locally perform relief cuts on the interlocks or remove in segments.<\/li>\n<li><strong>Disposal\/reuse:<\/strong> separate steel and concrete by type; check reusability of the piles after visual inspection of the interlocks.<\/li>\n<\/ol>\n<h3>Notes on Safety and Quality<\/h3>\n<ul>\n<li><strong>Cut path:<\/strong> place cuts so that residual stresses are relieved in a controlled manner; avoid buckling.<\/li>\n<li><strong>Material thicknesses:<\/strong> thick steel plates and multi-layer construction areas (nodes, overlaps) require appropriate cutting forces.<\/li>\n<li><strong>Fire protection\/environment:<\/strong> protection against flying sparks, drip trays, firefighting readiness; when working near bodies of water, observe water regulations.<\/li>\n<li><strong>Hot work controls:<\/strong> obtain permits, test atmospheres in confined spaces, and ensure continuous gas monitoring where required.<\/li>\n<li><strong>Prestress management:<\/strong> anchors and struts can be under load &#8211; define release procedures and exclusion zones before cutting.<\/li>\n<\/ul>\n<h2>Application Areas and Practical Relevance<\/h2>\n<p>Sheet pile profiles encounter the typical fields of application as follows:<\/p>\n<ul>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete demolition and special deconstruction<\/a>:<\/strong> capping beams, anchor heads, edge beams, and grout bodies are selectively deconstructed. <em>Concrete pulverizers<\/em> and <em>hydraulic splitters<\/em> enable controlled removal with minimal impact on the surroundings.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> steel structural members, bracing, and attachments on sheet pile walls are separated with steel shears, multi cutters, or tank cutters; clean cut edges facilitate pulling.<\/li>\n<li><strong>Rock demolition and tunnel construction:<\/strong> sheet pile walls also secure excavation pits at portal areas; for rock interfaces and grouted transitions, splitters assist in gently releasing mineral masses.<\/li>\n<li><strong>Natural stone extraction:<\/strong> indirect reference &#8211; on temporary infrastructure projects near quarries, sheet pile walls provide shoring; selective demolition techniques protect sensitive existing assets.<\/li>\n<li><strong>Special applications:<\/strong> confined conditions, heritage protection, sensitive subsoil, or work near installations with vibration limits require low-vibration removal techniques and precise cutting.<\/li>\n<\/ul>\n<p>Across these applications, robust planning of interfaces between steel and concrete components shortens deconstruction times and reduces risk.<\/p>\n<h2>Corrosion Protection and Service Life<\/h2>\n<p>The durability of a sheet pile wall depends strongly on corrosion exposure and the protection concept. Common measures include coatings, galvanic protection, cathodic corrosion protection, and material allowances. Exposure often varies by zone &#8211; atmospheric, splash, tidal, and fully submerged &#8211; and protection must be specified accordingly. Relevant for deconstruction: coatings can affect cutting and pulverizer operations (e.g., smoke development), so appropriate occupational and environmental protection measures must be provided. Local damage to remaining sheet pile walls must be repaired properly. Where legacy coatings contain hazardous substances, handling and disposal follow the applicable regulations and safety plans.<\/p>\n<h3>Reuse of Sheet Piles<\/h3>\n<p>Sheet piles are often used multiple times. Prerequisites are intact interlocks, sufficient remaining thickness, and a documented history. When pulling, avoid twisting to minimize interlock distortion. Mechanically clean separation cuts facilitate later adaptation and reworking. Thickness gauging and targeted non-destructive tests help assess residual capacity, and slight bends can often be corrected by straightening before reinstallation.<\/p>\n<h2>Quality Criteria in Planning and Execution<\/h2>\n<ul>\n<li><strong>Planning:<\/strong> choose the profile based on structural stability verifications and installation conditions; define allowable vibration, noise, and dust limits.<\/li>\n<li><strong>Execution:<\/strong> continuous control of wall alignment, interlock tightness (e.g., through probing), documentation of driving and deconstruction forces.<\/li>\n<li><strong>Interface management:<\/strong> coordinate between shoring, casting of capping beams, anchoring works, and later deconstruction, including the choice of suitable removal and cutting techniques.<\/li>\n<li><strong>Monitoring and acceptance:<\/strong> implement leakage checks, vibration monitoring, and as-built records for geometry and tie-in points; agree on acceptance criteria for temporary and final states.<\/li>\n<\/ul>\n<h2>Occupational Safety, Permits, and Environment<\/h2>\n<p>Work on sheet pile walls touches water protection, soil protection, and emission control. Measures for dust, noise, and vibration reduction, low-spark working, and safeguards against falls and crushing hazards must be specified. Requirements of authorities, clients, and safety plans must be observed. The information in this text is general and does not replace project-specific planning or approval.<\/p>\n<h2>Typical Interfaces with Concrete Components on Sheet Pile Walls<\/h2>\n<p>In many construction states, sheet pile walls are connected with concrete, for example as capping beams, secondary beams, pile head connections, or anchor heads. These components often govern the deconstruction sequence:<\/p>\n<ul>\n<li><strong>Capping beams:<\/strong> remove in sections with concrete pulverizers; expose and cut reinforcement in a controlled manner. Rebar scanning and test openings reduce the risk of damaging embedded services.<\/li>\n<li><strong>Anchor blocks:<\/strong> pre-split with hydraulic splitters to gradually relieve tie members; then make defined separation cuts on steel parts.<\/li>\n<li><strong>Grout and filler bodies:<\/strong> locally open to check sealing materials; proceed in a low-vibration manner to avoid damaging interlock areas.<\/li>\n<\/ul>\n<h2>Planning Aids for the Separating Deconstruction of Sheet Pile Profiles<\/h2>\n<p>The following principles have proven effective for efficient sequencing:<\/p>\n<ul>\n<li><strong>Sequencing:<\/strong> first reduce concrete parts (pulverizers, splitting), then define steel components (shears\/cutters), and finally pull the piles.<\/li>\n<li><strong>Access:<\/strong> plan work platforms, grab clearances, and lifting points early; secure crane and lifting gear logistics.<\/li>\n<li><strong>Quality assurance:<\/strong> define trial sections to verify cutting parameters, splitting spacings, and tool selection.<\/li>\n<li><strong>Contingency planning:<\/strong> allow for stuck piles, unexpected obstructions, or lock failures with predefined alternative methods and permits.<\/li>\n<li><strong>Documentation:<\/strong> maintain traceable records of sequence, loads, and outcomes to inform reuse decisions and future projects.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Sheet pile walls are among the core construction methods of hydraulic and civil engineering, special foundation engineering, and temporary pit shoring. The sheet pile profile describes the cross-sectional shape and the interlock geometry of a sheet pile which, in combination with other piles, forms a tight, bending-stiff wall. Whether in <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-profile\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19862","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sheet Pile Profile - Types, Design &amp; Installation<\/title>\n<meta name=\"description\" content=\"Guide to sheet pile profiles in civil engineering - geometry, interlocks, tightness &amp; safe removal \u2713 Expert tips.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-profile\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sheet Pile Profile - Types, Design &amp; Installation\" \/>\n<meta property=\"og:description\" content=\"Guide to sheet pile profiles in civil engineering - geometry, interlocks, tightness &amp; safe removal \u2713 Expert tips.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-profile\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-26T14:26:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sheet-pile-profile\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sheet-pile-profile\",\"name\":\"Sheet Pile Profile - Types, Design & Installation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-26T11:02:42+00:00\",\"dateModified\":\"2026-05-26T14:26:02+00:00\",\"description\":\"Guide to sheet pile profiles in civil engineering - geometry, interlocks, tightness & safe removal \u2713 Expert tips.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sheet-pile-profile#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sheet-pile-profile\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sheet-pile-profile#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Sheet pile profile\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sheet Pile Profile - Types, Design & Installation","description":"Guide to sheet pile profiles in civil engineering - geometry, interlocks, tightness & safe removal \u2713 Expert tips.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-profile","og_locale":"en_US","og_type":"article","og_title":"Sheet Pile Profile - Types, Design & Installation","og_description":"Guide to sheet pile profiles in civil engineering - geometry, interlocks, tightness & safe removal \u2713 Expert tips.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-profile","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-26T14:26:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-profile","url":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-profile","name":"Sheet Pile Profile - Types, Design & Installation","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-26T11:02:42+00:00","dateModified":"2026-05-26T14:26:02+00:00","description":"Guide to sheet pile profiles in civil engineering - geometry, interlocks, tightness & safe removal \u2713 Expert tips.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-profile#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-profile"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/sheet-pile-profile#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Sheet pile profile"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19862","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19862"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19862\/revisions"}],"predecessor-version":[{"id":27811,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19862\/revisions\/27811"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19862"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}